ATTACHMENT A - Specifications.pdf
PDF 12 MB Posted
- Attached to
- B115 Life Extension Center- Lean-to Construction
- Solicitation number
- 6046458
About this file
This document is an attachment to a federal solicitation from the Department of the Navy Naval Facilities Engineering Command. The solicitation is for the B115 Life Extension Center- Lean-to Construction project, which is reserved exclusively for vendors under the Blue Small Business MACC (Multiple Award Construction Contract) managed by NAVFAC Washington. The scope of work includes providing labor, materials, equipment, and supervision to repair and renovate the interior of a lean-to building, including replacing the fire protection systems, under slab sanitary sewer lines, and roof hatch. The project also requires the development of an explosive safety room and secure spaces with intrusion detection systems on the first and second floors. This is a design-build project, and the contractor will be responsible for the full design work.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ATTACHMENT C - FFE.pdf | ||
| Solicitation N40080-18-R-0002 X025..pdf | ||
| ATTACHMENT E - PreBid Inquiry Form.xls | XLS spreadsheet | |
| ATTACHMENT B - Drawings.pdf | ||
| ATTACHMENT D - CATEX.pdf | ||
| ATTACHMENT F - Base Access Form B-2805.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Updated: Sept 2021
WORK ORDER NO. 1665143
Contract NO. N40080-22-D-0001
TO NO. N4008022F5048
SPECIFICATIONS
CENTER LEAN TO ISSUED FOR CONSTRUCTION
SUBMISSION
FY22 H115 AE HANGAR LIFE EXTENSION
Naval Air Station Patuxent River – Patuxent River, MD
PREPARED BY:
Pond-Baker JV
3500 Parkway Lane Suite 600
Norcross, GA 30092-2861
Architectural: Jason Bischoff, RA Mechanical: Annie Heisler Interior: Sarah Koontz, NCIDQ Plumbing: Carlos Tellez Civil: Tanya Norman, PE Electrical: Tom Higgins, PE, RCDD Structural: Wayne Airgood, PE Communications: Tom Higgins, PE, RCDD Fire Protection: Daniel Brace, PE, GSP Life Safety: Daniel Walter, PE
Submitted By: Chris Drummond, PE Date: 03 MAY 2024 AE Project Manager
Project Manager: Name, Credential, Title (NAVFAC DM / PM) Date:
Approved By: Name, Credential, Title (NAVFAC DC4 / PMEB) Date:
H115 AE Hangar Life Extension DP1-C Center Lean To Issued for Construction Submission
H115 AE Hangar Life Extension DP1-C Center Lean To Issued for Construction Submission
H115 AE Hangar Li f e Ext ensi on DP1- C Cent er Lean To I ssued f or Const r uct i on Submi ssi on
PROJECT TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
01 11 00 08/ 15, CHG 2: 08/ 21 SUMMARY OF WORK
01 14 00 11/ 22 WORK RESTRI CTI ONS
01 20 00. 00 20 11/ 20, CHG 2: 08/ 21 PRI CE AND PAYMENT PROCEDURES
01 30 00 11/ 20, CHG 2: 05/ 22 ADMI NI STRATI VE REQUI REMENTS
01 30 01. 00 22 11/ 20, CHG 2: 05/ 22 DESI GN, PROCUREMENT, AND I NSTALLATI ON
OF FURNI TURE, FI XTURES, AND EQUI PMENT
01 30 02. 00 22 07/ 22 DESI GN, PROCUREMENT, AND I NSTALLATI ON
OF AUDI OVI SUAL EQUI PMENT
01 31 23. 13 20 05/ 17, CHG 7: 11/ 21 ELECTRONI C CONSTRUCTI ON AND FACI LI TY
SUPPORT CONTRACT MANAGEMENT SYSTEM
01 32 01. 00 10 02/ 15 PROJECT SCHEDULE
01 32 17. 00 20 05/ 18, CHG 3: 08/ 20 COST- LOADED NETWORK ANALYSI S SCHEDULES
( NAS)
01 33 00 08/ 18, CHG 4: 02/ 21 SUBMI TTAL PROCEDURES
01 33 29 02/ 21 SUSTAI NABI LI TY REPORTI NG
01 35 13 11/ 20, CHG 1: 02/ 22 SPECI AL PROJECT PROCEDURES
01 35 26 11/ 20, CHG 3: 02/ 22 GOVERNMENTAL SAFETY REQUI REMENTS
01 42 00 02/ 19 SOURCES FOR REFERENCE PUBLI CATI ONS
01 45 00. 00 20 11/ 11, CHG 8: 02/ 21 QUALI TY CONTROL
01 45 35 11/ 20 SPECI AL I NSPECTI ONS
01 50 00 11/ 20, CHG 2: 08/ 22 TEMPORARY CONSTRUCTI ON FACI LI TI ES AND
CONTROLS
01 57 19 08/ 22 TEMPORARY ENVI RONMENTAL CONTROLS
01 57 19. 01 20 11/ 15, CHG 5: 08/ 21 SUPPLEMENTAL TEMPORARY ENVI RONMENTAL
CONTROLS
01 58 00 08/ 19, CHG 5: 08/ 22 PROJECT I DENTI FI CATI ON
01 74 19 02/ 19, CHG 3: 11/ 21 CONSTRUCTI ON WASTE MANAGEMENT AND
DI SPOSAL
01 78 00 05/ 19, CHG 1: 08/ 21 CLOSEOUT SUBMI TTALS
01 78 23 08/ 15, CHG 2: 08/ 21 OPERATI ON AND MAI NTENANCE DATA
01 78 24. 00 20 02/ 15, CHG 3: 08/ 21 FACI LI TY ELECTRONI C OPERATI ON AND
MAI NTENANCE SUPPORT I NFORMATI ON ( eOMSI )
01 91 00. 15 20 02/ 21, CHG 1: 05/ 21 TOTAL BUI LDI NG COMMI SSI ONI NG
DI VI SI ON 02 - EXI STI NG CONDI TI ONS
02 41 00 05/ 10, CHG 2: 02/ 19 DEMOLI TI ON
02 81 00 11/ 18 TRANSPORTATI ON AND DI SPOSAL OF
HAZARDOUS MATERI ALS
02 82 00 11/ 18, CHG 1: 11/ 19 ASBESTOS REMEDI ATI ON
02 83 00 11/ 18 LEAD REMEDI ATI ON
02 84 16 11/ 22 HANDLI NG OF LI GHTI NG BALLASTS AND
LAMPS CONTAI NI NG PCBs AND MERCURY
02 84 33 11/ 22 REMOVAL AND DI SPOSAL OF
POLYCHLORI NATED BI PHENYLS ( PCBs)
DI VI SI ON 03 - CONCRETE
03 30 00 02/ 19, CHG 4: 08/ 22 CAST- I N- PLACE CONCRETE
03 42 13. 00 10 05/ 16 PLANT- PRECAST CONCRETE PRODUCTS FOR
BELOW GRADE CONSTRUCTI ON
DI VI SI ON 04 - MASONRY
04 20 00 11/ 15, CHG 2: 05/ 19 UNI T MASONRY
DOCUMENT PROJECT Page 1
DI VI SI ON 05 - METALS
05 30 00 05/ 15, CHG 2: 08/ 18 STEEL DECKS
05 50 13 05/ 17, CHG 1: 08/ 18 MI SCELLANEOUS METAL FABRI CATI ONS
05 51 00 02/ 17, CHG 1: 05/ 17 METAL STAI RS
05 51 33 02/ 16, CHG 2: 02/ 18 METAL LADDERS
05 52 00 02/ 18, CHG 1: 02/ 20 METAL RAI LI NGS
DI VI SI ON 06 - WOOD, PLASTI CS, AND COMPOSI TES
06 10 00 08/ 16, CHG 2: 11/ 18 ROUGH CARPENTRY
06 41 16. 00 10 08/ 10, CHG 1: 11/ 18 PLASTI C- LAMI NATE- CLAD ARCHI TECTURAL
CABI NETS
06 61 16 08/ 20 SOLI D SURFACI NG FABRI CATI ONS
DI VI SI ON 07 - THERMAL AND MOI STURE PROTECTI ON
07 21 16 11/ 11, CHG 4: 08/ 18 MI NERAL FI BER BLANKET I NSULATI ON
07 22 00 02/ 16, CHG 3: 11/ 18 ROOF AND DECK I NSULATI ON
07 52 00 05/ 12, CHG 5: 11/ 19 MODI FI ED BI TUMI NOUS MEMBRANE ROOFI NG
07 60 00 05/ 17, CHG 2: 11/ 18 FLASHI NG AND SHEET METAL
07 84 00 05/ 10, CHG 1: 08/ 13 FI RESTOPPI NG
07 92 00 08/ 16, CHG 3: 11/ 18 JOI NT SEALANTS
DI VI SI ON 08 - OPENI NGS
