Attachment A _ Technical Specifications.pdf

PDF 882 KB Posted

Attached to
Civic Center Re-Roof Project
Solicitation number
PE-70800-NONST-2026-000000038
Issued by
Oconee County, Georgia

About this file

This is a technical specifications document prepared by Precision Planning, Inc. for Oconee County Board of Commissioners in Watkinsville, Georgia, for the Oconee County Civic Center Re-Roof project. The project involves a complete reroofing of the civic center facility located at 2661 Hog Mountain Road, including removal and reinstallation of lightning protection, removal of existing abandoned gas exhaust flue and skylight, installation of preformed flute filler rigid insulation boards, installation of a new TPO (thermoplastic polyolefin) roofing system with contour ribs mimicking standing seam metal roof patterns, installation of new flashing as required, installation of new gutters and downspouts, and installation of a new exhaust flue from the existing gas duct furnace. The specifications are dated November 2025 and are prepared under project number A25-130.

The roofing system specifications require a single manufacturer with a minimum of twenty years of experience and a single installer with a minimum of ten years of demonstrated experience in installing products of the same type and scope. The basis of design manufacturer is Carlisle SynTec Systems. The system shall achieve a UL Class A fire resistance rating and meet all applicable federal, state, and local code requirements. The FleeceBACK TPO membrane specified is 115 mil nominal thickness in standard gray color with a 1/2-inch DensDeck Prime cover board mechanically attached over EPS flute fill insulation. The manufacturer shall provide a twenty-year standard warranty on the roof system at project closeout. Work hours are established as 7:30 a.m. through 5:00 p.m., Monday through Friday, with off-hours work requiring advance scheduling. The roofing contractor must submit product data, detail drawings for all flashing conditions, a mock-up sample of the TPO roof membrane with contour ribs, a letter of certification from the manufacturer authorizing the contractor to install the system, and a sample of the manufacturer's warranty prior to commencing work.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPECIFICATIONS

FOR

OCONEE COUNTY CIVIC CENTER RE-ROOF

OCONEE COUNTY

WATKINSVILLE, GA

OWNER

OCONEE COUNTY BOARD OF COMMISSIONERS

7635 MACON HIGHWAY

WATKINSVILLE, GA 30677

Prepared by:

400 Pike Boulevard

Lawrenceville, GA 30046

770-338-8000

November 2025

The drawings, specifications, and other bidding documents of Precision Planning, Inc. for the Oconee

County Civic Center Re-Roof project are provided for your use in offering bids for this project. Supplying these documents for bidding purposes does not convey any type of license for copying or transfer of ownership or intellectual property right, including copyright, to plan holders. No electronic devices, including photocopy, may be used to copy any part of these documents without the written permission of the

Architect or other copyright holder.

Oconee County Civic Center Re-Roof TABLE OF CONTENTS A25-130 / 11-2025 TOC-i

OCONEE COUNTY CIVIC CENTER RE-ROOF

TABLE OF CONTENTS

SECTION TITLES PAGES

I. TECHNICAL SPECIFICATIONS:

DIVISION 1 – GENERAL REQUIREMENTS

SECTION 01 25 00 – PROCEDURES FOR CONTRACT MODIFICATIONS .................. 01 25 00-1 to 01 25 00-3 SECTION 01 29 00 – PAYMENT APPLICATIONS .......................................................... 01 29 00-1 to 01 29 00-3 SECTION 01 31 00 – PROJECT COORDINATION ........................................................... 01 31 00-1 to 01 31 00-4 SECTION 01 32 20 – CONTRACT REPORTING .................................................................................... 01 32 20-1 SECTION 01 33 00 – SUBMITTALS .................................................................................. 01 33 00-1 to 01 33 00-6 SECTION 01 42 00 – DEFINITIONS AND EXPLANATIONS ......................................... 01 42 00-1 to 01 42 00-4 SECTION 01 45 00 – QUALITY CONTROL PROCEDURES ........................................... 01 45 00-1 to 01 45 00-5 SECTION 01 50 00 – TEMPORARY FACILITIES, CONTROLS & SERVICES ............. 01 50 00-1 to 01 50 00-5 SECTION 01 60 00 – PRODUCT REQUIREMENTS AND SELECTION ........................ 01 60 00-1 to 01 60 00-3 SECTION 01 63 00 – PRODUCT SUBSTITUTIONS PROCEDURES .............................. 01 63 00-1 to 01 63 00-3 SECTION 01 65 00 – MATERIAL AND EQUIPMENT HANDLING AND STORAGE .. 01 65 00-1 to 01 65 00-2 SECTION 01 73 00 – CONSTRUCTION EXECUTION .................................................... 01 73 00-1 to 01 73 00-3 SECTION 01 73 50 – CUTTING AND PATCHING ........................................................... 01 73 50-1 to 01 73 50-4 SECTION 01 74 00 – CLEANING....................................................................................... 01 74 00-1 to 01 74 00-2 SECTION 01 77 00 – CONTRACT CLOSE-OUT .............................................................. 01 77 00-1 to 01 77 00-8 SECTION 01 78 20 – OPERATIONS AND MAINTENANCE DATA .............................. 01 78 20-1 to 01 78 20-3 SECTION 01 78 40 – WARRANTIES ................................................................................. 01 78 40-1 to 01 78 40-3 SECTION 01 81 00 – PROJECT RECORD DOCUMENTS ............................................... 01 81 00-1 to 01 81 00-2

DIVISION 2 – EXISTING CONDITIONS (NOT USED)

DIVISION 3 – CONCRETE (NOT USED)

