Attachment_A_-_Schematic_Design_Document.pdf

PDF 9 MB Posted

Attached to
CONSTRUCTION MANAGEMENT AT RISK SERVICES FOR THE HERITAGE – NEW YORK AVENUE SHELTER
Solicitation number
DCAM-26-CS-RFP-0007
Issued by
District of Columbia

About this file

SCHEMATIC DESIGN DOCUMENT SUMMARY

This is a Schematic Design Document for The Heritage - New York Avenue Shelter, prepared by the District of Columbia Department of General Services (DGS) on behalf of the Department of Human Services (DHS). The project, located at 1201 New York Avenue NE, Washington, DC 20002, involves the design modifications and construction of a multi-story shelter facility. The design submission, dated June 4, 2026, represents 100% schematic design (SD) completion and includes comprehensive architectural, civil, landscape, structural, and mechanical-electrical-plumbing (MEP) drawings. The project scope encompasses a seven-story building with basement-level facilities, multiple floor plans ranging from basement to roof level, and exterior elevations showing a building height of approximately 92 feet, 9 inches to the penthouse level. The facility includes various functional spaces such as dormitories, consultation rooms, medical offices, dining areas, multipurpose rooms, showers, laundry facilities, secure storage, and administrative offices distributed across multiple floors. Site improvements include landscaping with bioretention areas, green roof on the mechanical penthouse, accessible parking, bike parking for four bicycles, a fenced recreation area, security perimeter fencing with rolling entrance gates, and pedestrian plaza areas.

The design team consists of SORG Architects as the primary architect, AMT Engineering as the civil engineer, Setty and Associates as the MEP engineer, CGLA as the landscape architect, and Silman as the structural engineer. The schematic design submission followed earlier design development phases, with permit documents issued as of April 30, 2025. The document notation indicates these plans are preliminary and not for construction, recording purposes, or implementation, suggesting the project is in the pre-construction phase. Associated with this design submission is a separate Request for Proposals for Construction Manager at Risk (CMAR) services, indicating the District is preparing to move forward with construction procurement and implementation of the facility design.

View the file

Other files

File Type Posted
Attachment_X_-_Move-in_Scope_of_Work.pdf PDF
Attachment_W_-_Payment_&_Performance_Bond.pdf PDF
Attachment_V_-_Campaign_Finance_Self-Certification_Form.pdf PDF
Attachment_U_-_C&P_Submission_Portal_Preview.pdf PDF
Attachment_T_-_Equal_Employment_Opportunity_Statement.pdf PDF
Attachment_S_-_Certification_to_Furnish_Performance_and_Payment_Bond.pdf PDF
Attachment_R_-_BIM_Requirements_for_Contractor.pdf PDF
Attachment_Q_-_DGS_Project_Turnover_Protocol_–_2016.pdf PDF
Attachment_P_-_Release_of_Lien_Forms.pdf PDF
Attachment_O_-_Conflict_of_Interest_Disclosure_Statement.pdf PDF
Attachment_N_-_Bid_Guaranty_Certification.pdf PDF
Attachment_M_-_NTP_and_Letter_Contract.pdf PDF
Attachment_L_-_Form_of_Contract_or_Agreement.pdf PDF
Attachment_K_-_Past_Performance_Evaluation_Form.pdf PDF
Attachment_J_-_2026,_Living_Wage_Act.pdf PDF
Attachment_I_-_First_Source_Employment_Agreement_and_Plan.pdf PDF
Attachment_H_-_SBE_Subcontracting_Plan.pdf PDF
Attachment_G_-_Standard_Contract_Provisions_(Construction).pdf PDF
Attachment_F_-_Bid_Bond_Form.pdf PDF
Attachment_E_-_E1_and_E2_Davis-Bacon_Wage_Rates_and_29_CFR_5.5.pdf PDF
Attachment_D_-_Tax_Affidavit.pdf PDF
Attachment_C_-_Bidder-Offeror’s_Certification_Form.pdf PDF
Attachment_B_-_Form_of_Offer_Letter_and_Bid_Form.pdf PDF
Attachment_A1_-_Program_of_Requirements.pdf PDF
DCAM-26-CS-RFP-0007_-_CMAR_Services_for_the_Heritage_-Final.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NEW YORK AVENUE

SHELTER

DESIGN MODIFICATIONS

SCHEMATIC DESIGN SUBMISSION

6/04/2026

WASHINGTON, D.C.

SCHEMATIC DESIGN

DRAWINGS

DISCIPLINE

SCALE

DATE

DRAWN BY

CHECKED BY

SORG PROJECT #

DRAWING NUMBER

DRAWING TITLE

SEAL

K E

Y P

L A

N

918 U Street NW, Washington DC 20001

T 202.796.7964

CONSULTANT

R E

V

IS

IO

N

S S

U B

M

IS

S

IO

N S

DATE DESCRIPTION

ARCH

D

W https://sorg.desig

2 3 4 5

C

B

A

N O T F

O R C

O N S T R U C T

IO

N

06/04/26 100% SD SET

BW

AB / JD / RC

06/04/26

COVER SHEET

G0.00

NEW YORK AVENUE

SHELTER

21-23

1201 NEW YORK AVENUE, NE,

WASHINGTON, DC 20002

NEW YORK AVENUE SHELTER

WASHINGTON, DC

SCHEMATIC DESIGN SUBMISSION

JUNE 4, 2026

LOCATION MAP

ABBREVIATIONS

1201 NEW YORK AVENUE

NE. WASHINGTON, DC

20002

PREPARED FOR

DEPARTMENT OF GENERAL SERVICES (DGS)

ON BEHALF OF

DEPARTMENT OF HUMAN SERVICES (DHS)

CIVIL ENGINEER:

AMT ENGINEERING

10 G St NE #430 Washington, DC 20002

ARCHITECT:

SORG ARCHITECTS

918 U St, NW Washington, DC 20001

MEP ENGINEER:

SETTY AND ASSOCIATES

1415 Elliot Pl NW Ste 100, Washington, DC 20007

LANDSCAPE:

CGLA

1025 Connecticut Ave NW #1000 Washington, DC 20036

STRUCTURAL ENGINEER:

SILMAN

1053 31st Street NW, Washington, DC 20007

AC

A/C

ALUM

AFF

ARCH

BD

BLKG

CAB

CER

CH

C

CLG

CMU

COL

CONC

CONT

C.O.T.R.

