Attachment F- Site Specific Safety Plan-final (1).pdf
PDF 2 MB Posted
- Solicitation number
- IFB-128698
- Issued by
- Prince William County, Virginia
About this file
This is a Site Specific Safety Plan template document for the Virginia Railway Express (VRE) used to establish safety requirements and procedures for contractors performing work on VRE property and railroad operations. The plan applies to the modernization of the east elevator at VRE's Woodbridge Station located at 1040 Express Way, Woodbridge, Virginia, which serves five floors within the parking garage.
The safety plan is organized into ten sections covering general safety information, railroad operating environment compliance, life-saving commitments across multiple hazard categories, and drug and alcohol prohibition policies. Contractors must evaluate each subject topic and indicate whether it is required, not applicable, or not needed for the specific project, providing detailed remarks for applicable items. Key areas addressed include employee safety training and compliance enforcement, personal protective equipment provisions, hot work permits, roadway worker protection under 49 CFR 214, blue signal protection under 49 CFR 218, bridge worker safety, lockout/tagout procedures, fall protection systems, crane and rigging operations, confined space entry, excavation safety, mobile equipment operations, caught-in and struck-by hazards, chemical handling and storage, and zero-tolerance drug and alcohol policies. The plan requires identification of a qualified Project Safety Manager with detailed descriptions of qualifications, planned schedule, and duties, and mandates that contractors maintain documentation and make safety inspection logs, training verification, and rescue plans available to the VRE Project Management Team prior to commencing work.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT F
1 Site Specific Safety Plan
Project Title
VRE Contract Number
Contractor’s Name
Location(s) of Project
Project Duration Period
Description of Scope of Work
(Large Projects*)
Contractor’s Project Safety Manager (include name, qualifications, planned schedule on project and detailed description of duties:
*A large project is defined as having a total contract value in excess of $5million dollars or whenever work includes one or more of the following:
• Bridge work above tracks
• Tunnel work below tracks
• Cranes and rigging where required crane capacity is greater than 50-tons
• Confined space entry
• Excavations greater than 4-feet
2 Site Specific Safety Plan
How to complete this plan:
Evaluate each subject topic and determine if it is required. If required, place a checkmark in the “yes” column and provide specific details in the “remarks” column. If more space is needed, find the blank
Attachment A page, at the end of the document, and make as many copies as necessary. Remember to use the item number from the “item #” column to associate any supplemental remarks.
If you don’t believe the category will be a factor in your project, check “N/A” and move to the next section.
Check marks under the “no” section will require remarks
Section 1 General Safety Plan Information
Item # Subject Required? Description/Response
Site Safety on VRE/Railroad Property N/A [ ]
GS1 Describe your plan for providing safety training for employees.
Yes No
GS2 Describe your plan for continued training and enforcement of compliance (formal and informal) of employees
GS3 Describe your plan for handling waste materials.
3 Site Specific Safety Plan
GS4 Describe your planned security procedures for preventing damage or theft of in-place work, property, and equipment owned by VRE or the Contractor.
GS5 Describe your emergency procedures to manage site emergencies, evacuations, extreme/sudden weather and other circumstances
GS6 What type of PPE will be used for this project?
GS7 Describe your plan for providing Personal Protective Equipment (PPE) to employees and visitors who may arrive without PPE.
4 Site Specific Safety Plan
GS8 Will any special PPE be required, i.e respirators? If yes, what type?
GS9 Will eye wash and shower stations need to be set up on the jobsite?
GS10 Has personnel received training for special PPE requirements?
GS11 Is there verification of medical respiratory protection clearance available to the VRE Project Management Team?
GS12 Will respirators be worn on a voluntary basis?
GS13 Is a de-con area required for suiting up/down?
GS14 Will perimeter barricades be used?
GS15 Will caution/danger signage be needed?
GS16 Will Hot Work (welding/cutting/grinding/soldering/electrical) need to occur?
Permission to conduct Hot Work is required from VRE before taking place.
