Attachment A-Scope of Work.pdf
PDF 268 KB Posted
- Solicitation number
- 2036386
- Issued by
- Miami-Dade County, Florida
About this file
This document is a Scope of Work for an urban forestry planting project by the City of Miami, funded through the Inflation Reduction Act Urban and Community Forestry Expansion Grant. The project involves purchasing and installing 644 trees across various size categories, including large (172 trees), medium (427 trees), small (35 trees), and palm (10 trees) varieties. The trees will be planted based on the Southwest Streetscape Master Plan, with specific requirements for tree quality, including Florida Grade #1 standards, single leader configuration, and precise caliper and height specifications. Tree species include Live Oak, Mahogany, Wild Tamarind, Green Buttonwood, Crape Myrtle, and various native Florida trees. The contract includes an 18-month maintenance period during which the contractor must water, fertilize, and replace any trees that do not survive, with monthly inspections and time-stamped photo documentation required.
The project has detailed specifications for planting, including soil composition (50% muck, 50% coarse silica sand), use of soil moist polymers, and Eucalyptus mulch. The contractor is responsible for protecting utilities, properly staking trees, and ensuring correct planting techniques. Invoicing requires proof of payment and lien releases from subcontractors. The total project value is not explicitly stated, but the comprehensive nature of the specifications suggests a significant urban forestry investment. Root deflectors may be installed at the discretion of the City Engineer or Project Manager, and there are provisions for potential tree relocation. The contractor bears the cost of replacements and must guarantee the trees' survival for the full 18-month period, with final acceptance contingent on the trees' health and growth.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT A
SCOPE OF WORK
SPECIFICATIONS FOR CITY-WIDE - URBAN FORESTRY PLANTING -
Inflation Reduction Act Urban And Community Forestry Expansion Grant
Location: Based upon the Southwest Streetscape Master Plan
Scope of Work: Furnish and install the following species of native trees, Florida #1 or better, see below for overall height, spread, diameter at breast height, and/or caliper as well as any additional specifications. Trees are to be planted, maintained, and watered per the Standard Contract Documents and Specifications for Public Works Projects and the below additional specifications.
Trees are to be maintained for an 18-month period.
Dbh = Diameter at Breast Height GW = Grey Wood height O.A. = Over All height SPR=Spread CT=Clear Trunk FG=Field Grown
Invoicing: Proof of payment and release of lien from the subcontractors and suppliers is required with each invoice.
Specifications: PLANTING
2B.01 PLANTING GENERAL
The Contractor shall furnish all labor, materials, equipment, watering, and related work required to complete the work in accordance with the contract documents and specifications.
I. SCHEDULING OF WORK: The work shall be coordinated with other contractors to prevent any conflicts as to scheduling with others.
II. PERSONNEL: All planting shall be performed by personnel familiar with planting procedures and under the supervision of a qualified planting foreman who is to be available at the job site during the course of the work.
III. PROTECTION OF UTILITIES AND STRUCTURES: Prior to the preparation of planting areas or plant pits, the Contractor shall ascertain the location of all electrical cables, all conduits, all utility lines, oil tanks, and supply lines, so that proper precautions may be taken not to disturb or damage any subsurface improvements. In the event any are uncovered, the Contractor shall promptly notify the City Arborist and/or Project Manager, who shall arrange to relocate the plant material, if possible. The Contractor shall be responsible for any damage to utilities and structures and shall properly maintain the protection of same.
IV. CLEAN UP:
A. The Contractor at all times shall keep the premises free from accumulation of waste materials or rubbish caused by his operation. At the completion of the work, he shall remove all waste materials and rubbish from the project site as well as all his tools, construction equipment, machinery, and surplus materials. The contractor shall clean all surfaces and leave the project site “broom clean.”
B. If the Contractor fails to clean up, the City may do so, and the cost thereof shall be charged to the Contractor.
V. SUBMITTALS:
A. Unit Prices: The unit prices bid will serve as the basis for any required addition or deletion to the Contract.
B. Materials: Submit four samples each with corresponding certificates of compliance from the product manufacturer or supplier for planting soil, fertilizer (analysis card), mulch, galvanized steel banding, turnbuckles, guy wires, and a sample of wood braces.
