Attachment A Special Provisions and Specifications~6.pdf
PDF 521 KB Posted
- Solicitation number
- S-73000-00014476
- Issued by
- Crook County, Oregon
About this file
This is a Special Provisions and Specifications document for the US101: MP 314.7 & MP 344.5 Emergency Repair Project issued by the Oregon Department of Transportation (ODOT) in Curry County, Oregon. The project involves emergency roadway repairs at two locations along the Oregon Pacific Coast Highway, requiring materials, equipment, labor and incidentals to provide temporary traffic protection and direction, install and maintain erosion control, remove and replace 24-inch culverts and concrete inlets, replace and repair damaged guardrail, and rebuild roadway sections using 36 inches of stone embankment, subgrade geotextile, 10 inches of aggregate base and 9 inches of asphalt concrete pavement. The work includes continuous 24-hour flagger operations with minimum 2 flaggers during stage construction, and management of contaminated soils containing lead at specified locations with approximately 280 cubic yards requiring disposal at permitted facilities.
The project involves significant environmental compliance requirements including lead contamination management, asbestos material removal from corrugated metal pipes (133 linear feet total), and adherence to erosion and sediment control measures between October 1 and May 31. Specialized personnel qualifications are required including Oregon DEQ certified asbestos workers and supervisors, and employees trained in lead awareness according to federal regulations. The contractor must provide written lead compliance plans, conduct soil sampling and analytical testing, and coordinate with multiple regulatory agencies including DEQ for waste disposal permits. Project contact is Jessica Spann, Project Manager, at (541) 396-1143, with professional engineering certifications required for contaminated media sampling and characterization work.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 00014476 Invitation to Bid.docx | DOCX document | |
| ATT C Bid Pricing Form_~1.xlsx | XLSX spreadsheet | |
| ATT G Project Wage Rates~1.pdf | ||
| ATT I FHWA Form 1273~2.pdf | ||
| Attachment B Plans~7.pdf | ||
| ATT C Bid Pricing Form Revised.xlsx | XLSX spreadsheet | |
| 00014476 Addendum 1.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT A
SPECIAL PROVISONS & SPECIFICATIONS FOR
US101: MP 314.7 & MP 344.5 EMERGENCY REPAIR PROJECT
SCOPE
The work to be completed under this Contract is located along the Oregon Pacific Coast Highway (US101) in Curry County, OR, which consists of supplying the materials, equipment, labor and incidentals required to perform the following tasks as described in the Contract plans and specifications:
1. Provide Temporary Protection & Direction of Traffic.
o Standard traffic control lane closures and measures to be used at MP344.5.
o Barriers should be utilized by separating the work zone and traffic control at
MP314.7.
2. Install and maintain erosion control.
3. Remove and Replace 24-inch culvert at both locations.
4. Remove and Replace Concrete Inlet a
5. Replace and Repair damaged guardrail at both locations.
6. Rebuild the roadway using 36 inches of stone embankment, subgrade geotextile, 10 inches of aggregate base and 9 inches of ACP at both locations.
7. Perform additional and incidental work as detailed in the Contract plans and specifications and as directed.
PROJECT INFORMATION
General information pertaining to this project may be obtained from the following:
Jessica Spann, Project Manager 307 Highway 42 Coquille, OR Phone: (541) 396-1143 Email: Jessica.SPANN@odot.state.or.us
APPLICABLE STANDARD SPECIFICATIONS AND SPECIAL PROVISIONS
Silence of Specifications: The apparent silence of the specifications as to any detail, or the apparent omission of a detailed description concerning any point, shall be regarded as meaning that the highest value commercial practices are to prevail and that only materials and workmanship of first quality are to be used.
| ��)� | ������� |
| ����� | |
| ��� | ������ |
| �����*���� | �������+�,-,.�)�/,012� |
�)�/0013��)��(� �4���� ������5����� ��������� ��� .��� 6����� �����#&��� 7����#��"�#���6�������8���������6��#���9�:����#���!����������������!���#��#��������������#����&!;��#����;��#�����<�����"%�=��������6�������8������������������������!"�'�����&�����'"��&���������%���6��#������>>?@>A�>>?B>A�>>?C>A�>>D>EA�>>D@>A�>>D?>A�>>DD>A�>>DD@A�>>DE>A�>>FFEA�>>FG>A�>>HF@A�>>GD>A�>>GFFA�>>B@>A�>?>E>A�>?F@EA�>?E@>������������������I7JKL�$L$M�<NJ7M�ONMP=$J��KQK7LKRL$�P8NJ�<$SP$6������������������
TUVWX�YZY[\Z]\̂]�Z]X_[XZ[̀Z]aZZa
PROFESSIONAL OF RECORD CERTIFICATION
The following special provisions were prepared and/or reviewed by the Engineer whose professional seal appears below. These specifications are not valid unless the appropriate signed seal appears below and shall not be modified without the approval of the Engineer.
OREGON DEPARTMENT OF TRANSPORTATION
SPECIAL PROVISIONS
FOR
US101: MP314.7 AND MP344.5
EMERGENCY REPAIR PROJECT
PROFESSIONAL OF RECORD CERTIFICATION:
Seal w/signature I certify the Special Provision Section(s) listed below are applicable to the design for the subject project for Roadway.
Modified Special Provisions were prepared by me or under my supervision.