CT

DET

DF

DN

DWG

EA

EL

ELEC

EQ

ETR

EWC

EXIST

EXPS

ACOUSTIC

AIR CONDITIONING

ALUMINUM

ABOVE FINISHED FLOOR

ARCHITECTURAL

AND

AT

BOARD

BLOCKING

CABINET

CERAMIC

CABINET HEATER

CENTER LINE

CEILING

CONCRETE MASONRY

UNIT

COLUMN

CONCRETE

CONTINUOUS

CONTRACTING OFFICER

TECHNICAL

REPRESENTATIVE

CERAMIC TILE

DETAIL

DRINKING FOUNTAIN

DIAMETER

DOWN

DRAWING

EACH

ELEVATION

ELECTRIC(AL)

EQUAL

EXISTING TO REMAIN

ELECTRIC WATER

COOLER

EXISTING

EXPOSED STRUCTURE

FD

FE

FIN FL

FLUOR

GA

GALV

GL

GYP

HDWR

HM

HORZ

HR

HT

INSUL

INT

JAN

JT

KD

LAV

MAX

MECH

MEP

MFR

MIN

MISC

MM

M

MTL

MO

FLOOR DRAIN

FIRE EXTINGUISHER

FINISH(ED) FLOOR(ING)

FLUORESCENT

GAUGE

GALVANIZED

GLASS/GLAZING

GYPSUM

HARDWARE

HOLLOW METAL

HORIZONTAL

HOUR

HEIGHT

INSULATION

INTERIOR

JANITOR

JOINT

KNOCKDOWN

LAVATORY

MAXIMUM

MECHANICAL

MECHANICAL

ELECTRICAL &

PLUMBING

MANUFACTURER

MINIMUM

MISCELLANEOUS

MILLIMETER

METER

METAL

MASONRY OPENING

NIC

NAT

NTS

OC

OD

OH

OPP

PLAM

PVC

PLY

PT

QT

R

REINF

REQD

RO

SEC

SIM

SQ

STOR

SUSP

T

TEMP

TPD

TYP

VERT

VB

W

WD

W/

NOT IN CONTRACT

NATURAL

NOT TO SCALE

ON CENTER

OUTSIDE DIAMETER

OVERHEAD

OPPOSITE

PLASTIC LAMINATE

POLYVINYL CHLORIDE

PLYWOOD

PRESSURE TREATED

QUARRY TILE

RISER/RADIUS

REINFORCED/REINFORCING

REQUIRED

ROUGH OPENING

SECTION

SIMILAR

SQUARE

STORAGE

SUSPENDED

TREAD

TEMPERED

TOILET PAPER DISPENSER

TYPICAL

VERTICAL

VINYL BASE

WIDE / WIDTH

WOOD

WITH

# DATE DESCRIPTION

ARCHITECTURAL

Sheet Number Sheet Name

A1.00 BASEMENT FLOOR PLAN

A1.01 FIRST FLOOR PLAN

A1.02 SECOND FLOOR PLAN

A1.03 THIRD FLOOR PLAN

A1.04 FOURTH FLOOR PLAN

A1.05 FIFTH FLOOR PLAN

A1.06 SIXTH FLOOR PLAN

A1.11 ROOF PLAN

A2.01 EXTERIOR ELEVATIONS - INDIVIDUAL - NORTH

A2.02 EXTERIOR ELEVATIONS - INDIVIDUAL - EAST AND WEST

A2.03 EXTERIOR ELEVATIONS - INDIVIDUAL - SOUTH

A3.03 BUILDING SECTION - LONGITUDINAL

GENERAL

Sheet Number Sheet Name

G0.00 COVER SHEET

G0.02 AXONOMETRIC

CIVIL

Sheet Number Sheet Name

C100 EXISTING CONDITIONS PLAN

C105 EXISTING CONDITIONS NOTES

C150 DEMOLITION PLAN

LANDSCAPE

Sheet Number Sheet Name

L101 LANDSCAPE SITE PLAN

ARCHITECTURAL Copy 1

Sheet Number Sheet Name

A0.01 ARCHITECTURAL SITE PLAN

DISCIPLINE

SCALE

DATE

DRAWN BY

CHECKED BY

SORG PROJECT #

DRAWING NUMBER

DRAWING TITLE

SEAL

K E

Y P

L A

N

918 U Street NW, Washington DC 20001

T 202.796.7964

CONSULTANT

R E

V

IS

IO

N

S S

U B

M

IS

S

IO

N S

DATE DESCRIPTION

ARCH

D

W https://sorg.desig

2 3 4 5

C

B

A

N O T F

O R C

O N S T R U C T

IO

N

06/04/26 100% SD SET

BW

AB / JD / RC

06/04/26

AXONOMETRIC

G0.02

NEW YORK AVENUE

SHELTER

21-23

1201 NEW YORK AVENUE, NE,

WASHINGTON, DC 20002

3D VIEW

# DATE DESCRIPTION

NEW YORK AVE. N.E.

F A

I R

V I E

W

A

V E

N

E

PAR

T O

F

PARCEL

129/1

NEW YORK AVE. N.E.

N66°01'18"E 453.00' (REC)

N65°58'01"E 453.00' (SURV)

S E

R

E C

S

S

U R

V

S66°42'00"W 213.26'(REC)

S66°38'41"W 213.47'(SURV)

S

W

R

E

C

S

S

U

R

V

N

R

E C

N

S

U R

V

S

W

R

E

C

S

W

S

U

R

V

S

Q

U

A

R

E

P A

R T

O

P

A R

C E

L

U.S. RESERVATION 495

APPROXIMATE

LOCATION

L

LOT 17

B

R

E

N

T

W

O

D

P

A

R

K

W

A

Y

N

E

B R

E N

T W

O O

D

P

A R

K W

A Y

N

E

NEW YORK AVE

F A

I R

V I E

W

A

V E

M

L

I

V

D

PARCEL 129 / 115

T.O.J.