DIVISION 4 – MASONRY (NOT USED)

DIVISION 5 – METALS (NOT USED)

DIVISION 6 – WOOD, PLASTICS AND COMPOSITES (NOT USED)

DIVISION 7 – THERMAL AND MOISTURE PROTECTION

SECTION 07 00 10 – ROOFING SUMMARY OF WORK ...................................................................... 07 00 10-1 SECTION 07 54 23 – METAL RETROFIT TPO ROOF ..................................................... 07 54 23-1 to 07 54 23-7

DIVISION 8 – OPENINGS (NOT USED)

DIVISION 9 – FINISHES (NOT USED)

DIVISION 10 – SPECIALTIES (NOT USED)

DIVISION 11 – EQUIPMENT (NOT USED)

DIVISION 12 – FURNISHINGS (NOT USED)

DIVISION 13 – SPECIAL CONSTRUCTION (NOT USED)

DIVISION 14 – CONVEYING EQUIPMENT (NOT USED)

DIVISION 21 – FIRE SUPPRESSION (NOT USED)

Oconee County Civic Center Re-Roof TABLE OF CONTENTS A25-130 / 11-2025 TOC-ii

SECTION TITLES PAGES

I. TECHNICAL SPECIFICATIONS (Continued)

DIVISION 22 – PLUMBING (NOT USED)

DIVISION 23 – HEATING, VENTILATING AND AIR CONDITIONING (NOT USED)

DIVISION 25 – INTEGRATED AUTOMATION (NOT USED)

DIVISION 26 – ELECTRICAL (NOT USED)

DIVISION 27 – COMMUNICATIONS (NOT USED)

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY (NOT USED)

DIVISION 31 – EARTHWORK (NOT USED)

DIVISION 32 – EXTERIOR IMPROVEMENTS (NOT USED)

DIVISION 33 – UTILITIES (NOT USED)

END OF TABLE OF CONTENTS

Oconee County Civic Center Re-Roof PROCEDURES FOR CONTRACT MODIFICATIONS A25-130 / 11-2025 01 25 00-1

SECTION 01 25 00

PROCEDURES FOR CONTRACT MODIFICATIONS

PART 1 – GENERAL

1.01 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract including General Conditions, apply to this Section.

1.02 SUMMARY

A. Change Proposal Request

B. Change Proposal

C. Change Order/Supplemental Agreement

D. Time and Materials Work

E. Architect's Field Directives

1.03 DEFINITIONS

A. Change Proposal Request: Any written request from the Owner or Architect to the Contractor for a quotation, price or cost breakdown on a change that is proposed but not yet ordered.

B. Change Proposal: Any written proposal from the Contractor to the Owner or Architect setting forth a change in the Scope of Work and the effect of such change on Contract Time and/or Contract Sum.

C. Change Order: A written order to the Contractor, prepared by the Architect and issued by the

Owner for directing changes in the Scope of Work of the Contract, adjustments in the Contract Sum or extensions of Contract Time. When executed by all parties, this item, also referred to herein as a Supplemental Agreement to the Contract, is an amendment to the Contract.

D. Modifications: Include Change Orders (Supplemental Agreements to the Contract) prepared by the

Architect and signed by the Owner and Contractor; written field directives issued by the Architect to the Contractor, which change the Scope of Work and may affect Contract Sum, but are necessary because of situations described elsewhere in this section; and written orders issued by the Architect for minor changes in the Work with no cost or schedule implications.

E. Time and Material Work: Work which will be paid for on the basis of the actual costs, including materials, labor, equipment and other expenses defined elsewhere herein; and documented by detailed records.

PART 2 – PRODUCTS (Not Used)

A25-130 / 11-2025 01 25 00-2

PART 3 – EXECUTION

3.01 CHANGE PROPOSAL REQUEST

A. The Change Proposal Request is the method by which Owner directed changes in the Scope of work are initiated. These requested changes may originate with the Owner or Architect, may be responses to unexpected site conditions, or may be responses to issues raised by the Contractor through its requests for information or document clarifications.

B. Change Proposal Requests are not directions to change the Work.

C. Unless specified differently on the Change Proposal Request, the Contractor will be expected to respond to all requests within seven (7) calendar days of receipt.

3.02 CHANGE PROPOSAL

A. The Contractor will submit Change Proposals in response to Change Proposal Requests, in response to Architect's field directives as applicable, in accompaniment of substitution requests, and as follow up to previously filed claims for extra cost or time.

B. Every Change Proposal shall include the following information as applicable:

1. The amount of change in the Contract Sum, if any.

2. The amount of change in the Contract Time, if any. The change in Contract Time shall be explained relative to the approved Construction Schedule and shall be justified in terms of the critical path of the Work and the requirements of the Contract.

3. Cost breakdowns detailing the applicable work items and inclusive of quantities and unit prices for labor, materials, products, equipment usage, expenses for bonds, insurance and taxes; and overhead and profit. Subcontractor and second tier subcontractor expenses shall be presented at the same level of detail.

4. The period of time within which the proposed changes in Contract Sum or Time will be valid.

5. A statement describing the effect the change may have on the work of other prime contractors or the Owner.

C. Fees for administration, overhead and profit shall be limited to amount stipulated in the contract.

D. The Contractor shall not place a reservation on a Change Proposal that holds open the Contractor's right to claim additional costs for indirect or impact damages related to the change such as alleged costs for disruption, interference, delay, acceleration or remobilization.

E. If the Change Proposal is related to a claim for additional cost or time, Contractor shall indicate the origin and date of the initial claim notice and detail the basis of the claim and the associated costs.

