Attachment A is a Specialized Experience Supplemental Information document for a Naval Facilities Engineering Systems Command (NAVFAC) Hawaii contract opportunity. The document provides a template for contractors to detail up to seven example projects demonstrating specialized experience in waterfront and marine infrastructure design. The template requires detailed project information including design disciplines (structural, waterfront, civil, architectural, mechanical, electrical, geotechnical), project roles, construction types, and specific project categories such as piers/wharves, drydocks, waterfront facilities, and seismic analysis studies.

The associated federal contract opportunity is an Indefinite Delivery/Indefinite Quantity (IDIQ) Architect-Engineer services contract for various waterfront projects, with responses due on Wednesday, April 30, 2025, at 2:00 p.m. Hawaii Standard Time. The solicitation (N6247825R5050) is currently in pre-solicitation status and seeks firms with demonstrated expertise in marine and waterfront engineering and design services, with a focus on projects primarily under NAVFAC Hawaii's jurisdiction.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT (A)

SPECIALIZED EXPERIENCE SUPPLEMENTAL INFORMATION

CRITERION 1 - SPECIALIZED EXPERIENCE
EXAMPLE PROJECT KEY NUMBER:
1
TITLE AND LOCATION (CITY & STATE):
YEAR DESIGN COMPLETED (NOT INCLUDING PCAS):
EST. CONSTRUCTION COMPLETED (YR):
PROJECT ROLE (PRIME A/E, DB DESIGNER OF RECORD, OR SUB CONSULTANT):
CONSTRUCTION COST (NOT AE DESIGN FEE):
AE FIRM NAME OR JV:
NEW CONSTRUCTION (NC) OR REPAIR (R):

SPECIFIED DESIGN/ENGINEERING SERVICES (CHECK ALL THAT APPLIES):

☐DD FORM 1391
☐FACD/CDW/DESIGN CHARRETTE
☐DESIGN-BID-BUILD CONSTRUCTION DOCUMENTS
☐DESIGN-BUILD RFP SOLICITATION DOCUMENTS
☐ENGINEERING STUDIES AND REPORTS

DISCIPLINES INVOLVED IN PROJECT (CHECK ALL THAT APPLIES):

☐STRUCTURAL
☐WATERFRONT
☐CIVIL
☐ARCHITECTURAL
☐MECHANICAL
☐ELECTRICAL
☐GEOTECHNICAL
☐FIRE PROTECTION
☐CATHODIC PROTECTION

RECENT RELEVANT PROJECTS (CHECK ALL THAT APPLIES):

☐PIERS/WHARVES
☐DRYDOCK AND/OR DRYDOCK CAISSONS
☐WATERFRONT FACILITIES
☐LOAD STUDIES FOR MOBILE CRANES ON PIERS/WHARVES
☐SEISMIC ANALYSIS STUDIES OF DRYDOCKS AND/OR DRYDOCK CAISSONS
CRITERION 1 - SPECIALIZED EXPERIENCE
EXAMPLE PROJECT KEY NUMBER:
2
TITLE AND LOCATION (CITY & STATE):
YEAR DESIGN COMPLETED (NOT INCLUDING PCAS):
EST. CONSTRUCTION COMPLETED (YR):
PROJECT ROLE (PRIME A/E, DB DESIGNER OF RECORD, OR SUB CONSULTANT):
CONSTRUCTION COST (NOT AE DESIGN FEE):
AE FIRM NAME OR JV:
NEW CONSTRUCTION (NC) OR REPAIR (R):

SPECIFIED DESIGN/ENGINEERING SERVICES (CHECK ALL THAT APPLIES):

☐DD FORM 1391
☐FACD/CDW/DESIGN CHARRETTE
☐DESIGN-BID-BUILD CONSTRUCTION DOCUMENTS
☐DESIGN-BUILD RFP SOLICITATION DOCUMENTS
☐ENGINEERING STUDIES AND REPORTS

DISCIPLINES INVOLVED IN PROJECT (CHECK ALL THAT APPLIES):

☐STRUCTURAL
☐WATERFRONT
☐CIVIL
☐ARCHITECTURAL
☐MECHANICAL
☐ELECTRICAL
☐GEOTECHNICAL
☐FIRE PROTECTION
☐CATHODIC PROTECTION

RECENT RELEVANT PROJECTS (CHECK ALL THAT APPLIES):