08 11 13 02/ 10 STEEL DOORS AND FRAMES
08 11 16 05/ 17, CHG 2: 11/ 18 ALUMI NUM DOORS AND FRAMES
08 14 00 08/ 16, CHG 1: 08/ 18 WOOD DOORS
08 31 00 05/ 17, CHG 1: 08/ 18 ACCESS DOORS AND PANELS
08 34 73 11/ 19, CHG 1: 02/ 21 SOUND CONTROL DOOR ASSEMBLI ES
08 51 13 05/ 19 ALUMI NUM WI NDOWS
08 51 23 08/ 20, CHG 1: 02/ 22 STEEL WI NDOWS
08 71 00 02/ 16 DOOR HARDWARE
08 81 00 05/ 19 GLAZI NG
08 91 00 08/ 20 METAL WALL AND DOOR LOUVERS
DI VI SI ON 09 - FI NI SHES
09 01 90. 50 05/ 09, CHG 1: 08/ 17 PREPARATI ON OF HI STORI C WOOD AND METAL
SURFACES FOR PAI NTI NG
09 22 00 02/ 10, CHG 2: 08/ 18 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 08/ 16, CHG 4: 02/ 20 GYPSUM BOARD
09 30 10 08/ 20 CERAMI C, QUARRY, AND GLASS TI LI NG
09 51 00 08/ 20 ACOUSTI CAL CEI LI NGS
09 62 38 08/ 17, CHG 1: 08/ 18 STATI C- CONTROL FLOORI NG
09 65 00 08/ 10, CHG 3: 08/ 18 RESI LI ENT FLOORI NG
09 67 23. 15 02/ 21 FUEL RESI STI VE RESI NOUS FLOORI NG,
3- COAT SYSTEM
09 68 00 11/ 17, CHG 2: 08/ 20 CARPETI NG
09 90 00 02/ 21 PAI NTS AND COATI NGS
DI VI SI ON 10 - SPECI ALTI ES
10 11 00 08/ 20 VI SUAL DI SPLAY UNI TS
10 14 00. 10 08/ 17, CHG 1: 11/ 18 EXTERI OR SI GNAGE
10 14 00. 20 08/ 20 I NTERI OR SI GNAGE
10 21 13 08/ 20 TOI LET COMPARTMENTS
DOCUMENT PROJECT Page 2
10 21 23. 16 04/ 06 CUBI CLE TRACK AND HARDWARE
10 26 00 08/ 20 WALL AND DOOR PROTECTI ON
10 28 13 08/ 20 TOI LET ACCESSORI ES
10 44 16 11/ 19 FI RE EXTI NGUI SHER CABI NETS
10 51 13 05/ 11 PLASTI C LOCKERS
DI VI SI ON 12 - FURNI SHI NGS
12 00 01. 00 20 02/ 23 FURNI TURE, FI XTURES AND EQUI PMENT
( FF&E) PACKAGE
12 24 13 08/ 20 ROLLER WI NDOW SHADES
12 48 13 08/ 17 ENTRANCE FLOOR MATS AND FRAMES
DI VI SI ON 14 - CONVEYI NG EQUI PMENT
14 21 13 05/ 16, CHG 1: 05/ 18 ELECTRI C TRACTI ON FREI GHT ELEVATORS
DI VI SI ON 21 - FI RE SUPPRESSI ON
21 13 13 08/ 20 WET PI PE SPRI NKLER SYSTEMS, FI RE
PROTECTI ON
DI VI SI ON 22 - PLUMBI NG
22 00 00 11/ 15, CHG 4: 05/ 21 PLUMBI NG, GENERAL PURPOSE
22 05 48. 00 20 04/ 06, CHG 1: 05/ 15 MECHANI CAL SOUND, VI BRATI ON, AND
SEI SMI C CONTROL
DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)
23 03 00. 00 20 08/ 10, CHG 3: 08/ 18 BASI C MECHANI CAL MATERI ALS AND METHODS
23 05 15 05/ 22 COMMON PI PI NG FOR HVAC
23 05 48. 19 05/ 18, CHG 2: 08/ 20 BRACI NG FOR HVAC
23 05 93 11/ 15 TESTI NG, ADJUSTI NG, AND BALANCI NG FOR
HVAC
23 07 00 02/ 13, CHG 7: 05/ 20 THERMAL I NSULATI ON FOR MECHANI CAL
SYSTEMS
23 08 00. 00 20 02/ 21, CHG 1: 05/ 21 COMMI SSI ONI NG OF MECHANI CAL AND
PLUMBI NG SYSTEMS
23 09 00 02/ 19, CHG 3: 05/ 21 I NSTRUMENTATI ON AND CONTROL FOR HVAC
23 09 13 11/ 15, CHG 2: 05/ 21 I NSTRUMENTATI ON AND CONTROL DEVI CES
FOR HVAC
23 09 23. 02 02/ 19, CHG 1: 02/ 20 BACNET DI RECT DI GI TAL CONTROL FOR HVAC
AND OTHER BUI LDI NG CONTROL SYSTEMS
23 11 20 05/ 20 FACI LI TY GAS PI PI NG
23 21 23 08/ 17 HYDRONI C PUMPS
23 30 00 05/ 20, CHG 1: 02/ 22 HVAC AI R DI STRI BUTI ON
23 52 43. 00 20 05/ 15, CHG 2: 08/ 18 LOW PRESSURE WATER HEATI NG BOI LERS
( UNDER 800, 000 BTU/ HR OUTPUT)
23 81 00 05/ 18, CHG 1: 02/ 21 DECENTRALI ZED UNI TARY HVAC EQUI PMENT
23 82 00. 00 20 02/ 16, CHG 1: 08/ 18 TERMI NAL HEATI NG UNI TS
DI VI SI ON 25 - I NTEGRATED AUTOMATI ON
25 05 11. 01 11/ 17 CYBERSECURI TY FOR FACI LI TY- HVAC
RELATED CONTROL SYSTEMS
25 05 11. 02 05/ 21, CHG 1: 08/ 23 CYBERSECURI TY FOR FI RE ALARM LI FE
SAFETY FACI LI TY- RELATED CONTROL SYSTEMS
25 05 11. 03 05/ 21, CHG 1: 08/ 23 CYBERSECURI TY FOR ELECTRI CAL
DOCUMENT PROJECT Page 3
FACI LI TY- RELATED CONTROL SYSTEMS
25 05 11. 04 05/ 21, CHG 1: 08/ 23 CYBERSECURI TY FOR ELECTRONI C SECURI TY
SYSTEM ( ESS) FACI LI TY- RELATED CONTROL
SYSTEMS
25 08 10 05/ 21 UTI LI TY MONI TORI NG AND CONTROL SYSTEM
TESTI NG
25 08 11. 00 20 11/ 20 RI SK MANAGEMENT FRAMEWORK FOR
FACI LI TY- RELATED CONTROL SYSTEMS
25 10 10 02/ 19, CHG 1: 05/ 21 UTI LI TY MONI TORI NG AND CONTROL SYSTEM
( UMCS) FRONT END AND I NTEGRATI ON
DI VI SI ON 26 - ELECTRI CAL
26 20 00 08/ 19, CHG 3: 11/ 21 I NTERI OR DI STRI BUTI ON SYSTEM
26 24 13 08/ 21 SWI TCHBOARDS
26 28 01. 00 10 08/ 21 COORDI NATED POWER SYSTEM PROTECTI ON
26 29 23 02/ 20 ADJUSTABLE SPEED DRI VE ( ASD) SYSTEMS
UNDER 600 VOLTS
26 41 00 11/ 13 LI GHTNI NG PROTECTI ON SYSTEM
26 51 00 05/ 20, CHG 2: 11/ 21 I NTERI OR LI GHTI NG
DI VI SI ON 27 - COMMUNI CATI ONS
27 10 00 08/ 11 BUI LDI NG TELECOMMUNI CATI ONS CABLI NG
SYSTEM
DI VI SI ON 28 - ELECTRONI C SAFETY AND SECURI TY
28 31 76 08/ 20 I NTERI OR FI RE ALARM AND MASS
NOTI FI CATI ON SYSTEM, ADDRESSABLE
DI VI SI ON 31 - EARTHWORK
31 00 00 08/ 08, CHG 2: 02/ 21 EARTHWORK
DI VI SI ON 32 - EXTERI OR I MPROVEMENTS
32 01 19. 61 11/ 19 SEALI NG OF JOI NTS I N RI GI D PAVEMENT
32 13 14. 13 11/ 22 CONCRETE PAVI NG FOR AI RFI ELDS AND
OTHER HEAVY DUTY PAVEMENTS
DI VI SI ON 33 - UTI LI TI ES
33 11 00 02/ 18, CHG 1: 02/ 22 WATER UTI LI TY DI STRI BUTI ON PI PI NG
33 30 00 05/ 18 SANI TARY SEWERAGE
33 82 00 04/ 06 TELECOMMUNI CATI ONS OUTSI DE PLANT ( OSP)
DI VI SI ON 43 - PROCESS GAS AND LI QUI D HANDLI NG, PURI FI CATI ON, AND STORAGE
EQUI PMENT
43 15 00. 00 20 04/ 06 LOW PRESSURE COMPRESSED AI R PI PI NG
( NON- BREATHI NG AI R TYPE)
- - End of Pr oj ect Tabl e of Cont ent s - -
DOCUMENT PROJECT Page 4
SECTI ON 01 11 00
SUMMARY OF WORK
08/ 15, CHG 2: 08/ 21
PART 1 GENERAL
1. 1 SUBMI TTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" or " S" c l assi f i cat i on. Submi t t al s not havi ng a " G" or " S" c l assi f i cat i on ar e f or Cont r act or Qual i t y Cont r ol appr oval . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:
SD- 01 Pr econst r uct i on Submi t t al s Sal vage Pl an; G
1. 2 WORK COVERED BY CONTRACT DOCUMENTS
1. 2. 1 Pr oj ect Descr i pt i on
The wor k i ncl udes r enovat i on of t he Hangar H115 Cent er Lean To and enabl i ng wor k i n adj acent ar eas and i nci dent al r el at ed wor k.