SB 162, P5

T.O.J.

SB 141, P121

T.O.J.

SB 198, P108

SUBJECT

SITE

PROPERTY DIAGRAM

N.T.S.

DISCIPLINE

SCALE

DATE

DRAWN BY

CHECKED BY

SORG PROJECT #

DRAWING NUMBER

DRAWING TITLE

SEAL

K E

Y

P

L A

N

918 U Street NW, Washington DC 20001

T 202.796.7964

CONSULTANT

R E

V I S

I O

N S

S U

B M

I S

S I O

N S

DATE DESCRIPTION

CIVIL

D

W https://sorg.design/

2 3 4 5

C

B

A

JSS

AML

2024/03/15

NEW YORK AVENUE

SHELTER

21-23

1201 NEW YORK AVENUE, NE,

WASHINGTON, DC 20002

# DATE DESCRIPTION

R

MISS UTILITY

DIAL 811 OR 202-265-7177

OR LOG ON TO

http://www.missutility.net

48 HOURS BEFORE YOU DIG

Know what'sbelow.

before you dig.Call

THESE PLANS ARE PRELIMINARY:

NOT FOR CONSTRUCTION,

RECORDING PURPOSES, OR

IMPLEMENTATION.

03/15/2024

0 30' 60'

SCALE: 1"=30'

LLC

PROFESSIONAL ENGINEERS & LAND SURVEYORS

N

C100

Existing Conditions Plan

SURVEY NOTES:

UTILITY NOTES:

UTILITY INFORMATION:

TRAVERSE DATA:

NO NORTHING EASTING ELEV DESCRIPTION

BENCH MARK DATA:

LEGEND:

STORM SEWER DATA:

SANITARY SEWER DATA:

DISCIPLINE

SCALE

DATE

DRAWN BY

CHECKED BY

SORG PROJECT #

DRAWING NUMBER

DRAWING TITLE

SEAL

K E

Y

P

L A

N

918 U Street NW, Washington DC 20001

T 202.796.7964

CONSULTANT

R E

V I S

I O

N S

S U

B M

I S

S I O

N S

DATE DESCRIPTION

CIVIL

D

W https://sorg.design/

2 3 4 5

C

B

A

JSS

AML

2024/03/15

NEW YORK AVENUE

SHELTER

21-23

1201 NEW YORK AVENUE, NE,

WASHINGTON, DC 20002

# DATE DESCRIPTION

R

MISS UTILITY

DIAL 811 OR 202-265-7177

OR LOG ON TO

http://www.missutility.net

48 HOURS BEFORE YOU DIG

Know what'sbelow.

before you dig.Call

THESE PLANS ARE PRELIMINARY:

NOT FOR CONSTRUCTION,

RECORDING PURPOSES, OR

IMPLEMENTATION.

03/15/2024

0 30' 60'

SCALE: 1"=30'

LLC

PROFESSIONAL ENGINEERS & LAND SURVEYORS

C105

Existing Conditions Notes

NEW YORK AVE. N.E.

FA

IR

V

IE

W A

V E

. N .E

NEW YORK AVE. N.E.

SQUARE

PAR

T O

F PAR

C

EL 129/115

U.S. RESERVATION 495

APPROXIMATE

LOCATION

LOT 816

LOT 17

BR

EN

TW

O

O D

PA

RK

W

AY

. N .E

B R

E N

TW

O

O D

P A

R K

W A

Y . N

.E

2 3 4

6 7 8 9

LO

D

LO

D

LO

D

LO

D

LOD

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD LOD LOD LOD LOD LOD LO

D

LO

D

LO

D

LO

D

LO

D

LOD

LO

D

LO

D

LOD

LODLODLODLODLODLODLODLODLODLODLOD

LOD

25 26

LEGEND

HATCH LEGEND

DISCIPLINE

SCALE

DATE

DRAWN BY

CHECKED BY

SORG PROJECT #

DRAWING NUMBER

DRAWING TITLE

SEAL

K

EY

P

LA

N

918 U Street NW, Washington DC 20001

T 202.796.7964

CONSULTANT

R

EV

IS

IO

N S

SU

B

M

IS

SI

O

N S

DATE DESCRIPTION

CIVIL

D

Whttps://sorg.design/

2 3 4 5

C

B

A

JSS

AML

04/30/2025

NEW YORK AVENUE

SHELTER

21-23

1201 NEW YORK AVENUE, NE,

WASHINGTON, DC 20002

# DATE DESCRIPTION

R

MISS UTILITY

DIAL 811 OR 202-265-7177

OR LOG ON TO

http://www.missutility.net

48 HOURS BEFORE YOU DIGKnow what's below.

before you dig.Call

THESE PLANS ARE ISSUED FOR AGENCY REVIEW.

ALL APPLICABLE AGENCY PERMIT APPROVALS

MUST BE OBTAINED PRIOR TO CONSTRUCTION.

04/30/2025

0 30' 60'

SCALE: 1"=30'

LLC

PROFESSIONAL ENGINEERS & LAND SURVEYORS

1 12/20/24 DESIGN DEVELOPMENT

2 04/22/25 PERMIT DOCUMENTS

04/30/2025

N

C150

DEMOLITION PLAN

DEMOLITION PLAN NOTES

HERITAGE TREE TO

REMAIN AND TO BE

PROTECTED

DEMOLITION AS REQUIRED

BY DDOT, REFERENCE A0.01

DEMOLITION OF EXISTING

PARKING

EXISTING ANIMAL SHELTER

TO BE DEMOLISHED

NEW YORK AVENUE NE

A

IR

V

IE

W

A V

E N

U E

N E

NEIGHBORING

2 STORY BUILDING

NEIGHBORING

2 STORY BUILDING

E X

IS

T

IN

G

P A

K

R E

M A

IN

NEIGHBORING

3 STORY ROW HOUSES

EXISTING SERVICE DRIVE

MT. OLIVET ROAD

M T

O

L

IV

E T

B Y

W A

Y

PERIMETER

SECURITY

FENCE, TYP.