Sections 00220, 00221, 00222, 00223, 00225, 00228
FINAL ELECTRONIC DOCUMENT AVAILABLE UPON REQUEST
| ��)� | ������� |
| ����� | |
| ��� | ������ |
| �����*���� | �������+�,-,.�)�/,012� |
�)�/0013���)��(� �4���� ������5����� ��������� ��� .��� 6����� �����#&���������� 7����#��"�#���6�������8���������6��#���9�:����#���!����������������!���#��#��������������#����&!;��#����;��#�����<�����"%�=��������6�������8������������������������!"�'�����&�����'"��&���������%���6��#������>>?@AB�>>?@C�������������������D7EFG�$G$H�<IE7H�JIHK=$E��FLF7GFMG$�K8IE�<$NK$6�������� OPQPRSTTU�VPQWXYZ[Z\][̂]_̂�_̀àbaZc�d[̂e[[e
| ��)� | ������� |
| ����� | |
| ��� | ������ |
| �����*���� | �������+�,-,.�)�/,012� |
�)�/0013���)��(� �4���� ������5����� ��������� ��� .��� 6����� �����#&��� 7����#��"�#���6�������8���������6��#���9�:����#���!����������������!���#��#��������������#����&!;��#����;��#�����<�����"%�=��������6�������8������������������������!"�'�����&�����'"��&���������%���6��#������>>?@>A�>>?BBA�>>?CB�������������������D7EFG�$G$H�<IE7H�JIHK=$E��FLF7GFMG$�K8IE�<$NK$6�������� OPQPRSTTU�VPQWXY Z[Z\][̂]_̀�_ab\cb[a�d[̂e[[e
SECTION 00210 – MOBILIZATION
Comply with Section 00210 of the Standard Specifications.
SECTION 00220 - ACCOMMODATIONS FOR PUBLIC TRAFFIC
Comply with Section 00220 of the Standard Specifications modified as follows:
00220.02(a) General Requirements - Add the following bullets to the end of the bullet list:
• During stage construction, provide continuous 24-hour flagger operation, with a minimum of 2 flaggers. Occupy the advance flagger stations, as directed.
00220.40(e)(1) Closed Lanes - Replace this subsection, except for the subsection number and title, with the following:
Traffic Lanes may be closed on the Oregon Coast Highway (US 101) when allowed, shown, or directed during the following periods of time except as specified in 00220.40(e)(2):
Single Lane Closures – One Traffic Lane on the Oregon Coast (US 101_) may be closed during the following times:
SECTION 00221 - COMMON PROVISIONS FOR WORK ZONE TRAFFIC CONTROL
Comply with Section 00221 of the Standard Specifications modified as follows:
00221.06 Traffic Control Plan - Replace this subsection with the following subsection:
00221.06 Traffic Control Plan and Tourist-Oriented Directional and Business Logo Signs –
(a) Traffic Control Plan - Submit one of the following, 5 Calendar Days before the preconstruction conference:
(1) Agency Traffic Control Plan - If the Contractor intends to use the Agency TCP without modification, a written notification indicating that the Agency TCP will be used without modification.
(2) Contractor-Modified Traffic Control Plan - The Contractor may request to use a Contractor-modified Agency TCP, or a TCP developed by the Contractor. Do not use a modified TCP, or a TCP developed by the Contractor, unless approved by the Engineer.
Use the Agency TCP unless a modified TCP, or a TCP developed by the Contractor is accepted.
The Engineer is not obligated to consider any modified Agency TCP or a TCP developed by the Contractor. The Agency will not be liable to the Contractor for failure to accept or act upon any request for a modified Agency TCP or a TCP developed by the Contractor.
To conserve time and funds, the Contractor may first submit a written request for a preliminary review by the Engineer. The request should contain a description of the proposal together with a rough estimate of anticipated dollar and time impacts. The Engineer will, within a reasonable time, respond to the Contractor in writing whether or not the request would be considered by the Agency.
If requesting a Contractor-modified Agency TCP, or a TCP developed by the Contractor, at a minimum the request shall meet all requirements of the Contract documents and comply with the Project transportation management plan (TMP). Provide the following information:
• Stamped Working Drawings according to 00150.35 that include the proposed TCP showing all TCM and quantities of TCD.
• A TPAR plan that includes:
• Details and features used to provide pedestrian accessibility.
• Pedestrian staging Plans at a scale no smaller than 1 inch = 50 feet.
• Temporary alternate facilities or detour routes for pedestrian traffic.
• Staging sequences and details for Work affecting vehicular, pedestrian, and bicycle traffic.
• Proposed order and duration of the TCM.
• A detailed temporary striping plan.
If the Contractor’s request to use a Contractor-modified Agency TCP, or a TCP developed by the Contractor is approved in whole or in part, acceptance will be made by a Change Order.
The Engineer will establish prices that represent a fair measure of the value of Work to be added, changed, or deleted as a result of any accepted modifications to the Agency TCP or an accepted TCP developed by the Contractor.
Once a TCP has been accepted by the Engineer, any additional modifications must be submitted by the Contractor for Agency review following the procedure described above.
The Engineer is not obligated to consider additional modifications to a previously approved TCP.
(b) Tourist-Oriented Directional and Business Logo Signs - Submit one of the following for approval, at least 5 Calendar Days before the preconstruction conference:
(1) No Signs - If there are no tourist-oriented directional (TOD) or business logo signs on the Project, a written notification that no TOD or business logo signs exist within the Project limits or
(2) Signs - Submit one copy of a sketch map of the Project showing all existing TOD and business logo signs and a written narrative describing how these signs will be kept in service and protected throughout all the construction stages. If modifications are necessary, submit updated information to the Engineer for approval at least 21 Calendar Days before the change is needed.
