This Technical Specifications document outlines the requirements for the Woodbridge Station East Elevator Modernization project, a modernization initiative by the Virginia Railway Express (VRE) for the east elevator located in the parking garage at VRE Woodbridge Station in Woodbridge, Virginia. The project encompasses the complete modernization of an elevator serving five floors within the facility. The specifications detail comprehensive requirements for elevator equipment, controls, safety systems, and installation standards that contractors must meet to qualify for this work. The document establishes technical performance criteria, material standards, and operational specifications necessary to ensure the modernized elevator meets current safety codes and VRE's operational requirements.

The technical specifications address equipment standards, control systems, door operations, safety features, and compliance with applicable codes and regulations governing elevator installations and modernization projects. The document serves as the baseline technical guidance for qualified contractors bidding on the IFB 027-002 contract, ensuring all bids propose solutions meeting established specifications and performance standards. Contractors must demonstrate their ability to comply with all outlined technical requirements and specifications during the bidding and execution phases of this modernization project.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IFB No.: 027-002 IFB Title: Woodbridge Station East Elevator

Modernization

Virginia Railway Express

ATTACHMENT A

SPECIFICATIONS

ENTITLED

WOODBRIDGE STATION EAST ELEVATOR

MODERNIZATION

DATED

SEPTEMBER 15, 2026

TABLE OF CONTENTS

00 01 10-1

VIRGINIA RAILWAY EXPRESS

WOODBRIDGE STATION EAST ELEVATOR MODERNIZATION

IFB 027-002

WOODBRIDGE STATION EAST ELEVATOR

MODERNIZATION

DIVISION 01 GENERAL REQUIREMENTS

01 11 00 SUMMARY OF WORK

01 22 00 UNIT PRICES

01 25 00 SUBSTITUTION PROCEDURES

01 26 00 CHANGE ORDER PROCEDURES

01 29 00 PAYMENT PROCEDURES

01 31 00

01 31 33

PROJECT MANAGEMENT AND COORDINATION

PROJECT MEETINGS

01 32 00 CONSTRUCTION PROGRESS DOCUMENTATION

01 33 00 SUBMITTAL PROCEDURES

01 35 23 SAFETY AND SECURITY REQUIREMENTS

01 42 00 REFERENCES, DEFINITIONS, ABBREVIATIONS, AND ACRONYMS

01 45 00 QUALITY ASSURANCE AND QUALITY CONTROL

01 50 00 TEMPORARY FACILITIES AND CONTROLS

01 61 00

01 71 14

01 73 00

01 73 10

COMMON PRODUCT REQUIREMENTS

MOBILIZATION AND DEMOBILIZATION

EXECUTION OF WORK

CUTTING AND PATCHING

01 77 00 CLOSEOUT PROCEDURES

DIVISION 2 EXISTING CONDITIONS

NOT USED

DIVISION 3 CONCRETE

NOT USED

DIVISION 4

MASONRY

DIVISION 5 METALS

DIVISION 6

WOOD, PLASTICS, AND COMPOSITES

DIVISION 7 THERMAL AND MOISTURE PROTECTION

NOT USED

DIVISION 8 OPENINGS

NOT USED

DIVISION 9 FINISHES

NOT USED

DIVISION 10 SPECIALTIES

DIVISION 11

EQUIPMENT

00 01 10-2

VIRGINIA RAILWAY EXPRESS

DIVISION 13

SPECIAL CONSTRUCTION

DIVISION 14 CONVEYING EQUIPMENT

14 25 00 HYDRAULIC ELEVATORS

DIVISION 21 FIRE SUPPRESSION

NOT USED

DIVISION 22 PLUMBING

NOT USED

DIVISION 23 HEATING VENTILATING AND AIR CONDITIONING

NOT USED

DIVISION 26 ELECTRICAL

NOT USED

DIVISION 27 COMMUNICATIONS

NOT USED

DIVISION 28 ELECTRONIC SAFETY & SECURITY

NOT USED

DIVISION 31 EARTHWORK

NOT USED

DIVISION 32 EXTERIOR IMPROVEMENTS

NOT USED

DIVISION 33 UTILITIES

NOT USED

DIVISION 34 TRANSPORTATION

NOT USED

DIVISION 40 PROCESS INTEGRATION

NOT USED

DIVISION 41 MATERIAL PROCESSING & HANDLING

NOT USED

DIVISION 46 WATER & WASTEWATER TREATMENT

NOT USED

DIVISION 48 ELECTRICAL POWER

NOT USED

OTHER

SPECIFICATIONS

01600 MATERIAL AND HANDLING

01700 FINAL CONTRACT COMPLIANCE REVIEW

01800 MAINTENANCE

01900 RELATED WORK

SUMMARY OF WORK 01 11 00 - 1

VIRGINIA RAILWAY EXPRESS

SECTION 01 11 00

SUMMARY OF WORK

PART 1 - GENERAL

1.1 SUMMARY

A. This section includes the following:

1. Work included in Contract Documents

2. Restrictions and Quality Control

3. Damages and Pre-Existing Conditions

4. Type of Contract

5. Sequence of Work

6. Work by Others

7. Use of Premises

8. Occupancy Requirements

9. Utility Location, Protection and Relocation

10. Utility Outages

11. Days/Hours of Work

12. Applicable Codes

13. Permits

1.2 RELATED SECTIONS

A. General Provisions

B. General Conditions for Construction

C. Special Provisions

D. Other Division 01 Specifications apply to this Section

1.3 WORK INCLUDED IN CONTRACT DOCUMENTS

A. This section includes requirements for the modernization of the Woodbridge Station East Elevator. The project consists of, but is not limited to, modernizing, furnishing and installing equipment as specified utilizing existing and/or modified hoistways and machine rooms.