1. 2. 2 Locat i on
The wor k i s l ocat ed at t he Pat uxent Ri ver Naval Ai r St at i on, Mar yl and, appr oxi mat el y as i ndi cat ed. The exact l ocat i on wi l l be shown by t he Cont r act i ng Of f i cer .
1. 2. 3 PROJECT ENVI RONMENTAL GOALS
Cont r act or shal l di st r i but e copi es of t he Envi r onment al Goal s t o each subcont r act or and t he Cont r act i ng Of f i cer . The over al l goal f or desi gn, const r uct i on, and oper at i on i s t o pr oduce a bui l di ng t hat meet s t he f unct i onal pr ogr am needs and i ncor por at es t he pr i nci pl es of sust ai nabi l i t y . Speci f i cal l y:
a. Pr eser ve and r est or e t he s i t e ecosyst em and bi odi ver si t y; avoi d s i t e degr adat i on and er osi on. Mi ni mi ze of f s i t e envi r onment al i mpact .
b. Use t he mi ni mum amount of ener gy, wat er , and mat er i al s f easi bl e t o meet t he desi gn i nt ent . Sel ect ener gy and wat er ef f i c i ent equi pment and st r at egi es.
c. Use envi r onment al l y pr ef er abl e pr oduct s and decr ease t oxi c i t y l evel of mat er i al s used.
d. Use r enewabl e ener gy and mat er i al r esour ces.
e. Opt i mi ze oper at i onal per f or mance ( t hr ough commi ssi oni ng ef f or t s) i n or der t o ensur e ener gy ef f i c i ent equi pment oper at es as i nt ended.
Consi der t he dur abi l i t y , mai nt ai nabi l i t y , and f l exi bi l i t y of bui l di ng syst ems.
f . Manage const r uct i on s i t e and st or age of mat er i al s t o ensur e no negat i ve i mpact on t he i ndoor envi r onment al qual i t y of t he bui l di ng.
g. Reduce const r uct i on wast e t hr ough r euse, r ecycl i ng, and suppl i er t ake- back
1. 3 OCCUPANCY OF PREMI SES
Bui l di ng( s) wi l l be occupi ed dur i ng per f or mance of wor k under t hi s
SECTI ON 01 11 00 Page 1
Cont r act . Occupancy not i f i cat i ons wi l l be post ed i n a pr omi nent l ocat i on i n t he wor k ar ea.
Bef or e wor k i s st ar t ed, ar r ange wi t h t he Cont r act i ng Of f i cer a sequence of pr ocedur e, means of access, space f or st or age of mat er i al s and equi pment , and use of appr oaches, cor r i dor s, and st ai r ways.
1. 4 EXI STI NG WORK
I n addi t i on t o FAR 52. 236- 9 Pr ot ect i on of Exi st i ng Veget at i on, St r uct ur es, Equi pment , Ut i l i t i es, and I mpr ovement s:
a. Remove or al t er exi st i ng wor k i n such a manner as t o pr event i nj ur y or damage t o any por t i ons of t he exi st i ng wor k whi ch r emai n.
b. Repai r or r epl ace por t i ons of exi st i ng wor k whi ch have been al t er ed dur i ng const r uct i on oper at i ons t o mat ch exi st i ng or adj oi ni ng wor k, as appr oved by t he Cont r act i ng Of f i cer . At t he compl et i on of oper at i ons, exi st i ng wor k must be i n a condi t i on equal t o or bet t er t han t hat whi ch exi st ed bef or e new wor k st ar t ed.
1. 5 LOCATI ON OF UNDERGROUND UTI LI TI ES
Obt ai n di ggi ng per mi t s pr i or t o st ar t of excavat i on, and compl y wi t h I nst al l at i on r equi r ement s f or l ocat i ng and mar ki ng under gr ound ut i l i t i es.
Cont act l ocal ut i l i t y l ocat i ng ser vi ce a mi ni mum of 48 hour s pr i or t o excavat i ng, t o mar k ut i l i t i es, and wi t hi n suf f i c i ent t i me r equi r ed i f wor k occur s on a Monday or af t er a Hol i day. Ver i f y exi st i ng ut i l i t y l ocat i ons i ndi cat ed on cont r act dr awi ngs, wi t hi n ar ea of wor k.
1. 5. 1 Not i f i cat i on Pr i or t o Excavat i on
Not i f y t he Cont r act i ng Of f i cer at l east 15 days pr i or t o st ar t i ng excavat i on wor k.
1. 6 GOVERNMENT- FURNI SHED MATERI AL AND EQUI PMENT
Pur suant t o Cont r act Cl ause FAR 52. 245- 1 Gover nment Pr oper t y, t he Gover nment wi l l f ur ni sh t he f ol l owi ng mat er i al s and equi pment f or i nst al l at i on by t he Cont r act or :
DESI GNATI ON NO. DESCRI PTI ON QUANTI TY *
Ant ennas al ong wi t h ant enna mount s, COAX cabl e, and associ at ed syst em component s. ( See
DWG T- 101)
Ant ennas, anet nna mount s, COAX cabl e, and associ at ed syst em component s as descr i bed on dr awi ngs ( See
DWG T- 101)
( 2) ant ennas, ( 2) ant enna mount s, r ef er t o dr awi ng f or appr oxi mat e r out i ng, t ot al l i near f t qt y t o be conf i r med wi t h Gov' t
Quant i t i es i ndi cat ed f or t he above- l i s t ed i t ems mar ked wi t h an ast er i sk ar e est i mat es. I t i s t he i nt ent i on of t he Gover nment t o f ur ni sh al l quant i t i es of t he ast er i sk i t ems r equi r ed t o compl et e t he wor k as
SECTI ON 01 11 00 Page 2 speci f i ed, and t he var i ous quant i t i es wi l l be adj ust ed when necessar y.
Quant i t i es st at ed f or t he above i t ems not mar ked wi t h an ast er i sk ar e al l t hat wi l l be f ur ni shed by t he Gover nment . Pr ovi de any addi t i onal quant i t i es t hat ar e r equi r ed.
