Attachment A3 - Specifications.pdf

PDF 2 MB Posted

Attached to
PMC Concrete Pavement Restoration on I-75
Solicitation number
RFP-591-250000002467-1
Issued by
Luce County, Sterling Heights City, Michigan

About this file

The document is a set of supplemental specifications and errata to the Michigan Department of Transportation's 2020 Standard Specifications for Construction, dated 04-30-25. This comprehensive document contains multiple technical modifications and corrections across various sections of the standard specifications, covering topics such as construction materials, concrete mixtures, aggregate requirements, testing procedures, equipment specifications, and contract measurement and payment guidelines. The errata address a wide range of technical details, including changes to footnotes, table entries, testing methods, material requirements, and specific construction procedures across sections ranging from 101 to 1006.

The supplemental specifications include detailed technical updates such as modifications to aggregate absorption limits (consistently set at 2.5%), changes in concrete mixture proportions, updates to testing standards, revisions to equipment and installation requirements, and adjustments to payment and measurement terms. The document provides precise technical guidance for contractors, specifying exact requirements for materials like Portland cement, aggregates, concrete mixes, and various construction components. The errata appear designed to clarify, refine, and update technical standards to reflect current engineering practices, material capabilities, and construction methodologies, ensuring contractors have the most current and precise specifications for transportation infrastructure projects.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

20TM107(A145)

MICHIGAN

DEPARTMENT OF TRANSPORTATION

SPECIAL PROVISION

FOR

INSURANCE

CSD:LFS 1 of 1 APPR:CM:DBP:11-19-20

Add the following after the first paragraph in subsection 107.10.C.4, of the Standard Specifications for Construction:

In addition to the above insurance requirements, the following agencies must be listed as additional insured:

City of St Ignace Mackinac County Mackinac County Road Commission

20RC502-A030-03

ASPHALT REPAIR MASTIC

CFS:TGH 1 of 2 APPR:CRB:NDM:08-02-23

a. Description. This work consists of cleaning, filling, and leveling the longitudinal construction joints, transverse joints, longitudinal and transverse cracks, and spalls with asphalt repair mastic material.

Clean and fill joints, cracks and spalls at the locations shown in the contract, or as directed by the Engineer.

b. Materials. Furnish applied, pre-packaged, pourable, aggregate filled, polymer modified asphalt repair mastic for both concrete and HMA pavement repairs. Use Deery Level, Go Repair Mastic; Crafco Mastic One; RightPointe Pave Patch Black; Fibrecrete SAMIscreed; Maxwell Gap Mastic Mod 201; P&T Products Dura-Fill Mastic T2; Pure Asphalt Mastic SR; or an approved equal, as determined by the Engineer.

For concrete pavement, use one of the following 100 percent solids silane primer products:

Baracade Silane 100C, Hydrozo® 100, Sikagard® 705L, or an approved equal 100 percent solids silane material, as determined by the Engineer. Do not use silane primer material for HMA pavement repairs.

c. Equipment. Heat the asphalt repair mastic material in a thermostatically controlled hot oil jacketed mastic mixer equipped with a full sweep horizontal agitator that can maintain a uniformly mixed product. The mixer must have an effective means of dispensing the thoroughly mixed mastic material.

d. Surface Preparation and Installation. Prepare all surfaces by ensuring they are free from dust, dirt, oil, grease, and loose material prior to application of the mastic using clean, dry, oil free compressed air at 90 psi minimum. Sound substrate surfaces and remove delaminated material prior to final cleaning. Ensure the surfaces of the pavement are completely dry and clean at the time of mastic application.

Artificial heat may be used to warm the substrate surface provided it does not apply a direct flame to the substrate surface, as recommended by the mastic manufacturer. Do not overheat pavement surfaces.

1. HMA. Apply asphalt repair mastic when pavement temperature is above 40 °F. Place and finish asphalt repair mastic within 10 minutes after warming the pavement area.

2. Concrete. Apply asphalt repair mastic when pavement temperature is above 40 °F.

Prior to placing the asphalt repair mastic material, apply silane primer onto the repair area and a minimum of 6 inches onto the adjacent pavement surface at a rate of no less than one gallon per 200 square feet. Allow a minimum of 1 hour for the primer to cure (more time may be necessary depending on weather conditions) prior to placing asphalt repair mastic.

20RC502-A030-03

CFS:TGH 2 of 2 08-02-23

Ensure the Contractor is trained and approved by the mastic manufacturer.

Heat and uniformly mix the asphalt repair mastic to the appropriate installation temperature using a mastic mixer. The product application temperature range is 350-400 °F, verify with specific manufacturer’s requirements. At application temperature, material is a thick, grainy appearing mastic.

Place the mastic onto the properly prepared pavement surface in accordance with the mastic manufacturer recommendations.

Apply the mastic to the joint, crack or spall from the bottom up in lifts appropriate to the specific application. Mastic should be applied to open joints, cracks and spalls that are wider than 1¼ inches width. If multiple lifts are required, product should be installed in layers not to exceed 2½ inches, with cooling to 200 °F maximum before applying the next layer. Fill the uppermost 1/2 to 1 inch with the final lift.

Use a heated ironing wand and or shoe box to level and smooth the mastic until the material has formed a durable, well-bonded, level repair as directed by the Engineer.

Place temporary pavement markings if permanent markings are more than fifty percent covered before opening the road to traffic.

e. Measurement and Payment. The completed work, as described, will be measured and paid for at the contract unit price using the following pay item:

Pay Item Pay Unit

Asphalt Repr Mastic ................................................................................................... Foot

Asphalt Repr Mastic will be measured in feet based on in-place quantities. Payment includes all surface preparation, temporary pavement markings, furnishing, hauling, placing, and finishing of all materials, removal, and disposal of all debris.