VEHICULAR

ROLLING

ENTRANCE

GATE

EXISTING FOREST

CONSERVATION

ZONE

HERITAGE TREE

(TO REMAIN)

PERIMETER

SECURITY

FENCE, TYP.

EXISTING

SIDEWALK

CURB CUT

NEW FOREST

CONSERVATION

ZONE

5' W

ID

E

S

ID

E W

A

LK

NEW GREEN

STRIP ZONE

NEW SIDEWALK

SIDEWALK

PEDESTRIAN ACCESS

ACCESSIBLE PARKING

5' W

IDE SIDEWALK

BIORETENTION

CURB EXTENSION

LOADING

BIKE PARKING (4)

FENCED IN

RECREATION AREA

GENERATOR

LONG TERM STORAGE

FENCE

FENCE

GREEN ROOF

L A

N D

S C

A P

IN

G

PLAZA

GUARD BOOTH

FENCE GATE

FENCE GATE

FENCE GATE

TRUCK TURNAROUND

MECHANICAL

PENTHOUSE

DISCIPLINE

SCALE

DATE

DRAWN BY

CHECKED BY

SORG PROJECT #

DRAWING NUMBER

DRAWING TITLE

SEAL

K E

Y P

L A

N

918 U Street NW, Washington DC 20001

T 202.796.7964

CONSULTANT

R E

V

IS

IO

N

S S

U B

M

IS

S

IO

N S

DATE DESCRIPTION

ARCH

D

W https://sorg.desig

2 3 4 5

C

B

A

N O T F

O R C

O N S T R U C T

IO

N

06/04/26 100% SD SET

1" = 30'-0"

BW

AB / JD

06/04/26

ARCHITECTURAL SITE PLAN

A0.01

NEW YORK AVENUE

SHELTER

21-23

1201 NEW YORK AVENUE, NE,

WASHINGTON, DC 20002

N

1" = 30'-0"1

ARCHITECTURAL SITE PLAN

NEW YORK AVENUE NE

FAIRVIEW

AVENUE NE

NEIGHBORING

2 STORY BUILDING

NEIGHBORING

2 STORY BUILDING

EX

IS

TI

N

G P

A R

K

TO

R

EM

A

IN

NEIGHBORING

3 STORY ROW HOUSES

EXISTING SERVICE DRIVE

MT. OLIVET ROAD

M T.

O

LI

VE

T

BY

W

AY

PERIMETER

SECURITY

FENCE, TYP.

VEHICULAR

ROLLING

ENTRANCE

GATE

EXISTING FOREST

CONSERVATION

ZONE

HERITAGE TREE

(TO REMAIN)

PERIMETER

SECURITY

FENCE, TYP.

EXISTING

SIDEWALK

CURB CUT

NEW FOREST

CONSERVATION

ZONE

5' W

ID

E

SI

DE

W

AL

K

NEW GREEN

STRIP ZONE

NEW SIDEWALK

SIDEWALK

PEDESTRIAN ACCESS

ACCESSIBLE PARKING

5' WIDE SIDEWALK

BIORETENTION

CURB EXTENSION

LOADING

BIKE PARKING (4)

FENCED IN

RECREATION AREA

GENERATOR

LONG TERM STORAGE

FENCE

FENCE

GREEN

ROOF

LANDSCAPING

PLAZA

GUARD BOOTH

FENCE GATE

FENCE GATE

FENCE GATE

TRUCK TURNAROUND

MECHANICAL

PENTHOUSE

3/18/24 100% SD SET

12/20/24 100% DD SET

1 2 3 4 5

L101

OVERALL SITE PLAN

1" = 30'-0"

DISCIPLINE

SCALE

DATE

DRAWN BY

CHECKED BY

SORG PROJECT #

DRAWING NUMBER

DRAWING TITLE

SEAL

K

EY

P

LA

N

918 U Street NW, Washington DC 20001

T 202.796.7964

CONSULTANT

# DATE DESCRIPTION

BPC

SB

05/02/2025

NEW YORK AVENUE

SHELTER

21-23

R

EV

IS

IO

N S

SU

B

M

IS

SI

O

N S

DATE DESCRIPTION

LA

1201 NEW YORK AVENUE, SE,

WASHINGTON, DC 20002

D

Whttps://sorg.design/

C

B

A

CARVALHO AND GOOD, PLLC

202.857.9720 (O) | CGLADC.COM

02/04/25 100% DD SET

L:\2022 - 2024 Projects\22020 - NY Avenue Shelter\Current\Xreferences\-DGS_Slogan-10105656.png

05/02/25 PERMIT SET

DISTRICT OF COLUMBIA

REGISTERED LANDSCAPE

ARCHITECT #00173

BRUNO P. CARVALHO, ASLA

K:\LEGAL\bruno signature.jpg bio-retention planting

2 x birch trees small trees in small parking islands native shrub planting

4ft concrete path mulch around ex.

heritage tree sod / seed shade trees evergreen hedge

- 36" sod / seed bench

GREEN ROOF

MECHANICAL

PENTHOUSE

UP

A3.03

A

D

B

C

PLUMBING

144E

EMERGENCY

ELEC.

144F

FIRE PUMP ROOM

144G

FREIGHT

ELEVATOR

ELEV3

BUILDING

SERVICES

I.T.