Submit these within thirty (30) days after the award of the Contract.
C. Schedule: A detailed sequence of planting shall be submitted to the City by the
Contractor. Submit revised schedule when departure from same is necessary.
D. Maintenance Guidelines: Submit detailed maintenance guidelines covering fertilization, watering, spraying, trimming, mulching, and any other pertinent issues related to landscape work required to ensure the viability of plant material. Submit maintenance guidelines sixty (60) days after the award of the Contract for review by the City or its representatives.
2B.02 MATERIALS
I. COMMERCIAL FERTILIZER:
A. Shall be delivered to the site in the original unopened containers, each bearing the manufacturer’s analysis.
B. Fertilizer shall be organic/slow-release fertilizer (6-3-2) unless noted otherwise, or equal.
II. PLANT MATERIAL:
A. Plant species shall conform to those indicated on the drawings and in these Specifications.
B. Plants shall be sound, healthy, vigorous, free from plant diseases, insect pests, or their eggs, and shall have healthy normal root systems. Plants shall be nursery-grown stock, except for site transplanted material or freshly dug, balled, and burlap plants. Container grown must be inspected and approved by Project Manager and/or City Arborist. No Root bound trees will be accepted
D. All plants shall have been transplanted or root pruned at least once in the three years previous to the contract date. Root-bound container plants will not be accepted.
E. Collected palms shall be heeled in the nursery for no less than three (3) months prior to final planting.
F. All plant material not otherwise specified as being Florida Fancy of Specimen shall be
Florida No. 1 or better quality graded in accordance with “Grades and Standards for Nursery Plants” published by the State of Florida Department of Agriculture.
G. Caliper measurement, height measurement, height relation to caliper, spread, bare root and ball dimensions, number of canes, types of vines and ground covers, etc., shall conform to the applicable standards given in “USA Standard for Nursery Stock 260.1,” sponsored by the “American Association of Nurserymen, Inc.”
H. Plants specified shall be used, substitutes will not be allowed unless sufficient evidence is submitted in writing, indicating plant unavailability. The Contractor is to submit a suggested listing of substitutes for review and comment by the City Arborist and/or Project Manager. No substitutions shall be made unless approved in writing. Said substitutes shall be submitted no less than five (5) days after the Award of Contract.
I. Any materials and/or work may be rejected if, in the opinion of the Project Manager, City Arborist, City Engineer and/or Project Manager, such does not meet the requirements of these Specifications. All rejected materials shall be promptly removed from the site by the Contractor at his expense.
J. Plants existing on the site and transplanted by the Contractor shall be subject to
Contractor’s Guarantee.
K. Plants used where symmetry is required shall be matched as nearly as possible. The
Contractor shall tag all trees and palms at the nursery for review by the City Arborist and/or Project Manager. The tagging for review shall be made no less than twenty-five
(25) days prior to the projected installation date. All material shall be clearly identified by the use of colored vinyl tapes. The Contractor shall tag 10% more than the quantities required and give five (5) days' notice minimum prior to the nursery visit.
III. SOIL MOIST POLYMERS
A. PLANTING SOIL: Shall be as follows:
50% Muck 50% Coarse Silica Sand
B. SOIL MOIST ACRYLIC POLYMERS: Provide polymers at the rate specified in 2B.03.III.F to each planting pit/tree or palm planting location.
C. MULCH: Shall be Eucalyptus Mulch Grade “A” delivered to the site in sealed and marked bags or approved equal.
D. ROOT GUARD: Root deflectors under the product name of “Root Solutions” or approved equal. This item will be installed at the discretion of the City Engineer, Project Manager and/or Certified Arborist at citywide locations.
2B.03 EXECUTION
I. SHIPMENT AND DELIVERY:
A. The Contractor shall notify the City Arborist and/or Project Manager forty-eight (48) hours in advance when plant material is to be delivered.
B. Plant material shall be protected from weather and adequately packed to prevent breakage and drying out during transit.