1. Project Location: 1040 Express Way, Woodbridge, VA 22191.

B. Construction Manager (CM): The CM for this Project will serve as a representative for VRE and to provide assistance in administering the Contract for Construction between VRE and the Contractor, according to a separate contract between the VRE and the Construction Manager.

C. Project Manager: When a Construction Manager has not been engaged, VRE will designate a Project

Manager (PM) to represent VRE and assist in monitoring the work under the Contract. In these instances, any reference to the Construction Manager, where it occurs in the Technical Specification documents, shall be understood to mean the Project Manager.

SUMMARY OF WORK 01 11 00 - 2

D. The delivered project shall:

1. Meet and/or exceed the requirements set forth elsewhere in the Contract Documents.

2. Be capable of safe and reliable operation meeting and/or exceeding industry standards and practices.

E. This Section outlines the main features of the Work to be performed under this Contract and is not a complete description. Work addressed in this Section but not addressed in other portions of the design shall still be considered part of the overall Work. The general details of the Work to be performed under this Contract are indicated more specifically in the other Specification sections, other documents of the design and other

Contract Documents.

F. The Work includes:

1. Mobilize and demobilize all labor and equipment necessary to complete the Work.

2. Prepare and deliver all required submittals to the satisfaction of the Construction Manager (CM) and

VRE.

3. Identify, protect and avoid all onsite utilities.

4. Establish temporary barriers and demolish and remove noted materials as necessary.

5. Modernize components of the existing elevator, to include but not limited to:

• Hoistway and pit.

• Machine room and machinery spaces.

• Electrical service, conductors and devices.

• Standby power.

• Door operation and protection.

• Direct plunger.

• Car enclosure.

• Signal fixtures.

• Operational and motor controls.

• Firefighters’ service components.

• Hydraulic pump unit.

• Sill support angles.

• Hoistway door unlocking devices.

G. Ownership of Materials:

1. Materials furnished by the Contractor under this Contract shall become the property of VRE.

2. VRE-furnished materials shall remain the property of VRE.

1.4 RESTRICTIONS AND QUALITY CONTROL

A. All site features and the facility shall be in accordance with Virginia Railway Express’ requirements as defined herein.

1.5 DAMAGES AND PRE-EXISTING CONDITIONS

A. The Contractor shall be responsible for all damages caused by the Contractor’s construction activities. The

Contractor shall provide all labor, materials, etc. to return any damaged areas, systems or equipment to their original condition at no additional cost to VRE.

B. The Contractor shall perform a survey of pre-existing conditions in the vicinity of the Contractor’s construction activities, utilizing photographs and other means as necessary to document existing damage or conditions. Submit two copies of this survey to the CM within 21 calendar days after Notice-To-Proceed.

The survey shall be approved by VRE prior to submission of first invoice by the Contractor. This survey will assist in resolving any damage claims against the Contractor during and after construction.

SUMMARY OF WORK 01 11 00 - 3

C. Unless noted otherwise, the Contractor shall preserve all facilities and portions thereof including but not limited to roadways, pedestrian and directional signage. The Contractor shall also deliver all removed facilities not required for reinstallation to VRE as directed by the CM.

D. The Contractor shall replace or repair lost or damaged facilities or portion thereof, to the satisfaction of VRE, at no cost to VRE.

1.6 TYPE OF CONTRACT

A. This project will be constructed under a general construction contract with predetermined pay items.

1.7 SEQUENCE OF WORK

A. Conduct the Work in one continuous operation. If phased construction is required, the Contractor shall arrange the sequence of construction, unless noted otherwise in the Contract Documents.

B. Work shall be performed in accordance with the Contractor’s “CPM Construction Schedule” as specified in

Division 01 Section “Construction Progress Documentation: and as approved by the Construction Manager.

1.8 WORK BY OTHERS

A. General: Cooperate fully with other entities (e.g. Utility Owner) so their work may be performed without interfering or delaying work within this Contract. Coordinate the Work of this Contract with work performed by other entities with the CM.

B. Preceding Work: VRE will award separate contract(s) for the following construction operations at the Project site. Those operations are scheduled to be substantially complete before work under this Contract begins.

1. No separate contracts are known for work preceding this Contract.

C. Concurrent Work: VRE may award separate contract(s) for various maintenance activities and other construction projects at the Project site. Those operations will be conducted simultaneously with work under this Contract.

1. No concurrent contracts are known for work during this Contract.

D. Future Work: VRE will award separate contract(s) for the following additional work to be performed at the

Project site after Substantial Completion. Completion of that work will depend on successful completion of preparatory under this Contract.

1. No separate contracts are known for work following this Contract.

E. For additional requirements for Cooperation Among Contractors, see Division 01, Section 01 73 00

“Execution of Work.”

1.9 USE OF PREMISES

A. Use of Site: Confine use of premises to work in areas indicated. Do not disturb portions of site beyond limits of construction areas in which the Work is indicated.

1. An equipment staging area designated by VRE will be available for use by the Contractor. The Contractor shall restrict usage to designated area and shall notify VRE prior to storing of any large equipment which will impose heavy concentrated loading on floor area. Do not store such equipment until approval is received.