3.03 CHANGE ORDER/SUPPLEMENTAL AGREEMENT

A. A Change Order or Supplemental Agreement is the only instrument by which the Contract can be modified to increase or decrease the Contract Sum or Contract Time. For a Change Order to be effective it must be executed by the Owner and Contractor. The cost basis of a Change Order may be a lump sum, unit prices, or time and materials, also referred to as force account. Lump sum changes must be supported by the cost breakdowns required by the Change Proposal.

3.04 ARCHITECT'S FIELD DIRECTIVES

A. The Architect may issue written field directives to the Contractor, which may change the Scope of Work and may affect Contract Sum but are necessary because of any of the following reasons: 1)

A25-130 / 11-2025 01 25 00-3 situations that threaten life and safety, 2) the need to address unknown conditions at the site of the Work, or 3) the need to maintain the timely and orderly sequencing of the Work.

B. The Contractor shall proceed with the work requested in such field directives and if there is a cost associated with such work, Contractor shall submit a Change Proposal as described herein. These costs, when mutually acceptable to the Owner and Contractor, shall be incorporated into the Contract by Change Order.

END OF SECTION 01 25 00

Oconee County Civic Center Re-Roof PAYMENT APPLICATIONS A25-130 / 11-2025 01 29 00-1

SECTION 01 29 00

PROCEDURES FOR PAYMENT APPLICATIONS

A. Drawings and general provisions of the Contract, including General Conditions and other Division 1 Specifications Sections, apply to this Section.

A. Section specifies administrative and procedural requirements governing Contractor’s Applications for Payment and includes:

1. Schedule of Values showing separate building structures and related site improvements

2. Applications for payment

3. Procedures for first payment

4. Procedures for payment application at Substantial Completion

5. Procedures for payment application at Final Completion

A. Schedule of Values: A detailed breakdown of the Contract Sum into individual cost items that will serve as the basis for evaluation of applications for progress payments made during construction.

3.01 SCHEDULE OF VALUES

A. Use only the Schedule of Values as the basis for the Contractor’s Application for Payment.

B. Correlate the Schedule of Values with other administrative schedules and submittals including:

1. Contractor Schedule.

2. List of subcontractors.

3. Schedule of alternates.

4. List of principal suppliers and fabricators.

5. Schedule of submittals.

C. Prepare a Schedule of Values on AIA Document G-703 “Continuation Sheet,” and submit it to the Architect for review no later than ten (10) calendar days prior to the submission of the first Contractor’s Application for Payment. Submit and identify with the names of the Project, Architect, Owner, and Contractor and the date of submittal.

D. In preparing the Schedule of Values, break down costs into line items for which the

Contractor wishes to receive payment in the application for payment. Schedule of Values shall include sufficient detail to allow the Architect to estimate % complete. Coordinate the line items in the schedule of values with the units or subdivisions of work identified in the Specifications and reference those section numbers from the Specifications. Further

A25-130 / 11-2025 01 29 00-2 divide major work subdivisions and subcontractors into individual cost items. Include in each line item its proportional share of overhead and profit.

E. Costs for General Requirements shall be identified separately and shall be itemized so that costs are identified for the following general items at a minimum:

1. Performance and Payment Bonds

2. Field Supervision

3. Engineering and Layout

4. Temporary Facilities and Services

5. Final Cleaning

F. Where applications for payment are likely to include products purchased or fabricated but not yet installed, provide individual line items for material cost, installation cost and other applicable phases of completion. Place cost of production materials delivered and unloaded at Project site with taxes paid under Column F, G-703. List total installed cost, with overhead and profit under Column C, G-703.

G. For each line item indicate the dollar value to the nearest whole dollar. Indicate the proportion of the Contract Sum represented by this item to the nearest one-hundredth percent.

H. The Architect will review the Schedule of Values and determine its acceptability.

Contractor shall revise and resubmit an acceptable schedule.

I. Submit a revised Schedule of Values when modifications change the Contract Sum or individual line items. Make each modification a new line item and show all information for that line item required for the original submittal.

3.02 APPLICATIONS FOR PAYMENT

Detailed requirements for processing Applications for Payment are outlined below and will be discussed in further detail at the preconstruction conference.

A. Prepare and submit Applications for Payment on Application and Certification for

Payment, AIA Document G-702. Include the Schedule of Values modified in format to enable indications of the value of work completed in the application period and for the Contract period. Base the initial application on the accepted Schedule of Values and make all other applications consistent with previous applications as certified and paid.

1. Submit one initial draft of the pay application to the Owner and Architect within seven (7) calendar days of the date of the Application for payment to coincide with the monthly project meeting for initial review.

2. Include amounts of Contract modifications fully executed before end of application period. Do not bill for claims or proposals that have not been officially accepted by the Owner.

3. If billing for materials stored on site, attach legible copies of relevant receipts and documentation. Billing for materials stored off-site, shall not be allowed unless approved by the Owner.

4. The Contractor shall prepare and submit an Interim Release of Lien with each Application for Payment.

B. Provide the following information with every application for payment which involves work completed on a time and material basis:

1. Detailed records of work done, including:

a. Dates and times work was performed, and by whom.

b. Time records and wage rates paid.

c. Invoices and receipts for products.

A25-130 / 11-2025 01 29 00-3

2. Provide similar detailed records for subcontracts.

C. No later than seven (7) calendar days prior to the date of the Application for Payment, submit a draft of the application for review by the Architect. Coordinate this submission and subsequent review with Architect's monthly observation of the Work in place to determine the acceptability of the proposed application. Make any changes if requested by Architect and resubmit the Application for Payment, to the Architect signed, notarized and with a transmittal form itemizing attached documentation.