00221.90(b) Temporary Protection and Direction of Traffic – Replace the bullet that begins “Providing, Surfacing, maintain…” with the following bullet:
• Providing, surfacing, maintaining, removing, and restoring the TPAR.
SECTION 00222 – TEMPORARY TRAFFIC CONTROL SIGNS
Comply with Section 00222 of the Standard Specifications modified as follows:
00222.40(e) Temporary Sign Placement - Add the following to the end of the bullet list:
• Place a “WAIT FOR FLAGGER” (CR4-23) sign approximately 50 feet in advance of each flagger station, facing incoming pedestrian traffic. Install the sign on a conical marker or other temporary sign support, as shown or as directed. Do not allow the sign installation height or location to block the visibility of the flagger for incoming Public Traffic.
• When the horizontal clearance for the Roadway is less than 19 feet, install horizontal clearance (CW21-12-48) signs, identifying the narrowest width of the Roadway. Locate these horizontal clearance signs as shown or as directed.
• Install a "24 HR FLAGGING AHEAD" (CW20-9) sign in each direction approximately
250 feet prior to the "BE PREPARED TO STOP" sign. Remove the temporary signs when 24-hour flagging is no longer required, or as directed.
• During pilot car operations, install a 15 by 24-inch "WAIT FOR PILOT CAR" (CR4-20) sign at stop-controlled side roads and accesses intersecting the Highway within the limits of the pilot car operation, as shown.
00222.90 Payment -
Add the following to the end of this subsection:
Payment will be made for not more than 1 set of Work Area signs. All additional sets of Work Area signs will be at no additional cost to the Agency.
SECTION 00223 - WORK ZONE TRAFFIC CONTROL LABOR AND VEHICLES
Comply with Section 00223 of the Standard Specifications.
SECTION 00224 – TEMPORARY TRAFFIC CHANNELIZING DEVICES
Comply with Section 00224 of the Standard Specifications.
SECTION 00225 - TEMPORARY PAVEMENT MARKINGS
Comply with Section 00225 of the Standard Specifications.
SECTION 00280 - EROSION AND SEDIMENT CONTROL
Comply with Section 00280 of the Standard Specifications modified as follows:
00280.00 Scope - Replace the paragraph that begins "This Work also consists of providing temporary …" with the following paragraph:
This Work also consists of providing temporary erosion and sediment control (ESC) measures and furnishing, installing, moving, operating, maintaining, inspecting, and removing ESC throughout the Project area according to the Standard Drawings, the erosion and sediment control plan (ESCP), the Specifications, or as directed, until the site is permanently stabilized. Included also is the monitoring of weather, of stormwater and receiving waters, the reporting of monitoring observations, the reporting of corrective actions (when necessary) and the updates and revisions of the ESCP, including ESCP cover sheet, necessary to keep it representative of current site conditions and compliant with the NPDES 1200-CA, 1200-CN, OR 1200-C permit if applicable.
Delete the paragraph that begins “When contaminants, pollutants or hazardous materials…”.
Add the following paragraph to the end of this subsection:
The Agency’s NPDES 1200-CA permit is not applicable to this Project. Comply with all applicable conditions of this Section.
00280.02 Definitions - Delete the definition Wet Season Work
00280.04 Erosion and Sediment Control Plan on Agency Controlled Lands - Replace the bullet that begins “Information required under 1200-CA…” with the following bullet:
• Information required under 1200-CA permit, if applicable.
00280.06 Erosion and Sediment Control Manager - Delete this subsection.
00280.16(k) Active Treatment System – Add the following sentence to the end of this subsection:
Obtain approval of the active treatment system from DEQ prior to use.
00280.41(c) Wet Season Work and Temporary Work Suspension - Replace this subsection with the following subsection:
00280.41(c) Temporary Work Interruption - Update the ESCP and schedule for Work proposed between October 1 and May 31 to ensure that all appropriate controls, including ESC during Work interruption, are implemented and maintained. Submit the updated ESCP and schedule to the Agency and receive approval before beginning any Work between October 1 and May 31.
Between October 1 and May 31, limit excavation and bare ground activities to only those required for immediate operations. Stabilize stockpiles at the end of each workday by diverting flows, placing covers, or installing Sediment barriers.
00280.41(f) Hauling Material – Replace this subsection, except for the subsection number and title, with the following:
Cover loads carrying soil or sediment which may generate dust. Haul saturated loads in water tight beds or drain saturated loads prior to leaving the Project Site.
00280.41(g) Underground Injection Controls (UIC) – Replace this subsection, except for the subsection number and title, with the following:
Do not allow storm water from work area to enter Underground Injection Control (UIC) inlets, UIC catch basins or UIC wells.
00280.48 Emergency Materials - Add the following paragraphs after the paragraph that begins "Provide, stockpile, and protect...":
Provide and stockpile the following emergency Materials on the Project Site:
Item Quantity
Plastic Sheeting ............................................... 500 sq. yds.
Straw Bale .............................................................. 30 each
When emergency materials are used, restock emergency materials within 48 hours of use.
00280.62 Inspecting and Monitoring – Delete the paragraph that begins “Inspect the Project Site…”.
00280.62(a) Inspection - Replace the paragraph that begins "Perform site inspection, complete…" with the following paragraph:
Inspect the Project Site and all ESC devices for Effective Function and potential erosion or sediment movement and complete all applicable parts of the ODOT Erosion Control Monitoring Form, and submit the form to the Agency as follows:
00280.64(a) Corrective Action Timelines – Delete the bullet that begins “If completion of corrective action is not feasible…”
Delete the bullet that begins “Provide a schedule for clean-up and corrective actions…”
Delete the bullet that begins “Provide all corrective action documentation and photographs…”
00280.91 Payment – Replace the paragraph that begins “Emergency Materials that are incorporated…” with the following paragraph:
Materials listed in 00280.48 that are incorporated into the Project will be paid for under the appropriate items listed in the Contract Schedule of Items.