SUMMARY OF WORK 01 11 00 - 4

2. The Contractor shall confine storage of materials on job site to limits approved by VRE and shall not unnecessarily encumber premises or overload any portion of building with materials to a greater extent than structure design load.

3. VRE Access: Allow VRE and its designees to have unencumbered access to areas designated for

VRE. Access to areas, restricted due to construction, shall be coordinated by the Construction

Manager, for VRE personnel involved in the performance of the construction contract. The remainder of the site, including newly constructed areas, shall be restricted to only VRE personnel involved in the performance of the construction contract, as designated by the Construction Manager, until VRE establishes occupancy of the project site.

4. The Contractor shall have full use of premises for construction operations within the areas designated by VRE during the hours indicated and as directed by the Construction Manager.

5. Unless noted otherwise, the Contractor shall keep the site free from accumulation of waste materials.

When the project is complete, the Contractor must remove from and about the project site, waste materials, tools, construction equipment, machinery and surplus materials. If a dispute arises regarding maintenance or clean-up of the premises, VRE may maintain and clean the site and assess actual damages to the Contractor.

B. Use of Existing Facilities: Maintain existing facilities in a weather tight condition throughout construction period. Damage caused by construction operation is to be repaired or replaced at the sole discretion of VRE.

Protect facilities and their occupants during construction period.

C. Concurrent Modernization Work and Building Operation

1. This project is a major elevator modernization in an existing building which is open for public business and will continue to operate throughout all phases of required work. It is essential that Contractor give special attention and priority to all matters concerning project safety, protection from dust and loose materials, reduction of noise level, protection from water and air infiltration into building, and maintenance of neat, sightly conditions in and around work areas inside and outside of building.

Packaging, scrap materials, and demolition debris shall be promptly removed from the building and site on a daily basis.

2. At all times, Contractor shall provide clearly visible warning and directional signs, barricades, temporary lighting, overhead protection, and hazard-free walking surfaces throughout public areas. At all times, special attention must be given to building entrances, exits, and proper safe exiting through work areas as required by law. The Contractor shall consult VRE and other contractors to establish and maintain safe temporary routes including, but not limited to, proper barricades, walking surfaces, lighting, fire protection, exiting, warning and directional signs, and general protection of persons from all hazards in accordance with Occupational Safety and Health Administration (OSHA) Standards due wholly or partially to its operations.

D. Protection of Work and Property

1. The Contractor shall continuously maintain adequate protection of all its work from damage and shall protect VRE property from injury or loss arising out of this Contract. Contractor shall make good any such damages, injury, or loss, except such as may be directly caused by agents, subcontractors, or employees of VRE. The Contractor shall provide all barricades required to protect open hoistways or shafts per OSHA regulations. Design of barricades in public areas shall be approved by VRE prior to fabrication and installation.

2. If Contract includes work which would be disruptive during normal business operations or would be dangerous to building occupants said work shall be performed during hours as building management

SUMMARY OF WORK 01 11 00 - 5

dictates. Examples of such work include, without limitation, saw cutting of concrete, jack hammering, welding, metal cutting, pouring concrete, erecting steel or hoisting equipment over occupied portions of the building, or performing tests requiring all elevators in a group. Contractor shall perform such work during off-hours and shall include all costs in its Bid.

3. Portable fire extinguishers shall be provided throughout Contractor’s area of work and shall be placed so as to be accessible at all times. Extinguishers shall be multi-purpose dry chemical type, provided on a basis of one 2A-20BC rated unit for each 3,000 square feet of floor area. Extinguishers to remain property of Contractor.

4. The Contractor shall at all times maintain work areas so that all portions are accessible to fire department personnel and apparatus. Fire hydrants and fire department connections to building sprinkler systems must be always kept free from obstruction.

5. The Contractor shall strictly supervise any welding, metal cutting or other operations employing open flame work. All welding and cutting equipment shall be safely arranged and all combustibles in vicinity of any work being performed shall either be removed or protected by a noncombustible cover.

Welding or cutting shall be attended by an assistant or fire watchman who is equipped with at least one 2A-20BC rated multi-purpose dry chemical fire extinguisher. Fire watchman will maintain strict surveillance during entire welding or cutting operation and extinguish flying sparks or burning slag.

After welding or cutting operation, fire watchman shall thoroughly search entire area for remnants of smoldering materials before he is released from his duty. Any welding or other operation employing open flame in any portion of building shall be scheduled with and receive approval of VRE.

6. The Contractor shall keep noise level below 80 db level during normal building hours. When it is necessary to produce noise above this level, the Contractor shall advise building management of such needs and times will be scheduled as directed. The Contractor shall anticipate and schedule excessive noise-generating procedures and include allowance for same in its quotation and schedule.

E. Use of Explosives: Explosives shall not be used on site, unless approved in writing by VRE.

1.10 OCCUPANCY REQUIREMENTS

A. Partial VRE Occupancy: VRE reserves the right to occupy, use and/or to place and install equipment in any completed or partially completed areas of the site/building, before Substantial Completion, provided such occupancy does not interfere with completion of the Work. Such placement of equipment and partial occupancy shall not constitute acceptance of the total Work. Partial VRE occupancy requirements are as follows:

1. Construction Manager will prepare a Certificate of Substantial Completion for each specified portion of the Work to be occupied before VRE occupancy.

2. Before partial VRE occupancy, mechanical and electrical systems shall be fully operational and required tests and inspections shall be successfully completed. On occupancy, VRE will operate and maintain mechanical and electrical systems serving occupied portions of the building/site.