GS17 Will Hot Work (welding/cutting/grinding/soldering/electrical) permits be required?
GS18 Will fire blankets/protective shields/screens be required?
GS19 Are fire-watch personnel properly trained?
GS20 Describe your After-Work watch plan
GS21 Will any utility interruption permit or railroad/municipality-issued dig tickets be required?
5 Site Specific Safety Plan
Section 2 Railroad Operating Environment
Item # Subject Required? Description/Response
Roadway Worker Protection
(RWP)
(49 CFR 214 Subpart C)
N/A [ ]
RR1 Will work be confined to VRE track territory?
Yes No If no: Amtrak [ ] CSX [ ] NS [ ]
RR2 Describe your plan to ensure all employees who will perform service in an area where RWP training is required receive proper training.
RR3 Describe your plan to ensure ongoing compliance with applicable RWP regulations and host railroad/VRE requirements.
RR4 Describe your plan to coordinate with the host railroad Employee in Charge to establish protection or to establish acceptable work windows.
6 Site Specific Safety Plan
RR5 Describe your plan to check for, investigate, and discipline violations of Roadway Worker Protection requirements.
Item # Subject Required? Description/Response
Blue Signal Protection
(49 CFR 218 Subpart B)
N/A [ ]
RR6 Will work be confined to VRE territory? Yes No If no: Amtrak [ ] CSX [ ] NS [ ]
RR7 Will individual blue tag cards with photos of isuee be distributed to applicable staff?
RR8 Describe your plan to coordinate with the VRE yard manager or host railroad point of contact to establish blue signal protection or to establish acceptable work windows.
RR9 Describe your plan to establish and maintain proficiency in Blue Signal Protection requirements among staff.
7 Site Specific Safety Plan
RR10 Describe your plan to check for, investigate, and discipline violations of Blue Signal Protection.
Item # Subject Required? Description/Response
Bridge Worker Safety
(49 CFR 214 Subpart B)
N/A [ ]
RR11 Contractor has full understanding and ensures full compliance with all applicable elements of 49 CFR 214 Subpart B prior to starting work.
Yes No
RR12 Contractor has a program in place that requires training in, adherence to, and use of safe procedures associated with climbing techniques and procedures to be used on or about the bridge structure.
RR13 Will scaffolding be involved in the work and will it fully comply with the requirements of 49 CFR 214.109?
RR14 Will fall protection systems be involved in the work and will it fully comply with the requirements of 49 CFR 214.109 and all other applicable requirements?
8 Site Specific Safety Plan
RR15 Will water that may pose a drowning risk or greater in depth than four (4) feet will be present at the worksite? If yes, a plan shall be developed to manage compliance with this hazard.
Section 3 Life Saving Commitments – Stored Energy
Item # Subject Required? Description/Response
Lockout/Tagout (LOTO) N/A [ ]
SE1 Will LOTO be required? Yes No If yes, Contractor Superintendent will inspect LOTO source and ensure LOTO procedures are followed.
SE2 Are LOTO procedures available?
SE3 Has a responsible person been assigned for overseeing LOTO requirements?
9 Site Specific Safety Plan
Item # Subject Required? Description/Response
Pipe and Vessel Pressure Testing N/A [ ]
SE4 Will any pipe/vessel pressure testing be required?
Yes No
SE5 Will pipe/vessel testing be performed within design specifications?
SE6 Has a Pressure Testing Safety Plan been developed and approved?
Note- Pressure Testing Safety Plans may be requested by VRE Project Management Team for approval.
Hydrostatic is the preferred testing method.
Item # Subject Required? Description/Response
Compressed Gas N/A [ ]
SE7 Will cylinders be brought on site? Yes No Type of cylinders and quantity:
SE8 Are there plans for safe use and storage on site?
10 Site Specific Safety Plan
Section 4 Life Saving Commitments – Fall Protection
Item # Subject Required? Description/Response
Ladders/Scaffolding N/A [ ]
FP1 Will ladders be required? (All ladders shall have a min 300 lb rating)
Yes No Metal ladders will be approved by VRE Project Management Team.