☐PIERS/WHARVES
☐DRYDOCK AND/OR DRYDOCK CAISSONS
☐WATERFRONT FACILITIES
☐LOAD STUDIES FOR MOBILE CRANES ON PIERS/WHARVES
☐SEISMIC ANALYSIS STUDIES OF DRYDOCKS AND/OR DRYDOCK CAISSONS
CRITERION 1 - SPECIALIZED EXPERIENCE
EXAMPLE PROJECT KEY NUMBER:
3
TITLE AND LOCATION (CITY & STATE):
YEAR DESIGN COMPLETED (NOT INCLUDING PCAS):
EST. CONSTRUCTION COMPLETED (YR):
PROJECT ROLE (PRIME A/E, DB DESIGNER OF RECORD, OR SUB CONSULTANT):
CONSTRUCTION COST (NOT AE DESIGN FEE):
AE FIRM NAME OR JV:
NEW CONSTRUCTION (NC) OR REPAIR (R):

SPECIFIED DESIGN/ENGINEERING SERVICES (CHECK ALL THAT APPLIES):

☐DD FORM 1391
☐FACD/CDW/DESIGN CHARRETTE
☐DESIGN-BID-BUILD CONSTRUCTION DOCUMENTS
☐DESIGN-BUILD RFP SOLICITATION DOCUMENTS
☐ENGINEERING STUDIES AND REPORTS

DISCIPLINES INVOLVED IN PROJECT (CHECK ALL THAT APPLIES):

☐STRUCTURAL
☐WATERFRONT
☐CIVIL
☐ARCHITECTURAL
☐MECHANICAL
☐ELECTRICAL
☐GEOTECHNICAL
☐FIRE PROTECTION
☐CATHODIC PROTECTION

RECENT RELEVANT PROJECTS (CHECK ALL THAT APPLIES):

☐PIERS/WHARVES
☐DRYDOCK AND/OR DRYDOCK CAISSONS
☐WATERFRONT FACILITIES
☐LOAD STUDIES FOR MOBILE CRANES ON PIERS/WHARVES
☐SEISMIC ANALYSIS STUDIES OF DRYDOCKS AND/OR DRYDOCK CAISSONS
CRITERION 1 - SPECIALIZED EXPERIENCE
EXAMPLE PROJECT KEY NUMBER:
4
TITLE AND LOCATION (CITY & STATE):
YEAR DESIGN COMPLETED (NOT INCLUDING PCAS):
EST. CONSTRUCTION COMPLETED (YR):
PROJECT ROLE (PRIME A/E, DB DESIGNER OF RECORD, OR SUB CONSULTANT):
CONSTRUCTION COST (NOT AE DESIGN FEE):
AE FIRM NAME OR JV:
NEW CONSTRUCTION (NC) OR REPAIR (R):

SPECIFIED DESIGN/ENGINEERING SERVICES (CHECK ALL THAT APPLIES):

☐DD FORM 1391
☐FACD/CDW/DESIGN CHARRETTE
☐DESIGN-BID-BUILD CONSTRUCTION DOCUMENTS
☐DESIGN-BUILD RFP SOLICITATION DOCUMENTS
☐ENGINEERING STUDIES AND REPORTS

DISCIPLINES INVOLVED IN PROJECT (CHECK ALL THAT APPLIES):

☐STRUCTURAL
☐WATERFRONT
☐CIVIL
☐ARCHITECTURAL
☐MECHANICAL
☐ELECTRICAL
☐GEOTECHNICAL
☐FIRE PROTECTION
☐CATHODIC PROTECTION

RECENT RELEVANT PROJECTS (CHECK ALL THAT APPLIES):

☐PIERS/WHARVES
☐DRYDOCK AND/OR DRYDOCK CAISSONS
☐WATERFRONT FACILITIES
☐LOAD STUDIES FOR MOBILE CRANES ON PIERS/WHARVES
☐SEISMIC ANALYSIS STUDIES OF DRYDOCKS AND/OR DRYDOCK CAISSONS
CRITERION 1 - SPECIALIZED EXPERIENCE
EXAMPLE PROJECT KEY NUMBER:
5
TITLE AND LOCATION (CITY & STATE):
YEAR DESIGN COMPLETED (NOT INCLUDING PCAS):
EST. CONSTRUCTION COMPLETED (YR):
PROJECT ROLE (PRIME A/E, DB DESIGNER OF RECORD, OR SUB CONSULTANT):
CONSTRUCTION COST (NOT AE DESIGN FEE):
AE FIRM NAME OR JV:
NEW CONSTRUCTION (NC) OR REPAIR (R):

SPECIFIED DESIGN/ENGINEERING SERVICES (CHECK ALL THAT APPLIES):

☐DD FORM 1391
☐FACD/CDW/DESIGN CHARRETTE
☐DESIGN-BID-BUILD CONSTRUCTION DOCUMENTS
☐DESIGN-BUILD RFP SOLICITATION DOCUMENTS
☐ENGINEERING STUDIES AND REPORTS