3. On occupancy, VRE will assume responsibility for maintenance and custodial service for occupied portions of building.

1.11 UTILITY LOCATION, PROTECTION AND RELOCATION

A. Coordinate utility location services to identify and mark the location of all utility lines, that may be impacted by construction activities, including but not limited to the following:

1. Electric power lines

SUMMARY OF WORK 01 11 00 - 6

2. Natural gas lines

3. Sanitary sewers

4. Stormwater/drainage

5. Water supplying piping

6. Petroleum/Fuel lines

7. Telephone lines

8. Data and Communication/ Fiber Optic Lines

9. Underground Storage Tanks

10. Steam/water lines

11. Underground utilities and lines abandoned in place

B. The information in the Contract Documents concerning the type and location of utilities is neither guaranteed nor inclusive. The Contractor is responsible for determining the type and location of utilities, regardless of whether such utilities are indicated or not, so as to avoid damage thereto.

C. Check and verify the horizontal and vertical location (coordinates and elevation) of all utility lines that may exist within the limits of new work, regardless of whether such utilities are indicated or not, by use of a

Subsurface Utility Engineering company. Reconfirm such locations and verification of utilities discovered, regardless of whether such utilities are indicated or not, and submit to the Project Manager a dimensional survey with such notations.

D. Test pits shall be accomplished by means of non-destructive testing in the vicinity of the discovered utilities, as indicated on the Contract Plans. Additional test pits may be performed by the Contractor, at their expense, in coordination with the CM and applicable utility.

E. Repair any damage to discovered utility lines due to construction operations at no expense to VRE. VRE will assist the Contractor by making available any known information.

F. If utilizing an independent subsurface utility engineering company, submit the name of firm and qualifications to the CM, for written approval.

G. Within 60 consecutive calendar days of NTP, submit to the CM a survey of all utility location results.

H. For additional requirements for Cooperation with Utility Companies, see Division 01, Section 01 73 00

“Execution of Work.”

1.12 UTILITY OUTAGES

A. Prior to any utility outage/interruption, prepare a schedule of such outage. Include in the outage schedule duration, identification of the service affected, temporary utility service to be provided, identification of available service alternative, and the action to be taken in the event of any emergency. Apply for all outages of utility systems in writing. Fully coordinate outage requests with the CM. Schedule shall include date, time, and duration of outage. Obtain approval in writing by the CM.

1.13 DAYS/HOURS OF WORK

A. The Contractor shall confine work to the areas specified and not unreasonably impact the site with materials or equipment. The Contractor shall perform all work between the hours of 7:00 A.M. and 7:00 P.M. ET, Monday through Saturday (except Federal holidays) and nights and weekends as authorized in advance, in writing, by VRE.

SUMMARY OF WORK 01 11 00 - 7

B. The Contractor must remain aware that the area of work is near active rail lines. Extreme caution and safety must be exercised at all times.

1.14 APPLICABLE CODES

A. Compliance with Regulatory Agencies: Comply with most stringent applicable provisions of following codes, laws, and/or authorities, including revisions and changes in effect:

1. Safety Code for Elevators and Escalators, ASME A17.1

2. Guide for Inspection of Elevators, Escalators, and Moving Walks, ASME A17.2

3. Elevator and Escalator Electrical Equipment, ASME A17.5

4. National Electrical Code, NFPA 70

5. Americans with Disabilities Act, ADA

6. Local Fire Authority

7. Requirements of all other codes, ordinances and laws applicable within the governing jurisdiction

8. Life Safety Code, NFPA 101

9. Uniform Federal Accessibility Standard, UFAS

1.15 PERMITS

A. Individual trade permits will be required from Prince William County (mechanical, electrical, fire protection, etc.). The Contractor shall obtain and pay for all permits required to complete required work. In addition, the

Contractor shall arrange, schedule, and pay for all required final inspections by state, local, or independent certified inspecting authorities necessary for issuance of all required permits in regard to completed work.

PART 2 – PRODUCTS

PART 3 – EXECUTION

END OF SECTION

WOODBRIDGE STATION EAST E ELEVATOR MODERNIZATION

UNIT PRICE 01 22 00 - 1

SECTION 01 22 00

UNIT PRICES

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes administrative and procedural requirements for unit prices, measurements and non-conformance, and only applies to Unit Price contracts.

B. General Conditions for Construction

C. Special Provisions

D. Section 01 26 00 – Change Order Procedures

E. Section 01 29 00 – Payment Procedures

1.3 DEFINITIONS

Pay Item: A specifically described unit of work for which a Unit Price is provided in the Contract.

Unit Price: An amount proposed by Bidders, stated on the Bid Form, incorporated in the Contract and applicable during the duration of the Work as a price per unit of measurement for materials, equipment, or services, or a portion of the Work, added to or deducted from the Contract Value by appropriate modification, if the Scope of Work or estimated quantities of Work required by the Contract Documents are increased or decreased.

1.4 PROCEDURES

A. Unit prices include all necessary material, cost for delivery, installation, insurance, applicable taxes, overhead, and profit. The sum of all extended unit prices in the Bid Form, shall be deemed to include all work described in the Contract Documents including Contract Plans and Specification.

B. Payments to the Contractor will be made for the actual quantities of Contract items performed in accordance with the plans and the requirements of the Specifications and other Contract Documents. If, upon completion of the Work, the actual quantities vary, either by an increase or decrease from the estimated quantities shown in the Contract, the Contract unit prices shall prevail and payment will be made for actual quantities performed at such unit prices, unless the unit prices have been modified by a Contract Amendment.