C. Plants shall not be planted on the job site until they have been inspected at receiving site and accepted by the City Arborist and/or Project Manager. Plants that do not meet specifications for quality herein stated, or plants that show improper handling, or arrive on site in an unsatisfactory condition shall be rejected. Rejected plants shall immediately be removed, and disposed of by the Contractor, and approved nursery stock of like variety, size, and age shall be replaced by the contractor without additional compensation.
D. The Contractor shall coordinate all project planting plans and project timelines with the
City Arborist and/or Project Manager and seek approval prior to project commencement.
E. Final Acceptance of plant material will be given only after the material is planted and after meeting the requirements prescribed herein.
II. STAKING:
A. All staking shall be indicated in the Specifications.
B. It shall be the Contractor’s responsibility to prevent plants from falling or being blown over and to straighten and replace all plants that are damaged. No nails are allowed against the trunk of the palms. Plants blown over by high winds shall not be cause for the additional expense to the City but shall be the responsibility of the Contractor.
Damaged plants shall be replaced by the Contractor at no additional expense to the City, except the Contractor shall not be held responsible for the loss or death of any tree, shrub, or plant, after being properly planted, as a result of hailstorms, lighting, flood, fire, or other acts of providence beyond his control.
III. PLANTING OF TREES:
A. Except as otherwise specified, the Contractor’s work shall conform to accepted horticultural practices as used in the trade.
B. Plants shall be protected upon arrival at the site by being thoroughly watered and properly maintained until planted. Plants shall be planted within twenty-four (24) hours after arriving at the site. At all times, workmanlike methods customarily in good horticultural practice shall be exercised.
C. Before digging holes or beds, the location and/or arrangement of the planting shall be staked by the Contractor and accepted by the City Arborist and/or Project Manager.
The staking should be ready for inspection at least FIVE (5) days prior to the projected planting date. Three (3") two-inch lodge pole stakes. Install approximately two (2") inches away from the edge of the root ball. Stake location shall not interfere with permanent branches and rootball.
D. The existence and location of underground utilities if shown on the plans are not guaranteed and shall be investigated and verified in the field by the vicinity of existing structures and utilities shall be carefully done. The Contractor shall be held responsible for any damage to and for maintenance and protections for existing utilities and structures.
E. All circular pits with vertical sides shall be excavated to sizes and depths as shown in the Engineering Standards: Landscape (LD-05/LD-23) and backfilled with planting soil.
The contractor shall test and fill all tree/palm pits with water before planting to assure proper drainage and that percolation is available. Pits that are found not to be adequately draining shall be backfilled with coarse gravel or crushed rock. No allowances will be made for lost plants due to improper drainage.
F. Backfill with the specified planting soil mix and incorporate a minimum of six (6) ounces to nine (9) ounces of Soil Moist acrylic copolymers evenly spread around and adjacent to the root ball mid-way in depth.
G. The final level of the ground and that of the sod shall conform to the surrounding grade.
H. The plants shall be set on prepared planting soil backfill brought to a height permitting planting at the depth of the root flair.
I. Upright plants shall be kept in a vertical position. All plants shall be handled by an earthy ball only. Handling by the plant itself will be caused for rejection of such plants.
J. After placing the plant in the pit, the backfill shall be watered and firmly tampered to ensure the backfill mixture in and about all the roots. All backfill mixtures shall be such that no plants will settle lower than the depth indicated on the drawings.
K. After filling halfway on the earth ball, the burlap shall be loosened and laid back off the top of the ball, or if too bulky, cut away and removed, after which the balance of the pit shall be backfilled and tamped.
L. All plants shall be thoroughly watered at the time of planting and kept adequately watered until the time of acceptance. The Contractor shall provide the means to adequately water where water lines are not available.
M. Apply fertilizer to planting beds and saucer areas as follows:
Trees: One (1) pound per inch trunk diameter. Spread the fertilizer evenly about the base.
Thoroughly water plants before and after fertilization then mulch.
