Attachment A1 - Diagrams and Notes~1.pdf
PDF 653 KB Posted
- Attached to
- Emission Factor Testing on Pile Burning
- Solicitation number
- S-34000-00017362
- Issued by
- Oregon
About this file
Attachment A1 - Diagrams and Notes
This document is a technical attachment supporting the State of Oregon Department of Environmental Quality's Intermediate Procurement for Emission Factor Testing on Pile Burning. The attachment comprises diagrams and technical notes that provide visual representations and detailed specifications relevant to the emission factor testing methodology and pile burning procedures. The diagrams illustrate the proposed test setup, measurement configurations, and spatial arrangements for conducting the emission factor tests on pile burning operations. The technical notes supplement these diagrams with explanatory information regarding measurement protocols, equipment placement, data collection points, and procedural guidance necessary for executing the testing program. These materials serve as reference documentation to guide potential bidders in understanding the technical requirements and operational parameters for the proposed emission testing work.
The diagrams and notes establish the technical framework within which bidders must develop their testing methodologies and cost proposals. By providing detailed visual and written specifications upfront, the procurement documentation enables contractors to accurately assess scope requirements, identify necessary equipment and personnel, and prepare comprehensive bids based on clearly defined technical parameters. This attachment is essential for ensuring that all potential bidders have access to identical technical information and can submit competitive proposals based on a common understanding of the project's testing requirements and operational procedures.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEQ Solicitation #: S-34000-00017362
Attachment A1 - Diagrams and Notes
The following schematics represent the existing hood. Upon award of a contract, the exact schematics will be available from the fabricator. Dimensions of the hood in the following schematics are not exact. The hood is approximately 1.5’ wide and long enough to extend over the entire length of the ACI unit. Modifications to the hood will be made to allow for coverage of a pile of material approximately 6’ square.
Figure 1: Schematic of ducting with sampling ports
Figure 2: Hood which was constructed to be placed over the ACI and adjacent to the manifold
Figure 3: Aerial view of manifold and hood
Figure 4: Side view of manifold and hood
Figure 5: Manifold and hood in place over ACI
Figure 6: Manifold and hood in place over ACI
File details come from the government source that posted it. Updated .