3.03 PROCEDURES FOR FIRST APPLICATION FOR PAYMENT

A. The first Application for Payment will not be reviewed until the following submittals from the Contractor have been received and accepted by the Architect or Owner as applicable.

1. Schedule of values.

2. Contractor's construction schedule.

3. Submittal schedule

4. List of subcontractors and principal suppliers and fabricators.

3.04 PROCEDURES FOR PAYMENT APPLICATION AT SUBSTANTIAL COMPLETION

A. Administrative actions and submittals that shall precede or coincide with the Application for Payment include:

1. Any local jurisdiction permits and similar approvals as required.

2. Issuance and execution of Certificate of Substantial Completion inclusive of list of incomplete Work recognized as exceptions to the Certificates.

3. All submittals specified in the Contract Documents to be completed before

Substantial Completion.

3.05 PROCEDURES FOR PAYMENT APPLICATION AT FINAL COMPLETION

A. Administrative actions and submittals that shall precede or coincide with this Application for Payment include:

1. Completion of Closeout Procedures in Section 01 77 00 Part 1.05.

END OF SECTION 01 29 00

Oconee County Civic Center Re-Roof PROJECT COORDINATION A25-130 / 11-2025 01 31 00-1

SECTION 01 31 00

PROJECT COORDINATION

A. Drawings and other general provisions of the Contract, including General Conditions and other Division 1 Specification Sections, apply to this Section.

A. This section specifies administrative and supervisory requirements necessary for coordination of the Work for the duration of construction, but not necessarily limited to:

1. Coordination

2. Administrative and supervisory personnel

3. General installation provisions

4. Cleaning and protection

1.03 COORDINATION

A. Coordination Among Trades: Contractor shall coordinate construction activities included under the Drawings and various sections of these Specifications to insure efficient and orderly construction operations included under different sections of the Specifications that are dependent upon each other for proper installation, connection, and operation.

1. If necessary, inform each party involved, in writing, of procedures required for coordination; including requirements for giving notice, submitting reports, and attending meetings.

2. Where installation of one part of the Work is dependent on installation of other components, either before or after its own installation, schedule construction activities in the sequence required to obtain the best results.

3. Where availability of space is limited, coordinate installation of different components to ensure maximum accessibility for later installations and for required maintenance, service and repair.

a. Where limited available space may cause conflicts in the locations of installed products, and where required to coordinate installation of products and materials, prepare coordination drawings. Said coordination drawings shall show plan and cross-section dimensions of the available space and include obstructions caused by structural and systems elements.

b. Coordinate shop drawings and other submittals prepared by subcontractors, suppliers and other entities to facilitate installation of products and systems and avoid field conflicts in the Work.

c. Prepare plans or schedules describing installation sequences and provide said documents to affected parties.

4. Make adequate provisions to accommodate items scheduled for later installation.

5. Inform the Owner when coordination of Owner's work under separate contracts is required. Inform the Owner when Owner's work under separate contracts is incomplete, in non-compliance or prohibits efficient and orderly completion of work under this Contract.

6. Coordinate dissemination of information between subcontractors or suppliers when information from one is needed by or is of assistance to the other.

Distribute interrelated shop drawings between subcontractors or suppliers prior to shop drawing submittal to Architect.

A25-130 / 11-2025 01 31 00-2

B. Administrative Procedures: Coordinate scheduling and timing of required administrative procedures with other construction activities to avoid conflicts and ensure orderly progress of the Work. Such administrative activities include, but are not limited to, the following:

1. Preparation of schedules

2. Installation and removal of temporary facilities.

3. Delivery and processing of submittals.

4. Progress meetings.

5. Project close-out activities.

C. Continue coordination procedures by actively controlling Project conditions as follows:

1. Verify and ensure that products and materials of all trades are stored in an orderly fashion, under conditions complying with manufacturers' instructions and at planned locations.

2. Verify and ensure execution of the Work is in compliance with environmental conditions established by manufacturers' instructions and specific requirements of relevant Sections of these Specifications.

3. Verify and ensure adherence to tolerances required by these Specifications as the Work progresses.

4. Inspect job conditions before one trade follows another in compliance with these requirements:

a. Plan and conduct joint inspections involving the affected trades.

b. Notify Architect at least one week in advance of such inspections and provide opportunity for Architect's participation in the inspection.

c. While the Architect may confine his observations and inspections to only limited areas, the Contractor shall be responsible for similar inspections in all involved areas.

d. Review of job conditions, in whole or in part, by Architect in no way relieves Contractor of his obligation to provide various stages of the Work as well as finished Work complying with Contract Documents.

e. Allow no work to proceed over unsatisfactory conditions that would prevent execution of new work as specified.

1.04 ADMINISTRATIVE AND SUPERVISORY PERSONNEL

A. Contractor shall designate a Project Manager for the Project who shall be the primary point of contact and communication for the Owner and Architect for the project. The Project Manager shall be assigned to the Project until completion of Final Contract Close-Out. All written communications to the Architect shall be by or through the Project Manager. Architect shall address all his written communications to the Contractor to the Project Manager, unless authorized by Project Manager to communicate directly to others.

B. Contractor shall provide adequate supervision at the Project site at all times. At a minimum, the Contractor shall designate and assign at least one (1) Superintendent that shall direct and oversee the Work under the Contract for the project. Superintendent(s) shall be assigned to the Project until Final Completion of Contract Closeout.