C. No allowance or other adjustment will be made for any increased expense, loss of expected reimbursement, or loss of anticipated profits suffered or claimed by the Contractor resulting directly from such variance, or from the Contractor’s unbalanced allocation among the Contract items of overhead expense and subsequent loss of expected reimbursements therefore, or from any other cause.

UNIT PRICE 01 22 00 - 2

D. In the event the actual quantity of Work performed exceeds or is below the estimated quantity by more than

10%, a Contract Amendment will be issued.

E. When the accepted quantity of a unit price pay item increases or decreases more than 25% of the original

Contract quantity, an equitable adjustment in the unit price may be negotiated if requested by the Contractor or

VRE. The equitable adjustment shall be made upon any increase or decrease in cost due solely to the variation less than 75% or in excess of 125% of the estimated quantity and shall apply to the actual amount of work performed.

F. If the quantity variation is such as to cause an increase in time necessary for completion, the Contractor may request, in writing, an extension of time, to be received by the CM within ten (10) consecutive calendar days from the beginning of the delay, or within such further period as may be granted by VRE before the date of final settlement of the Contract. Upon the receipt of a written request for an extension, VRE shall ascertain the facts and make an adjustment for extending the completion date as, if in the judgement of VRE, is warranted.

G. The Contractor shall accept the compensation provided for in the Contract as full payment for the following:

1. Furnishing all materials, labor, tools, equipment, and incidentals necessary to complete the Work according to the Contract.

2. Performing all work specified in the Contract.

3. All loss or damage arising from the nature of the Work or from action of the elements or any other unforeseen difficulties that may be encountered during prosecution of the Work and until its final acceptance.

4. Any license, use, or infringement of a patent, trademark, or copyright.

5. The completion of the Work in accordance with the Contract requirements.

H. The Contractor shall notify the CM when items of work are ready for measurement. The Contractor and CM or Inspector shall coordinate on site to measure the work in place for payment according to the requirements of this Specification Section. The CM may question or reject the Contractor's measurement of work-in-place if the Contractor and CM have not measured the work together or come to an agreement on the measured quantities. VRE reserves the right to reject the Contractor’s measurement of work-in-place that involves the use of established unit prices and to have this work measured, at VRE’s expense, by a qualified independent

3rd party acceptable to the Contractor.

I. At the discretion of VRE, payment may be reduced for any Work which is not in full compliance with the

Contract Documents or which has been damaged or repaired by the Contractor. Such action may be used when the end product may have a reduced service life or less than desirable aesthetic characteristics.

1.5 MEASUREMENT OF QUANTITIES

A. General

1. Work specified in the Contract will be measured by the CM in accordance with U.S. Standard Measure.

The methods of measurement and computations to be used to determine quantities of material furnished and work performed will be those generally recognized as conforming to good engineering practice.

2. Specific methods of measurement shall be as indicated in the specific Section for the Contract item.

3. Longitudinal measurements for surface area computations will be made along the surface

UNIT PRICE 01 22 00 - 3

(horizontally), and transverse measurements will be the surface measure shown on the plans or ordered in writing by the CM. Individual areas of obstructions with a surface area of 9 square feet or less will not be deducted from surface areas measured for payment.

4. Structures will be measured in accordance with the neat lines shown on the plans or as otherwise approved in writing.

5. Items that are measured by the linear foot will be measured parallel to the base or foundation upon which they are placed.

6. Allowance will not be made for surfaces placed over an area greater than that shown on the plans or for any material moved from outside the area of the cross-section and lines shown on the plans.

7. When standard manufactured items are specified, and are identified by weights or dimensions, such identification will be considered nominal. Unless more stringently controlled by tolerances in cited specifications, manufacturing tolerances established by the industries involved will be accepted.

B. Measurement by Weight

1. Materials that are measured or proportioned by weight shall be weighted on accurate scales as specified in this Section.

2. The Contractor shall have the weigh person perform the following:

a. Furnish a signed weigh ticket for each load that shows the date, load number, plant name, size and type of material, project number, schedule or purchase order number, and the weights specified herein.

b. Maintain sufficient documentation so that the accumulative tonnage and distribution of each lot of material, by Contract, can be readily identified.

c. Submit by the end of the next working day a summary of the number of loads and total weights for each type of material by Contract.

3. Trucks used to haul material shall be equipped with a cover suitable to protect the material and to protect the traveling public.

4. The truck tare to be used in the weighing operation shall be the weight of the empty truck determined with full tank(s) of fuel and the operator seated in the cab. The tare weight of trucks shall be recorded to the nearest 20 pounds. At the option of the Contractor, a new tare may be determined for each load. When a new tare is obtained for each load, the requirement for full tank(s) of fuel will be waived.

5. Net rail shipment weights may be used for pay quantities when evidenced by railroad bills of lading.

However, such weights will not be accepted for pay quantities of materials that subsequently pass through a stationary mixing plant.

6. Scales shall conform to the requirements for accuracy and sensitivity as set forth in the National

Institute of Standards and Technology Handbook No. 44 for Specification Tolerances and

Requirements for Commercial and Weighing Devices. Scales used in the weighing of materials paid for on a tonnage basis shall be approved and sealed in accordance with the requirements of the policies of the Bureau of Weights and Measures of the Department of Agriculture and Consumer Services, or other approved agencies, at least once every six months and upon being moved. Hopper and truck scales shall be serviced and tested by a scale service representative at least once every six months. Hopper scales shall be checked with a minimum 500 pounds of test weights and truck scales shall be checked with a

UNIT PRICE 01 22 00 - 4

minimum 20,000 pounds of test weights.