20RC807(A070)

HAND DIGGING GUARDRAIL POST

GCB:CT 1 of 1 APPR:DBP:CAL:04-23-20

a. Description. This work consists of hand digging holes to place guardrail posts that are in close proximity to utilities as indicated on the plans, as directed by the Engineer. Perform this work in accordance with section 807 of the Standard Specifications for Construction, as shown on the plans, as directed by the Engineer and as contained herein.

b. Materials. Ensure materials are in accordance with the section 807 of the Standard Specifications for Construction.

c. Construction. Install posts to the proper depth and alignment as required by the contract by means of hand digging holes, then backfilling and compacting sound earth around the posts in 12-inch layers.

d. Measurement and Payment. The completed work, as described, will be measured and paid for at the contract unit price using the following pay item:

Hand Digging Guardrail Post ..................................................................................... Each

Hand Digging Guardrail Post will include hand excavating a hole for the guardrail post, and then backfilling and compacting the fill around the guardrail post. The guardrail post is included in the payment for the guardrail item being installed.

20TM800-A355-03

MARKING MICHIGAN DEPARTMENT OF TRANSPORTATION UTILITY TYPE

FACILITIES

ITS:EG 1 of 1 APPR:NJM:ERT:08-15-24

a. Description. Per MCL 460.727, et seq, also known as the “MISS DIG Underground Facility Damage Prevention and Safety Act,” MDOT is exempt from marking its underground facilities, which include freeway lighting, traffic signals, ITS, and other miscellaneous electrical facilities. This work consists of completing and submitting the MDOT Underground Infrastructure Staking Request Form 5300

(https://mdotjboss.state.mi.us/webforms/GetDocument.htm?fileName=5300.pdf) a minimum of 5 calendar days prior to the start date of excavation activities, excluding weekends and holidays. Only contact the respective region representative below for additional notifications and/or inquiries; not for emergencies for damaged utilities.

• Superior Region

◦ ITS: Justin Junttila; 906-241-8184

◦ Electrical: Jason DeGrand, 906-241-0599 https://mdotjboss.state.mi.us/webforms/GetDocument.htm?fileName=5300.pdf

20SP-1001A-01

MIXING PORTLAND CEMENT CONCRETE

CFS:JFS 1 of 1 APPR:CPM:TEB:12-17-21

FHWA:APPR:12-20-21

Add the following paragraph to subsection 1001.03.E.1 of the Standard Specifications for Construction:

Weigh and batch each material into its respective weighing device within the tolerance from the individual batch weights or quantities documented in the approved JMF as follows:

a. Cementitious Materials. Provide cementitious materials within -2.0 percent to +5.0 percent of the required weight.

b. Aggregates. Provide aggregate within ±3.0 percent of the required weight.

c. Water. Provide net water to not exceed the required water quantity and the required maximum water/cementitious ratio (w/cm).

d. Air Entraining Admixtures. Provide the necessary quantity or dosage rate per 100 pounds of cementitious material to achieve the required air content of fresh concrete.

e. Other Admixtures. Provide water-reducing and other admixtures within ±3.0 percent of the required quantity.

20SP-1002A-01

ALKALI SILICA REACTIVITY OF FINE AGGREGATE USED IN PORTLAND

CEMENT CONCRETE

CFS:CPM 1 of 2 APPR:TES:JFS:05-19-20

FHWA:APPR:05-27-20

a. Description. This special provision sets out the requirements for all fine aggregate used in Portland cement concrete (PCC) mixtures to be tested by an independent testing laboratory and determined to be resistant to the potential for deleterious expansion caused by alkali-silica reactivity (ASR). ASR testing is not required for concrete pavement repairs, temporary concrete pavements, and other items covered by the contract.

Except as explicitly modified by this special provision, all materials, test methods, and PCC mixture requirements of the standard specifications and the contract apply.

b. Definition. ASR is a chemical reaction which occurs over time within concrete between highly alkaline cement paste and reactive forms of silica found in some aggregates. In the presence of moisture, an expansive ASR gel is formed which can exert pressure within the concrete, causing random cracking and premature deterioration of the concrete.

c. Laboratory Requirements. The independent laboratory, including all associated testing equipment and staff performing ASR testing of aggregates, must be proficient in ASR testing in accordance with the applicable test methods and procedures. The laboratory must provide documentation to the Regions that they are qualified and proficient to conduct ASR testing in accordance with the required test procedures.

d. Laboratory Testing Requirements. Perform testing on fine aggregate proposed to be used in any PCC Job Mix Formula (JMF). The Contractor must ensure the testing is conducted in accordance with a designated standard test procedure described herein. Test results must conform to the specified criterion for one of the following standard test methods. The Rounding Method described in ASTM E29 must be used when reporting expansion test results.

(1) Method 1. ASTM C1293. Concrete Prism Test. If the expansion of concrete prisms is not greater than 0.040 percent (rounded to the nearest 0.001 percent) after 1 year, the fine aggregate is considered non-deleterious to ASR and may be used in the JMF.

(2) Method 2. ASTM C1567. Mortar Bar Test. If no previous test data are available for the fine aggregate that shows it is resistant to ASR using Method 1, above, replace 25 to 40 percent of the Portland cement in the concrete mixture with a supplementary cementitious material (slag cement of fly ash). A blended cement meeting the requirements of ASTM C595/C595M containing the above Portland cement and supplementary cementitious material proportions may also be used.