A25-130 / 11-2025 01 31 00-3

3.01 GENERAL INSTALLATION PROCEDURES

A. Inspection of Conditions: Require the installer of each component to inspect both the substrate and conditions under which work is to be performed. Do not proceed until unsatisfactory conditions have been corrected in an acceptable manner.

B. Manufacturers' Instructions: Comply with manufacturers' installation instructions and recommendations, to the extent that those instructions and recommendations are more explicit or stringent than requirements contained in Contract Documents.

C. Connection: Provide attachment and connection devices and methods necessary for securing work. Secure work true to line and level. Allow for expansion and building movement.

D. Visual Effects: Provide uniform joints widths in exposed work. Arrange joints in exposed work to obtain the best possible results. Isolate each part of the completed construction from incompatible material as necessary to prevent deterioration.

E. Temporary Enclosures: Provide and coordinate placement of temporary enclosures with required inspections and tests, to minimize the necessity of uncovering completed construction for that purpose.

F. Mounting Height: Where mounting heights are not indicated, contact the Architect for direction prior to proceeding with the work.

G. Access panels: Where access panels are required in any wall or ceiling, and the panel is not specifically located on a drawing, contact the Architect prior to proceeding with the work.

H. Joints: Plan and coordinate work to provide caulk joints at all junctions of dissimilar materials, even if such joints are not called for on Drawings or elsewhere in these Specifications.

I. Costs for Adherence to all specified installation procedures are included in the Contract

Sum.

3.02 CLEANING & PROTECTION

A. During handling and installation, clean and protect construction in progress and adjoining materials in place. Apply protective coverings where required to insure protection from damage or deterioration prior to Substantial Completion.

B. Clean and maintain completed construction as frequently as necessary through the remainder of the construction period. Adjust and lubricate operable components to ensure operability without damaging effects.

C. Supervise construction activities to ensure that no part of the construction, completed or in progress, is subject to harmful, dangerous, damaging or otherwise deleterious exposure during the construction period. Where applicable, such exposures include, but are not limited to the following:

1. Excessive static or dynamic loading.

2. Excessive internal or external pressures.

3. Excessive high or low temperatures.

A25-130 / 11-2025 01 31 00-4

4. Excessive high or low humidity.

5. Water or ice.

6. Solvents.

7. Chemicals.

8. Light.

9. Puncture.

10. Abrasion.

11. Heavy traffic.

12. Soiling, staining, and corrosion.

13. Rodent and insect infestation.

14. Combustion.

15. Unusual wear or other misuse.

16. Contact between incompatible materials.

17. Destructive testing.

18. Misalignment.

19. Excessive weathering.

20. Unprotected storage.

21. Improper shipping or handling.

22. Vandalism.

END OF SECTION 01 31 00

Oconee County Civic Center Re-Roof CONTRACT REPORTING A25-130 / 11-2025 01 32 20-1

SECTION 01 32 20

CONTRACT REPORTING

1 .01 RELATED DOCUMENTS

A. Drawings and general provisions of Contract, including General Conditions and other Division-1 Specification Sections, apply to this Section.

1 .02 SUMMARY

A. General: This Section specifies administrative and procedural requirements for reports required for proper performance of the Work.

B. Reports required include:

1. Daily construction reports.

2. Field correction reports.

3. Special reports.

1 .03 REPORTS

A. Daily Construction Reports: Prepare a daily construction report, recording the following information concerning events at the site; and submit duplicate copies to the Architect at weekly intervals:

1. List of workers/subcontractors at the site.

2. List of Owner’s separate contractors at the site.

3. Approximate count of personnel by trade at the site.

4. High and low temperatures, precipitation, and general weather conditions.

5. Accidents (refer to Special Reports).

6. Meetings and significant decisions.

7. Unusual events (refer to Special Reports).

8. Stoppages, delays, shortages, losses.

9. Emergency procedures.

10. Orders and requests of governing authorities.

11. Field Directives, or Change Proposal Requests received; Change Proposals implemented.

12. Services connected, disconnected.

13. Equipment or system tests and start-ups.

B. Field Correction Report: When the need to take corrective action that requires a departure from the Contract Documents arises, prepare a detailed report including a statement describing the problem and recommended changes. Indicate reasons the Contract Documents cannot be followed. Submit a copy to the Architect immediately.

C. Special Reports: When an event of an unusual and significant nature occurs at the Project site, prepare and submit a special report. List the chain of events, persons participating, response by the Contractor's personnel, an evaluation of the results or effects and similar pertinent information. Advise the Owner in advance when such events are known or predictable.

PART 2 – PRODUCTS (NOT USED)

PART 3 – EXECUTION (NOT USED)

END OF SECTION 01 32 20

Oconee County Civic Center Re-Roof SUBMITTALS A25-130 / 11-2025 01 33 00-1

SECTION 01 33 00

SUBMITTALS

Division 1 Specification Sections, apply to this Section.

A. Section Includes:

1. Definitions

2. General requirements

3. Submittal schedule

4. Submittal coordination

5. Submittal format and preparation

a. Shop drawings

b. Samples

c. Product data

6. Contractor review and responsibilities

7. Architect's review

8. Return, resubmission and distribution

B. Refer to individual Specification Sections for identified equipment and material for which submittals are required.

C. Do not submit on equipment or materials not requested in the Specifications.

A. Submittals: General term including samples, shop drawings and product data, as applicable.

B. Samples: Physical examples prepared to illustrate materials, equipment or workmanship to be installed in the Project and to establish standards by which work will be judged as complying with Contract requirements.

C. Shop Drawings: Drawings, diagrams, illustrations, schedules and performance charts, prepared by the entity that is to do the work to illustrate that portion of the Work in detail.