The ext ent of Gover nment - f ur ni shed, Cont r act or - i nst al l ed ( GFCI ) equi pment ar e t he Ant ennas and Coax cabl e not ed above and sal vaged mat er i al ( t o be sal vaged by cont r act or ) as i dent i f i ed on dr awi ngs A- 111 and A- 302 as exi st i ng GFCI . Al l ot her Gover nment - f ur ni shed i t ems ar e Gover nment - i nst al l ed
1. 6. 1 Del i ver y Schedul e
Not i f y t he Cont r act i ng Of f i cer i n wr i t i ng at l east 45 cal endar days i n advance of t he dat e on whi ch t he mat er i al s and equi pment ar e r equi r ed.
Pi ck up mat er i al s and equi pment no l at er t han 30 cal endar days af t er such dat e. When mat er i al s and equi pment ar e not pi cked up by t he 30t h day, t he Cont r act or wi l l be char ged f or st or age at t he r at e of $500. 00 per mont h or f r act i on t her eof .
1. 6. 2 Del i ver y Locat i on
The mat er i al s and equi pment wi l l be del i ver ed t o t he j obsi t e or t o a l ocat i on t o be coor di nat ed bet ween cont r act i ng of f i cer and cont r act or .
1. 7 GOVERNMENT- I NSTALLED WORK
Cont r act or t o coor di nat e i nst al l at i on of Gover nment - f ur ni shed, Gover nment - i nst al l ed ( GFGI ) i t ems ( al so r ef er r ed t o as User - pr ovi ded, User i nst al l ed ( UPUI ) i t ems wi t h cont r act i ng of f i cer pr i or t o devel opment of cont r act or s const r uct i on schedul e.
1. 8 NAVY AND MARI NE CORPS I NTRANET( NMCI ) COORDI NATI ON REQUI REMENTS
1. 8. 1 NMCI Cont r act or Access
Al l ow t he NMCI Cont r act or access t o t he f aci l i t y t owar ds t he end of const r uct i on ( f i ni shes 90 per cent compl et e, r ough- i n 100 per cent compl et e, I nsi de Pl ant ( I SP) / Out si de Pl ant ( OSP) i nf r ast r uct ur e i n pl ace) t o pr ovi de equi pment i n t he t el ecommuni cat i ons r ooms and make f i nal connect i ons.
Coor di nat e ef f or t s wi t h t he NMCI Cont r act or t o f aci l i t at e j oi nt use of bui l di ng spaces dur i ng t he f i nal phases of const r uct i on. Af t er t he Cont r act i ng Of f i cer has f aci l i t at ed coor di nat i on meet i ngs bet ween t he t wo cont r act or s, wi t hi n one week, i ncor por at e t he ef f or t of addi t i onal coor di nat i on wi t h t he NMCI Cont r act or i nt o t he const r uct i on schedul e t o demonst r at e a pl an f or mai nt ai ni ng t he cont r act dur at i on.
1. 9 SALVAGE MATERI AL AND EQUI PMENT
I t ems desi gnat ed by t he Cont r act i ng Of f i cer t o be sal vaged r emai n t he pr oper t y of t he Gover nment . Segr egat e, i t emi ze, del i ver and of f - l oad t he sal vaged pr oper t y at t he Gover nment desi gnat ed st or age ar ea l ocat ed wi t hi n 3 mi l es of t he const r uct i on s i t e.
Pr ovi de a sal vage pl an, l i s t i ng mat er i al and equi pment t o be sal vaged, and t hei r st or age l ocat i on. Mai nt ai n pr oper t y cont r ol r ecor ds f or mat er i al or equi pment desi gnat ed as sal vage. Pr ovi de a syst em f or pr oper t y cont r ol i n t he sal vage pl an. St or e and pr ot ect sal vaged mat er i al s and equi pment unt i l di sposi t i on by t he Cont r act i ng Of f i cer .
SECTI ON 01 11 00 Page 3
PART 2 PRODUCTS
Not used.
PART 3 EXECUTI ON
Not used.
- - End of Sect i on - -
SECTI ON 01 11 00 Page 4
SECTI ON 01 14 00
WORK RESTRI CTI ONS
11/ 22
PART 1 GENERAL
1. 1 SUBMI TTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" or " S" c l assi f i cat i on. Submi t t al s not havi ng a " G" or " S" c l assi f i cat i on ar e f or Cont r act or Qual i t y Cont r ol appr oval . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:
SD- 01 Pr econst r uct i on Submi t t al s
Li st of Cont act Per sonnel ; G
1. 2 CONTRACTOR ACCESS AND USE OF PREMI SES
1. 2. 1 Act i v i t y Regul at i ons
Ensur e t hat Cont r act or per sonnel empl oyed on t he Act i v i t y become f ami l i ar wi t h and obey Act i v i t y r egul at i ons i ncl udi ng saf et y, f i r e, t r af f i c and secur i t y r egul at i ons. Keep wi t hi n t he l i mi t s of t he wor k and avenues of i ngr ess and egr ess. Wear appr opr i at e per sonal pr ot ect i ve equi pment ( PPE) i n desi gnat ed ar eas. Do not ent er any r est r i ct ed ar eas unl ess r equi r ed t o do so and unt i l c l ear ed f or such ent r y. Ensur e al l Cont r act or equi pment , i ncl ude del i ver y vehi c l es, ar e c l ear l y i dent i f i ed wi t h t hei r company name.
1. 2. 1. 1 Subcont r act or s and Per sonnel Cont act s
Pr ovi de a l i s t of cont act per sonnel of t he Cont r act or and subcont r act or s i ncl udi ng addr esses and t el ephone number s f or use i n t he event of an emer gency. As changes occur and addi t i onal i nf or mat i on becomes avai l abl e, cor r ect and change t he i nf or mat i on cont ai ned i n pr evi ous l i s t s.
1. 2. 1. 2 Addi t i onal Per sonnel Requi r ement sSub Ti t l e
1. 2. 1. 2. 1 Secur i t y Requi r ement s
Cont r act Cl ause " FAR 52. 204- 2, Secur i t y Requi r ement s and Al t er nat e I I , " FAC 5252. 236- 9301, Speci al Wor ki ng Condi t i ons and Ent r y t o Wor k Ar ea, " and t he f ol l owi ng appl y:
1. 2. 1. 2. 1. 1 Naval Ai r St at i on ( NAS) , Pat uxent Ri ver , MD
For ei gn Nat i onal s: For ei gn Nat i onal s and Dual Ci t i zens ar e not per mi t t ed t o wor k on pr oj ect . Onl y U. S. Ci t i zens ar e per mi t t ed t o wor k on t hi s pr oj ect and t o access t hi s s i t e.
1. 2. 1. 3 I nst al l at i on Access
Obt ai n access t o Navy i nst al l at i ons t hr ough par t i c i pat i on i n t he Def ense Bi omet r i cs I dent i f i cat i on Syst em ( DBI DS) . Requi r ement s f or Cont r act or empl oyee r egi st r at i on, and t r ansi t i on f or empl oyees cur r ent l y under Navy Commer ci al Access Cont r ol Syst em ( NCACS) , ar e avai l abl e at ht t ps: / / www. cni c. navy. mi l / Oper at i ons- and- Management / Base- Suppor t / DBI DS/ .
SECTI ON 01 14 00 Page 1
No f ees ar e associ at ed wi t h obt ai ni ng a DBI DS cr edent i al .
Par t i c i pat i on i n t he DBI DS i s not mandat or y, and Cont r act or per sonnel may appl y f or One- Day Passes at t he Base Vi s i t or Cont r ol Of f i ce t o access an i nst al l at i on.
1. 2. 1. 3. 1 Regi st r at i on f or DBI DS
Regi st r at i on f or DBI DS i s avai l abl e at ht t ps: / / www. cni c. navy. mi l / Oper at i ons- and- Management / Base- Suppor t / DBI DS/ .
