Attachment A1 Building Description and Structures.docx
DOCX document 22 KB Posted
- Attached to
- Facility Maintenance Services for Warrenton VA - Amendment 5 Federal contract opportunity
- Solicitation number
- 693KA9-21-R-00016
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment S-5 Planned Building Configuration and Exterior Photos.docx | DOCX document | |
| SIR 693KA9-21-R-00016-Rev 1.docx | DOCX document | |
| Government Respnses to QA Submissions.pdf | ||
| 693KA9-21-R-00016 SF-33 Cover Pg.pdf | ||
| Attachment S-3 Past Performance Questionnaire Rev1.doc | DOC document | |
| Attachment A-5 SCA Wage Determination Register 15-4281 Rev No 19.pdf | ||
| Attachment A4 Janitorial Services.doc | DOC document | |
| Attachment A2 As-Built Drawings.pdf | ||
| Attachment S-2 CLIENT AUTHORIZATION LETTER Warrenton.docx | DOCX document | |
| Attachment S-1_Question and Comments Form_.doc | DOC document | |
| SIR - 693KA9-21-R-00016.docx | DOCX document | |
| Attachment A3 Equipment and System List.docx | DOCX document | |
| Attachment S-4 BusinessDeclarationForm.pdf | ||
| Attachment S-3 Past Performance Questionnaire 042820.doc | DOC document |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT A1
BUILDING DESCRIPTION AND STRUCTURES
3721 MacIntosh Drive, Warrenton, VA consists of a commercial building in the Fauquier Count/Vint Hill Parkway. The site totals 149,402 square feet (3.43 acres) including building and land. The building consist of two-level concrete and masonry commercial/office building constructed in 2007.
Specific building details below:
| - | Government Owned Building | ||
| - | Single Tenant Occupancy | Est. 230 onsite personnel | |
| - | Gross Building Area (GBA): | 43,650 sf | |
| - | Net Rentable Area (NRA): | 42,775 sf | |
| - | Parking spaces: | 172 |
The property will undergo a complete renovation including but not limited to: interior design, mechanical, electrical, and plumbing. Final drawings and specifications will be provided to the contractor upon completion. The base building layout is below:
| Existing Building |
| Description |
| Bathrooms |
| Pantries |
| 1st Floor |
| Cubicles, Offices, and Conference Rooms |
| 1 Male – 3 stalls, 2 urinals, 2 sinks |
1 Female – 3 stalls, 3 sinks
| 2nd Floor |
| Cubicles, Offices, and Conference Rooms |
| 1 Male – 3 stalls, 2 urinals, 2 sinks |
1 Female – 3 stalls, 3 sinks
Building Service Hours Core hours of the building service hours will be from 7:00 a.m. to 5:00 p.m. Monday through Friday with the exception of Federal Holidays. Services requested and provided outside of the core hours are considered overtime and will be reimbursed.
File details come from the government source that posted it. Updated .