Demonstrate the ability of the supplementary cementitious material to control the deleterious expansion caused by ASR by molding and testing mortar bars in accordance with the standard

20SP-1002A-01

CFS:CPM 2 of 2 05-19-20 test method described in ASTM C1567 using the mix proportions and constituent sources for both the aggregates and the cementitious materials that will be used for the project. Make at least three test specimens for each cementitious materials-aggregate combination. If the average of three mortar bars for a given cementitious materials-aggregate combination produces an expansion less than 0.10 percent (rounded to the nearest 0.01 percent) at 14 days of immersion, the JMF associated with that combination will be considered non-deleterious to ASR. If the average expansion is 0.10 percent (rounded to the nearest 0.01 percent) or greater, the JMF associated with that combination will be considered not sufficient to control the deleterious expansion caused by ASR and the JMF will be rejected.

(3) Method 3. ASTM C1260. Mortar Bar Test. If the expansion of the mortar bars is less than 0.10 percent (rounded to the nearest 0.01 percent) at 14 days of immersion, the fine aggregate is considered non-deleterious to ASR and may be used in the concrete without the need for ASR mitigation.

The Engineer will not approve the use of the JMF if the expansion exceeds the threshold limits for the respective ASTM test method used. The test results and report are valid for 2 years from the completion of testing.

e. Submittals. A current ASR test report for the fine aggregate proposed to be used in the Job Mix Formula (JMF) must accompany each JMF. Ensure the ASR test report is accompanied by a certification stating which test procedure was followed and that all testing was conducted in accordance with the designated standard test procedure.

f. Measurement and Payment. All materials, labor, equipment, and laboratory facilities necessary to complete the work in accordance with this special provision is included in other contract pay items and no additional compensation will be permitted.

20SP-1002B-01

REDUCED TESTING FOR NON-CRITICAL CONCRETE PLACEMENTS

CFS:JJG 1 of 2 APPR:JFS:TES:11-17-21

FHWA:APPR:12-09-21

a. Description. The Contractor must administer QC and the Department will administer QA procedures that will be used for acceptance of and payment for all Portland cement concrete (PCC) for the project. Except as explicitly modified by this special provision, all materials, test methods, and PCC mixture requirements of the standard specifications and the contract apply.

Non-critical concrete placements as specified in this special provision or otherwise approved by the Engineer are eligible for reduced testing. All other QC and QA requirements for the project apply.

b. Terminology.

Non-critical Concrete Placements. Concrete meeting the reduced testing requirements below, that is incorporated into a non-structural element such as a sign post foundation, fence post foundation, signal controller foundation, electrical service pedestals, electrical racks, encased conduits, and isolated sidewalk panels, or similar items as approved by the Engineer.

Quality Control (QC). All activities administered by the Contractor to monitor, assess, and adjust production and placement processes to ensure the final product will meet the specified levels of quality, including, but not limited to, training, materials selection, construction, sampling, testing, project oversight and documentation.

c. Reduced Concrete Testing Requirements. Ensure all of the following criteria are met for use of reduced concrete testing:

1. The concrete must be a non-critical placement as defined above.

2. Ensure a concrete QC plan is submitted for approval and followed for all other concrete work on the project per the contract. This applies even if the total concrete quantity on the project is less than 100 cubic yards.

3. No more than 100 cubic yards of non-critical concrete placements will be permitted for the project. Quantities greater than this value must follow the standard specifications.

4. No more than five cubic yards of non-critical quantity concrete will be incorporated into any individual work element (pedestal foundation, single fence post foundation, etc.) per day unless approved otherwise by the Engineer.

5. No more than 20 cubic yards of non-critical quantity concrete will be allowed on the project per day unless approved otherwise by the Engineer.

6. The Engineer has received written certification from the Contractor that the ready-

20SP-1002B-01

CFS:JJG 2 of 2 11-17-21 mixed concrete producer/supplier has a current QC plan in place for their facility for all concrete, which is available for review by the Engineer, upon request.

7. The Engineer is given advanced notification of each concrete placement and is provided sufficient opportunity to witness concrete placement.

8. Any modifications or adjustments to the JMF for non-critical concrete prior to concrete placement, which are necessary to ensure compliance, must be made by a certified concrete technician (Michigan Level II).

9. The JMF represents a standard MDOT Grade of Concrete. Ensure the JMF is approved prior to placement.

10. Reduced testing for non-critical concrete placements will not be considered for any items of work associated with concrete pavements, driveways and driveway ramps, anchorage foundations, structures, and/or any other element that will be subjected to live loading.

11. Strain pole foundations are not eligible for reduced testing.

d. Quality Control Testing. Contractor QC testing of fresh concrete is not required for placements meeting the requirements for reduced concrete testing above. Compressive strength sampling and testing is not required for non-critical concrete placements as defined in this special provision.

e. Acceptance, Sampling and Testing. Prior to concrete discharge into forms, the Engineer will confirm by visual inspection and/or verification testing (and note in the Inspector’s Daily Report) that the concrete represents the required physical quality properties. At any time during concrete placement, the Engineer may sample and conduct verification testing for temperature, slump, and air content of the fresh concrete. Do not resume concrete placement until verification tests validate that the concrete meets specifications. Do not add additional water to the concrete mixer after commencement of discharge.

The Engineer may perform QA testing of any nature on any non-critical quantity concrete at their discretion. If test results do not meet specification requirements, the use of reduced testing for non-critical concrete placements may be eliminated on the project and standard concrete QC and QA will apply per the contract.

f. Measurement and Payment. All costs associated with this work will be included in the item of work associated with the non-critical placement of concrete.