SECTION 00290 - ENVIRONMENTAL PROTECTION
Comply with Section 00290 of the Standard Specifications modified as follows:
00290.20(c)(2) Clean Fill - Add the following paragraph to the end of this subsection:
Manage all excavated soil that does not meet the definition of clean fill according to Section 00294.
Add the following subsection:
00290.30(a)(7) Water Quality:
• Do not discharge water contaminated by pollutants including sediment, drilling fluids and waste, concrete, grout, or water contained within a work area isolation, into any waters of the State or U.S. or conveyances draining thereto until it has been treated using Materials such as those listed in 00280.15 or 00280.16 or by pumping to a vegetated upland location.
Do not allow Project discharges to increase the concentration of any pollutant in the receiving water to a level that exceeds the limits prescribed by OAR 340-041.
• Implement containment measures adequate to prevent pollutants from entering waters of the State or U.S. Such pollutants include but are not limited to construction and demolition materials, waste spoils, fuel or petroleum products, detergents, silt, welding slag and grindings, concrete sawcutting by-products and sandblasting abrasives.
• Do not allow curing concrete or grout to be submerged within waters of the State or U.S.
less than 24 hours after placement, except within work area isolation. Do not end-dump riprap into the waters of the State or U.S. Place riprap from above the ordinary high water line.
00290.34 Protection of Fish and Fish Habitat - Add the following paragraph:
Meet with the Agency Biologist, Resource Representative, Engineer, and inspector on site, before moving equipment on-site or beginning any work, to ensure that all parties understand the locations of sensitive biological sites and the measures that are required to be taken to protect them.
Add the following subsection:
00290.34(c) Aquatic Species Protection Measures Required by Environmental Permits:
(1) General Requirements:
Use heavy equipment as follows:
• Secure absorbent material around all stationary power equipment (for example: generators, cranes, drilling equipment) operated within 150 feet of wetlands, waters of the State, waters of the U. S., drainage ditches, or water quality facilities to prevent leaks, unless suitable containment is provided to prevent spills from entering waters of the State or waters of the U.S.
• Store fuel and maintain all equipment in staging areas that are at least 150 feet away from any waters of the State, waters of the U.S., or storm inlet or on an impervious surface that is isolated from any waters of the State, waters of the U.S., or storm inlet.
00290.36(a) Migratory Birds - Add the following to the end of this subsection:
Do not disturb migratory bird nesting habitat (shrubs, trees, and structures), or clear vegetation from March 1 to September 1 of each year without prior written approval from the Engineer. Notify the Engineer, in writing, a minimum of 10 Calendar Days prior to starting activities that could harm nesting birds.
00290.51 Protection of Sensitive Cultural Sites - Add the following to the end of this subsection:
An Inadvertent Discovery Plan (IDP) has been developed for this project. The IDP is available from the Engineer.
SECTION 00294 - CONTAMINATED MEDIA
Section 00294, which is not a Standard Specification, is included in this Project by Special Provision.
Description
00294.00 Scope - In addition to the requirements of Section 00290 and the Specifications, this Work consists of the following:
• Excavate, segregate, stockpile, transport, and dispose of Contaminated Soils, Shoulder Soils, and contaminated grubbing materials, as defined by 00294.01, from the following locations:
Contaminated Soil Location Table 00294-1
From Location/Station to
Location/Station
Depth below grade
(feet) Approximate Quantity (cy) Suspected Contaminants
“L1” 15+00 to 20+00, Rt or Lt, from edge of pavement to the roadwork limits
0 -1.5’ 140 Lead
“L2” 35+00 to 45+00, Rt or Lt, from edge of pavement to the roadwork limits
0 -1.5’ 140 Lead
Approximate Total Quantity 280 Cy Quantity to be reused on Project 0 CY Quantity to be disposed at landfill 455 Tons
• In areas where excavation is not required, leave contaminated Material , Shoulder Soils, and clearing and grubbing Material in place.
The June 2025 ODOT report, titled Emergency HazMat Comprehensive Clearance Document US101: M.P. 314.7 & 344.44 Repair Project (M25052) documenting the contaminated media identified within the Project, is available from the Engineer.
• Prepare a written lead compliance plan for work within contaminated areas of the Project.
00294.01 Definitions:
Contaminated Soil - Soil that does not meet the DEQ definition of "Clean Fill", as defined by OAR 340-093-0030(18). This Contaminated Soil is a regulated waste, subject to OAR 340-093- 0005 through OAR 340-093-0290. If the grubbing Material has been determined to be contaminated, it will be considered and treated as Contaminated Soil for the purposes of this Section.
Shoulder Soil - Soil outside of the existing Highway Pavement and within Highway Right-of-Way generated during Highway maintenance or construction activities. This definition applies to excess Soil generated to a maximum depth of 1.5 feet below ground surface. This definition does not apply to Soil that is covered by existing impervious surfaces, including but not limited to curbs, sidewalks and parking lots constructed of asphalt or concrete.