Pr ocedur e i ncl udes:
a. Pr esent a l et t er or of f i c i al awar d document ( i . e. DD For m 1155 or SF 1442) f r om t he Cont r act i ng Of f i cer , t hat pr ovi des t he pur pose f or access, t o t he base Vi s i t or Cont r ol Cent er r epr esent at i ve.
b. Pr esent val i d i dent i f i cat i on, such as a passpor t or Real I D Act - compl i ant st at e dr i ver ' s l i cense.
c. Pr ovi de compl et ed SECNAV FORM 5512/ 1 t o t he base Vi s i t or Cont r ol Cent er r epr esent at i ve t o obt ai n a backgr ound check. Thi s f or m i s avai l abl e f or downl oad at ht t ps: / / www. cni c. navy. mi l / Oper at i ons- and- Management / Base- Suppor t / DBI DS/ .
d. Upon successf ul compl et i on of t he backgr ound check, t he Gover nment wi l l compl et e t he DBI DS enr ol l ment pr ocess, whi ch i ncl udes Cont r act or empl oyee phot o, f i nger pr i nt s, base r est r i ct i on and sever al ot her assessment s.
e. Upon successf ul compl et i on of t he enr ol l ment pr ocess, t he Cont r act or empl oyee wi l l be i ssued a DBI DS cr edent i al , and wi l l be al l owed t o pr oceed t o wor ksi t e.
1. 2. 1. 3. 2 DBI DS El i gi bi l i t y Requi r ement s
Thr oughout t he l engt h of t he cont r act , t he Cont r act or empl oyee must cont i nue t o meet backgr ound scr een st andar ds. Per i odi c backgr ound scr eeni ngs ar e conduct ed t o ver i f y cont i nued DBI DS par t i c i pat i on and i nst al l at i on access pr i v i l eges. DBI DS access pr i v i l eges wi l l be i mmedi at el y suspended or r evoked i f at any t i me a Cont r act or empl oyee becomes i nel i gi bl e.
An adj udi cat i on pr ocess may be i ni t i at ed when a backgr ound scr een f ai l ur e r esul t s i n di squal i f i cat i on f r om par t i c i pat i on i n t he DBI DS, and Cont r act or empl oyee does not agr ee wi t h t he r eason f or di squal i f i cat i on.
The Gover nment i s t he f i nal aut hor i t y.
1. 2. 1. 3. 3 DBI DS Not i f i cat i on Requi r ement s
a. I mmedi at el y r epor t i nst ances of l ost or st ol en badges t o t he Cont r act i ng Of f i cer .
b. I mmedi at el y col l ect DBI DS cr edent i al s and not i f y t he Cont r act i ng Of f i cer i n wr i t i ng under t he f ol l owi ng ci r cumst ances:
( 1) An empl oyee has depar t ed t he company wi t hout havi ng pr oper l y r et ur ned or sur r ender ed t hei r DBI DS cr edent i al s.
( 2) Ther e i s a r easonabl e basi s t o concl ude t hat an empl oyee, or
SECTI ON 01 14 00 Page 2 f or mer empl oyee, mi ght pose a r i sk, compr omi se, or t hr eat t o t he saf et y or secur i t y of t he I nst al l at i on or anyone t her ei n.
1. 2. 1. 3. 4 One- Day Passes
Per sonnel appl y i ng f or One- Day passes at t he Base Vi s i t or Cont r ol Of f i ce ar e subj ect t o dai l y mandat or y vehi c l e i nspect i on, and wi l l have l i mi t ed access t o t he i nst al l at i on. The Gover nment i s not r esponsi bl e f or any cost or l ost t i me associ at ed wi t h obt ai ni ng dai l y passes or added vehi c l e i nspect i ons i ncur r ed by non- par t i c i pant s i n t he DBI DS.
1. 2. 1. 4 Empl oyee Li st
The Cont r act or must pr ovi de t o t he Cont r act i ng of f i cer , i n wr i t i ng, t he names of t wo desi gnat ed r epr esent at i ves aut hor i zed t o r equest per sonnel and vehi c l e passes f or empl oyees and subcont r act or ' s empl oyees pr i or t o commencement of wor k under t hi s cont r act . The Cont r act or must adher e t o t he r equi r ement s of " I mpor t ant Cl ar i f i cat i ons - Cont r act or s - How t o Gai n Access, " dat ed 31 Oct ober 1995, i n obt ai ni ng access t o t he Naval Ai r St at i on compl ex f or t he l i f e of t he cont r act . A copy of t hese r equi r ement s wi l l be pr ovi ded at t he pr econst r uct i on meet i ng.
1. 2. 1. 5 No Smoki ng Pol i cy
Smoki ng i s pr ohi bi t ed wi t hi n and out si de of al l bui l di ngs on i nst al l at i on, except i n desi gnat ed smoki ng ar eas. Thi s appl i es t o exi st i ng bui l di ngs, bui l di ngs under const r uct i on and bui l di ngs under r enovat i on. Di scar di ng t obacco mat er i al s ot her t han i nt o desi gnat ed t obacco r ecept acl es i s consi der ed l i t t er i ng and i s subj ect t o f i nes. The Cont r act i ng Of f i cer wi l l i dent i f y desi gnat ed smoki ng ar eas.
1. 2. 2 Wor ki ng Hour s
Regul ar wor ki ng hour s wi l l consi st of an 8 1/ 2 hour per i od est abl i shed by t he Cont r act i ng Of f i cer , bet ween 7 a. m. and 3: 30 p. m. , Monday t hr ough Fr i day , and 7 a. m. t o 11 p. m. on Sat ur day , excl udi ng Gover nment hol i days.
1. 2. 3 Wor k Out si de Regul ar Hour s
Wor k out si de r egul ar wor ki ng hour s r equi r es Cont r act i ng Of f i cer appr oval .
Make appl i cat i on 15 cal endar days pr i or t o such wor k t o al l ow ar r angement s t o be made by t he Gover nment f or i nspect i ng t he wor k i n pr ogr ess, gi v i ng t he speci f i c dat es, hour s, l ocat i on, t ype of wor k t o be per f or med, cont r act number and pr oj ect t i t l e. Based on t he j ust i f i cat i on pr ovi ded, t he Cont r act i ng Of f i cer may appr ove wor k out si de r egul ar hour s. Dur i ng per i ods of dar kness, t he di f f er ent par t s of t he wor k must be l i ght ed i n a manner appr oved by t he Cont r act i ng Of f i cer . Make ut i l i t y cut over s af t er nor mal wor ki ng hour s or on Sat ur days, Sundays, and Gover nment hol i days unl ess di r ect ed ot her wi se.
1. 2. 4 Occupi ed Bui l di ngs
The Cont r act or shal l be wor ki ng ar ound exi st i ng bui l di ngs whi ch ar e occupi ed. Do not ent er t he bui l di ngs wi t hout pr i or appr oval of t he Cont r act i ng Of f i cer .
The exi st i ng bui l di ngs and t hei r cont ent s must be kept secur e at al l t i mes. Pr ovi de t empor ar y c l osur es as r equi r ed t o mai nt ai n secur i t y as di r ect ed by t he Cont r act i ng Of f i cer .
SECTI ON 01 14 00 Page 3
Pr ovi de dust cover s or pr ot ect i ve encl osur es t o pr ot ect exi st i ng wor k t hat r emai ns, and Gover nment mat er i al l ocat ed i n t he f aci l i t y dur i ng t he const r uct i on per i od. Dust cover s or pr ot ect i ve encl osur es i ncl udes demi si ng par t i t i ons wi t hi n each hangar bay.
Leave at t ached equi pment i n pl ace, and pr ot ect i t agai nst damage, or t empor ar i l y di sconnect , r el ocat e, pr ot ect , and r ei nst al l i t at t he compl et i on of t he wor k.
The Gover nment wi l l r emove and r el ocat e ot her Gover nment pr oper t y i n t he ar eas of t he bui l di ng schedul ed t o r ecei ve wor k.
1. 2. 5 Ut i l i t y Cut over s and I nt er r upt i ons
a. Make ut i l i t y cut over s and i nt er r upt i ons af t er nor mal wor ki ng hour s or on Sat ur days, Sundays, and Gover nment hol i days. Conf or m t o pr ocedur es r equi r ed i n par agr aph WORK OUTSI DE REGULAR HOURS.
b. Ensur e t hat new ut i l i t y l i nes ar e compl et e, except f or t he connect i on, bef or e i nt er r upt i ng exi st i ng ser vi ce.
c. I nt er r upt i on t o wat er , sani t ar y sewer , st or m sewer , t el ephone ser vi ce, el ect r i c ser vi ce, ai r condi t i oni ng, heat i ng, f i r e al ar m, and compr essed ai r , ar e consi der ed ut i l i t y cut over s pur suant t o t he par agr aph WORK OUTSI DE REGULAR HOURS.
d. Oper at i on of St at i on Ut i l i t i es: The Cont r act or must not oper at e nor di st ur b t he set t i ng of cont r ol devi ces i n t he st at i on ut i l i t i es syst em, i ncl udi ng wat er , sewer , el ect r i cal , and st eam ser vi ces. The Gover nment wi l l oper at e t he cont r ol devi ces as r equi r ed f or nor mal conduct of t he wor k. The Cont r act or must not i f y t he Cont r act i ng Of f i cer gi v i ng r easonabl e advance not i ce when such oper at i on i s r equi r ed.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTI ON
Not Used
SECTI ON 01 14 00 Page 4
SECTI ON 01 20 00. 00 20
PRI CE AND PAYMENT PROCEDURES
11/ 20, CHG 2: 08/ 21
PART 1 GENERAL
1. 1 REFERENCES
The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.
