This document is a project location and log for a Michigan Department of Transportation (MDOT) maintenance contract for Interstate -75 (I-75) in Mackinac County, specifically covering areas in Moran Township and the City of St. Ignace. The project involves concrete pavement repairs, asphalt repair mastic application, and guardrail placement along approximately 30.5 miles of highway, including the main interstate and three connecting ramps (Ramp C, Ramp F, and Ramp N). The work will be performed on both northbound and southbound lanes, with specific focus on addressing pavement distresses such as spalls, delaminations, and joint damages. The project is based on 2020 Standard Specifications for Construction and will require maintaining traffic throughout the project using lane closures.
The contract includes detailed quantitative measurements for various repair activities, with significant quantities including 1,355 square yards of pavement removal and replacement, 1,001 linear feet of intermediate saw cutting, 273 epoxy-anchored lane ties, and multiple joint repairs (contraction and expansion joints). Additional work involves guardrail removal and replacement, with specific focus on protecting an existing light pole. The project will require careful coordination, hand digging near underground utilities, and adherence to specific technical specifications. The work is funded through MDOT and includes provisions for mobilization, contractor staking, and a concrete quality initiative, with a total budgeted amount of $13,000 for quality assurance measures.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CS 49025 MAINTENANCE PROJECT
LOG OF PROJECT
I-75
CS 49025 MAINTENANCE PROJECT
PROJECT LOCATION
This project is located on I-75 in Mackinac County, Control Section 49025, in the city of St.
Ignace and Moran Township. The point of beginning (Station 226+04, MP 4.361) is at Graham Ave, north of the Mackinac Bridge Authority Toll Plaza. The point of ending (Station 256+50, MP 4.942) is south of the US-2 and I-75 intersection in the city of St. Ignace. The project includes two north bound ramps (ramp C and N), and one south bound ramp (ramp F).
PROJECT MILE POINT LOG
All work will occur in the following segments:
I-75 NB: Station 226+04 (POB) to Station 256+50 (POE) I-75 SB: Station 226+04 (POB) to Station 254+50 (POE) Ramp F (US-2 EB to I-75 SB): Station 0+00 (POB) to Station 28+15 (POE) Ramp N (US-2 EB to I-75 NB): Station 0+00 (POB) to Station 20+84 (POE) Ramp C (I-75 NB to US-2 EB): Station 0+00 (POB) to Station 16+40 (POE)
The mile points for the POB and POE are approximate and their exact locations will be marked in the field by the Engineer. Pavement stenciling (metric) does exist at some locations within the project and is approximate.
DESCRIPTION OF WORK
The project consists of concrete pavement repairs, applying asphalt repair mastic, and guardrail placement, as detailed in the log, and as directed by the Engineer.
Construct all work items in accordance with the 2020 Standard Specifications for Construction, Special Provisions, Special Details, and/or Standard Plans. Traffic shall be maintained at all times throughout the project using lane closures as described in the Special Provision for Maintaining Traffic contained in this proposal.
ITEMS OF WORK
Concrete Pavement Repair
Location: Sta 226+04 (POB) to Sta 256+50 (POE)
Description of Work The existing concrete pavement was constructed in circa 1999-2000 and consists of 9.5-inch-thick Reinforced Concrete Pavement. Concrete patching was completed in 2020.
Complete concrete pavement repairs at locations specified in the log and as directed by the Engineer. The concrete patch log shall be used for estimating purposes only, actual locations of concrete patches will be as directed by the Engineer in the field. Epoxy anchored lane ties shall be placed into adjacent lanes for all patches greater than or equal to 15 feet in length. All locations for sawing and sealing of longitudinal and transverse pavement joints and asphalt mastic repair shall be as directed by the Engineer in the field.
Concrete grade P-NC will be required for all patches.
All contraction joints (CRG and CP) and expansion joints (ERG and ESC) shall be placed per Standard Plan R-44 series and as directed by the Engineer. Expansion joints (ERG and ESC) shall continue through all adjacent lanes along the same joint.