FP2 Will scaffolding be required?
(Scaffold tags and inspections are required when scaffolding is used)
Provide person(s) name, contact information and training verification.
FP3 Will fall protection be required? List equipment to be used.
11 Site Specific Safety Plan
Fall Protection, Leading Edge
Work, Elevated Surfaces (no safety monitors)
N/A [ ]
FP4 Has a Fall Protection Rescue Plan been developed? If yes, attach and describe the plan.
Yes No
FP5 Will fall protection be required? (No safety monitors). 100% protection > 6 feet is required.
Systems to be used:
FP6 Are competent/qualified persons identified to perform system and equipment inspections, identify hazards and anchor points as needed?
Provide individual’s name, qualifications/certifications and contact information.
Item # Subject Required? Description/Response
Roof Work N/A [ ]
FP7 Will roof access be required? Yes No Attach Fall Protection Plan and Emergency Rescue Plan (Primary and alternate plan to be submitted prior to commencing work)
12 Site Specific Safety Plan
FP8 Is there a plan to get materials on/off roof in place?
FP9 Has a method for securing materials to prevent “blow offs” been identified?
FP10 Are chemicals or flammable/combustible materials going on roof?
This is required to be approved by VRE Project Management Team.
13 Site Specific Safety Plan
Fall Protection, Leading Edge
Work, Elevated Surfaces (no safety monitors - 29 CFR 1926.502(h))
N/A [ ]
FP11 Will fall protection be required?
(Mandatory for all unprotected edges and sides, 6 feet and higher above lower level)
Yes No Systems to be used:
FP12 Has a Fall Protection Rescue Plan been developed?
Describe and attach the plan.
14 Site Specific Safety Plan
FP13 Are competent/qualified persons identified to perform system and equipment inspections, identify hazards and anchor points as needed?
Provide individual’s name, qualifications and contact information.
15 Site Specific Safety Plan
Section 5 Life Saving Commitments – Cranes & Rigging
Item # Subject Required? Description/Response
Cranes & Rigging N/A [ ]
CR1 Will crane operations be required? If yes, discuss with your PM team about the need to have a Crane Operations and Safety Plan established and available for inspection.
Yes No
CR2 Have all overhead lines been identified and has a plan been established to communicate and/or mark their presence?
CR3 Will any special lifting devices be needed?
CR4 Will any Critical Lifts take place? A Critical Lift meets any of the following criteria: 1) exceeds 75% of the capacity of the crane or derrick; 2) requires more than one crane or derrick; 3) involves lifts over people or critical work processes.
Discuss with the VRE Project Management Team about the need to develop a critical lift plan and activity summary.
CR5 Has all rigging equipment been inspected?
Submit verification of inspection training to the VRE Project Management Team (prior to commencing work).
CR6 Is all equipment appropriate for the task(s)?
CR7 Have all required safety inspections been completed?
Be prepared to make inspection logs completed for equipment/lift devices available to the VRE Project Management Team.
CR8 Will traffic control be provided?
(pedestrian, passenger & vehicular)
Be prepared to provide flaggers’ names and evidence of training to the VRE Project Management Team.
16 Site Specific Safety Plan
Section 6 Life Saving Commitments – Confined Spaces
Item # Subject Required? Description/Response
Confined Spaces* *OSHA Definition
N/A [ ]
CS1 Will any confined space work be performed? Note: Atmospheric testing must be conducted and documented daily prior to entry into a Confined Space.
Yes No
CS2 Will any Confined Space Entry permits be required?
CS3 Have affected personnel been trained for Confined Space entry?
CS4 Will external rescue team services be used? If yes, specify the name of the provider.
CS5 Have all entry procedures been provided and documented?
Be prepared to provide Confined Space Plan to VRE Project Management Team.