7. Copies of scale test reports shall be maintained on file at the scale location for at least 18 months, and copies of all scale service representative test reports shall be forwarded to VRE upon request.

8. The quantity of materials paid for on a tonnage basis shall be determined on scales equipped with an automatic printer. Truck scale printers shall print the net weight and either the gross or tare weight of each load. Hopper scale printers shall print the net weight of each load. The weigh ticket shall also show the legal gross weight for material weighed on truck scales and the legal net weight for material weighed on hopper scales.

9. If the automatic printer becomes inoperative, the weighing operation may continue for 48 hours provided satisfactory visual verification of weights can be made. The written permission of the VRE shall be required for the operation of scales after 48 hours.

10. If significant discrepancies are discovered in the printed weight, the ultimate weight for payment will be calculated on volume measurements of the materials in place and unit weights determined by the CM or by other methods deemed appropriate to protect the interests of VRE.

C. Measurement by Volume (e.g. Cubic Yard)

1. Material that is measured by the cubic yard, loose measurement or vehicular measurement, shall be hauled in approved vehicles and measured therein at the point of delivery. Material measured in vehicles, except streambed gravel, silt cleanout, or other self-consolidating material will be allowed at the rate of 2/3 the volume of the vehicle. The full volume of the vehicle will be allowed for streambed gravel. Such vehicles may be of any size or type acceptable to the Engineer provided the body is of such shape that the actual contents can be readily and accurately determined. Unless all approved vehicles are of uniform capacity, each vehicle shall bear a plainly legible identification mark indicating the specific approved capacity. Each vehicle shall be loaded to at least its water level capacity.

2. When approved by the CM in writing, material specified to be measured by the cubic yard may be weighed and such weights converted to cubic yards for payment purposes. Factors for conversion from weight to volume measurement will be determined by the CM and shall be agreed to by the Contractor before they are used.

D. Measurement by Lump Sum

1. When used as an item of payment, the term lump sum will mean full payment for completion of the corresponding item of work described in the Contract. When a complete structure or structural unit is specified as a Contract item, the unit of measurement will be lump sum, and shall include all necessary fittings and accessories. The quantities may be shown on the plans for items for which lump sum is the method of measurement. If shown, the quantities are approximate and are shown for estimating purposes only and no measurement of quantities will be made for payment. Items that are to be measured as complete units will be counted by the VRE Representative in the presence of a representative of the

Contractor.

E. Measurement by Length (e.g. Linear Foot or Vertical Linear Foot)

1. When used as an item of payment, the term of length will mean full payment for completion of the corresponding item of work described in the Contract. When a pay item unit is specified as a Contract item, the unit of measurement designated as a unit of length shall include all necessary fittings and accessories. The quantities may be shown on the plans for items for which length is the method of measurement. Items that are to be measured as complete units will be counted by the Inspector in the

UNIT PRICE 01 22 00 - 5

presence of a representative of the Contractor.

F. Measurement by Area (e.g. Square Feet)

1. When used as an item of payment, the term of area will mean full payment for completion of the corresponding item of work described in the Contract. When a pay item unit is specified as a Contract item, the unit of measurement designated as a unit of area shall include all necessary fittings and accessories. The quantities may be shown on the plans for items for which area is the method of measurement. Items that are to be measured as complete units will be counted by the Inspector in the presence of a representative of the Contractor.

G. Measurement by Item or Count (e.g. Each)

1. When used as an item of payment, the term of item or count will mean full payment for completion of the corresponding item of work described in the Contract. When a pay item unit is specified as a

Contract item, the unit of measurement designated as a unit of item or count shall include all necessary fittings and accessories. The quantities may be shown on the plans for items for which item and count is the method of measurement. Items that are to be measured as complete units will be counted by the

Inspector in the presence of a representative of the Contractor.

1.6 PLAN QUANTITIES

A. When specified in the Contract, Contract items will be measured and paid for on the basis of plan quantities.

The quantities allowed for compensation will be those shown on the plans with deductions from or authorized additions to such quantities resulting from authorized deviations from the plans.

B. In the case of excavation, only excavation within the cross-section prism will be paid for on a plan quantity basis.

C. If the Contractor believes that any plan quantity is incorrect, they may solicit, at their own expense, the aid of a Professional Engineer licensed to practice engineering in the State, Commonwealth, or District where the project is physically located to check the quantity or they may ask the CM in writing to check computations of the quantity. Written requests for a quantity check by the CM shall be accompanied by calculations, drawings, or other evidence indicating why the plan quantity is believed to be in error. If any item of the

Contract is found to be in error and so verified by the CM, payment will be made in accordance with the corrected plan quantity.

D. If the CM or VRE determines during construction that there is an error in the plan quantity, or that conditions vary from those anticipated in the design to the extent that an actual measurement of a plan quantity item is warranted, the CM will make such measurement and will notify the Contractor, in writing, of the rationale for adjustment. Payment will then be based on the measured quantity in lieu of the plan quantity.

SUBSTITUTION PROCEDURES 01 25 00-1

SECTION 01 25 00

SUBSTITUTION PROCEDURES

Section includes administrative and procedural requirements for major material substitutions after Notice of

Award of Contract.