Pay Item Quantity Unit
Pavt Repr, Rem 1,355 Syd
Pavt Repr, Nonreinf Conc, 10 inch 1,355 Syd
Saw Cut, Intermediate 1,001 Ft
Lane Tie, Epoxy Anchored 273 Ea
Joint, Contraction, Crg 2,425 Ft
Joint, Contraction, Cp 206 Ft
Joint, Expansion, Erg 123 Ft
Joint, Expansion, Esc 4 Ft
Hand Patching 10 Ton
Non-Chloride Accelerator 752 Gal
Crack Sealing, Conc Pavt 3,000 Ft
Resealing Trans Joints with Hot-Poured Rubber 6,000 Ft
Resealing Longit Joints with Hot-Poured Rubber 4,000 Ft
Asphalt Repr Mastic 3,000 Ft
Guardrail
Location: Southbound I-75 in median at Sta 233+00.
Description of Work Work will consist of removal of the southbound guardrail panels and blocks of the existing TD guardrail in the median of I-75. Proposed Guardrail, Type T and departing terminal shall be placed as a stand alone run shielding an existing light pole. Additional oversized offset blocks will be required to transition from the existing TD guardrail to Type T (included in payment for guardrail, type T). Flare (1:15) proposed guardrail away from existing TD guardrail to an offset of 12’ from the southbound edge of metal in front of the light pole. Hand dig guardrail posts in proximity to existing underground electric lines for light poles.
Pay Item Quantity Unit
Guardrail, Rem 100 Ft
Guardrail, Type T, 84 inch Post 113 Ft
Guardrail Departing Terminal, Type T 2 Ea
Hand Digging Guardrail Post 10 Ea
Guardrail Reflector 4 Ea
Maintaining Traffic and Permanent Traffic Control Devices
Location: Sta 226+04 (POB) to Sta 256+50 (POE)
Description of Work All work and related activities for maintaining traffic on this project must be in accordance with the applicable special provisions included in the proposal.
Pay Item Quantity Unit
Minor Traf Devices 1 LSUM
Connected Arrow Board, Type C, Furn 2 Ea
Connected Arrow Board, Type C, Oper 2 Ea
Channelizing Device, 42 inch, Fluorescent, Furn 180 Ea
Channelizing Device, 42 inch, Fluorescent, Oper 180 Ea
Sign Cover 2 Ea
Sign Cover, Type I 2 Ea
Sign, Type B, Temp, Prismatic, Furn 880 Sft
Sign, Type B, Temp, Prismatic, Oper 880 Sft
Sign, Type A, Temp, Prismatic, Furn 8 Sft
Sign, Type A, Temp, Prismatic, Oper 8 Sft
Speed Radar Trailer, Temp 2 Ea
Miscellaneous Quantities
Location: Sta 226+04 (POB) to Sta 256+50 (POE)
Description of Work
The following items of work will be done as they apply throughout the project. These items of work are not detailed within the Log of Project.
Pay Item Quantity Unit
Mobilization, Max 1 LSUM
Contractor Staking 1 LSUM
Staking Plan Errors and Extras, Max $180/hour 5 Hr
Conc Quality Initiative 13,000 Dlr
GENERAL NOTES
UTILITIES
MISS DIG/UNDERGROUND UTILITY NOTIFICATION
Contact MISS DIG System, Inc. for the protection of underground utilities and in conformance with MCL 460.721 et seq, by phone at 811 or 800-482-7171 or via the web at http://www.missdig811.org/, a minimum of 3 working days prior to excavating, excluding weekends and holidays.
SURVEY
PRESERVATION OF BOUNDARY MONUMENTS
Preserve all corners within the project limits, whether shown or not. Adjust monument boxes as required.
STATIONING
Stationing on this project was taken from old plans and is not necessarily accurate.
OLD PLANS
OLD ROAD PLANS
The following old road plans were referred to in the design of this project.
_49025-33799 Concrete Pavement Construction (1999)____ _49025-204335 Concrete Pavement Patching (2020)______
PAVEMENT
CONCRETE HAND FINISHING
Strike off, consolidate, and hand finish concrete pours using hand methods on variable width lanes and lanes formed by flexible forms for short radius curves, as directed by the Engineer.
GUARDRAIL
GUARDRAIL CONNECTIONS TO EXISTING GUARDRAIL
Field drill connections of proposed guardrail to existing guardrail. Payment for this work is included in the pay item of the proposed guardrail.
SIGNS
EXISTING SIGN RELOCATION
Salvage and reset any permanent signs requiring relocation due to Contractor operations at locations designated by the Engineer. Replace signs and posts damaged during the removal and storage operations with new signs and posts. The cost of this work is the Contractor’s responsibility.