17 Site Specific Safety Plan
Section 7 Life Saving Commitments – Excavations
Item # Subject Required? Description/Response
Excavations N/A [ ]
EX1 Will equipment be brought on site? If yes, specify type.
Yes No
EX2 Will any work activities involve excavations greater than four feet?
EX3 Will a trench box/shoring be needed?
EX4 Does fencing/barricade need to be installed?
Section 8 Life Saving Commitments – Mobile/On Track Equipment
Item # Subject Required? Description/Response
Mobile Equipment / Powered
Industrial Fork Trucks / Lifts /
Booms / Ballast Regulators /
N/A [ ]
ME1 Will any mobile powered equipment be required?
Yes No If yes, list types to be brought on site and keep daily/shift inspection logs on the equipment.
ME2 Will you be using any special attachments? Ex. Jibs, manlifts, etc.
ME3 Are operators trained/certified for operations of equipment?
Be prepared to produce verification of training to VRE Project Management Team.
ME4 Is there a plan for fuel transfer/storage or battery changes?
Spill kit/containment pad required containing 80% equipment capacity.
18 Site Specific Safety Plan
Section 9 Life Saving Commitments – Caught-In/Struck-By
Item # Subject Required? Description/Response
Caught-In/Struck-By N/A [ ]
OF1 Are employees familiar with pinching and crushing point locations?
Yes No
OF2 Are special precautions taken when working around belts, pulleys, chains, etc.?
OF3 Are employees aware of the hazards associated with overhead loads and swing radius?
OF4 Are vehicles equipped with appropriate back-up alarms, horns and lights?
OF5 Is contractor prepared to comply with the requirement to provide a spotter for all vehicles reversing with restricted rear vision?
Section 9 Life Saving Commitments – Chemical Hazards
Item # Subject Required? Description/Response
Chemical Hazards N/A [ ]
CH1 Are MSDS/SDS available at job site and available for inspection by the VRE Project Management Team?
Yes No
CH2 Are employees trained to handle/use and store specific materials?
CH3 Does storage and use meet all internal, VRE, state and federal regulations?
CH4 Do employees working with OSHA regulated chemicals have proper training for the job? (silica, RCS’, Etc..)
Be prepared to produce evidence of successful training to VRE Project Management team.
CH5 Are there any additional exhausts or fans needed during application/curing time?
CH6 Will sealant be applied to this job? Please specify quantity and job type.
CH7 Will this require off-hours application to avoid contact with passengers.
19 Site Specific Safety Plan
CH8 Will any flammable gases and/or liquids be used?
CH9 Have provisions for their storage been made?
CH10 Will appropriate containers be utilized?
Safety Cans are required.
CH11 Are secondary containment and spill kits required?
CH12 Will designated smoking areas be identified?
CH13 Have the appropriate number of fire extinguishers been identified?
CH14 Have emergency phone numbers been identified and plan to be posted in a conspicuous location?
CH15 Is there a plan for waste disposal in places that are capable of being rain and leak proof?
CH16 Are all characterization, containerization, segregation, storage and disposal requirements understood?
CH17 Is there a plan for water/wastewater discharges in place?
Be prepared to make plan available to VRE Project Management Team.
CH18 Is an Erosion Control Plan in place? Be prepared to make plan available to VRE Project Management Team.
CH19 Is there a Spill Plan in place? Be prepared to make plan available to VRE Project Management Team.
Section 10 Life Saving Commitments – Drug & Alcohol Prohibition
Item # Subject Required? Description/Response
Drug & Alcohol N/A [ ]
DA1 Contractors and subcontractors must agree to the zero-tolerance drug and alcohol prohibition (influence, use, possession) from all VRE contract work.
Yes No
20 Site Specific Safety Plan
Appendix A – Supplemental Information Sheet
Use this page to provide supplemental content to any of the elements above. Reproduce this portion as many times as is needed.