20SP-1003A-01

QUALITY INDEX FOR PORTLAND CEMENT CONCRETE

CFS:CPM 1 of 9 APPR:JFS:TES:04-30-20

FHWA:APPR:05-19-20

a. Description. This special provision establishes pay factor and price adjustments for Portland cement concrete based on Department administered Quality Assurance (QA) testing of 28-day compressive strength and fresh concrete air content of Portland cement concrete (PCC).

Perform all work in accordance with the standard specifications and this special provision.

Percent-within-limits (PWL) analysis for payment adjustments apply for mainline, shoulder, miscellaneous concrete pavement (including ramps), and concrete pavement overlay applications. Non-PWL analysis for payment adjustments apply for all other applications.

b. Materials. Mixture requirements will be in accordance with section 1004 of the Standard Specifications for Construction, unless otherwise specified in the contract.

c. Sampling. Sampling will be in accordance with subsections 1003.03.H and 1003.03.L of the Standard Specifications for Construction, except as modified herein. A sample is defined as a representative quantity of concrete taken during production which is used to measure the quality characteristics for the concrete. Compressive strength specimens for each sample consist of two cylinders, either 4-inch by 8-inch or 6-inch by 12-inch.

1. PWL Applications. Production lots for PWL analysis are made of at least five approximately equal sublots. The Engineer may approve occasional small individual quantities of concrete to be combined with a larger production lot provided they are of the same grade, contain the same Job Mix Formula (JMF), and are used for the same PWL application.

The random number method for PWL sampling will be used to determine the sampling locations. A random number will be generated for each sublot. The sampling frequency for a production lot is one QA sample per sublot.

If a sublot is not completed in sufficient quantity to permit it to be randomly sampled during its production day, as planned, the quantity of concrete for the sublot that was not placed as part of the day’s production will be sampled during the following production day in accordance with the original random number sampling protocol. The random sample will then represent the total quantity of concrete for the sublot placed over the respective multiple days of production.

If the quantity of a grade of concrete to be sampled on the last day of production for the project is not sufficient to make up three or more equivalent sublots, combine the test results for these one or two remaining sublots, or fraction thereof, with the previous day’s production lot for quality index analysis.

The Engineer will mold and cure two additional compressive strength cylinders, in the same

CFS:CPM 2 of 9 04-30-20 manner as the QA specimens, that are to be retained in the event of dispute resolution.

2. Non-PWL Applications. See subsection 1003.03.L of the Standard Specifications for Construction.

3. Small Incidental Quantities. See subsection 1003.03.J in the Standard Specifications for Construction for reduced sampling and testing for small incidental quantities.

d. Quality Index Analysis. The Engineer’s QA test results will be used to determine the pay factor (PF) and price adjustment (ADJ). The Contractor QC test results will not be used for PF and ADJ analysis. The Engineer will complete PF and ADJ analysis within 7 working days after completion of all 28-day compressive strength testing for the represented production lot or quantity of concrete. All values for PWL, overall lot pay factor (OLPF), and PF are in percent.

PWL values are rounded to the nearest whole number. PF and OLPF values are rounded to two decimal places.

1. PWL Applications. The PWL, PF, OLPF, and associated ADJ will be determined using the MDOT Concrete PWL Worksheet. The acceptable quality level (AQL), rejectable quality limit (RQL), lower specification limit (LSL), and upper specification limit (USP) are shown in Table 1. The Engineer will perform the quality index analysis for all concrete represented by lot size and makeup necessary for random sampling.

Table 1: Quality Index Parameter Specification Limits for PWL Applications

Quality Index Parameters Grade of Concrete

3500/3500HP

28-Day Compressive Strength

Specification Limit – Lower (LSL) (psi) 3500

Specification Limit – Upper (USL) N/A

Acceptable Quality Level (AQL) 95 PWL

Rejectable Quality Level (RQL) 50 PWL

Rejection Limit for an Individual Strength Sample Test Result (psi) 2500

Air Content of Fresh Concrete

Specification Limit – Lower (LSL) (percent) 5.5

Specification Limit – Upper (USL) (percent) 8.5

Acceptable Quality Level (AQL) 90 PWL

Rejectable Quality Level (RQL) 50 PWL

Suspension Limits (percent) < 5.0 or > 9.0

A. Pay Factor Determination for PWL Applications. The MDOT Concrete PWL

Worksheet uses the following formulas to calculate the PF and associated ADJ for each production lot. The maximum calculated numerical values for PF and OLPF will not exceed 105.00.

(1) Pay Factor for 28-day Compressive Strength (PFs). If PWL for 28-day compressive strength (PWLs) is 95 to 100 inclusive, use the following formula to determine PFs:

PFs = 5 + PWLs

CFS:CPM 3 of 9 04-30-20

If PWLs is from 50 to less than 95, use the following formula to determine PFs:

PFs = 47.22 + (0.5556 x PWLs)

If PWLs is less than 50, the production lot is rejectable and the Engineer will require additional evaluation to decide what further action may be warranted as described in section e of this special provision.

(2) Pay Factor for Air Content of Fresh Concrete (PFac). If PWL for air content of fresh concrete (PWLac) is 70 to 100 inclusive, use the following formula to determine PFac:

PFac = 55 + (0.5 x PWLac)

If PWLac is from 50 to less than 70, use the following formula to determine PFac:

PFac = 37.5 + (0.75 x PWLac)

If PWLac is less than 50, the Engineer will elect to do one of the following:

(a) Require removal and replacement of the entire production lot with new testing conducted on the replacement concrete and repeat the evaluation procedure.