N. Three (3”) inches of mulch shall be placed between and around all plant material within twenty-four (24_ hours after any planting. For individual plants, the mulch shall be spread to cover the saucer area. When mulch is in place, thoroughly water the tree within the saucer area.
O. Pruning shall be done at the time of planting and with due regard to the natural form and growth characteristics of each species. Trees with pruned terminal leaders will Not be Accepted.
P. During the course of planting, excess and waste materials shall be removed daily. All reasonable precautions shall be taken to avoid damage to all structures and plants.
When planting in an area that has been completed, the area shall be thoroughly cleaned up.
IV. ROOT GUARD INSTALLATION:
A. As per Bulletin NO.33, shade trees planted within the right-of-way and having less than two (2’) foot clearance from the sidewalk or curbs will require root barriers, i.e., sections of metal pipe or root deflector under the product name of “Root Solutions” or approved equal.
V. WATERING AND MAINTENANCE:
A. Watering and Maintenance shall begin immediately after each plant is planted and shall continue throughout the course of operations on the site.
1. Watering: Plants shall be watered by hose soaking thoroughly each day for the first three weeks (21 calendar days) and three (3x) times a week for the following three
(3) week period. Soaking then shall continued on a twice-weekly basis for another period of five (5) weeks, amounting to a total of seventy-four (74) days after installation.
2. At the end of this hose Soaking period, earth saucers shall be collapsed leaving the guying and/or staking in place.
B. Plant maintenance shall include watering, pruning, spraying, dusting, weeding, cultivating, mulching, tightening and repairing of braces and guys, replacement of sick or dead plants, resetting plants to proper grades or upright position, and restoration of the planting saucer, and all other care needed for the planting saucer, and all other care needed for proper growth of the plants.
Watering: All trees and palms shall be watered by hand hosing as follows:
Once a day for the first three (3) weeks after planting, three (3x) times per week for the following three (3) weeks, and twice a week for five (5) weeks thereafter until inspection for Acceptance.
C. Spraying and Dusting: During the maintenance period and up to the issuance of the certificate of final acceptance, the Contractor shall do all seasonal spraying and/or dusting of plant material. The materials and methods shall be in accordance with the highest standard nursery practices and in accordance with all regulatory agencies having jurisdiction.
D. Protection: Planting areas and plants shall be protected against trespassing and damage.
If any plants become damaged or injured, they shall be treated or replaced as directed.
No work shall be done within or over planting areas or adjacent to plants without proper safeguards and protection.
E. Damage resulting from erosion, gullies, washouts, or other causes shall be repaired by filling with topsoil, tamping, and fertilizing by the Contractor at his expense if such damage occurs prior to Acceptance by the City Arborist and/or Project Manager.
VI. INSPECTION FOR ACCEPTANCE
A. Upon completion of all planting, an inspection for Acceptance of work will be held.
The Contractor shall notify the City Arborist and/or Project Manager for scheduling of the inspection five (5) days prior to the anticipated inspection date. Partially completed portions will Not be inspected.
It is the Contractor’s responsibility to ensure that the work is completed and ready for inspection before calling for same.
B. At the time of Acceptance for inspection, if the materials are in whole a written notice will be given by the City Arborist and/or Project Manager that the guarantee period begins from the date of the inspection.
C. In case a substantial number of plants are sick or dead at the time of inspection, Acceptance will not be granted and the Contractor’s responsibility for maintenance of all the plants shall be extended until replacements are made.
D. Replacements shall conform in all respects to the specifications for new plants and shall be planted in the same manner. Said replacements are to be made within five (5) days of said inspection.
E. After the inspection for Acceptance of replacements is made and the work is found to be acceptable, the Contractor shall continue to hand water all trees, as specified in Section, (V. Watering and Maintenance).
F. A Final Walk-through for Final Acceptance must be scheduled by the contractor prior to the expiration of the eighteen (18) month warranty period.
VII. PLANT GUARANTEE AND REPLACEMENT
A. Guarantee: All plant materials including site-relocated material shall be guaranteed for a period of eighteen (18) months, After the date of inspection for Acceptance. All plant materials shall be alive and in satisfactory growth at the end of the eighteen (18) month guarantee period.