Section # Item # Subject
| Printed Name: |
| Date: |
| Project Title: |
| VRE Contract Number: |
| Contractor's Name: |
| Location(s) of Project: |
| Project Duration Period: |
| Scope of Work Description: |
| Project Safety Manager: |
| GS1: |
| GS2: |
| GS3: |
| GS4: |
| GS5: |
| GS6: |
| GS7: |
| GS8: |
| GS9: |
| GS10: |
| GS11: |
| GS12: |
| GS13: |
| GS14: [Select one] |
| GS16: [Select one] |
| GS17: [Select one] |
| GS15: [Select one] |
| GS18: [Select one] |
| GS19: [Select one] |
| GS20: |
| GS21: |
| RR1N: Off |
| RR1Y: Off |
| RR1A: Off |
| RR1C: Off |
| RR1NS: Off |
| RR2: |
| RR3: |
| RR4: |
| RR5: |
| N/A RR: Off |
| N/A GS: Off |
| N/A BS: Off |
| RR218A: Off |
| RR218C: Off |
| RR218N: Off |
| RR218NO: Off |
| RR218YES: Off |
| RR7Y: Off |
| RR7N: Off |
| RR8: |
| RR9: |
| RR10: |
| 214: Off |
| RR11Y: Off |
| RR11N: Off |
| RR12Y: Off |
| RR12N: Off |
| RR13Y: Off |
| RR13N: Off |
| RR14N: Off |
| RR13 Remarks: Additional Remarks |
| RR14 Remarks: Additional Remarks |
| RR14Y: Off |
| RR15N: Off |
| RR15Y: Off |
| RR15 Remarks: Additional Remarks |
| LOTO: Off |
| SE1Y: Off |
| SE1N: Off |
| SE2N: Off |
| RR11 Additional Remarks: |
| SE3Y: Off |
| SE3N: Off |
| SE3 Supplemental Remarks: |
| SE2Y: Off |
| SE1Supplemental Remarks: Additional Remarks |
| SE4Y: Off |
| SE2 Supplemental Remarks: |
| SE4N: Off |
| SE4Additional Remarks: |
| SE5Y: Off |
| SE5N: Off |
| SE5Additional Remarks: |
| SE6Y: Off |
| SE6N: Off |
| CGSENA: Off |
| SE7N: Off |
| SE6Additional Remarks: |
| SE7Y: Off |
| SE8Y: Off |
| SE8N: Off |
| SE7Additional Remarks: |
| SE8Additional Remarks: |
| SEPVNA: Off |
| FP1Y: Off |
| FP1N: Off |
| FP2 Additional Remarks: |
| FP3 Additional Remarks: |
| FP2Y: Off |
| FP2N: Off |
| FP3N: Off |
| FP3Y: Off |
| FPNA: Off |
| FP4N: Off |
| FP4Y: Off |
| FP5N: Off |
| FP4 Additional Remarks: |
| FP5Y: Off |
| FP6N: Off |
| FP6Y: Off |
| FP5 Additional Remarks: |
| FP6 Additional Remarks: |
| LENA: Off |
| RWNA: Off |
| FP7N: Off |
| FP7Y: Off |
| FP8N: Off |
| FP7 Additional Remarks: |
| FP8Y: Off |
| FP8 Additional Remarks: |
| FP9Y: Off |
| FP10: Off |
| FP9N: Off |
| FP10N: Off |
| FP9 Additional Remarks: |
| FP10 Additional Remarks: |
| LEFPNA: Off |
| FP11Y: Off |
| FP11N: Off |
| FP11Additional Comments: |
| FP12Y: Off |
| FP12N: Off |
| FP12Additional Comments: |
| FP13Y: Off |
| FP13N: Off |
| CRNA: Off |
| CR1Y: Off |
| CR1N: Off |
| FP13Additional Comments: |
| CR1Additional Comments: |
| CR2Y: Off |
| CR2N: Off |
| CR3Y: Off |
| CR3N: Off |
| CR2Additional Comments: |
| CR4Y: Off |
| CR4N: Off |