(b) Provided no individual test results for the production lot are outside the suspension limits for air content, allow the production lot to remain in place and apply an Overall Lot Pay Factor (OLPF) of 50.00.

(c) Allow submittal of a corrective action plan for the Engineer’s approval. If the Engineer does not approve the plan for corrective action, subsections d.1.A.(2).(a) or d.1.A.(2).(b) of this special provision will be applied, as determined by the Engineer. All costs associated with plan submittal and corrective action under this subsection will be borne by the Contractor. Positive ADJ (quality initiative) will not apply for production lots subject to corrective action.

(3) Overall Lot Pay Factor (OLPF). Use the following formula to calculate the

OLPF:

OLPF = (0.60 x PFs) + (0.40 x PFac)

B. Price Adjustment for PWL Applications. Both pay factors (PFs and PFac) must be

100.00 or greater for the production lot to be eligible for positive ADJ (quality initiative) consideration. Use the following formula to determine price adjustment for each production lot, using the established Base Price for the pay item included in the contract:

ADJ = (OLPF-100)(Price)/100

2 Non-PWL Applications. Positive ADJ (quality initiative) does not apply for non-PWL applications. Each individual QA strength sample test result will be used to determine the PF and ADJ for the respective quantity of concrete that it represents, based on the sampling rate.

CFS:CPM 4 of 9 04-30-20

The specification limits for non-PWL applications are defined in Tables 2 and 3. Unless otherwise specified in the contract, concrete not conforming to the requirements specified in Tables 2 and 3 is rejectable and subject to further evaluation.

Table 2: Quality Index Parameter Specification Limits for Non-PWL Applications

Quality Characteristic Specification Limits

Air Content of Fresh Concrete (percent) 5.5 – 8.5

Rejection Limit (percent) <5.0 or >9.0

Conc. Temp. (deg. F) 45 - 90 at time of placement

Slump (max.) (inch) See footnotes a through l in Table 1004-1 of the Standard Specifications for Construction

28-day Compressive Strength (psi) For LSL see Table 3

Rejection Limit - 28-day Compressive Strength See Table 3

Table 3: Quality Index Parameter Specification Limits for 28-Day Compressive Strength (psi) for Non-PWL Applications

A. Pay Factor Determination for Non-PWL Applications.

(1) Pay Factor for 28-Day Compressive Strength (PFs). If the tested strength does not meet the minimum rejection limit in Table 3, the Engineer will require additional evaluation as described in section e. of this special provision. Use the following formula to determine PFs:

PFs = (QA Test Strength)/LSL

(2) Pay Factor for Air Content of Fresh Concrete (PFac). The pay factor for air content of fresh concrete (PFac) will be in accordance with Table 4.

Table 4: Air Content of Fresh Concrete Pay Factor (PFac) for Non-PWL Applications

Air Content of Fresh Concrete (percent) Pay Factor (PFac)

5.5 – 8.5 1.00

5.0 – 5.4 0.50

Below 5.0 Rejection

8.6 – 9.0 0.75

Above 9.0 Rejection

If the air content of fresh concrete is below 5.0 or above 9.0 percent, the Engineer will elect to do one of the following:

Parameter Grade of Concrete

3000 3500 3500HP 4000 4000HP 4500 4500HP

Lower Specification Limit (psi) 3000 3500 3500 4000 4000 4500 4500

Rejection Limit for an Individual Strength Sample Test Result (psi)

2500 3000 3000 3500 3500 4000 4000

CFS:CPM 5 of 9 04-30-20

(a) Require removal and replacement of the entire quantity of concrete represented by the test with new testing conducted on the replacement concrete and repeat the evaluation procedure.

(b) Allow submittal of a corrective action plan for the Engineer's approval. If the Engineer does not approve the plan for corrective action, subsection d.2.A.(2).(a) will be applied. All costs associated with plan submittal and corrective action under this subsection will be borne by the Contractor.

(3) Overall Lot Pay Factor. Use the following formula to determine the OLPF. The

OLPF cannot exceed 1.00:

OLPF = (0.60 x PFs) + (0.40 x PFac)

B. Price Adjustment for Non-PWL Applications. Use the following formula to calculate the price adjustment:

ADJ = (OLPF - 1) x (Price)

3. Small Incidental Quantities. Positive ADJ (quality initiative) does not apply to small incidental quantities. Price adjustment for 28-day compressive strength deficiencies will be based on test results for the corresponding weekly QA test specimens and the pay factor (PFs) calculated in accordance with the formula defined in subsection d.2.A.(1). Price adjustment is calculated using the following formula, using the pay factor for 28-day compressive strength (PFs) and the established base price for the pay item (Price):

(ADJ) = (PFs – 1) x (Price)

e. Evaluation of Rejectable Concrete. The Engineer will require additional evaluation to decide what further action may be warranted. Results for air content testing of fresh concrete are not eligible for re-evaluation.

If the Engineer determines that non-destructive testing (NDT) is appropriate, this work must be done by the Contractor in the presence of the Engineer within 45 calendar days of concrete placement. All costs associated with this work will be borne by the Contractor. Ensure a complete set of non-destructive tests is conducted (in accordance with the respective standard test method) at a minimum of three randomly selected locations. If NDT is used to estimate the in-situ strength, a calibrated relationship between the project job mix formula (JMF) under evaluation and the NDT apparatus must have been established prior to NDT testing in accordance with its respective standard test method.

1. PWL Applications. If the quality index analysis for 28-day compressive strength shows that the RQL has not been met (50 PWL, minimum) for a production lot or the rejection limit for the individual strength sample test result representing the rejected sublot within a production lot has not been achieved (as specified in Table 1), the associated concrete will be rejected.