TOILET

111 542 3 7 8 96 10

CORRIDOR

DISCIPLINE

SCALE

DATE

DRAWN BY

CHECKED BY

SORG PROJECT #

DRAWING NUMBER

DRAWING TITLE

SEAL

K E

Y P

L A

N

918 U Street NW, Washington DC 20001

T 202.796.7964

CONSULTANT

R E

V

IS

IO

N

S S

U B

M

IS

S

IO

N S

DATE DESCRIPTION

ARCH

D

W https://sorg.desig

2 3 4 5

C

B

A

N O T F

O R C

O N S T R U C T

IO

N

06/04/26 100% SD SET

1/8" = 1'-0"

BW

AB

06/04/26

BASEMENT FLOOR PLAN

A1.00

NEW YORK AVENUE

SHELTER

21-23

1201 NEW YORK AVENUE, NE,

WASHINGTON, DC 20002

1/8" = 1'-0"1

BASEMENT FLOOR PLAN

A3.03

CONSULTATION

CONSULTATION

111CONSULTATION

SHOWERS

LOADING

HOT BOX

TOILET

CLIENT STORAGE

INTAKE

SCREENING

EXAM

EXAM

RESPITE

RESPITE

RESPITE

A

D

B

C

L A

N D

S C

A P

IN

G

TOILET

TOILET

TOILET

NURSE'S STATION

TRASH

SHOWERS

ELEC.

ELEVATOR#2

ELEV2

ELEVATOR#1

ELEV1

SECURITY

VESTIBULE

QUEUE

SECURITY

WAITING

STAIR#1

ST1-1

FREIGHT ELEVATOR

ELEV6

I.T.

STAIR#2

ST2-1

TOILET

RESPITE

CORRIDOR

MEDICAL OFFICE

NURSE'S STATION

WAITING

MEDICAL RECORD /

STO.

ADMIN

DIRECTOR

STAFF T

TOILET

SECURE STO

CLIENT LAUNDRY

133 SHOP

RAMP

UP

CANOPY ABOVE

PLAZA

COFFEE

STATION

OPEN TO

BELOW

STAFF LOCKERS

287 STAFF LAUNDRY

VEHICULAR ROLLING ENTRANCE GATE

FENCE

BIORETENTION

GENERATOR

UP

BOOTH

111 542 3 7 8 96 10

DISCIPLINE

SCALE

DATE

DRAWN BY

CHECKED BY

SORG PROJECT #

DRAWING NUMBER

DRAWING TITLE

SEAL

K E

Y P

L A

N

918 U Street NW, Washington DC 20001

T 202.796.7964

CONSULTANT

R E

V

IS

IO

N

S S

U B

M

IS

S

IO

N S

DATE DESCRIPTION

ARCH

D

W https://sorg.desig

2 3 4 5

C

B

A

N O T F

O R C

O N S T R U C T

IO

N

06/04/26 100% SD SET

1/8" = 1'-0"

BW

AB

06/04/26

FIRST FLOOR PLAN

A1.01

NEW YORK AVENUE

SHELTER

21-23

1201 NEW YORK AVENUE, NE,

WASHINGTON, DC 20002

N

1/8" = 1'-0"1

FIRST FLOOR PLAN

DN

DN

A3.03

ELEC.

I.T.

CORRIDOR

STAIR#1

ST1-2

STAIR#2

ST2-2

DINING

ELEVATOR#2

ELEV2

ELEVATOR#1

ELEV1

FREIGHT ELEVATOR

ELEV6

MULTIPURPOSE ROOM

146A

MULTIPURPOSE

STORAGE

WARMING KITCHEN

TERRACE

A

D

B

C

CLASSROOM

CLASSROOM

BALCONY

SEC

STORAGE

FIRE CURTAIN ABOVE

CLASSROOM

JAN.

STORAGE

238 STORAGE

TOILET

TOILET

TOILET

111 542 3 7 8 96 10

SERVING

COUNTER

DISCIPLINE

SCALE

DATE

DRAWN BY

CHECKED BY

SORG PROJECT #

DRAWING NUMBER

DRAWING TITLE

SEAL

K E

Y P

L A

N

918 U Street NW, Washington DC 20001

T 202.796.7964

CONSULTANT

R E

V

IS

IO

N

S S

U B

M

IS

S

IO

N S

DATE DESCRIPTION

ARCH

D

W https://sorg.desig

2 3 4 5

C

B

A

N O T F

O R C

O N S T R U C T

IO

N

06/04/26 100% SD SET

1/8" = 1'-0"

BW

AB

06/04/26

SECOND FLOOR PLAN

A1.02

NEW YORK AVENUE

SHELTER

21-23

1201 NEW YORK AVENUE, NE,

WASHINGTON, DC 20002

1/8" = 1'-0"1

SECOND FLOOR PLAN

SHOWERS

A3.03

ELEC.

SEC

I.T.

STAIR#1

ST1-3

STAIR#2

ST2-3

CORRIDOR

ELEVATOR#2

ELEV2

ELEVATOR#1

ELEV1

FREIGHT

ELEVATOR

ELEV6

SENIORS

SENIORS

SENIORS

LOUNGE

A

D

B

C

TOILET

TOILET

TOILET

TOILET

LB DORM

LB DORM

LB DORM

SENIORS

BALCONY

SHOWERS

NURSE'S STATION

STAFF T

STORAGE

MEDICAL OFFICE

TOILET

SENIORS

QUIET LOUNGE

ROLL-UP DOOR

TOILET

SENIORS

111 542 3 7 8 96 10

FLOOR PLAN KEY NOTES

6 CANOPY

LOCKERS

7 CASEWORK

8 CANE DECTECTION RAIL

2 BAGGAGE SCREENING

MAGNETOMETER

3 REMOVABLE STANCHIONS

9 FOLDING PANEL PARTITION

5 BIKE RACKS

OVERHANG ABOVE

11 LADDER TO HATCH ABOVE

12 PARKING LOT ATTENDANT BOOTH

13 SITE RETAINING WALL

14 METAL RAILING / HANDRAIL

15 BIORETENTION

16 STOREFRONT

17 STEP LIGHTS, TYP.

GENERAL NOTES

1. WINDOW SHADES ARE REQUIRED AT ALL WINDOWS IN

EXTERIOR WALLS EXCEPT FOR LOBBIES, VESTIBULES,

CORRIDORS AND THE ATRIUM.