DISCIPLINES INVOLVED IN PROJECT (CHECK ALL THAT APPLIES):

☐STRUCTURAL
☐WATERFRONT
☐CIVIL
☐ARCHITECTURAL
☐MECHANICAL
☐ELECTRICAL
☐GEOTECHNICAL
☐FIRE PROTECTION
☐CATHODIC PROTECTION

RECENT RELEVANT PROJECTS (CHECK ALL THAT APPLIES):

☐PIERS/WHARVES
☐DRYDOCK AND/OR DRYDOCK CAISSONS
☐WATERFRONT FACILITIES
☐LOAD STUDIES FOR MOBILE CRANES ON PIERS/WHARVES
☐SEISMIC ANALYSIS STUDIES OF DRYDOCKS AND/OR DRYDOCK CAISSONS
CRITERION 1 - SPECIALIZED EXPERIENCE
EXAMPLE PROJECT KEY NUMBER:
6
TITLE AND LOCATION (CITY & STATE):
YEAR DESIGN COMPLETED (NOT INCLUDING PCAS):
EST. CONSTRUCTION COMPLETED (YR):
PROJECT ROLE (PRIME A/E, DB DESIGNER OF RECORD, OR SUB CONSULTANT):
CONSTRUCTION COST (NOT AE DESIGN FEE):
AE FIRM NAME OR JV:
NEW CONSTRUCTION (NC) OR REPAIR (R):

SPECIFIED DESIGN/ENGINEERING SERVICES (CHECK ALL THAT APPLIES):

☐DD FORM 1391
☐FACD/CDW/DESIGN CHARRETTE
☐DESIGN-BID-BUILD CONSTRUCTION DOCUMENTS
☐DESIGN-BUILD RFP SOLICITATION DOCUMENTS
☐ENGINEERING STUDIES AND REPORTS

DISCIPLINES INVOLVED IN PROJECT (CHECK ALL THAT APPLIES):

☐STRUCTURAL
☐WATERFRONT
☐CIVIL
☐ARCHITECTURAL
☐MECHANICAL
☐ELECTRICAL
☐GEOTECHNICAL
☐FIRE PROTECTION
☐CATHODIC PROTECTION

RECENT RELEVANT PROJECTS (CHECK ALL THAT APPLIES):

☐PIERS/WHARVES
☐DRYDOCK AND/OR DRYDOCK CAISSONS
☐WATERFRONT FACILITIES
☐LOAD STUDIES FOR MOBILE CRANES ON PIERS/WHARVES
☐SEISMIC ANALYSIS STUDIES OF DRYDOCKS AND/OR DRYDOCK CAISSONS
CRITERION 1 - SPECIALIZED EXPERIENCE
EXAMPLE PROJECT KEY NUMBER:
7
TITLE AND LOCATION (CITY & STATE):
YEAR DESIGN COMPLETED (NOT INCLUDING PCAS):
EST. CONSTRUCTION COMPLETED (YR):
PROJECT ROLE (PRIME A/E, DB DESIGNER OF RECORD, OR SUB CONSULTANT):
CONSTRUCTION COST (NOT AE DESIGN FEE):
AE FIRM NAME OR JV:
NEW CONSTRUCTION (NC) OR REPAIR (R):

SPECIFIED DESIGN/ENGINEERING SERVICES (CHECK ALL THAT APPLIES):

☐DD FORM 1391
☐FACD/CDW/DESIGN CHARRETTE
☐DESIGN-BID-BUILD CONSTRUCTION DOCUMENTS
☐DESIGN-BUILD RFP SOLICITATION DOCUMENTS
☐ENGINEERING STUDIES AND REPORTS

DISCIPLINES INVOLVED IN PROJECT (CHECK ALL THAT APPLIES):

☐STRUCTURAL
☐WATERFRONT
☐CIVIL
☐ARCHITECTURAL
☐MECHANICAL
☐ELECTRICAL
☐GEOTECHNICAL
☐FIRE PROTECTION
☐CATHODIC PROTECTION

RECENT RELEVANT PROJECTS (CHECK ALL THAT APPLIES):

☐PIERS/WHARVES
☐DRYDOCK AND/OR DRYDOCK CAISSONS
☐WATERFRONT FACILITIES
☐LOAD STUDIES FOR MOBILE CRANES ON PIERS/WHARVES
☐SEISMIC ANALYSIS STUDIES OF DRYDOCKS AND/OR DRYDOCK CAISSONS

File details come from the government source that posted it. Updated .