D. Product Data: Dated, printed literature of a product manufacturer which describes product and installation procedures. Product data may include test and performance data, illustrations, standard brochures and special details.

E. Informational Submittals: Submittals indicated in the Contract Documents as to be submitted for information only.

1.04 GENERAL REQUIREMENTS

A. Submittals shall be in orderly sequence and timed to cause no delay in the Work.

A25-130 / 11-2025 01 33 00-2

B. Contractor shall commence no portion of the Work requiring submittals until submittal has been reviewed and accepted by Architect.

C. Do not utilize submittal review process as a means of requesting substitutions or changes in the scope of the Work.

D. Job delays occasioned by requirement of re-submission of samples, shop drawings and product data not in accordance with Contract Documents are Contractor's responsibility, and will not be considered valid justification for extension of Contract time.

E. The Contractor shall not be relieved of responsibility for deviations from requirements of the Contract Documents by the Architect's review of shop drawings, product data, samples or similar submittals unless the Contractor has specifically informed the Architect in writing of such deviation at the time of submittal and the Architect has given written approval to the specific deviation. The Contractor shall not be relieved of responsibility for errors or omissions in shop drawings, product data, samples or similar submittals by the Architect's review thereof.

D. The Contractor shall direct specific attention, in writing or on resubmitted shop drawings, product data, samples or similar submittals to revisions other than those requested by the Architect on previous submittals.

E. Resubmitted shop drawings, product data, samples or similar submittals shall be complete and shall cloud or highlight the changes.

1.05 SUBMITTAL SCHEDULE

A. Submit to the Architect a list of all required submittals organized and referenced by the sections of these Specifications. On the list, indicate the timing for submission of the required submittals and relationship to the construction sequence. Submit the schedule to the Architect within the date required for establishment and submission of Contractor's Construction Schedule.

B. Following approval by the Architect of the submittal schedule, print and distribute copies to the Architect, Owner, subcontractors, suppliers and others required to comply with the submittal dates indicated. Maintain a copy in the field. When revisions are made, distribute to same parties that received initial document.

C. Maintain updated submittal schedule during course of the Work that shows status of all submittals. Provide copies for Architect at progress meetings and when requested.

1.06 SUBMITTAL COORDINATION

A. Coordinate preparation and processing of submittals with performance of construction activities. Transmit each submittal well in advance of performance of related construction activities to avoid delay.

B. Coordinate each submittal with other submittals and related activities--purchasing, fabrication, testing, delivery, etc.--that require sequential activity. Coordinate transmittal of different types of submittals for related elements of the Work so submittals can be reviewed concurrently. The Architect reserves the right to withhold action on a submittal requiring coordination with other submittals until all related submittals are received.

C. Allow sufficient review time so that installation will not be delayed as a result of the time required to process submittals, including time for re-submittals. If submittal must be reviewed within a certain time in order to maintain the progress of the Work, state so

A25-130 / 11-2025 01 33 00-3 clearly on the submittal. Nevertheless, allow a minimum of one (1) week for the first processing of each submittal and allow even more time if the submittal must be coordinated with later submittals. Allow a minimum of one (1) week for processing of resubmittals. No extension of Contract Time will be authorized because of failure to transmit submittals to the Architect sufficiently in advance of the Work to permit processing.

3.01 SUBMITTAL FORMAT AND PREPARATION

A. Transmittals:

1. Submittals will be accepted only through transmittal from the Contractor.

Submittals received from other entities will be returned without review or action.

2. Submittals must be accompanied by a transmittal form containing the following information:

a. Project name.

b. Submittal date.

c. Transmittal number.

d. Applicable Specifications Section number.

e. To: Architect's name and address.

f. From: Contractor's name and address.

g. Name of applicable subcontractor(s), supplier(s) or manufacturer(s).

h. Submittal type (shop drawing, sample, product data, informational submittal).

i. Description of submittal.

j. Record of distribution.

k. Action marking.

l. List of any deviations from Contract Document requirements.

m. Comments.

B. Form, Size and Quantity:

1. Label each submittal with the following information:

a. Project name.

b. Date of submittal.

c. Contractor's name and address.

d. Architect's name and address.

e. Subcontractor's name and address.

f. Supplier's name and address.

g. Manufacturer's name.

h. Specification section where the submittal is specified.

i. Numbers of applicable drawings and details.

j. Other necessary identifying information.

2. Provide a space on each submittal for approval stamp and notations.

3. For Samples submit a minimum of two (2) sets.

4. Contractor shall stamp and sign in red ink on all copies.

C. Shop Drawing Preparation and Format:

1. Shop Drawings shall conform to the following content requirements:

a. Number drawings consecutively.

b. Indicate working and erection dimensions and relationship to adjacent work at accurate scale.

c. Show arrangements and sectional views, where applicable.

A25-130 / 11-2025 01 33 00-4

d. Show compliance with specific referenced standards, such as materials, gauges, thickness, finishes, and characteristics.

e. Name specific products or materials used.

f. Indicate anchoring and fastening details, including information for making connections to adjacent work.

g. Contractor shall make any and all modifications in red ink and shall sign in red ink.

2. Reference applicable details, sections and similar information from Drawings from which shop drawing data was developed; include applicable Specification Section numbers and names.

3. Do not reproduce Contract Documents or copy standard information as basis of shop drawings. Standard information prepared without specific reference to the Project is not considered shop drawings.

D. Sample Preparation:

1. Required samples shall be submitted for the Architect's selection and review so as to maintain construction progress. Acceptance and color selections will not be made unilaterally where selections regarding adjacent materials must be made for purpose of aesthetics. Submit samples for adjacent and inter-related materials concurrently.