ODOT Beneficial Use Determination (ODOT BUD) - The statewide ODOT Beneficial Use Determination (ODOT BUD), approved by DEQ (No. BUD-20181204), outlines a series of pre-approved non-residential reuse options for excess Soil Materials that do not meet DEQ’s Clean Fill Standards in some circumstances. These options may vary based on project scope and location, and documentation may vary, as directed by the Engineer.
00294.02 Testing of Contaminated Soil, Shoulder Soil, and Groundwater - When additional testing of Contaminated Soil or groundwater is required to characterize the Material for reuse, recycle, or disposal, conduct the tests according to 00290.20(c).
Use analytical methods meeting DEQ's Clean Fill Guidance Screening Levels for each analyte.
Contaminated Soil , Shoulder Soil, and groundwater sampling must be conducted by an Oregon Registered Geologist or Professional Engineer who has experience characterizing contaminated media.
Collect at least 2 composite Soil samples at each location listed in Table 00294-01 and submit for the following required testing:
• TPH-Dx by Northwest methods.
• The following volatile organic compounds (VOCs) by EPA Method 8260.
• Benzene, toluene, ethylbenzene, xylenes.
• Polynuclear aromatic hydrocarbons (PAHs) by EPA Method 8270SIM.
• Total metals for Cadmium, Chromium, and Lead.
• One TCLP lead by using EPA Method 1311.
00294.03 Submittals - Submit the following documents:
• A Project-specific written lead compliance plan, meeting the project applicable requirements of 29 CFR 1926.62(e)(2), at least 10 Calendar Days before the pre-construction conference.
When applicable, include compliance procedures for cadmium and chromium VI, according to 29 CFR 1926.1127 and 29 CFR 1926.1126.
• Modifications to the written lead compliance plan that are requested by the Engineer within 7 Calendar Days of the request.
• Current employee training certificates and medical surveillance information before beginning Work within the contaminated areas.
Submit the following documents within 48 hours of removal of contaminated media:
• Permits, permit applications, and documentation of compliance.
• All reuse, recycled, and disposal receipts.
• Final quantities of Soil and groundwater reused, recycled, and disposed and their final location.
• All analytical test results.
Labor
00294.30 Personnel Qualifications - Provide employees meeting the following requirements:
• For removal of Contaminated Soil and Shoulder Soil, provide employees trained in:
• Lead awareness according to 29 CFR 1926.62(l).
• Chromium according to 29 CFR 1926.1126(j)(2).
• Cadmium according to 29 CFR 1926.1127(m)(4).
Construction
00294.40 Contaminated Soil Excavation and Shoulder Soil - Excavate and handle Contaminated Soil or Shoulder Soil from Project excavations according to the following:
• Notify the Engineer 3 Calendar Days before beginning excavation activities within contaminated areas.
• Allow the Agency to collect Soil samples during excavation activities.
• Load Contaminated Soil or Shoulder Soil directly into trucks and transport directly to the recycling or disposal facility, or on-site reuse areas or, when approved by the Engineer, temporarily store Contaminated Soil or Shoulder Soil on-site.
• Remove contaminated media from the exterior of all vehicles before they leave the Project Site
• Cover trucks transporting contaminated materials to prevent spillage during transit to the disposal facility according to OAR 340-093-0220.
• Where over excavation is required, backfill the excavation according to 00330.42.
00294.41 Contaminated and Shoulder Soil Management - Reuse, recycle, or dispose of Contaminated Soil and Shoulder Soil according to any of the following:
(a) Landfill Disposal:
• Obtain the Engineer's approval of the disposal facility before disposing of the Contaminated Soil.
• Transport the Contaminated Soil or Shoulder Soil to a DEQ permitted municipal solid waste landfill or a permitted construction and demolition landfill for disposal. Dispose of temporarily stored Contaminated Soils or Shoulder Soil within 30 Days of beginning excavation work or before Second Notification, whichever occurs first.
• Complete and sign all manifests and bill-of-lading forms for handling, loading, transporting, and disposing of the Contaminated Soil and Shoulder Soil.
• Pay all filing and permit fees.
(b) Recycling:
• Obtain the Engineer's approval of the recycling facility before disposing of the Contaminated Soil.
• Transport Contaminated Soil to a DEQ permitted recycling facility or asphalt batch plant.
Recycle temporarily stored Contaminated Soils within 30 Days of beginning excavation or before Second Notification, whichever occurs first.
• Complete and sign all manifests and bill-of-Lading forms for handling, loading, transporting, and recycling the Contaminated Soil.
(c) Reuse On-Site:
• Temporarily stockpile the Contaminated Soil or Shoulder Soil from Table 00294-1.
• Reuse the Contaminated Soil or Shoulder Soil on the Project within the project limits as shown and directed by the Engineer.
• Within 30 Calendar Days of completing on-site reuse or before Second Notification, whichever occurs first, transport all Contaminated Soil or Shoulder Soil that is not reused on the Project to a DEQ permitted municipal solid waste landfill or a permitted construction and demolition landfill (or a permitted recycling facility).
Measurement
00294.80 Measurement - Work performed under this Section will be measured according to the following:
No measurement of quantities will be made for the following:
• Lead compliance plan.
• Segregate and stockpile Contaminated Soil.
Soil sample and analytical testing will be measured on the unit basis for each sample submitted and tested according to 00294.02 when test results are submitted according to 00294.03.
The quantities of Contaminated Soil or Shoulder Soil disposed will be measured on the weight basis, based on weigh tickets from the recycling or disposal facility.
Clearing and grubbing will be measured according to 00320.80.