A. If the results from evaluation of the rejected concrete indicate that the RQL has been met (50 PWL, minimum) for the rejected production lot, or the rejection limit for the individual strength sample test result representing the rejected sublot within a production lot has been achieved, the represented quantity of concrete under evaluation will remain

CFS:CPM 6 of 9 04-30-20 in place and a pay factor for 28-day compressive strength (PFs) of 50.00 will be applied for overall lot pay factor (OLPF) and price adjustment (ADJ) determinations in accordance with subsection d.1 of this special provision.

B. If the results from evaluation of the rejected concrete confirm that the RQL has not been met (50 PWL, minimum) for the rejected production lot, or the rejection limit for the individual strength sample test result represented by the rejected sublot within a production lot has not been achieved, the Engineer will elect to do one of the following:

(1) Require removal and replacement of the entire rejected production lot, or the individual rejected sublot within a production lot, including new initial tests for quality index analysis conducted in accordance with subsection d.1.A of this special provision.

(2) Allow the Contractor to submit a plan for corrective action, for the Engineer’s approval, to address the disposition of the rejected concrete. If the Engineer does not approve the plan for corrective action, subsection e.1.B.(1) will be applied. All costs associated with plan submittal and corrective action under this subsection will be borne by the Contractor.

2. Non-PWL Applications. If the 28-day compressive strength QA test results show that the rejection limit (as specified in Table 3) has not been achieved, the quantity of concrete under evaluation will be rejected and the Engineer will require additional evaluation to decide what further action may be warranted.

Propose an evaluation plan and submit it to the Engineer for approval before proceeding. The results from NDT will be used only to decide what further action is required. This determination will be made by the Engineer, as follows:

A. For non-structural concrete. If no test result from non-destructive testing falls below the lower specification limit (LSL) 28-day compressive strength, the represented quantity of concrete under evaluation will remain in place and a pay factor for 28-day compressive strength (PFs) of 1.00 will be applied for overall lot pay factor (OLPF) and price adjustment (ADJ) determinations will be in accordance with subsection d.2 of this special provision.

B. For structural concrete (including overhead sign foundations). If no test result from non-destructive testing falls below the lower specification limit (LSL), the represented quantity of concrete under evaluation will remain in place and a pay factor for 28-day compressive strength (PFs) of 0.85 will be applied for overall lot pay factor (OLPF) and price adjustment (ADJ) determinations will be in accordance with subsection d.2 of this

C. If one or more of the non-destructive test results fall below the lower specification limit (LSL) 28-day compressive strength, the Engineer may elect to do one of the following:

(1) Require removal and replacement of the entire rejected quantity of concrete, including new initial tests for quality index analysis conducted in accordance with subsection d.2 of this special provision.

(2) Allow the Contractor to submit a plan for corrective action, for the Engineer’s approval, to address the disposition of the rejected concrete. If the Engineer does not

CFS:CPM 7 of 9 04-30-20 approve the plan for corrective action, subsection e.2.C.(1) will be applied. All costs associated with plan submittal and corrective action under this subsection will be borne by the Contractor.

(3) Allow the in-situ quantity of concrete under evaluation to remain in place and a pay factor (PFs) of 0.50 will be applied for overall lot pay factor (OLPF) and price adjustment (ADJ) determinations in accordance with subsection d.2 of this special

f. Lot Dispute Resolution.

1. Requirements. Dispute resolution pertains to production lots subject to quality index analysis for PWL applications only. Dispute resolution will not be considered if it is shown that the Contractor QC has not been completed in accordance with the approved QC plan. Failure by the Contractor to maintain the proper curing environment during initial cure will not be the basis for rejection of samples or claims against the Department. If the Contractor does not maintain the proper curing environment for initial cure, the production lot represented by the improperly cured samples are not eligible for dispute resolution. Air content of fresh concrete is not eligible for dispute resolution.

Submit the Contractor’s 28-day compressive strength QC test results to the Engineer, accompanied by a signed statement certifying that the QC test results are true and accurate, prior to the Engineer’s release of any QA test results for the respective production lot. The 28-day compressive strength QA test results for a production lot of concrete may be eligible for dispute resolution only if criteria below are met. If the Engineer determines, based on the criteria below, that further evaluation is not warranted, the ADJ for the production lot will be based on the Engineer’s original 28-day compressive strength QA test results.

A. The request for dispute resolution testing was submitted by the Contractor in writing within 2 working days of receipt of the results of the quality index analysis for the production lot.

B. Complete records and reports for all QC tests and inspections as described in subsection 1002.03.C of the Standard Specifications for Construction, including documentation of what action was taken to correct deficient concrete, along with sufficient information and production lot identification to allow the test results to be correlated with the items of work represented, were submitted to the Engineer within 24 hours after the date covered by the records and reports.

C. QC sampling and testing procedures were conducted in the same manner as the

Department’s QA sampling and testing procedures.

D. The Contractor’s QC and Department’s QA 28-day compressive strength test specimen for the production lot in dispute are the same nominal size (either 6-inch by 12-inch or 4-inch by 8-inch).

E. The pay factor for 28-day compressive strength (PFs), as re-calculated by the

Engineer using the Contractor’s QC test results, is greater than that determined by the Engineer using the QA test results.

F. Each sublot within the respective production lot under dispute is represented by

CFS:CPM 8 of 9 04-30-20 complete QC test results.

G. The QC sampling and testing for the production lot in dispute was conducted by a Michigan Concrete Association (MCA) certified Michigan Concrete Technician Level I or

II.