2. Prepare samples in sizes, shapes and finishes in accordance with provisions of individual Specification sections; attach documentation showing compliance.

Where samples are for selection of color, pattern, texture or similar characteristics from a range of standard choices, submit a full set of choices for the material or product. Submittals will be reviewed and returned with Architect's selection indicated and other action as appropriate.

3. Samples furnished under this section are not to be confused with full-size, on-the-site "mock-ups," which may be specified in certain sections of the Specifications.

4. Keep final approved samples or sample sets at Project site for use during progress of the Work.

E. Product Data Preparation and Format:

1. When Product Data submittals are prepared specifically for the Project (in the absence of standard printed information) submit such information as Shop Drawings.

2. Content:

a. Submit manufacturer's standard printed data sheets.

b. Identify the particular product being submitted; submit only pertinent pages.

c. Show compliance with properties specified.

d. Identify which options and accessories are applicable.

e. Include recommendations for application and use.

f. Show compliance with the specific standards referenced.

g. Show compliance with specified testing agency listings; show the limitations of their labels or seals, if any.

h. Identify dimensions which have been verified by field measurement.

i. Show special coordination requirements for the product.

3.02 CONTRACTOR'S REVIEW AND RESPONSIBILITIES

A. Review submittals and stamp with approval prior to submission to the Architect.

Contractor's stamp shall bear the Contractor's name and word "Approved," date of the approval, and shall be initialed by the individual responsible for reviewing submittals.

Enter stamp on a blank, unmarked area on the submittal.

A25-130 / 11-2025 01 33 00-5

B. By approving submittals, Contractor represents that they have determined and verified all materials, field measurements, and field construction criteria related thereto, or will do so, and that they have checked and coordinated the information contained within such submittals with the requirements of the Work and of the Contract Documents.

C. Where work is indicated "By others," Contractor shall indicate responsibility for providing and coordinating such work; whether by subcontractor or under separate contracts.

D. Contractor agrees that submittals processed by Architect are not substitutions or changes in scope of the Work; that purpose of submittals by Contractor is to demonstrate that Contractor understands design concept; that they demonstrate their understanding by indicating which equipment and material they intend to furnish and install and by detailing fabrication and installation methods they intend to use.

E. Contractor represents by submitting samples, shop drawing and product data that he has complied with provisions specified above. Submissions made without Contractor's approval indicated thereon will be returned without being reviewed for compliance with these requirements.

F. Accompany submittal with transmittal letter containing Project name, Contractor's name, number of samples or drawings, titles and other pertinent data. Transmittal shall outline deviations, if any, in submittals from requirements of Contract Documents.

G. No portion of the Work requiring submission of a shop drawing, product data or sample shall be commenced until the submittal has been reviewed and accepted by the Architect as specified herein. All such portions of the Work shall be executed in accordance with accepted submittals bearing the Architect's stamp.

3.03 ARCHITECT'S REVIEW AND ACCEPTANCE

A. Architect's review and acceptance is only for conformance with design concept of Project and with information in Contract Documents. Architect's acceptance of a specific item shall not indicate acceptance of an assembly in which item is a component. The Architect’s review is not conducted for the purpose of determining the accuracy and completeness of details such as dimensions and quantities, or for substantiating instructions for installation of equipment or systems, which remain the responsibility of the Contractor. When professional certification of performance characteristics of materials, systems, or equipment is required by the Construction Documents, the Architect shall be entitled to rely upon such certifications to establish the materials, systems or equipment will meet performance criteria required by the Construction Documents.

B. Architect will review each submittal, mark it with appropriate action, and return it to

Contractor with reasonable promptness, except where it must be held for coordination, and the Contractor is so advised. Submittals will be marked by Architect as follows:

1. "Reviewed" indicates the drawings have been reviewed for conformance with design and no exceptions are taken. Proceed with the work.

2. "Make Corrections as Noted" indicates Contractor may proceed with the work as noted.

3. "Amend and Resubmit" indicates drawings to be revised and resubmitted for review prior to proceeding with the work.

4. "Rejected, See Remarks" indicates that the submittal does not comply with

Contract Documents.

5. The Architect shall make any and all comments in green ink and shall sign in green ink.

A25-130 / 11-2025 01 33 00-6

C. Submittals required to be submitted "for Architect's information only" are required to demonstrate that the Work complies with performance requirements of the Contract Documents. Such submittals, if acceptable to Architect, will not be returned to Contractor.

3.04 SUBMITTAL RETURN, RESUBMISSION AND DISTRIBUTION

A. Architect will return reviewed and approved submittals in PDF format.

B. Resubmissions: In making resubmissions, follow the same procedures and formats required for original submissions. Make corrections and changes indicated by Architect on unacceptable submissions. In resubmission transmittals, identify clearly and direct specific attention to any revisions other than corrections requested by Architect on previous submissions.

C. Distribution:

1. Contractor is responsible for obtaining and distributing copies of submittals to their subcontractors and material suppliers after final acceptance. Prints of reviewed shop drawings shall be made from reproducibles that carry the Architect's appropriate stamp.

2. Contractor shall maintain a file of accepted submittals bearing the Architect's stamp for duration of project, which shall be delivered to Owner as a part of the Project's Record Documents.