18 SITE WALLS

19 PROPERTY LINE

20 HATCH ABOVE

21 CONCRETE TERRACES

22 RAMP PER LANDSCAPE PLANS

23 DECK PER LANDSCAPE PLANS

24 BOLLARD W/ AIPHONE AND CARD READER

DISCIPLINE

SCALE

DATE

DRAWN BY

CHECKED BY

SORG PROJECT #

DRAWING NUMBER

DRAWING TITLE

SEAL

K E

Y P

L A

N

918 U Street NW, Washington DC 20001

T 202.796.7964

CONSULTANT

R E

V

IS

IO

N

S S

U B

M

IS

S

IO

N S

DATE DESCRIPTION

ARCH

D

W https://sorg.desig

2 3 4 5

C

B

A

N O T F

O R C

O N S T R U C T

IO

N

06/04/26 100% SD SET

1/8" = 1'-0"

BW

AB

06/04/26

THIRD FLOOR PLAN

A1.03

NEW YORK AVENUE

SHELTER

21-23

1201 NEW YORK AVENUE, NE,

WASHINGTON, DC 20002

1/8" = 1'-0"1

THIRD FLOOR PLAN

N

1 Date 1 Revision 1

420 SHOWERS

A3.03

LB DORM

LB DORM

LB DORM

LB DORM

LB DORM

LB DORM

ELEC.

STAIR#2

ST2-4

CORRIDOR

STAIR#1

ST1-4

LB DORM

I.T.

FREIGHT

ELEVATOR

ELEV6

ELEVATOR#2

ELEV2

ELEVATOR#1

ELEV1

LOUNGE

LB DORM

LOUNGE

A

D

B

C

LB DORM

BALCONY

SEC.

STORAGE

JAN.

STAFF T

111 542 3 7 8 96 10

FLOOR PLAN KEY NOTES

6 CANOPY

LOCKERS

7 CASEWORK

8 CANE DECTECTION RAIL

2 BAGGAGE SCREENING

MAGNETOMETER

3 REMOVABLE STANCHIONS

9 FOLDING PANEL PARTITION

5 BIKE RACKS

OVERHANG ABOVE

11 LADDER TO HATCH ABOVE

12 PARKING LOT ATTENDANT BOOTH

13 SITE RETAINING WALL

14 METAL RAILING / HANDRAIL

15 BIORETENTION

16 STOREFRONT

17 STEP LIGHTS, TYP.

GENERAL NOTES

1. WINDOW SHADES ARE REQUIRED AT ALL WINDOWS IN

EXTERIOR WALLS EXCEPT FOR LOBBIES, VESTIBULES,

CORRIDORS AND THE ATRIUM.

18 SITE WALLS

19 PROPERTY LINE

20 HATCH ABOVE

21 CONCRETE TERRACES

22 RAMP PER LANDSCAPE PLANS

23 DECK PER LANDSCAPE PLANS

24 BOLLARD W/ AIPHONE AND CARD READER

DISCIPLINE

SCALE

DATE

DRAWN BY

CHECKED BY

SORG PROJECT #

DRAWING NUMBER

DRAWING TITLE

SEAL

K E

Y P

L A

N

918 U Street NW, Washington DC 20001

T 202.796.7964

CONSULTANT

R E

V

IS

IO

N

S S

U B

M

IS

S

IO

N S

DATE DESCRIPTION

ARCH

D

W https://sorg.desig

2 3 4 5

C

B

A

N O T F

O R C

O N S T R U C T

IO

N

06/04/26 100% SD SET

1/8" = 1'-0"

BW

AB

06/04/26

FOURTH FLOOR PLAN

A1.04

NEW YORK AVENUE

SHELTER

21-23

1201 NEW YORK AVENUE, NE,

WASHINGTON, DC 20002

1/8" = 1'-0"1

FOURTH FLOOR PLAN

LOUNGE

LB DORM

LB DORM

SHOWERS

A3.03

SHOWERS

ELEC.

LB DORM

LB DORM

LB DORM

SEC

LB DORM

I.T.

LB DORM

CORRIDOR

STAIR#1

ST1-5

STAIR#2

ST2-5

ELEVATOR#1

ELEV1

ELEVATOR#2

ELEV2

FREIGHT

ELEVATOR

ELEV6

QUIET LOUNGE

LB DORM

LB DORM

A

D

B

C

BALCONY

STORAGE

JAN.

STAFF T

111 542 3 7 8 96 10

FLOOR PLAN KEY NOTES

6 CANOPY

LOCKERS

7 CASEWORK

8 CANE DECTECTION RAIL

2 BAGGAGE SCREENING

MAGNETOMETER

3 REMOVABLE STANCHIONS

9 FOLDING PANEL PARTITION

5 BIKE RACKS

OVERHANG ABOVE

11 LADDER TO HATCH ABOVE

12 PARKING LOT ATTENDANT BOOTH

13 SITE RETAINING WALL

14 METAL RAILING / HANDRAIL

15 BIORETENTION

16 STOREFRONT

17 STEP LIGHTS, TYP.

GENERAL NOTES

1. WINDOW SHADES ARE REQUIRED AT ALL WINDOWS IN

EXTERIOR WALLS EXCEPT FOR LOBBIES, VESTIBULES,

CORRIDORS AND THE ATRIUM.

18 SITE WALLS

19 PROPERTY LINE

20 HATCH ABOVE

21 CONCRETE TERRACES

22 RAMP PER LANDSCAPE PLANS

23 DECK PER LANDSCAPE PLANS

24 BOLLARD W/ AIPHONE AND CARD READER

DISCIPLINE

SCALE

DATE

DRAWN BY

CHECKED BY

SORG PROJECT #

DRAWING NUMBER

DRAWING TITLE

SEAL

K E

Y P

L A

N

918 U Street NW, Washington DC 20001

T 202.796.7964

CONSULTANT

R E

V

IS

IO

N

S S

U B

M

IS

S

IO

N S

DATE DESCRIPTION

ARCH

D

W https://sorg.desig

2 3 4 5

C

B

A

N O T F

O R C

O N S T R U C T

IO

N

06/04/26 100% SD SET

1/8" = 1'-0"

BW

AB

06/04/26

FIFTH FLOOR PLAN

A1.05

NEW YORK AVENUE

SHELTER

21-23

1201 NEW YORK AVENUE, NE,

WASHINGTON, DC 20002

1/8" = 1'-0"1

FIFTH FLOOR PLAN

WORK DORM

WORK DORM

A3.03

SHOWERS

ELEC.