U. S. ARMY CORPS OF ENGI NEERS ( USACE)
EP 1110- 1- 8 ( 2021) Engi neer i ng and Desi gn - - Const r uct i on Equi pment Owner shi p and Oper at i ng Expense Schedul e
1. 2 SUBMI TTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" or " S" c l assi f i cat i on. Submi t t al s not havi ng a " G" or " S" c l assi f i cat i on ar e f or Cont r act or Qual i t y Cont r ol appr oval . Submi t t al s wi t h an " S" ar e f or i ncl usi on i n t he Sust ai nabi l i t y eNot ebook, i n conf or mance wi t h Sect i on 01 33 29 SUSTAI NABI LI TY REPORTI NG. Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:
SD- 01 Pr econst r uct i on Submi t t al s
Ear ned Val ue Repor t ; G
1. 3 EARNED VALUE REPORT
1. 3. 1 Dat a Requi r ed
Thi s Cont r act r equi r es t he use of a cost - l oaded Net wor k Anal ysi s Schedul e ( NAS) . Schedul e of Pr i ces must not be used wi t h cost - l oaded Net wor k Anal ysi s Schedul e ( NAS) . Use Ear ned Val ue Repor t der i ved f r om cost - l oaded NAS. Wi t hi n 15 cal endar days of not i ce of awar d, pr epar e and del i ver t o t he Cont r act i ng Of f i cer a Ear ned Val ue Repor t ( const r uct i on Cont r act ) as di r ect ed by t he Cont r act i ng Of f i cer . Pr ovi de a det ai l ed br eakdown of t he Cont r act pr i ce, gi v i ng quant i t i es f or each of t he var i ous k i nds of wor k, uni t pr i ces and ext ended pr i ces. Cost s shal l be summar i zed and t ot al s pr ovi ded f or each const r uct i on cat egor y.
1. 3. 2 Schedul e I nst r uct i ons
Payment s wi l l not be made unt i l t he Ear ned Val ue Repor t f r om t he cost - l oaded NAS has been submi t t ed t o and accept ed by t he Cont r act i ng Of f i cer .
1. 3. 3 Real Pr oper t y Asset s
The Gover nment wi l l pr ovi de t he Dr af t DD For m 1354, Tr ansf er and Accept ance of Mi l i t ar y Real Pr oper t y f i l l ed i n wi t h t he appr opr i at e Real Pr oper t y Uni que I dent i f i er s ( RPUI D) and r el at ed const r uct i on Cat egor y Codes t o summar i ze t he desi gned r eal pr oper t y asset s t hat appl y t o t hi s
SECTI ON 01 20 00. 00 20 Page 1 cont r act . The Cont r act or shal l meet wi t h t he Cont r act i ng Of f i cer and t he Real Pr oper t y Account i ng Of f i cer dur i ng t he Pr e Const r uct i on Meet i ng and t he Pr oj ect Cl oseout Meet i ngs t o modi f y and i ncl ude any necessar y changes t o t he DD For m 1354. The Cont r act or shal l pr ovi de t he I nt er i m DD For m 1354 t hat uses t he appr opr i at e di v i s i on of t he RPUI Ds/ Cat egor y Codes t o r epr esent t he f i nal const r uct ed f aci l i t y and i ncl ude al l associ at ed cost .
Coor di nat e t he Cont r act or ' s Pr i ce and Payment st r uct ur e wi t h t he st r uct ur e of t he RPUI Ds/ Cat egor y Codes.
Di vi de det ai l ed asset br eakdown i nt o t he RPUI Ds and r el at ed const r uct i on Cat egor y Codes and popul at e associ at ed cost s whi ch r epr esent al l aspect s of t he wor k. Wher e asset s di ver ge i nt o mul t i pl e RPUI D/ Cat egor y Codes, di v i de t he asset and pr ovi de t he pr opor t i on of t he asset s i n each RPUI D/ Cat egor y Code. Asset s and r el at ed RPUI D/ Cat egor y Codes may be modi f i ed by t he Cont r act i ng Of f i cer as necessar y dur i ng cour se of t he wor k.
Coor di nat e i dent i f i cat i on and pr opor t i on of t hese asset s wi t h t he Gover nment Real Pr oper t y Account i ng Of f i cer .
Cost dat a accumul at ed under t hi s sect i on ar e r equi r ed i n t he pr epar at i on of DD For m 1354.
1. 4 CONTRACT MODI FI CATI ONS
I n conj unct i on wi t h t he Cont r act Cl ause DFARS 252. 236- 7000 Modi f i cat i on Pr oposal s- Pr i ce Br eakdown, and wher e act ual owner shi p and oper at i ng cost s of const r uct i on equi pment cannot be det er mi ned f r om Cont r act or account i ng r ecor ds, base equi pment use r at es upon t he appl i cabl e pr ovi s i ons of t he
EP 1110- 1- 8.
1. 5 CONTRACTOR' S I NVOI CE AND CONTRACT PERFORMANCE STATEMENT
1. 5. 1 Cont ent of I nvoi ce
Request s f or payment wi l l be pr ocessed i n accor dance wi t h t he Cont r act Cl ause FAR 52. 232- 27 Pr ompt Payment f or Const r uct i on Cont r act s and FAR
52. 232- 5 Payment s Under Fi xed- Pr i ce Const r uct i on Cont r act s. I nvoi ces not compl et ed i n accor dance wi t h cont r act r equi r ement s wi l l be r et ur ned t o t he Cont r act or f or cor r ect i on of t he def i c i enci es. The r equest s f or payment shal l i ncl ude t he document s l i s t ed bel ow.
a. The Cont r act or ' s i nvoi ce, on NAVFAC For m 7300/ 30 f ur ni shed by t he Gover nment , showi ng i n summar y f or m, t he basi s f or ar r i v i ng at t he amount of t he i nvoi ce. For m 7300/ 30 must i ncl ude cer t i f i cat i on by Qual i t y Cont r ol ( QC) Manager as r equi r ed by t he Cont r act .
b. The Ear ned Val ue Repor t f r om t he cost - l oaded NAS, showi ng i n det ai l :
t he est i mat ed cost , per cent age of compl et i on, and val ue of compl et ed per f or mance. Use NAVFAC For m 43300/ 54 on NAVFAC cont r act s when a Mont hl y Est i mat e f or Voucher i s r equi r ed.
c. Updat ed Pr oj ect Schedul e and r epor t s r equi r ed by t he cont r act . d.
Cont r act or Saf et y Sel f Eval uat i on Checkl i st .
d. Phot os and ot her suppor t i ng document s as r equest ed.
e. Updat ed copy of submi t t al r egi st er .
f . I nvoi ces not compl et ed i n accor dance wi t h cont r act r equi r ement s wi l l be r et ur ned t o t he Cont r act or f or cor r ect i on of t he def i c i enci es.
SECTI ON 01 20 00. 00 20 Page 2
1. 5. 2 Submi ssi on of I nvoi ces
I f DFARS Cl ause 252. 232- 7006 Wi de Ar ea Wor kFl ow Payment I nst r uct i ons i s i ncl uded i n t he Cont r act , pr ovi de t he document s l i s t ed i n above par agr aph CONTENT OF I NVOI CE i n t hei r ent i r et y as at t achment s i n Wi de Ar ea Wor k Fl ow ( WAWF) f or each i nvoi ce submi t t ed. The maxi mum si ze of each WAWF at t achment i s t wo megabyt es, but t her e ar e no l i mi t s on t he number of at t achment s. I f a document cannot be at t ached i n WAWF due t o syst em or s i ze r est r i ct i on, pr ovi de i t as i nst r uct ed by t he Cont r act i ng Of f i cer .