3. The Contractor's superintendent also shall maintain an orderly file of all accepted submittals at the Project site. In the event that the Architect or Owner should question the installation of any aspect of the Work requiring accepted submittal data, the inability of the superintendent to produce the required accepted submittal data upon demand shall constitute cause for a "stop work" order to be issued on that particular questioned aspect of the Work and all relevant appurtenant work. The cause shall be equal to the Contractor's not having received required acceptance of the submittal data. If so issued, such "stop orders" shall not be considered valid justification for extensions of Contract time or claims for additional monetary compensation.

END OF SECTION 01 33 00

Oconee County Civic Center Re-Roof DEFINITIONS AND EXPLANATIONS A25-130 / 11-2025 01 42 00-1

SECTION 01 42 00

DEFINITIONS AND EXPLANATIONS

2. Specifications, format and content explanation

3. Drawing symbols

4. Industry standards

A. Certain terms used repetitiously in these Specifications and elsewhere in the Contract Documents are defined generally in this section. The definitions and explanations of this section are not necessarily either complete or inclusive, but are general for the Work to the extent such definitions or explanations are not stated more explicitly in another provision of the Contract Documents.

B. Approve: The terms "approve," "review," "inspect" and their variations, where used in conjunction with the Architect's actions on the Contractor's submittals, applications and requests, are limited to the responsibilities and duties of the Architect stated in the General Conditions and elsewhere in these Specifications. Such approvals shall not release the Contractor from their responsibility to fulfill the requirements of the Contract Documents, unless otherwise provided in the Contract Documents.

C. Directed, Requested, etc: Where nor otherwise explained, terms such as "directed,"

"requested," "authorized," "selected," "required," and "permitted," mean directed by the Architect, requested by the Architect, and similar phrases. However, no such implied meaning shall be interpreted to extend the Architect's responsibility into the Contractor's area of construction supervision.

D. Indicated: The term "indicated" is a cross reference to details, notes or schedules on the

Drawings, other paragraphs or schedules in the Specifications, and similar means of recording requirements in the Contract Documents. Where other terms such as "shown," "noted," "scheduled," and "specified" are used, it is to help locate the reference; no limitation on location is intended except as specifically noted.

E. Refer: Used to indicate that the subject is defined or specified in further detail at another location in the Contract Documents, or elsewhere as indicated.

F. Furnish: The term "furnish" is used to mean supply and deliver to the Project site, ready for unloading, unpacking, assembly, installation, and similar operations, as applicable in each instance.

A25-130 / 11-2025 01 42 00-2

G. Install: Except as otherwise defined in greater detail, the term "install" is used to describe operations at Project site including the unloading, unpacking, assembly, erection, placing, anchoring, applying, working to dimension, finishing, curing, protecting, cleaning and similar operations, as applicable to a material, product or system in each instance.

H. Provide: Except as otherwise defined in greater detail, the term "provide" means to furnish and install, complete and ready for the intended use as applicable in each instance.

1.04 SPECIFICATION FORMAT AND CONTENT EXPLANATION

A. General: This section is provided to help the user of the Specifications understand the format, language, implied requirements, and similar conventions. None of the explanations shall be interpreted to modify the substance of the Contract.

B. Specifications Production: Portions of these Specifications have been edited by the

Owner and Architect and may contain minor deviations from traditional formats. Such deviations are a normal result of the production technique, and no other meaning will be implied or permitted. References to Specifications or Technical Specification, shall mean the same.

C. Specification Format: Although not all portions may fully comply, the format of these

Specifications is principally as described below. No meaning or significance is attached to such compliance or non-compliance.

1. Sections and Divisions: For convenience, the basic unit of the Specifications is a "section," each unit of which is named and numbered. These sections are organized into related families of sections which are categorized as "divisions."

These divisions are recognized as present construction industry practice on uniform organization and sequencing of specifications. Section titles are not intended to limit the meaning or content of a section, to be fully descriptive of the requirements therein, or to be an integral part of the text.

2. Section Numbering: Sections are given a numeric sequence to assist in cross referencing information in the Contract Documents. The numbering sequence, however, is not complete.

3. Parts: Each section has been divided into three or fewer "parts" (Part 1 - General, Part 2 - Products, and Part 3 - Execution). These titles do not limit the meaning of and are not an integral part of the text of the Specification requirements.

D. Specifications Content: The Specifications have been produced employing conventions in the use of language and in the intended meaning of certain words, terms and phrase when used in particular situations or circumstances. These conventions are explained as follows:

1. Language used in the Specifications is the abbreviated type. Implied words and meanings will be appropriately interpreted. Singular words will be interpreted as plural and plural words interpreted as singular where applicable and where the full context of the Contract Documents so indicates.

2. Specifying Methods: The techniques or methods of specifying requirements vary throughout the Specifications text, and may include "prescriptive," "open generic-descriptive," "compliance with standards," "performance," "proprietary," or a combination of these. The method used for specifying one unit of work has no bearing on requirements for another unit of work. Except for cases of overlapping or conflicting requirements as described in the following paragraph 3, where more than one set of requirements are specified for a

A25-130 / 11-2025 01 42 00-3 particular unit of work, the option is intended to be Contractor's regardless of whether specifically indicated as such.

3. Overlapping and Conflicting Requirements: Where compliance with two (2) or more industry standards or sets of requirements is specified, and overlapping of those different standards or requirements is specified, and overlapping of those different standards or requirements establishes two (2) different or conflicting levels of quality, the most stringent requirement is intended and will be enforced, unless specifically detailed language written into the Contract Documents clearly indicates that the less stringent requirement is to be fulfilled.

Refer uncertainties as to which of the two (2) levels of quality is more stringent to the Architect for a decision before proceeding.

4. Imperative Language is generally used throughout the Specifications.

Requirements expressed imperatively are to be performed by the Contractor.