WORK DORM

WORK DORM

LOUNGE

SEC

WORK DORM

I.T.

WORK DORM

CORRIDOR

STAIR#1

ST1-6

STAIR#2

ST2-6

ELEVATOR#1

ELEV1

ELEVATOR#2

ELEV2FREIGHT

ELEVATOR

ELEV6

WORK DORM

WORK DORM

WORK DORM

A

D

B

C

WORK DORM

615 WORK DORM

BALCONY

STAFF T

111 542 3 7 8 96 10

FLOOR PLAN KEY NOTES

6 CANOPY

LOCKERS

7 CASEWORK

8 CANE DECTECTION RAIL

2 BAGGAGE SCREENING

MAGNETOMETER

3 REMOVABLE STANCHIONS

9 FOLDING PANEL PARTITION

5 BIKE RACKS

OVERHANG ABOVE

11 LADDER TO HATCH ABOVE

12 PARKING LOT ATTENDANT BOOTH

13 SITE RETAINING WALL

14 METAL RAILING / HANDRAIL

15 BIORETENTION

16 STOREFRONT

17 STEP LIGHTS, TYP.

GENERAL NOTES

1. WINDOW SHADES ARE REQUIRED AT ALL WINDOWS IN

EXTERIOR WALLS EXCEPT FOR LOBBIES, VESTIBULES,

CORRIDORS AND THE ATRIUM.

18 SITE WALLS

19 PROPERTY LINE

20 HATCH ABOVE

21 CONCRETE TERRACES

22 RAMP PER LANDSCAPE PLANS

23 DECK PER LANDSCAPE PLANS

24 BOLLARD W/ AIPHONE AND CARD READER

DISCIPLINE

SCALE

DATE

DRAWN BY

CHECKED BY

SORG PROJECT #

DRAWING NUMBER

DRAWING TITLE

SEAL

K E

Y P

L A

N

918 U Street NW, Washington DC 20001

T 202.796.7964

CONSULTANT

R E

V

IS

IO

N

S S

U B

M

IS

S

IO

N S

DATE DESCRIPTION

ARCH

D

W https://sorg.desig

2 3 4 5

C

B

A

N O T F

O R C

O N S T R U C T

IO

N

06/04/26 100% SD SET

1/8" = 1'-0"

BW

AB

06/04/26

SIXTH FLOOR PLAN

A1.06

NEW YORK AVENUE

SHELTER

21-23

1201 NEW YORK AVENUE, NE,

WASHINGTON, DC 20002

1/8" = 1'-0"1

SIXTH FLOOR PLAN

ELEV. CONTROL ROOM

FREIGHT

ELEVATOR

ELEV6

STAIR#2

ST2-7

A

D

B

C

111 542 3 7 8 96 10

MECH PENTHOUSE

PV READY

GREEN ROOF

ELEVATOR

OVERRUN

DISCIPLINE

SCALE

DATE

DRAWN BY

CHECKED BY

SORG PROJECT #

DRAWING NUMBER

DRAWING TITLE

SEAL

K E

Y P

L A

N

918 U Street NW, Washington DC 20001

T 202.796.7964

CONSULTANT

R E

V

IS

IO

N

S S

U B

M

IS

S

IO

N S

DATE DESCRIPTION

ARCH

D

W https://sorg.desig

2 3 4 5

C

B

A

N O T F

O R C

O N S T R U C T

IO

N

06/04/26 100% SD SET

1/8" = 1'-0"

BW

AB

06/04/26

ROOF PLAN

A1.11

NEW YORK AVENUE

SHELTER

21-23

1201 NEW YORK AVENUE, NE,

WASHINGTON, DC 20002

N

1/8" = 1'-0"1

ROOF PLAN

LEVEL 1 (+105.5)

0' - 0"

LEVEL 2

14' - 10 5/8"

LEVEL 3

29' - 9 1/4"

LEVEL 4

41' - 9 1/4"

LEVEL 5

53' - 9 1/4"

LEVEL 6

65' - 9 1/4"

ROOF

77' - 9 1/4"

PARAPET

83' - 3 1/4"

PENTHOUSE

92' - 9 1/4"

11 15 4 23789 610

/8

/8

/4

19' - 10"19' - 4"19' - 4"19' - 4"19' - 4"19' - 4"19' - 4"19' - 4"9' - 11"9' - 11"

KEYPLAN-ELEVATION

DISCIPLINE

SCALE

DATE

DRAWN BY

CHECKED BY

SORG PROJECT #

DRAWING NUMBER

DRAWING TITLE

SEAL

K E

Y P

L A

N

918 U Street NW, Washington DC 20001

T 202.796.7964

CONSULTANT

R E

V

IS

IO

N

S S

U B

M

IS

S

IO

N S

DATE DESCRIPTION

ARCH

D

W https://sorg.desig

2 3 4 5

C

B

A

N O T F

O R C

O N S T R U C T

IO

N

06/04/26 100% SD SET

As indicated

BW

JD / RC / AB

06/04/26

EXTERIOR ELEVATIONS -

INDIVIDUAL - NORTH

A2.01

NEW YORK AVENUE

SHELTER

21-23

1201 NEW YORK AVENUE, NE,

WASHINGTON, DC 20002

1/8" = 1'-0"1

EXTERIOR ELEVATION - NORTH

KEYPLAN-ELEVATION

0' - 0"

LEVEL 2

14' - 10 5/8"

LEVEL 3

29' - 9 1/4"

LEVEL 4

41' - 9 1/4"

LEVEL 5

53' - 9 1/4"