Contact Mike Kovalchick, (888) 645-6467 from Michigan Logos, at least two weeks prior to construction to remove / relocate Michigan Logo or tourist oriented directional signs.
http://www.missdig811.org/
NOTES APPLYING TO STANDARD PLANS
Where the following items are called for on the plans, they are to be constructed according to the standard plan given below opposite each item unless otherwise indicated.
Title Plan No.
ROAD
MONUMENT BOXES R-11-E
TRANSVERSE PAVEMENT JOINTS (PLAIN CONCRETE
PAVEMENT)
R-39-K
LOAD TRANSFER ASSEMBLY FOR TRANSVERSE JOINTS R-40-I
LONGITUDINAL PAVEMENT JOINTS R-41-H
CONCRETE PAVEMENT REPAIR R-44-G *
GUARDRAIL TYPES A, B, BD, T, TD, MGS-8 & MGS-8D R-60-J *
GUARDRAIL DEPARTING TERMINAL TYPES B, T, & MGS R-66-E *
* Denotes Special Detail
Station
Length
(FT)
Width
(FT) SYD Lane Description
Distress
Type
Saw cut
Int
(FT)
Lane tie, Epoxy
Anchored
(Ea)
CRG
(Ft)
ERG
(Ft)
CP
(Ft)
ESC IN
CURB
AND
GUTTER
(Ft)
226+20 6 14 9.3 REST AREA OFF RAMP SPALL 28
231+40 6 12 8.0 RAMP ACCEL LANE SPALL 24
236+10 6 12 8.0 LEFT LANE JOINT SPALL+DELAM ON ONE SIDE 24
236+35 12 12 16.0 FAST LANE JOINT SPALL + DELAM 12 24 12
237+40 50 12 66.7 FAST LANE DELAM JOINT TO JOINT 108 92 24 24
238+60 12 12 16.0 FAST LANE SPALLS AND EX FAILED PATCH 12 24
239+20 14 12 18.7 FAST LANE SPALLS 24 24
239+50 15 12 20.0 FAST LANE SPALL 12 24
239+90 13 12 17.3 FAST LANE SPALL 24 24
241+00 6 12 8.0 FAST LANE SPALL 24
241+40 6 12 8.0 FAST LANE SPALL 24
242+00 90 12 120.0 FAST LANE SPORATIC SPALLS 180 24 48
245+45 12 12 16.0 FAST LANE SPALLS AND EX FAILED PATCH 12 24
246+50 6 12 8.0 FAST LANE SPALL 24
250+50 6 24 16.0 SLOW LANE +FAST LANE SPALL IN JOINT 48
253+30 14 12 18.7 FAST LANE SPALLS TO JOINT 24 24
255+05 12 12 16.0 FAST LANE SPALLS IN JOINT 12 24 12
255+26 6 12 8.0 FAST LANE SPALL IN JOINT 24
TOTAL = 398.7 420.0 92.0 460.0 0.0 96.0 0.0
I-75 NB
(FT)
Width
(FT) SYD Lane Description
Distress
Type
Saw cut
Int
(FT)
Lane tie, Epoxy
Anchored
(Ea)
CRG
(Ft)
ERG
(Ft)
CP
(Ft)
ESC IN
CURB
AND
GUTTER
(Ft)
249+75 6 12 8.0 SLOW LANE LARGE DELAM 24
247+20 6 12 8.0 FAST LANE JOINT/CRACK 24
247+00 6 12 8.0 FAST LANE SPALL 24
246+10 6 12 8.0 RAMP ACCEL SMALL DELAM 24
245+20 6 12 8.0 SLOW LANE SPALL ON JOINT 24
244+15 12 12 16.0 SLOW LANE SPALL ON JOINT 12 24 12
243+50 6 12 8.0 SLOW LANE LARGE DELAM 24
242+95 18 12 24.0 SLOW LANE LARGE DELAM EX PATCH FAIL (2) 24 16 24 12
242+00 22 12 29.3 SLOW LANE SPALL ON JOINT+DELAM+SPALL ON JOINT 24 20 24 24