Payment
00294.90 Payment - The accepted quantities of Work performed under this Section will be paid for at the Contract unit price, per unit of measurement, for the following items:
Pay Item Unit of Measurement
(b) Lead Compliance Plan .............................................. Lump Sum
(c) Segregate and Stockpile Contaminated Soil ............. Lump Sum
(d) Soil Sample Collection and Analytical Testing ................ Each
(e) Contaminated Soil Disposal ............................................ Ton
Item (c) includes segregating, handling, and stockpiling Contaminated Soil or Shoulder Soil within the Project Site for the purpose of analytical testing, on-site reuse, or disposal.
Item (d) includes mobilization, Soil sampling, testing, analyses, and preparation of reports for tests required in 00294.02. Additional testing beyond that listed in 00294.02 will only be paid if authorized by the Engineer.
Item (e) includes all costs involved with the disposal of Contaminated Soil or Shoulder Soil at a recycling or disposal facility.
No separate or additional payment will be made for the excavation or reuse of Contaminated Soil or contaminated Shoulder Soil. Payment will be included in payment made for the appropriate items under which the excavation or reuse of Contaminated Soils or contaminated Shoulder Soil is required.
Clearing and grubbing will be paid for according to 00320.90.
Payment will be payment in full for removing and disposing of all Materials, and for furnishing all Equipment, labor, Plans, test results, and Incidentals necessary to complete the Work as specified.
SECTION 00295 - ASBESTOS MATERIALS
Section 00295, which is not a Standard Specification, is included in this Project by Special Provision.
Description
00295.00 Scope - In addition to the requirements of Section 00290, remove asbestos according to the following Specifications.
Remove asbestos from the following locations in Table 00295-1:
Table 00295-1
Location/Address Material Description Quantity
(ft. or sq.ft.)
Percent Asbestos
Friable or Non-Friable
M.P. 314.7 on US 101 Corrugated metal pipe with black tar coating 11 ft Unknown Unknown
M.P. 344.44 on US 101 Corrugated metal pipe with black tar coating 122 ft Unknown Unknown
The materials listed in Table 00295-2 were not sampled.
Table 00295-2
Location/Address Material Description Quantity
(ft. or sq.ft.)
Friable or Non-Friable
M.P. 314.7 on US 101 Corrugated metal pipe with black tar coating 11 ft Unknown
M.P. 344.44 on US 101 Corrugated metal pipe with black tar coating 122 ft Unknown
The June 2025 ODOT report, titled Emergency HazMat Comprehensive Clearance Document US101: M.P. 314.7 & 344.44 Repair Project (M25052) documenting the asbestos identified within the Project is available from the Engineer. Maintain a copy of this report and all additional asbestos survey results on site at all times and readily available to employees and inspectors during demolition and repair activities.
00295.01 Definitions:
Asbestos Containing Material (ACM) - Any material containing more than 1% asbestos.
00295.03 Submittals - The following forms and reports are required:
• Asbestos survey report documenting sample locations and analytical results according to Oregon Administrative Rule (OAR) 340-248-0270 (3)(d).
• Completed and signed DEQ Project Notification Form and an abatement plan to Agency and DEQ at least 10 Calendar Days before beginning friable asbestos removal.
• Completed and signed DEQ Waste Shipment Report Form according to the following:
• Send the form along with the asbestos waste to the disposal facility.
• Provide a copy of the form to the Engineer within 48 hours of transportation of the asbestos waste.
• Obtain the final signed form from the disposal facility along with the disposal receipts and submit them to the Engineer within 3 Calendar Days after receiving them from the waste disposal facility.
Labor
00295.30 Personnel Qualifications - Provide employees meeting the following requirements:
• A current Oregon DEQ Asbestos Abatement Contractor license.
• A current Oregon DEQ Certified Supervisor meeting the requirements of
OAR 340-248-0130.
• Current Oregon DEQ Certified asbestos workers meeting the requirements of
OAR 340-248-0130
• A current AHERA Inspector Training Certification according to 40 CFR 763, Part 763, Appendix C - TSCA Tile II
• Workers trained according to 29 CFR 1926.1101.
When a DEQ Certified Supervisor is required, ensure the supervisor is on site and overseeing the work whenever asbestos materials are disturbed or removed.
Materials Testing
00295.35 Testing of Suspect Asbestos Containing Material - When additional testing is needed for suspected ACM listed in Table 00295-2, complete the following with an Asbestos Hazard Emergency Response Act (AHERA) Inspector prior to removal of material listed in the Table 00295-2:
• Collect at least 2 samples of each material listed in the Table 00295-2 to determine if asbestos is present.
• Submit samples to a National Voluntary Laboratory Accreditation Program (NVLAP) certified laboratory for analysis by polarized light microscopy (PLM) following EPA Method 600/R-93/116.
• Submit the laboratory test results to Engineer for review.
If asbestos is detected in any material sample then all similar material are considered asbestos containing material and all similar materials are to be removed according to 00295.40.
Construction
00295.40 Asbestos Removal - Comply with 29 CFR 1910, 29 CFR 1926.1101, 40 CFR 61, 40 CFR 763, OAR 340-248, ORS 468A and the following:
• Before beginning asbestos removal work, sign and submit all notifications and pay all fees to DEQ. Provide copies to the Engineer.
• Complete and sign all manifests and bill-of-lading forms for transporting and disposing the
ACM.
• Maintain the ACM in an undamaged and non-friable condition by keeping the material wet during demolition or by using methods approved by DEQ.
• Keep material sealed during transport to the disposal facility. Transport and dispose of all ACM according to OAR 340-248-280 and OAR 340-248-290.