A. General Conditions for Construction

B. Section 01 33 00 – Submittal Procedures

1.3 GENERAL

A. The Contract is based on the materials, equipment and methods described in the Contract documents that allow for compliance to all Federal, State, and Local rules and regulations. No substitutions or cancellations shall be permitted after award without the written approval of VRE. VRE will consider requests for substitutions of materials, equipment and methods only when requests are accompanied by full and complete technical data and all other information required to evaluate the proposed substitution.

B. Substitutions, if approved, shall be without any additional compensation except when extension of contract time from VRE, unless approved otherwise.

1.4 SUBMITTALS

A. Timing:

1. Submit substitution requests within a maximum of forty-five (45) consecutive calendar days after

Notice to Proceed or as otherwise necessary and coordinated with the CM. Requests received after that time may be considered or rejected at the sole discretion of VRE. Substitutions will not be considered if they cannot be procured and delivered within the approved construction schedule.

B. Conditions:

1. VRE will consider Contractor’s request for substitution only when the following conditions are satisfied. If the following conditions are not satisfied, the CM will return requests without action, except to record noncompliance with these requirements:

a. Requested substitution does not require extensive revisions to the Contract Documents.

b. Requested substitution is consistent with the Contract Documents and will produce indicated results.

c. Substitution request is fully documented and properly submitted.

d. Requested substitution will not adversely affect Contractor’s Construction Schedule.

SUBSTITUTION PROCEDURES 01 25 00-2

e. Requested substitution has received necessary approvals of authorities having jurisdiction.

f. Requested substitution is compatible with other portions of the Work.

g. Requested substitution has been coordinated with other portions of the Work.

h. Requested substitution provides specified warranty.

i. If requested substitution involves more than one Contractor, requested substitution has been coordinated with other portions of the Work, is uniform and consistent, is compatible with other products, and is acceptable to all Contractors involved.

C. Identify specified product or fabrication or installation method to be replaced. Include Specification Section number and title and Drawing numbers and titles.

D. Show compliance with requirements for substitutions and the following, as applicable:

1. Statement indicating why specified product or fabrication or installation cannot be provided, if applicable.

2. Coordination information, including a list of changes or revisions needed to other parts of the Work that will be necessary to accommodate proposed substitution.

3. Detailed comparison of significant qualities of proposed substitution with those of the Work specified.

Significant qualities include attributes such as performance, weight, size, durability, visual effect, sustainable design characteristics, warranties, and specific features and requirements indicated.

4. Indicate deviations, if any, from the Work as specified.

5. Detailed information regarding any change in cost or contract time, including the cost of additional engineering required to properly incorporate proposed substitution.

6. Product Data, including drawings and descriptions of products and fabrication and installation procedures.

7. Samples, where applicable or requested.

8. Certificates and qualification data, where applicable or requested.

9. Material test reports from a qualified testing agency indicating and interpreting test results for compliance with requirements indicated.

10. Drawings as required to demonstrate details of the proposed product.

11. Technical specification for the proposed product, if not included in the original contract.

12. Contractor's certification that proposed substitution complies with requirements in the Contract

Documents except as indicated in substitution request, is compatible with related materials, and is appropriate for applications indicated.

13. Contractor's certification waiving rights to additional payment or time that may subsequently become necessary because of failure of proposed substitution to produce indicated results.

SUBSTITUTION PROCEDURES 01 25 00-3

E. If necessary, the CM will request additional information or documentation for evaluation within 15 consecutive calendar days of receipt of a request for substitution. The CM will provide written acceptance or rejection of proposed substitution within 30 calendar days of receipt of request, or 30 calendar days of receipt of additional information or documentation, whichever is later.

F. Do not use the RFI process for submittal of Substitution Requests.

G. Contractor’s submittal and VRE’s review or approval Shop Drawings, Product Data or Samples related to a substitution does not itself constitute a final approval of the requested substitution, nor does it relieve the

Contractor from fulfilling existing Contract requirements.

CHANGE ORDER PROCEDURES 01 26 00 - 1

SECTION 01 26 00

CHANGE ORDER PROCEDURES

A. Section includes procedures and requirements related to handling and processing Change Orders to include:

1. Change Order Procedures

2. Preparation of Proposed Change Orders

3. Lump Sum Change Orders

4. Unit Price Change Orders

5. Time and Material Change Orders

6. Contract Time Extensions

7. Change Orders for Compensable Delay

8. Differing Site Conditions

9. Payment for Contract Amendment Work

1. 01 22 00 Unit Prices

2. 01 29 00 Payment Procedures

3. 01 32 00 Construction Progress Documentation

4. General Conditions for Construction

1.3 MINOR CHANGES IN WORK

1. VRE shall have authority to make minor changes in the Work by supplemental instructions when such changes do not involve extra cost and are not inconsistent with the purpose of the Project. Otherwise, except in an emergency endangering life or property, no extra Work or change shall be made unless in pursuance of a written Construction Change Directive or Change Order and no claim for an addition to the Contract

Amount or Contract Time shall be valid unless so ordered. If the Contractor believes a cost is associated with the supplemental instructions, the Contractor is to provide written notice to the CM within seven (7) consecutive calendar days of receipt of instructions.

CHANGE ORDER PROCEDURES 01 26 00 - 2

1.4 CHANGE ORDER PROCEDURES

A. Changes to the work can be by:

1. Change Order issued by VRE to the Contractor.

2. Contractor proposing a Potential Change Order (PCO) to VRE.

3. Time and Material as directed by the CM or VRE.

4. Specific requirements for a VRE ordered change or preparation and submission of a Contractor POC are detailed in the following subsections of this specification.