240+50 6 12 8.0 SLOW LANE SPALL ON JOINT 24
239+90 6 24 16.0 SLOW LANE /FAST LANE CRACK, OFFSET 3' ADJ LANE 48
239+40 7 24 18.7 SLOW LANE /FAST LANE CRACK +ADDNL SPALL IN EX PATCH 24 48
238+30 6 12 8.0 SLOW LANE SPALL IN EX PATCH 24
236+50 6 12 8.0 SLOW LANE SPALL ON EX PATCH 9 24
236+00 8 27 24.0 SLOW LANE +FAST LANE +MED VAL GUTTER SPALL ON JOINT +DELAM 27 27 27
235+75 12 12 16.0 SLOW LANE SPALLS ON EX PATCH 12 24
234+70 6 32 21.3 SLOW LANE + FAST LANE + RAMP TAPER SPALL ON JOINT 64
234+45 6 24 16.0 SLOW LANE + FAST LANE SPALL ON JOINT 48
233+80 12 12 16.0 SLOW LANE SPALL ON JOINT 24 12
232+80 6 12 8.0 SLOW LANE SPALL ON JOINT 24
230+20 6 12 8.0 SLOW LANE SPALL ON JOINT 24
230+10 12 38 50.7 SLOW + FAST + TOLL TAPER + MEDIAN SHLDR SPALL ON JOINT 38 76 38
229+30 15 12 20.0 SLOW LANE SPALLS ON EX PATCH 36 14 24 12
228+55 6 24 16.0 FAST LANE + TOLL CRACK + ADDNL SPALL 48
227+80 6 12 8.0 SLOW LANE SPALL ON JOINT 24
226+35 6 64 42.7 ALL LANES+SHOULDERS JOINT 64 64 4
TOTAL = 422.7 206.0 50.0 855.0 91.0 110.0 4.0
I-75 SB (Concrete Pavement begins at Sta 254+50)
(FT)
Width
(FT) SYD Lane Description
Distress
Type
Saw cut
Int
(FT)
Lane tie, Epoxy
Anchored
(Ea)
CRG
(Ft)
ERG
(Ft)
CP
(Ft)
ESC IN
CURB
AND
GUTTER
(Ft)
1+05 6 16 10.7 ISOLATED SPALLS 3 16 16
1+70 8 16 14.2 ISOLATED SPALLS 16 3 32
1+94 6 16 10.7 SPALL 3 32
2+15 6 16 10.7 SPALL 3 32
3+70 8 16 14.2 SPALLS/EXISTING JOINT 16 3 32
4+26 12 16 21.3 SPALLES ACROSS LANE 16 5 32
4+80 6 16 10.7 ISOLATED SPALL 3 32
5+00 15 16 26.7 SPALLS ACROSS LANE 32 6 32
5+50 9 16 16.0 SPALLS ACROSS LANE 16 4 32
6+20 12 16 21.3 SPALLS ACROSS LANE 16 5 32
7+40 6 16 10.7 ISOLATED SPALLS 3 32
7+60 6 16 10.7 LARGE SPALL CENTER OF LANE 3 32
8+20 6 16 10.7 LARGE SPALL CENTER OF LANE 3 32
8+75 8 16 14.2 LARGE SPALL CENTER OF LANE 16 3 32
9+38 6 16 10.7 SPALL 3 32
9+51 11 16 19.6 SPALL 16 5 16 16
11+56 6 19 12.7 LANE+TURN LN SPALLED JOINT 3 38
13+16 6 15 10.0 LANE+TURN LN SPALLED JOINT 3 30
13+34 6 15 10.0 LANE+TURN LN SPALL 3 30
15+15 6 15 10.0 LANE+TURN LN SPALLED CRACK 3 30
15+45 10 23 25.6 LANE+TURN LN SPALLED JOINT 23 4 46
TOTAL = 301.1 167.0 74.0 654.0 32.0 0.0 0.0
0+50 2' Gore location on NB I-75 (240+72)
16+40 Center of I-75 BL
RAMP C (I-75 NB TO EB US-2/ST IGNACE)
(FT)
Width
(FT) SYD Lane Description
Distress
Type
Saw cut
Int
(FT)
Lane tie, Epoxy
Anchored
(Ea)
CRG
(Ft)
ERG
(Ft)
CP
(Ft)
ESC IN
CURB
AND
GUTTER
(Ft)
5+30 6 12 8.0 TRAVELED LANE JOINT 0 3 24
