Attachment B-1 - GRC 533 Supplemental Cost Report.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
Environmental, Safety, Health, and Mission Assurance (ESHMA), Draft RFP
Solicitation number
80GRC022R0017
Issued by

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Supplemental Layout

FieldLengthDescription / Criteria
High Level Cost Category3VALUE / DESCRIPTION OF ITEM

EQP / Equipment FAC / Facility and Lease LAB / Grouping for all Labor Categories LIC / License MS / Materials/Supplies SUB / Small Subcontractors TRN / Training TRV / Travel OTH / Other

Reporting Year4Calendar Year cost was reported in (example: 2015)
Reporting Month2Month worked performed (example: January = 1, February =2)
Work Order #5Wxxxx where xxxx is the sequence number of the work effort
CLIN2NASA CLIN (contract line item number) if applicable, if not leave blank
Rate Type1Regular = R; Overtime = O; Comp = C
Organization20VALUE / DESCRIPTION OF ITEM

PRM / Prime Sub 1 [Name] / value "Sub1" space Company Name Sub 2 [Name] / value "Sub2" space Company Name Sub 3 [Name] / value "Sub3" space Company Name Labor Category / Other Direct Cost Type 35 Examples (Labor Categories) Electrical Engineer II (ELE2) Electrical Engineer III (ELE3)

VALUE / DESCRIPTION OF OTHER DIRECT COST

EQP / Equipment FAC / Facility and Lease LAB / Grouping for all Labor Categories LIC / License MS / Materials/Supplies SUB / Small Subcontractors TRN / Training TRV / Travel OTH / Other Rate (unburdened) 9 -Prime and subcontracts -Currency format with two trailing decimals Hours 9 -Prime and subcontracts -Number format with 1 trailing decimal Dollars 9 -Prime and subcontracts not burdened -Small subcontractors burdened -Currency format with two trailing decimals Total Work Order Burdened Cost plus Fee 9 -Full Burdened amount plus Fee -Currency format with two trailing decimals

533 Supplemental Cost Report High Level Cost Category Reporting Year Reporting Month Work Order # CLIN Rate Type Organization Labor Category / Other Direct Cost Type Rate (unburdened) Hours Dollars Total Work Order Burdened Cost plus Fee

533 Supplemental Cost Rpt Exmpl

High Level Cost CategoryReporting YearReporting MonthWork Order #CLINRate TypeOrganizationLabor Category / Other Direct Cost TypeRate (unburdened)HoursDollarsTotal Work Order Burdened Cost plus Fee
LAB20174W000101RPRM / Company XElectrical Engineer II (ELE2)$ 10.005.1$ 51.00$ 53.04
TRN20174W000303TRN-$ 2.50$ 2.60
LIC20174W002203LIC-$ 17.00$ 17.68
LAB20174W045101RSub1 / Company YElectrical Engineer IV (ELE4)$ 12.0044.2$ 530.40$ 551.62

File details come from the government source that posted it. Updated .