LEVEL 6

65' - 9 1/4"

ROOF

77' - 9 1/4"

PARAPET

83' - 3 1/4"

PENTHOUSE

92' - 9 1/4"

AD BC

19' - 8" 19' - 8" 19' - 8"

/8

/8

/4

LEVEL 1 (+105.5)

0' - 0"

LEVEL 2

14' - 10 5/8"

LEVEL 3

29' - 9 1/4"

LEVEL 4

41' - 9 1/4"

LEVEL 5

53' - 9 1/4"

LEVEL 6

65' - 9 1/4"

ROOF

77' - 9 1/4"

PARAPET

83' - 3 1/4"

PENTHOUSE

92' - 9 1/4"

A DB C

/8

/8

/4

19' - 8" 19' - 8" 19' - 8"

DISCIPLINE

SCALE

DATE

DRAWN BY

CHECKED BY

SORG PROJECT #

DRAWING NUMBER

DRAWING TITLE

SEAL

K E

Y P

L A

N

918 U Street NW, Washington DC 20001

T 202.796.7964

CONSULTANT

R E

V

IS

IO

N

S S

U B

M

IS

S

IO

N S

DATE DESCRIPTION

ARCH

D

W https://sorg.desig

2 3 4 5

C

B

A

N O T F

O R C

O N S T R U C T

IO

N

06/04/26 100% SD SET

As indicated

BW

JD / RC / AB

06/04/26

EXTERIOR ELEVATIONS -

INDIVIDUAL - EAST AND WEST

A2.02

NEW YORK AVENUE

SHELTER

21-23

1201 NEW YORK AVENUE, NE,

WASHINGTON, DC 20002

1/8" = 1'-0"1

EXTERIOR ELEVATION - EAST

1/8" = 1'-0"2

EXTERIOR ELEVATION - WEST

KEYPLAN-ELEVATION

0' - 0"

LEVEL 2

14' - 10 5/8"

LEVEL 3

29' - 9 1/4"

LEVEL 4

41' - 9 1/4"

LEVEL 5

53' - 9 1/4"

LEVEL 6

65' - 9 1/4"

ROOF

77' - 9 1/4"

PARAPET

83' - 3 1/4"

PENTHOUSE

92' - 9 1/4"

111 542 3 7 8 96 10

/8

/8

/4

19' - 10" 19' - 4" 19' - 4" 19' - 4" 19' - 4" 19' - 4" 19' - 4" 19' - 4" 9' - 11" 9' - 11"

DISCIPLINE

SCALE

DATE

DRAWN BY

CHECKED BY

SORG PROJECT #

DRAWING NUMBER

DRAWING TITLE

SEAL

K E

Y P

L A

N

918 U Street NW, Washington DC 20001

T 202.796.7964

CONSULTANT

R E

V

IS

IO

N

S S

U B

M

IS

S

IO

N S

DATE DESCRIPTION

ARCH

D

W https://sorg.desig

2 3 4 5

C

B

A

N O T F

O R C

O N S T R U C T

IO

N

06/04/26 100% SD SET

As indicated

BW

JD / RC / AB

06/04/26

EXTERIOR ELEVATIONS -

INDIVIDUAL - SOUTH

A2.03

NEW YORK AVENUE

SHELTER

21-23

1201 NEW YORK AVENUE, NE,

WASHINGTON, DC 20002

1/8" = 1'-0"1

EXTERIOR ELEVATION - SOUTH

0' - 0"

LEVEL 2

14' - 10 5/8"

LEVEL 3

29' - 9 1/4"

LEVEL 4

41' - 9 1/4"

LEVEL 5

53' - 9 1/4"

LEVEL 6

65' - 9 1/4"

ROOF

77' - 9 1/4"

LB DORM

LB DORM

WORK DORM

WORK DORM

/8

/8

/4

LB DORM

WORK DORM

WORK DORM

LB DORM

LB DORM

DINING

LB DORM

LB DORM

LB DORM

LB DORM

LB DORM

LB DORM

LB DORM

WORK DORM

PARAPET

83' - 3 1/4"

SHOP

114 CONSULTATION

CONSULTATION

111 CONSULTATION

LB DORM

LB DORM

WORK DORM

PENTHOUSE

92' - 9 1/4"

BASEMENT

-12' - 0"

111 542 3 7 8 96 10

CLIENT LAUNDRY

WAITING

SCREENING

NURSE'S STATION

WAITING

TOILET

RESPITE

241NURSE'S STATION

RESPITE

TOILET

TOILET

RESPITE

RESPITE

TOILET

LB DORM

LB DORM

LB DORM

TOILET

SENIORS

SENIORS

TOILET

TOILET

SENIORS

SENIORS

TOILET

TOILET

SENIORS

TOILET

SENIORS

LB DORM

MECH PENTHOUSE

WARMING KITCHEN

STORAGE

MULTIPURPOSE ROOM

146A

QUEUE

LB DORM

LB DORM

WORK DORM

LB DORM

WORK DORM

WORK DORM

EMERGENCY ELEC.

144F

BUILDING SERVICES

CORRIDOR

DISCIPLINE

SCALE

DATE

DRAWN BY

CHECKED BY

SORG PROJECT #

DRAWING NUMBER

DRAWING TITLE

SEAL

K E

Y P

L A

N

918 U Street NW, Washington DC 20001

T 202.796.7964

CONSULTANT

R E

V

IS

IO

N

S S

U B

M

IS

S

IO

N S

DATE DESCRIPTION

ARCH

D

W https://sorg.desig

2 3 4 5

C

B

A

N O T F

O R C

O N S T R U C T

IO

N

06/04/26 100% SD SET

1/8" = 1'-0"

BW

JD / RC

06/04/26

BUILDING SECTION -

LONGITUDINAL

A3.03

NEW YORK AVENUE

SHELTER

21-23

1201 NEW YORK AVENUE, NE,

WASHINGTON, DC 20002

1/8" = 1'-0"1

BUILDING SECTION

File details come from the government source that posted it. Updated .