6+20 7 16 12.4 TRAVELED LANE PREVIOUS REPAIR SPALLED 16 3 32
10+37 6 16 10.7 TRAVELED LANE SPALL/CRACK 0 3 32
11+06 6 16 10.7 TRAVELED LANE SPALL/CRACK INCLUDING PREV REPAIR 16 3 32
11+31 14 16 24.9 TRAVELED LANE SPALLS IN LANE/PREVIOUS REPAIR 16 5 32
12+00 6 16 10.7 TRAVELED LANE SPALL 16 3 32
12+25 6 16 10.7 TRAVELED LANE SPALL 0 3 32
14+76 6 16 10.7 TRAVELED LANE SPALL IN CRACK INCLUDING PREV REPAIR 0 3 32
15+75 16 16 28.4 TRAVELED LANE SPALL/EXISTING PATCH 32 6 32
16+20 8 16 14.2 TRAVELED LANE SPALL/EXISTING PATCH 16 3 32
16+45 20 16 35.6 TRAVELED LANE SPALLS IN CENTERLINE 48 7 32
17+50 6 16 10.7 TRAVELED LANE SPALL 0 3 32
18+60 16 16 28.4 TRAVELED LANE SPALLS 48 6 32
TOTAL = 216.0 208.0 51.0 408.0 0.0 0.0 0.0
0+00 Gore Pt on US-2
28+15.26 Gore Pt on I-75 SB (Sta 240+15.25)
RAMP F (US-2 EB TO I-75 SB)
(FT)
Width
(FT) SYD Lane Description
Distress
Type
Saw cut
Int
(FT)
Lane tie, Epoxy
Anchored
(Ea)
CRG
(Ft)
ERG
(Ft)
CP
(Ft)
ESC IN
CURB
AND
GUTTER
(Ft)
10+20 6 12 8.0 TRAVELED LANE CRACK 3 24
16+42 6 12 8.0 TRAVELED LANE SPALL 3 24
TOTAL = 16.0 0.0 6.0 48.0 0.0 0.0 0.0
0+00 Gore Pt on US-2 EB
20+83.7 Gore Pt on I-75 NB (Sta 25+13.51)
RAMP N (US-2 EB TO I-75 NB)
LIGHTPOLE PROTECTION GUARDRAIL WORK
INTERSTATE
INTERSTATE
N
CS:
JN:
TSC:
DATE:
DESIGN UNIT:
DRAWING SHEET
49025
05/09/25
VERT. (FT)
HORZ. (FT)
GARDNER
NEWBERRY
SOUTHBOUND I-75
1070 FEET NORTH OF MACKINAC BRIDGE TOLL PLAZA
GUARDRAIL PROTECTION OF LIGHT POLE
NO SCALE
FILE:
Michigan Department of Transportation
SECT
NORTHBOUND
SOUTHBOUND
(SOUTHBOUND FACE)
100 FT GUARDRAIL, REM
100'
1:15 FLARE MAX
100' GUARDRAIL, TYPE T
DEPARTING TERMINAL, TYPE T
EX LIGHT POLE
FLAMMABLE MATERIAL
HAZARDOUS OR
HAND DIG PROPOSED GUARDRAIL POSTS
INCLUDED IN PAYMENT FOR GUARDRAIL, TYPE T
OVERSIZED OFFSET BLOCK AS REQUIRED,
& MBA PLAZA LANE
TO DENSMORE ST EXIT
EX LANE ADDITION
EX EXIT RAMP TO ST IGNACE (344A)
EX GUARDRAIL, TYPE TD1:15 FLARE, MAX
12.5' GUARDRAIL, TYPE T, 84 INCH POST
DEPARTING TERMINAL, TYPE T
INCLUDED IN PAYMENT FOR GUARDRAIL, TYPE T
OVERSIZED OFFSET BLOCK AS REQUIRED,
| Insert from: "Note Sheet 2020 - Log Job.pdf" |
| GENERAL NOTES |
| UTILITIES |
| MISS DIG/UNDERGROUND UTILITY NOTIFICATION |
| SURVEY |
| PRESERVATION OF BOUNDARY MONUMENTS |
| STATIONING |
| OLD PLANS |
| OLD ROAD PLANS |
| PAVEMENT |
| CONCRETE HAND FINISHING |
| GUARDRAIL |
| GUARDRAIL CONNECTIONS TO EXISTING GUARDRAIL |
File details come from the government source that posted it. Updated .