1. 5. 3 Fi nal I nvoi ce
a. A f i nal i nvoi ce must be accompani ed by t he cer t i f i cat i on r equi r ed by DFARS 252. 247. 7023 Tr anspor t at i on of Suppl i es by Sea, and t he Cont r act or ' s Fi nal Rel ease. I f t he Cont r act or i s i ncor por at ed, t he Fi nal Rel ease must cont ai n t he cor por at e seal . An of f i cer of t he cor por at i on must s i gn and t he cor por at e secr et ar y must cer t i f y t he Fi nal Rel ease.
b. For f i nal i nvoi ces bei ng submi t t ed v i a WAWF, t he or i gi nal Cont r act or ' s Fi nal Rel ease For m and r equi r ed cer t i f i cat i on of Tr anspor t at i on of Suppl i es by Sea must be pr ovi ded di r ect l y t o t he r espect i ve Cont r act i ng Of f i cer pr i or t o submi ssi on of t he f i nal i nvoi ce. Once r ecei pt of t he or i gi nal Fi nal Rel ease For m and r equi r ed cer t i f i cat i on of Tr anspor t at i on of Suppl i es by Sea has been conf i r med by t he Cont r act i ng Of f i cer , t he Cont r act or must t hen submi t f i nal i nvoi ce and at t ach a copy of t he Fi nal Rel ease For m and r equi r ed cer t i f i cat i on of Tr anspor t at i on of Suppl i es by Sea i n WAWF.
c. Fi nal i nvoi ces not accompani ed by t he Cont r act or ' s Fi nal Rel ease and r equi r ed cer t i f i cat i on of Tr anspor t at i on of Suppl i es by Sea wi l l be consi der ed i ncompl et e and wi l l be r et ur ned t o t he Cont r act or .
1. 6 PAYMENTS TO THE CONTRACTOR
Payment s wi l l be made on submi ssi on of i t emi zed r equest s by t he Cont r act or whi ch compl y wi t h t he r equi r ement s of t hi s sect i on, and wi l l be subj ect t o r educt i on f or over payment s or i ncr ease f or under payment s made on pr evi ous payment s t o t he Cont r act or .
1. 6. 1 Obl i gat i on of Gover nment Payment s
The obl i gat i on of t he Gover nment t o make payment s r equi r ed under t he pr ovi s i ons of t hi s Cont r act wi l l , at t he di scr et i on of t he Cont r act i ng Of f i cer , be subj ect t o r educt i ons and suspensi ons per mi t t ed under t he FAR and agency r egul at i ons i ncl udi ng t he f ol l owi ng i n accor dance wi t h FAR
32. 103 Pr ogr ess Payment s Under Const r uct i on Cont r act s:
a. Reasonabl e deduct i ons due t o def ect s i n mat er i al or wor kmanshi p;
b. Cl ai ms whi ch t he Gover nment may have agai nst t he Cont r act or under or i n connect i on wi t h t hi s Cont r act ;
c. Unl ess ot her wi se adj ust ed, r epayment t o t he Gover nment upon demand f or over payment s made t o t he Cont r act or ; and
d. Fai l ur e t o mai nt ai n accur at e " as- bui l t " or r ecor d dr awi ngs i n accor dance wi t h FAR 52. 236. 21.
SECTI ON 01 20 00. 00 20 Page 3
1. 6. 2 Payment f or Onsi t e and Of f s i t e Mat er i al s
Pr ogr ess payment s may be made t o t he Cont r act or f or mat er i al s del i ver ed on t he si t e, f or mat er i al s st or ed of f const r uct i on s i t es, or mat er i al s t hat ar e i n t r ansi t t o t he const r uct i on s i t es under t he f ol l owi ng condi t i ons:
a. FAR 52. 232- 5( b) Payment s Under Fi xed Pr i ce Const r uct i on Cont r act s.
b. Mat er i al s del i ver ed on t he si t e but not i nst al l ed, i ncl udi ng compl et ed pr epar at or y wor k, and of f - s i t e mat er i al s t o be consi der ed f or pr ogr ess payment must be maj or hi gh cost , l ong l ead, speci al or der , or speci al t y i t ems, not suscept i bl e t o det er i or at i on or physi cal damage i n st or age or i n t r ansi t t o t he const r uct i on s i t e. Exampl es of mat er i al s accept abl e f or payment consi der at i on i ncl ude, but ar e not l i mi t ed t o, st r uct ur al st eel , non- magnet i c st eel , non- magnet i c aggr egat e, equi pment , machi ner y, l ar ge pi pe and f i t t i ngs, pr ecast / pr est r essed concr et e pr oduct s, pl ast i c l umber ( e. g. , f ender pi l es/ cur bs) , and hi gh- vol t age el ect r i cal cabl e. Mat er i al s not accept abl e f or payment i ncl ude consumabl e mat er i al s such as nai l s, f ast ener s, condui t s, gypsum boar d, gl ass, i nsul at i on, and wal l cover i ngs.
c. Mat er i al s t o be consi der ed f or pr ogr ess payment pr i or t o i nst al l at i on must be speci f i cal l y and separ at el y i dent i f i ed i n t he Cont r act or ' s est i mat es of wor k submi t t ed f or t he Cont r act i ng Of f i cer ' s appr oval i n accor dance wi t h Ear ned Val ue Repor t r equi r ement of t hi s Cont r act .
Request s f or pr ogr ess payment consi der at i on f or such i t ems must be suppor t ed by document s est abl i shi ng t hei r val ue and t hat t he t i t l e r equi r ement s of t he c l ause at FAR 52. 232- 5 Payment s Under Fi xed- Pr i ce Const r uct i on Cont r act s have been met .
d. Mat er i al s ar e adequat el y i nsur ed and pr ot ect ed f r om t hef t and exposur e.
e. Pr ovi de a wr i t t en consent f r om t he sur et y company wi t h each payment r equest f or of f s i t e mat er i al s.
f . Mat er i al s t o be consi der ed f or pr ogr ess payment s pr i or t o i nst al l at i on must be st or ed ei t her i n Hawai i , Guam, Puer t o Ri co, or t he Cont i nent al Uni t ed St at es. Ot her l ocat i ons ar e subj ect t o wr i t t en appr oval by t he Cont r act i ng Of f i cer .
PART 2 PRODUCTS
Not Used
PART 3 EXECUTI ON
Not Used
SECTI ON 01 20 00. 00 20 Page 4
SECTI ON 01 30 00
ADMI NI STRATI VE REQUI REMENTS
11/ 20, CHG 2: 05/ 22
PART 1 GENERAL
1. 1 REFERENCES
The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.
U. S. ARMY CORPS OF ENGI NEERS ( USACE)
EM 385- 1- 1 ( 2014) Saf et y - - Saf et y and Heal t h Requi r ement s Manual
1. 2 SUBMI TTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" or " S" c l assi f i cat i on. Submi t t al s not havi ng a " G" or " S" c l assi f i cat i on ar e f or Cont r act or Qual i t y Cont r ol appr oval . Submi t t al s wi t h an " S" ar e f or i ncl usi on i n t he Sust ai nabi l i t y eNot ebook, i n conf or mance wi t h Sect i on 01 33 29 SUSTAI NABI LI TY REPORTI NG. Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:
SD- 01 Pr econst r uct i on Submi t t al s
Pr ogr ess and Compl et i on Pi ct ur es; G
1. 3 PROGRESS AND COMPLETI ON PI CTURES
Phot ogr aphi cal l y document s i t e condi t i ons pr i or t o st ar t of const r uct i on oper at i ons. Pr ovi de mont hl y, and wi t hi n one mont h of t he compl et i on of wor k, di gi t al phot ogr aphs, 1600x1200x24 bi t t r ue col or mi ni mum r esol ut i on i n JPEG f i l e f or mat showi ng t he sequence and pr ogr ess of wor k. Take a mi ni mum of 20 di gi t al phot ogr aphs each week t hr oughout t he ent i r e pr oj ect f r om a mi ni mum of t en di f f er ent v i ewpoi nt s sel ect ed by t he Cont r act or unl ess ot her wi se di r ect ed by t he Cont r act i ng Of f i cer . I ndi cat e phot ogr aphs demonst r at i ng envi r onment al pr ocedur es. Al so pr ovi de t he vi ew l ocat i on sket ch on t he CD as a di gi t al f i l e. Al l f i l e names shal l i ncl ude a dat e desi gnat or i n f i l e names. Phot ogr aphs pr ovi ded ar e f or unr est r i ct ed use by t he Gover nment .