| CR5Y: Off |
| CR5N: Off |
| CR6Y: Off |
| CR6N: Off |
| CR3Additional Comments: |
| CR7Y: Off |
| CR7N: Off |
| CR8Y: Off |
| CR8N: Off |
| CS1N: Off |
| CR6Additional Comments: |
| CS1Y: Off |
| CS2Y: Off |
| CS2N: Off |
| CS1Additional Comments: |
| CS3Y: Off |
| CS3N: Off |
| CS2Additional Comments: |
| CS4Y: Off |
| CS4N: Off |
| CS3Additional Comments: |
| CS5Y: Off |
| CS5N: Off |
| CS4Additional Comments: |
| CSNA: Off |
| CS5Additional Comments: |
| EX1Y: Off |
| EX1N: Off |
| EX2N: Off |
| EX2Additional Comments: |
| EX1Additional Comments: |
| EX2Y: Off |
| EX3Y: Off |
| EX3Additional Comments: |
| EX4N: Off |
| EX3N: Off |
| EX4Y: Off |
| EXNA: Off |
| OTENA: Off |
| EX4Additional Comments: |
| ME1Y: Off |
| ME1N: Off |
| ME2Y: Off |
| ME2N: Off |
| ME1Additional Comments: |
| ME3Y: Off |
| ME3N: Off |
| ME4Y: Off |
| ME4N: Off |
| ME2Additional Comments: |
| OF1Y: Off |
| OF1N: Off |
| OF1Additional Comments: |
| OF2Y: Off |
| OF2N: Off |
| OF3Y: Off |
| OF3N: Off |
| OF4Y: Off |
| OF4N: Off |
| OF5Y: Off |
| OF5N: Off |
| OF3Additional Comments: |
| OF4Additional Comments: |
| OF2Additional Comments: |
| OFNA: Off |
| CHNA: Off |
| CH1Y: Off |
| CH1N: Off |
| CH2Y: Off |
| CH2N: Off |
| CH3Y: Off |
| CH3N: Off |
| CH4Y: Off |
| CH4N: Off |
| CH5Y: Off |
| CH5N: Off |
| CH6Y: Off |
| CH6N: Off |
| CH7Y: Off |
| CH7N: Off |
| CH7Additional Comments: |
| CH6Additional Comments: |
| CH5Additional Comments: |
| CH3Additional Comments: |
| CH2Additional Comments: |
| CH1Additional Comments: |
| OF5Additional Comments: |
| CH8Y: Off |
| CH8N: Off |
| CH9Y: Off |
| CH9N: Off |
| CH10Y: Off |
| CH10N: Off |
| CH11Y: Off |
| CH11N: Off |
| CH12Y: Off |
| CH12N: Off |
| CH13Y: Off |
| CH13N: Off |
| CH14Y: Off |
| CH14N: Off |
| CH15Y: Off |
| CH15N: Off |
| CH16Y: Off |
| CH16N: Off |
| CH17Y: Off |
| CH17N: Off |
| CH18Y: Off |
| CH18N: Off |
| CH19Y: Off |
| CH19N: Off |
| DA1: Off |
| CH8Additional Comments: |
| CH9Additional Comments: |
| CH10Additional Comments: |
| CH11Additional Comments: |
| CH12Additional Comments: |
| CH13Additional Comments: |
| CH14Additional Comments: |
| CH16Additional Comments: |
| DA1Additional Comments: |
| Dropdown111: [SELECT SECTION] |
| SUPPLEMENTAL ITEM#: |
| SUBJECT: |
| APPENDIX SUPPLEMENTAL INFORMATION: |
| GS9Y: Off |
| GS9N: Off |
| GS8Y: Off |
| GS8N: Off |
| GS10Y: Off |
| GS10N: Off |
| GS11Y: Off |
| GS11N: Off |
| GS12Y: Off |
| GS12N: Off |
| GS13Y: Off |
| GS13N: Off |
| GS21Y: Off |
| GS21N: Off |
File details come from the government source that posted it. Updated .