B. If any change causes an increase or decrease in the Contractor’s cost of, or time required for, the performance of any part of the Work under the Contract, the Contracting Officer shall make an equitable adjustment and amend the Contract in writing. Approval may be contingent on funding agency or VRE Board authorization.

VRE will issue a Contract Amendment all-inclusive of the terms of the Change Order(s) to the Contractor for signature. Once the Contract Amendment has been signed by the Contractor and VRE, it is considered executed.

1. VRE may require additional bond protection when a Contract price is increased. Such change will require notice to sureties and require that Performance and Payment Bonds be increased by the Contractor. The increase in protection shall generally equal one hundred percent (100%) of the increase in Contract price.

2. A copy of the revised Payment and Performance Bonds shall be provided by the Contractor to the

Purchasing and Contracts Office within 14 consecutive calendar days of VRE’s approval of such change.

The Contractor shall execute change orders with the consent of the surety or sureties on the Payment and

Performance Bond unless otherwise directed by the sureties. All such work shall be executed under the conditions of the original Contract, except that modification of the Time for Completion caused thereby shall be made at the time of approving such change.

3. Upon the Contractor’s request, VRE may decrease bond amounts as deliverables are received.

C. Work may be invoiced for payment only once the Contractor possesses a fully executed Contract Amendment.

D. The Construction Manager is not authorized to approve Change Orders or authorize extra work without written concurrence of the VRE Contracting Officer.

1.5 VRE CHANGE ORDERS

A. VRE, without invalidating the Contract, may order extra Work or make changes by addition, deletion or revision in the Work, with the total Contract Amount being adjusted accordingly if applicable. Changes shall include:

1. A detailed description of a proposed change.

2. Supplementary or revised drawings and specifications.

3. A change in Contract Time for executing the change work required.

4. The period of time during which the requested price will be considered valid.

5. Contractor will prepare and submit an estimate in a timely manner in order to not cause delay to the

CHANGE ORDER PROCEDURES 01 26 00 - 3

project schedule. VRE may further issue a directive to proceed with additional work under Time and

Material basis.

B. The Contractor shall review any VRE requested or directed change and shall respond in writing within 14 consecutive calendar days after receipt of the proposed change stating the effect of the proposed change upon

Contractor’s work, including any increase or decrease in Contract time and price. The Contractor shall furnish

VRE an itemized breakdown of the quantities and prices used in computing the proposed change. The

Contractor shall also furnish any sketches, drawings, and/ or pictures to properly explain the change or impact to VRE. It is the sole responsibility of the Contractor to provide adequate change order backup to satisfy

VRE.

1. The value of any such extra work or change shall be proposed by VRE in one or more of the following ways: (a) by estimate in a lump sum; (b) by cost and fixed fee; (c) by unit price additions or deletions of quantities stated in the Contract; or (d) any other method permitted under VRE’s Procurement Manual.

2. If none of the aforementioned methods is agreed upon the Contractor shall proceed with the work without delay under Time and Materials, provided the Contractor receives a Construction Change Directive. In such case, the Contractor shall keep and present in such form as the CM may direct, a correct account of the cost, together with vouchers. The CM shall be permitted to verify such records on a daily basis and may require such additional records as are necessary to determine the cost of the change to the Work.

The CM shall include a firm Not-to-Exceed ceiling price that the Contractor may not exceed except at its own risk. A complete accounting of the extra cost shall be made within 14 consecutive calendar days after completion of the work involved in the claim. Refer to Time and Materials (Force Account) Change

Orders, below for a description of allowable costs when work is performed under force account.

C. Once the scope, cost and schedule impacts, if any, are agreed upon, the CM will prepare the Change Order, possibly combining with other approved Change Orders, and submit to VRE for Processing. Approval may be contingent on funding agency or VRE Board authorization. Once processed, a Contract Amendment will be issued for signature by the Contractor. Once the Contract Amendment has been signed by the Contractor and

VRE, it is considered executed. VRE may require additional bond protection as described above.

1.6 PREPARATION OF CONTRACTOR PROPOSED CHANGE ORDERS

A. The Contractor may propose a change by submitting a Potential Change Order (PCO) commonly known as

Request for Change (RFC) to the Construction Manager, describing the proposed change and its full effect on the Work, with a statement describing the reason for the change, the effect on the Contract Sum and Contract

Time with full documentation and a statement describing the effect on Work by separate or other contractors.

B. Contractor shall provide written notice of intent to claim additional cost or time within 14 consecutive calendar days of their knowledge of such. Failure to do so will result in automatic rejection of claims.

C. Submit a description of work that is considered beyond the scope of the contract for review and approval prior to start of work. VRE must be allowed sufficient time to review and make a determination of entitlement for additional compensation or time. The Contractor’s submittal shall be in sufficient detail to enable VRE to determine the basis of entitlement.

D. PCO must be signed and dated by the Contractor in order to be accepted by VRE.

E. Failure to furnish sufficient documentation or to qualify their reason for failure to do so may delay the project.

If such delay occurs, it will in no way relieve the Contractor of their obligation to meet the time limits or other requirements established for the contract or constitute basis for a delay claim on part of the Contractor.

CHANGE ORDER PROCEDURES 01 26 00 - 4

F. Maintain detailed records of related work performed, including photos if they help demonstrate the work.

Provide complete information required for evaluation of proposed changes and to substantiate costs of changes in the Work.

G. Document each quotation for a change in itemized cost or time with sufficient data to allow evaluation of the quotation.

This is the start of the file's text. The full file is on GovTribe.