B. Replacements: During the guarantee period, there shall be monthly inspections by the
Contractor to ascertain the viability of the plant material. The Contractor shall send a Time- Stamped photo every month of all trees that are deemed “Accepted” by the City Arborist and/or Project Manager. Any plant that is missing, dead, or fails to become established due to the Contractor’s negligence shall be replaced within ten (10) days after the monthly inspection and notification to the Arborist and/or Project Manager at no cost to the Owner/the City of Miami.
C. At the end of the eighteen (18) month guarantee period, the Contractor shall notify the City of Miami that the project is ready for a Final Inspection. In order to receive Final Inspection Acceptance, the contractor must ensure that all plant material is deemed to be in vigorously good health and that all tree braces, tree tags, tree guides, tree saucers are removed. Any plant that is not alive, fails to show satisfactory growth or is missing due to the Contractor’s negligence, will be removed, and replaced at no cost to the Owner/City of Miami.
Replacements shall be made within ten (10) days after the Final Inspection and notification to the Arborist and/or Project Manager at no cost to the Owner/the City of Miami.
D. Materials and Operations: All replacements shall be plants of the same kind and size specified in the Plant Schedule. They shall be furnished and planted as specified with the cost borne by the Contractor.
E. City will accept the trees after an eighteen (18) month, period from the last replacement if any.
F. The Contractor shall not be held responsible for the loss or death of any tree, shrub, or plant, after being properly planted, as a result of hailstorms, lightning, flood, fire, or other acts of providence beyond his/her control.
SIZE
CATEGORY
TREE SPECIFICATIONS SPECIES QUANTITY
(172) Florida (FL) Grade #1/Single Leader/Standard/4"-6” Caliper/20-22' Height (HT)/6'-8’ Spread (SPR)
Live Oak/Quercus Virginiana ‘Boardwalk’
FL GRADE#1/ SINGLE LEADER/ STANDARD/ 3”-4" CALIPER/ 16’-18’
HT/4’-6’ SPR
Horseflesh Mahogany/Lysiloma sabicu 5 Florida (FL) Grade #1/Single Leader/Standard/ 4-6” Caliper/18-20' Height (HT)/4-6' Spread (SPR)
Mahogany/Swietenia mahagoni 22 Florida (FL) Grade #1/Single Leader/Standard/3-4" Caliper/16-18' Height (HT)/6-8' Spread (SPR)
Wild tamarind/Lysiloma latisiliqua 9
FL GRADE#1/SINGLE
LEADER/STANDARD/3”-4” CALIPER/ 16’-18’ HT/ 6’-8’ SPR
Paradise tree/Simarouba glauca 17
FL GRADE#1/SINGLE
LEADER/STANDARD/3”-4” CALIPER/ 16’-18’ HT/ 6’-8’ SPR Copperpod/Peltophorum pterocarpum 10 Florida (FL) Grade #1/Single Leader/Standard/4" - 5”-inch CALIPER /16 - 18’-foot (ft.) Height (HT)/6-8' ft. Spread (SPR) Black Olive "Shady Lady"/Terminalia buceras 15 Florida (FL) Grade #1/Single Leader/Standard/2.5-3.5” Caliper/12- 16' Height (HT)/6-8' Spread (SPR)
Jamaican Dogwood/Piscidia piscipula 5 Medium
(427)
FL GRADE#1/ SINGLE LEADER/ STANDARD/ 2.5”- 3.5” CALIPER/ 12’-