H. A current and complete QC plan, for the appropriate items of work, was submitted and approved by the Engineer prior to start of related work.

I. The QC sampling and testing was performed on the same production lot of concrete as the Department’s QA sampling and testing, and all associated QC records include the appropriate production lot identification number that coincides with the Engineer’s QA production lot identification number.

J. The corresponding Contractor QC and Department QA 28-day compressive strength test specimens for the production lot in dispute were properly secured during initial curing in the curing facility provided and maintained by the Contractor.

K. The QC test results and documentation for aggregate gradation, slump, air content, temperature, and density (unit weight) of the fresh concrete were complete and within specification requirements.

L. The appropriate corrective action was taken in the event QC action limits were exceeded, as described in the QC plan.

M. QC suspension limits for the associated production lot of concrete were not exceeded.

2. Schedule. If the Engineer determines, based on the above criteria, that lot dispute resolution is warranted, the following schedule and testing process will be initiated.

A. The Engineer will document receipt of the request for dispute resolution and will deliver the dispute resolution samples along with the appropriate sample identification submittal forms to the MDOT Construction Field Services (CFS) Central Laboratory for testing within 3 working day of the receipt of the request.

B. The Department’s CFS Central laboratory will test all dispute resolution test specimens within 2 working days of their receipt.

C. The MDOT CFS Central laboratory will return the dispute resolution test results to the Engineer within 10 working days from receipt of the dispute resolution samples.

3. Testing Process.

A. All lot dispute resolution samples will be tested for the production lot under dispute resolution.

B. All dispute resolution test results will replace their respective original QA test results.

C. The PFs for the production lot under dispute will be recalculated using the

CFS:CPM 9 of 9 04-30-20 compressive strength test results from the dispute resolution test specimens.

D. If the recalculated lot PFs is less than or equal to the original corresponding PFs, the costs for dispute resolution sample testing will be borne by the Contractor.

E. If the recalculated lot PFs is greater than the original corresponding PFs, the costs for dispute resolution sample testing will be borne by the Department.

F. The OLPF will then be recalculated using the PFs from the compressive strength dispute resolution test results and the original corresponding PFac.

g. Measurement and Payment. Any positive price adjustment payment made in connection with this special provision will use the following pay item:

Conc Quality Initiative .............................................................................................. Dollar

Conc Quality Initiative is a budgeted amount established in the contract to cover the potential positive ADJ for the pay items associated with the PWL application only. Conc Quality Initiative does not apply to the pay items associated with non-PWL applications.

If a price adjustment is made for reasons included in this special provision, that adjustment will be made using the base price established for the specific item. If a contract unit price requires adjustment for other reasons not described in this special provision, the adjustments will be made using the original unit price and the adjustments will be cumulative.

Separate payment will not be made for providing, implementing, and maintaining an effective QC program. All costs associated with this work will be included in the applicable unit prices for the concrete items. Failure by the Contractor to maintain the proper curing environment during initial cure will not be basis for claim against the Department.

All costs associated with providing, locating, relocating, maintaining, and securing the adequate number of portable initial curing facilities for both the QC and QA strength test specimens will be included in the applicable unit prices for the concrete items. No additional payment will be permitted. The Contractor is responsible for damage, theft, subsequent replacement, and removal after completion of the work for each curing facility used on the project.

20SP-101A-01

CONSTRUCTION MANAGEMENT

COS:DCB 1 of 2 APPR:JJG:LFS:04-19-23

FHWA:APPR:04-28-23

a. Description. This work consists of complying with the Department’s construction management processes. The Department will manage this contract using the AASHTOWare Project Construction Materials (APCM) software. Ensure all change orders are approved using APCM. No paper documents, faxes, or other methods/media are permitted for change order approvals except as allowed by this special provision or specifically approved by the Engineer.

b. Terminology. Replace the following terms in all of the contract:

● Inspector’s Daily Report (IDR) replaced with Daily Work Report (DWR)

● Contract Modification replaced with Change Order

● Construction Pay Estimate Report replaced with Pay Estimate for Contractor

● Contractor’s Performance Evaluation replaced with Contractor Evaluation

● Site Times replaced with Contract Times

The new terms have the same definition as the term being replaced.

c. Contractor Access to APCM. APCM access is available at no cost to all contractors associated with the project. APCM user accounts and access is granted using the State of Michigan Identity, Credential and Access Management solution, MILogin. MILogin is a web based access portal at the following website:

https://milogintp.michigan.gov

Use MILogin to submit all APCM access requests.

d. Roles and Contract Authority. Roles restrict what data each user can view and the actions they can perform in the system. Roles will be assigned at user creation through the MILogin access request process. Read only and change order approver roles are available to the Contractor. The change order approval role requires written authorization from an authorized officer of the company.

Contract authority grants the user the ability to use one of the user’s roles on a specific contract.

Contract authority will be granted by the Engineer at the request of the Contractor. Provide the Engineer with a list of users and the user role for this contract at the time of the preconstruction meeting.

Notify the Engineer within 24 hours of any user access changes for this contract.

e. Training. Additional documentation and training for APCM processes, details of scheduled classes and methods for requesting training are available by emailing the MDOT https://milogintp.michigan.gov/

20SP-101A-01

COS:DCB 2 of 2 04-19-23

AASHTOWare Help Desk at MDOT-ConstructionSoftware@michigan.gov between the hours of 8:00 a.m. and 4:00 p.m., Monday through Friday.

f. Technical Issue Resolution. Upon discovery of an APCM access issue the Contractor must immediately notify the Engineer and submit a notice to the e-mail resource at:

MDOT-ConstructionSoftware@michigan.gov.

g. Change Order Approvals. Ensure electronic review/approval of change orders are accomplished through APCM approval decisions and automated e-mail notifications. An approval decision is the system recorded decision entered by the user. When a change order is ready for approval, the user with authority to approve is notified by e-mail. Submit the approval decision by accessing APCM, reviewing the change order, and recording the approval decision within the system.

h. Data/File Retention. The electronic data and files stored within APCM are part of the official project documentation and will be retained per the current documentation retention schedule.

i. Measurement and Payment. The work included in this special provision will not be paid for separately and is considered to be included in other pay items of work in the contract.