Measurement
00295.80 Measurement - The quantities of removing asbestos containing materials will be measured on either the length basis or the area basis.
No measurement of quantities will be made for bulk asbestos sampling, analytical testing, and reporting.
Payment
00295.90 Payment - The accepted quantities of Work performed under this Section will be paid for at the Contract unit price, per unit of measurement, for the following item(s):
Pay Item Unit of Measurement
(a) Remove Asbestos Material, Black tar coated corrugated metal pipe Foot
(c) Bulk asbestos sampling, analytical testing, and reporting ....... Lump Sum
Payment will be payment in full for furnishing all Equipment, labor, and Incidentals necessary to complete the Work as specified.
SECTION 00305 - CONSTRUCTION SURVEY WORK
Comply with Section 00305 of the Standard Specifications.
SECTION 00310 - REMOVAL OF STRUCTURES AND OBSTRUCTIONS
Comply with Section 00310 of the Standard Specifications.
SECTION 00320 - CLEARING AND GRUBBING
Comply with Section 00320 of the Standard Specifications modified as follows:
00320.40(c) Tree and Vegetation Trimming - Replace the bullet that begins “Trim branches obstructing sight…” with the following bullet:
• Trim and remove branches, vegetation, or other materials obstructing sight distance at intersections or impairing visibility of signs, signals, illumination, and other TCD.
SECTION 00330 - EARTHWORK
Comply with Section 00330 of the Standard Specifications modified as follows:
00330.03 Basis of Performance - Add the following paragraph to the end of this subsection:
Perform all earthwork under this Section on the excavation basis.
00330.41(a)(9) Excavation Below Grade - Delete subsection 00330.41(a)(9)(c).
00330.42(c)(3) Embankment Slope Protection - Add the following paragraph to the end of this subsection:
Construct the outer 12 inches of embankments with suitable materials to establish slope stabilization through permanent seeding. If suitable material is not available, provide suitable materials from a Contractor-provided source which conforms to the requirements of 00330.11 or 00330.13 and provides favorable conditions for germination of seed and growth of grass.
00330.43(d) Small, Irregular Fill Areas – Replace the paragraph that begins “The density requirements of 00330.43 do not apply…” with the following paragraph:
The density requirements of 00330.43 do not apply to irregular fill areas outside of the travel lanes that have a total volume of no more than 150 cubic yards at each location. Construct these areas according to the following:
00330.91(d) General Excavation - Delete the bullet that begins "Includes Unsuitable Material…".
SECTION 00331 - SUBGRADE STABILIZATION
Comply with Section 00331 of the Standard Specifications.
SECTION 00350 - GEOSYNTHETIC INSTALLATION
Comply with Section 00350 of the Standard Specifications modified as follows:
00350.01 Definitions - Add the following definition to the end of the definition list:
PVC Liner - An essentially impermeable membrane, composed of Polyvinyl Chloride (PVC) (HDPE), used as a liquid barrier.
00350.41 (a)(2) Overlaps - Add the following after “Roadbed Subgrade Stabilization”:
PVC liner 24 inches, lapped in the direction of flow.
00350.90 Payment - Add the following pay item to the pay item list:
(g) PVC Liner ................................................................................. Square Yard
SECTION 00445 - SANITARY, STORM, CULVERT, SIPHON, AND IRRIGATION PIPE
Comply with Section 00445 of the Standard Specifications.
SECTION 00470 - MANHOLES, CATCH BASINS, AND INLETS
Comply with Section 00470 of the Standard Specifications.
SECTION 00641 - AGGREGATE SUBBASE, BASE, AND SHOULDERS
Comply with Section 00641 of the Standard Specifications modified as follows:
00641.10(a) Base and Shoulder Aggregate - In the paragraph that begins "Aggregate for bases…", add the following sentence after the first sentence:
Base Aggregate shall be either 1”-0” or 3/4”-0” size.
Add the following subsection:
00641.46 Small, Irregular Areas – Haul, place, shape and compact small irregular areas according to 00640.41 through 00640.43. A small or irregular area is outside of the Traveled Way and requires no more than 5 Tons of Aggregate Base or as otherwise approved by the Engineer.
In areas not accessible to the Equipment specified in 00641.24, use a weighted roller, vibratory plate compactor, tamping rammer compactor, or other approved Equipment suitable for the area as approved by the Engineer.
SECTION 00730 - EMULSIFIED ASPHALT TACK COAT
Comply with Section 00730 of the Standard Specifications modified as follows:
00730.11 Emulsified Asphalt – Replace the sentence that begins “Furnish CSS-1, CSS-1h…” with the following sentence:
Furnish CSS-1, CSS-1h, CMS-2, CMS-2S, CMS-2h, CRS-1, CRS-2, HFRS-2, HFMS-2 or HPTC as selected by the Contractor.
00730.90 Payment - Replace this subsection, except for the subsection number and title, with the following:
No separate or additional payment will be made for Emulsified Asphalt tack coat. Approximately _0.75_ Tons of Emulsified Asphalt in tack coat will be required on this Project.
SECTION 00744 - ASPHALT CONCRETE PAVEMENT
Comply with Section 00744 of the Standard Specifications modified as follows:
00744.11(a) Asphalt Cement - Add the following to the end of this subsection:
Provide PG 64-22 grade asphalt cement for this Project.