14’ HT/ 6’-8’ SP
Bottlebrush/ Callistemon rigidus 21 Florida (FL) Grade #1/Single Leader/Standard/2.5”- 3.5" Caliper/14’-16' Height (HT)/4’-8' Spread (SPR)
White Tabebuia/Tabebuia Bahamensis 10
FL GRADE#1/ SINGLE LEADER/ 2.5"3.5” CALIPER/ 14’-16’ HT/6’-8’
SPR/
Cinnecord/Acacia choriophylla 5 Florida (FL) Grade #1/Single Leader/3.5-4.5" Caliper/16-18' Height (HT)/6’-8’ Spread (SPR)
Pink Shower/ Cassia Bakeriana 10 Florida (FL) Grade #1/Single Leader/Standard/3.5”-4" Caliper/14’- 16' Height (HT)/6-8' Spread (SPR)/Field Grown
Green Buttonwood/ Conocarpus Erectus 140
FL GRADE#1/ SINGLE LEADER/ STANDARD/ 4”-6” CALIPER/ 16’-18’
HT/ 6’-8’ SPR
Bridalveil/Caesalpinia granadillo 30
FL GRADE#1/ SINGLE LEADER/ STANDARD/ 2.5”-3” CALIPER/ 14’-16’
HT/ 6’-8’ SPR)
Pigeon plum/Coccoloba diversifolia 41 Florida (FL) Grade #1/Single Leader/Standard/2.5-3.5" Caliper/14- 16' Height (HT)/6’-8' Spread (SPR)
Pink Trumpet/Tabebuia heterophylla 5 Florida (FL) Grade #1/Single Leader/Standard/3"-3.5” Caliper/14- 18' Height (HT)4’-6' Spread (SPR)
Verawood/ Bulnesia Arborea 27
FL GRADE#1/ SINGLE LEADER/ STANDARD/ 4”-5” CALIPER/ 16’-86’
HT/ 6’-8’ SPR)
Apple Blossom/Cassia javanica 10
FL GRADE#1/ SINGLE LEADER/ STANDARD/ 3.5”-4” CALIPER/ 14’-16’
HT/ 6’-8’ SPR)
Dahoon Holly/Ilex cassine 9
Florida (FL) Grade #1/Single Leader/Standard/2-3" Caliper/12-14' Height (HT)/4-6' Spread (SPR)
Silver Buttonwood/Conocapus Erectus Var. Sericeus 43
Florida (FL) Grade #1/Single Leader/Standard/2-3" Caliper/14'-16’ Height (HT)/4-6' Spread (SPR) Crape Myrtle/Lagerstroemia x
‘Natchez’Crapemyrtle 15 Florida (FL) Grade #1/Single Leader/Standard/2-3" Caliper/14'-16’ Height (HT)/4-6' Spread (SPR)
Crape Myrtle/Lagerstroemia x Muskogee 15 Florida (FL) Grade #1/Single Leader/Standard/2-3" Caliper/14'-16’ Height (HT)/4-6' Spread (SPR)
Crape Myrtle/Lagerstroemia x Indica 15 Florida (FL) Grade #1/Single Leader/Standard/3-3.5 in. Caliper/14- 16 ft. HT/4'-6'6-8 ft. SPR Queen's Crepe Myrtle/Lagerstroemia speciosa 5 Florida (FL) Grade #1/Single Leader/Standard/3"-4” Caliper/14-16' Height (HT)/4-6' Spread (SPR)
Black Ironwood/Krugiodendron ferreum 26 Small (35)
FL GRADE#1/ SINGLE LEADER/ 2-3" CALIPER/ 10’-12’ HT/4-6’ SPR
Krug's Holly/Ilex krugiana 10 FL GRADE#1/ SINGLE LEADER/ 2-3" CALIPER/ 10’-12’ HT/4-6’ SPR Jamaica Caper/Capparis cynophallophora 25 Palm (10)
FL GRADE#1/ SINGLE LEADER / FIELD GROWN/BALLED AND
BURLAPPED /16’-18’ OA HT) FIELD GROWN
Spindle Palm/ Hyophorbe Verschaffeltii
Tree and Palm Relocation. I f it has been determined that there is a conflict w ith the tree installation and the tree needs to be relocated to another location.
Location To be determined by Project Manager.
Relocated and Installed at the Discretion of Project Manager
Site Specific Cost -Per Tree 20 Root Deflector Under the product name of “Root Solutions” or approved equal. 12” Depth interlocking panels. To be installed per linear Ft. as determined by Project Manager.
Installed at the Discretion of Project Manager
TBD
Total