20SP-102C-01

DISSEMINATION OF PUBLIC RELATIONS INFORMATION

CFS:JJG 1 of 1 APPR:LFS:MRB:04-14-21

FHWA:APPR:04-14-21

a. Description. This special provision establishes the requirements for dissemination of any public relations communications and/or products intended for an external audience pertaining to this contract. Dissemination must not be made without prior written approval from the Department’s Office of Communications, and then only in accordance with explicit instructions by the Department. This includes the use of the Michigan Department of Transportation (MDOT) logo.

A violation of this provision may be considered a default of contract and the Department may exercise its rights in accordance with subsection 108.11 of the Standard Specifications for Construction.

b. Public Relations Information. Examples of communications and/or products may include, but are not limited to: brochures, flyers, invitations, programs, postings on social media sites or web sites, new or updated video, digital versatile disk (DVD) productions, or video sharing productions, exhibits, presentations, or any other printed materials intended for an external audience.

20SP-102D-01

NON-COMPLIANCE WITH CONTRACT REQUIREMENTS

CFS:LLR 1 of 2 APPR:JJG:LFS:05-23-23

FHWA:APPR:06-15-23

Delete subsection 102.19, on page 1-31 of the Standard Specifications for Construction, in its entirety and replace with the following:

102.19. Contract Non-Compliance

The Engineer will issue non-compliance notices (form 1165) to the Contractor when contract requirements have not been met. Non-compliance notices may be issued at any time during the course of the contract. Notices of non-compliance may include, but are not limited to, the following criteria.

A. Jobsite Safety

B. Prevailing Wage

C. Subcontract

D. Prompt Payment

E. Disadvantaged Business Enterprise

F. Soil Erosion and Sedimentation Control

G. Plans and Specifications

H. Prosecution and Progress

I. Submittals (material testing, certifications, shop drawings, etc.)

J. Work Zone Safety and Mobility

Non-compliance notices may be used as a basis for modifying the prequalification ratings of the Contractor and any tier subcontractor. Any action to modify the Contractor’s prequalification ratings will be taken in accordance with the duly promulgated administrative rules for prequalification.

If a Contractor and or any tier subcontractor fails to honor a request by the Engineer to submit a performance improvement plan or to meet to discuss the plan, or if a Contractor or subcontractor at any tier fails to carry out an approved performance improvement plan, that failure may be used as a basis for modifying the prequalification ratings of the Contractor or subcontractor at any tier as applicable. Any action to modify the

20SP-102D-01

COS:LLR 2 of 2 05-23-23

Contractor’s prequalification ratings will be taken in accordance with the duly promulgated administrative rules for prequalification.

20SP-102E-01

SUBLETTING CONTRACT WORK TO DISADVANTAGED BUSINESS

ENTERPRISES

CSD:LFS 1 of 2 APPR:KMF:LST:11-09-23

FHWA:APPR:11-13-23

Replace subsection 102.17 on page 1-30, of the Standard Specifications for Construction, in its entirety and replace with the following:

102.17. Subletting Contract Work to Disadvantaged Business Enterprises (DBEs)

The DBE participation goal specified in the notice of advertisement must be made available to certified DBEs. Compliance with the designated DBE participation goal must be met by using DBEs to perform commercially useful functions as required by 49

CFR 26.55.

A. Pre-Award. All Bidders must provide the overall DBE percentage they have attained at time of bid within the DBE goal tab of the bid file on all projects with a DBE goal designation. All Bidders must submit MDOT Forms 2653 Contractor Good Faith Efforts and 2653D Commitment Confirmation for DBE Subcontractors within 5 calendar days of the bid letting. These forms must be submitted whether or not the Bidders have been able to meet the DBE participation goal. Submit these forms by e-mail to MDOT-DBESheets@Michigan.gov.

A Bidder who fails to meet the submittal requirements for DBE participation will be deemed ineligible for award of the contract. If a Bidder fails to achieve the DBE participation goal set for a contract, the Department will evaluate the efforts of all Bidders to determine eligibility for award.

B. Post Award. If the Contractor determines during construction that the approved the

DBE participation goal will not be met, the Contractor must submit updated MDOT Forms 2653 and 2653D to MDOT-GFE@michigan.gov within 7 calendar days in accordance with current Department DBE Program Procedures.

Prime Contractors may not terminate for convenience an approved DBE working on a federally assisted contract and then perform the work of the terminated DBE.

The Contractor must notify the Department immediately of a DBE’s inability to perform any of its work and the Contractor’s intent to obtain a substitute DBE by filling out MDOT Form 0196 (DBE Removal/Substitution Request).

C. Reconsideration. Bidders whose Good Faith Efforts (GFE) have been found insufficient may have their GFE reconsidered in accordance with current Department DBE Program Procedures.

mailto:MDOT-DBESheets@Michigan.gov mailto:MDOT-GFE@michigan.gov

20SP-102E-01

CSD:LFS 2 of 2 11-09-23

The Department reserves the right to modify any requirement or shorten any time…