1. 4 MI NI MUM I NSURANCE REQUI REMENTS
Pr ovi de t he mi ni mum i nsur ance cover age r equi r ed by FAR 28. 307- 2 Li abi l i t y , dur i ng t he ent i r e per i od of per f or mance under t hi s cont r act . Pr ovi de ot her i nsur ance cover age as r equi r ed by St at e l aw.
a. Compr ehensi ve gener al l i abi l i t y : $500, 000 per occur r ence
b. Aut omobi l e l i abi l i t y : $200, 000 per per son, $500, 000 per occur r ence f or bodi l y i nj ur y, $20, 000 per occur r ence f or pr oper t y damage
c. Wor kmen' s compensat i on as r equi r ed by Feder al and St at e wor ker s ' compensat i on and occupat i onal di sease l aws.
d. Empl oyer ' s l i abi l i t y cover age of $100, 000, except i n St at es wher e wor ker s compensat i on may not be wr i t t en by pr i vat e car r i er s.
SECTI ON 01 30 00 Page 1
1. 5 FI RST TI ER CONTRACTOR REQUI REMENTS FOR ASBESTOS CONTAI NI NG MATERI AL
Accompl i sh al l cont r act r equi r ement s of Sect i on 02 82 00 ASBESTOS REMEDI ATI ON, assi gned t o t he Pr i vat e Qual i f i ed Per son, Desi gnat ed Compet ent Per son, di r ect l y wi t h a f i r st t i er subcont r act or .
1. 6 SUPERVI SI ON
1. 6. 1 Mi ni mum Communi cat i on Requi r ement s
Have at l east one qual i f i ed super i nt endent , or compet ent al t er nat e, capabl e of r eadi ng, wr i t i ng, and conver si ng f l uent l y i n t he Engl i sh l anguage, on t he j ob- si t e at al l t i mes dur i ng t he per f or mance of cont r act wor k. I n addi t i on, i f a Qual i t y Cont r ol ( QC) r epr esent at i ve i s r equi r ed on t he cont r act , t hen t hat i ndi v i dual must al so have f l uent Engl i sh communi cat i on ski l l s .
1. 6. 2 Super i nt endent Qual i f i cat i ons
Pr ovi de pr oj ect super i nt endent wi t h a mi ni mum of 10 year s exper i ence i n const r uct i on wi t h at l east 5 of t hose year s as a super i nt endent on pr oj ect s s i mi l ar i n s i ze and compl exi t y. The i ndi v i dual must be f ami l i ar wi t h t he r equi r ement s of EM 385- 1- 1 and have exper i ence i n t he ar eas of hazar d i dent i f i cat i on and saf et y compl i ance. The i ndi v i dual must be capabl e of i nt er pr et i ng a cr i t i cal pat h schedul e and const r uct i on dr awi ngs. The qual i f i cat i on r equi r ement s f or t he al t er nat e super i nt endent ar e t he same as f or t he pr oj ect super i nt endent . The Cont r act i ng Of f i cer may r equest pr oof of t he super i nt endent ' s qual i f i cat i ons at any poi nt i n t he pr oj ect i f t he per f or mance of t he super i nt endent i s i n quest i on.
Super i nt endent shal l not ser ve as QC manager or as Si t e Saf et y and Heal t h Of f i cer ( SSHO) .
1. 6. 2. 1 Dut i es
The pr oj ect super i nt endent i s pr i mar i l y r esponsi bl e f or managi ng and coor di nat i ng day- t o- day pr oduct i on and schedul e adher ence on t he pr oj ect .
The super i nt endent i s r equi r ed t o at t end NAVFAC Red Zone meet i ngs, par t ner i ng meet i ngs, and qual i t y cont r ol meet i ngs. The super i nt endent or qual i f i ed al t er nat i ve must be on- si t e at al l t i mes dur i ng t he per f or mance of t hi s cont r act unt i l t he wor k i s compl et ed and accept ed.
1. 6. 3 Pr oj ect Manager
Assi gn a Pr oj ect Manager wi t h t he r esponsi bi l i t y f or t he over al l management of t he pr oj ect . The Cont r act i ng Of f i cer may r equest pr oof of t he Pr oj ect Manager ' s qual i f i cat i ons at any poi nt i n t he pr oj ect i f t he per f or mance of t he Pr oj ect Manager i s i n quest i on.
1. 6. 3. 1 Pr oj ect Manager Qual i f i cat i ons
The Pr oj ect Manager must have a mi ni mum 10 year s exper i ence as a Pr oj ect Manager or Super i nt endent on pr oj ect s of s i mi l ar s i ze and compl exi t y.
1. 6. 4 Non- Compl i ance Act i ons
The Pr oj ect Super i nt endent i s subj ect t o r emoval by t he Cont r act i ng Of f i cer f or non- compl i ance wi t h r equi r ement s speci f i ed i n t he cont r act and
SECTI ON 01 30 00 Page 2 f or f ai l ur e t o manage t he pr oj ect t o ensur e t i mel y compl et i on.
Fur t her mor e, t he Cont r act i ng Of f i cer may i ssue an or der st oppi ng al l or par t of t he wor k unt i l sat i sf act or y cor r ect i ve act i on has been t aken. No par t of t he t i me l ost due t o such st op or der s i s accept abl e as t he subj ect of c l ai m f or ext ensi on of t i me f or excess cost s or damages by t he Cont r act or .
1. 7 PRECONSTRUCTI ON
Af t er awar d of t he cont r act but pr i or t o commenci ng any wor k at t he s i t e, coor di nat e wi t h t he Cont r act i ng Of f i cer t o di scuss and devel op a mut ual under st andi ng r el at i ve t o t he admi ni st r at i on of t he val ue engi neer i ng and saf et y pr ogr am, pr epar at i on of t he schedul e of pr i ces or ear ned val ue r epor t , shop dr awi ngs, and ot her submi t t al s, schedul i ng pr ogr ammi ng, pr osecut i on of t he wor k, and cl ear expect at i ons of t he " I nt er i m DD For m 1354" Submi t t al . Maj or subcont r act or s who wi l l engage i n t he wor k must al so at t end.
1. 8 FACI LI TY TURNOVER PLANNI NG MEETI NGS ( NAVFAC Red Zone Meet i ngs - NRZ)
Meet wi t h t he Gover nment t o i dent i f y st r at egi es t o ensur e t he pr oj ect i s car r i ed t o expedi t i ous c l osur e and t ur nover t o t he Cl i ent . St ar t pl anni ng t he t ur nover pr ocess at t he Pr e- Const r uct i on Conf er ence meet i ng wi t h a di scussi on of t he Red Zone pr ocess and convene at r egul ar l y schedul ed NRZ Meet i ngs begi nni ng at appr oxi mat el y 75 per cent of pr oj ect compl et i on.
I ncl ude t he f ol l owi ng i n t he f aci l i t y Tur nover ef f or t :
1. 8. 1 NRZ Checkl i st
a. Cont r act i ng Of f i cer ' s Techni cal Repr esent at i ve ( COTR) wi l l pr ovi de t he Cont r act or a copy of t he Red Zone Checkl i st t empl at e.
b. Pr i or t o 75 per cent compl et i on, modi f y t he Red Zone Checkl i st t empl at e by addi ng or del et i ng cr i t i cal act i v i t i es appl i cabl e t o t he pr oj ect and assi gn pl anned compl et i on dat es f or each act i v i t y. Submi t t he modi f i ed Red Zone Checkl i st t o t he Cont r act i ng Of f i cer . The Cont r act i ng Of f i cer may r equest addi t i onal act i v i t i es be added t o t he Red Zone Checkl i st at any t i me as necessar y.
1. 8. 2 Meet i ngs
a. Upon Gover nment accept ance of t he NRZ Checkl i st , t he Pr oj ect Super i nt endent i s r equi r ed t o l ead r egul ar NRZ Meet i ngs begi nni ng at appr oxi mat el y 75 per cent pr oj ect compl et i on, or t hr ee t o s i x mont hs pr i or t o Benef i c i al Occupancy Dat e ( BOD) , whi chever comes f i r st .
b. The Cont r act i ng Of f i cer wi l l est abl i sh t he f r equency of t he meet i ngs, whi ch i s expect ed t o i ncr ease as t he pr oj ect compl et i on dr aws near er .
c. Usi ng t he NRZ Checkl i st as a Pl an…
This is the start of the file's text. The full file is on GovTribe.