00744.16 Sampling and Testing - Replace this subsection, except for the subsection number and title, with the following:
For each 1,000 Tons of placement, have a CAT I perform a minimum of one of each of the following test methods as modified in the MFTP:
• Asphalt Content - AASHTO T 308 with ODOT TM 323 determined Calibration Factor
• Gradation - AASHTO T 30
• Mix Moisture - AASHTO T 329
• Maximum Specific Gravity - AASHTO T 209
• Field Compacted Gyratory Specimens - ODOT TM 326
When less than 1,000 Tons of mix is placed in a Day, perform a minimum of one series of tests per Day. Provide test results to the Engineer by the middle of the following work shift. The Engineer may waive the requirement for any of AASHTO T 308, AASHTO T 30, AASHTO T 329, and ODOT TM 326 on a daily basis. The Engineer may waive the requirement for AASHTO T 209 when less than 500 Tons of ACP is placed in a single work shift.
Provide samples or split samples to the Engineer when requested.
00744.17 Acceptance - Replace this subsection, except for the subsection number and title, with the following:
If the test result for each mix gradation constituent, asphalt content, and density measurement is within the specification limits, the material will be accepted. If the asphalt content, one or more gradation constituents, or the density measurement are not within the specification limits, the material that is not within the specification limits will be accepted according to 00150.25.
00744.41 Mixing Temperature - Replace the table with the following:
Temperature, °F Type Maximum Minimum Behind at Mixer Paver
HMAC 350 240
WMAC 350 215
00744.49 Compaction - Replace the paragraph that begins "Determine compliance with…" with the following paragraph:
Determine compliance with density Specifications by random testing of the compacted surface with calibrated nuclear gauges. Determine the density by averaging QC tests performed by a CDT with the nuclear gauge operated in the backscatter mode according to AASHTO T 335 at one random location for each 100 Tons of asphalt concrete placed, but take no less than three tests each shift. Do not locate the center of a density test less than 1 foot from the Panel edge.
Calculate MAMD according to ODOT TM 305. The Engineer may waive compaction testing requirements when less than 500 Tons of ACP is placed in a single work shift.
Add the following subsection:
00744.51 Opening Sections to Traffic - Schedule work so that, during the same shift, the surfaces being paved are paved full width and length through the wearing Course before opening to traffic.
SECTION 00810 - METAL GUARDRAIL
Comply with Section 00810 of the Standard Specifications modified as follows:
00810.15 Salvaged Material - Replace the paragraph that begins "Material salvaged as part…" with the following paragraph:
Materials salvaged as part of removal work on the Project may be reused in new construction if the Engineer determines that the Materials meet the requirements of 0810.10, except for preservative treatment requirements, and conform to the following:
00810.15(a) Wood Posts - Replace this subsection, except for the subsection number and title, with the following:
Use only structurally sound and treated wood posts, free from damage that would affect their strength and durability. Do not incorporate into the Work any post damaged to the extent that untreated wood is exposed.
It is estimated that 50 % of the existing wood guardrail posts may be reused and incorporated into new guardrail work.
SECTION 00840 - DELINEATORS AND MILEPOST MARKER POSTS
Comply with Section 00840 of the Standard Specifications.
SECTION 00855 - PAVEMENT MARKERS
Comply with Section 00855 of the Standard Specifications.
SECTION 00865 - LONGITUDINAL PAVEMENT MARKINGS - DURABLE
Comply with Section 00865 of the Standard Specifications.
SECTION 02050 – CURING MATERIALS
Comply with Section 02050 of the Standard Specifications modified as follows:
02050.10 Liquid Compounds – Replace the paragraph that begins “Furnish liquid membrane-forming curing …” with the following:
Furnish liquid membrane-forming curing compounds from the QPL and meeting the requirements of ASTM C309. Before use, submit two, one quart samples from each lot for testing. Samples will be tested according to ODOT TM 721. Samples are not required for curing compounds used on Commercial Grade Concrete.
SECTION 02415 - PLASTIC PIPE
Comply with Section 02415 of the Standard Specifications modified as follows:
02415.40 Polypropylene Pipe – Replace this subsection, except for the subsection number and title, with the following:
Furnish polypropylene pipe and fittings as follows:
(a) Non-Pressure Storm Sewers and Culverts - Furnish polypropylene pipe and fittings for non-pressure storm sewers and culverts from the QPL and meeting the following requirements:
Dual Wall Pipe .............................. ASTM F2764, ASTM F2881, or AASHTO M 330 Type S Triple Wall Pipe ......... ASTM F2764 or AASHTO M 330 Type D Watertight Joints ................................................... ASTM D3212
(b) Non-Pressure Sanitary Sewers - Furnish polypropylene pipe and fittings for non-pressure sanitary sewers from the QPL and meeting the following requirements:
Dual Wall Pipe .................................................ASTM F2764 Triple Wall Pipe ...............................................ASTM F2764 Watertight Joints ............................................. ASTM D3212
SECTION 02510 – REINFORCEMENT
Comply with Section 02510 of the Standard Specifications modified as follows:
02510.11(c) Coated Reinforcement Ties and Supports - Delete this subsection.
02510.11(d) Epoxy Coating Repair - Delete this subsection.
02510.30(d) Ties and Support - Delete this subsection.
02510.60 Wire Reinforcement - Replace this subsection with the following subsection:
02510.60 Ties and Supports - Provide tie wire and supports according to CRSI Manual of Standard Practice.
(a) Coated Reinforcement Ties and Supports – Provide nonmetallic coated ties and supports for coated reinforcement, including ties for coated-to-uncoated reinforcement connections.
(b) Uncoated Reinforcement Ties and Supports - Tie all mats of galvanized steel bars with galvanized ties. Provide precast concrete blocks with galvanized ties that support galvanized reinforcement.