This is a Quality Assurance Surveillance Plan (QASP) for a trash waste removal services contract at the VA Medical Center (VAMC) in Salisbury, North Carolina, under VISN 6 Network Contract Activity.
The QASP establishes eight performance standards, each with a 95% Acceptable Quality Level (AQL), monitored through periodic inspections and direct observation by the Contracting Officer (CO) and Contracting Officer's Representative (COR). The performance objectives include adherence to collection requirements (SOW Section 1.1), general solid waste handling (Section 1.1.2), reports and records requirements (Section 1.1.3), disposal requirements (Section 2), container and collection area maintenance (Section 1.1.6), cleaning and disinfecting contractor-owned containers (Section 1.1.7 with 100% monthly invoice and report review), equipment maintenance for compactors (Section 3.0), and safety protocols (Section 6.3). The assigned COR is Jay Wallace; the Contract Specialist is Kamilah Nye; and the Contracting Officer is Jamie Sullivan, all located at 100 Emancipation Drive, Hampton, VA 23667. Performance ratings are classified as positive (no more than 1 incident), neutral (no more than 3 incidents), or negative (more than 3 incidents) during the performance period. Disincentives for non-compliance include issuance of Contract Discrepancy Reports (CDRs) on the first instance of failure, and two or more CDRs may result in a 5% reduction of the monthly invoice. Repeated or consistent failures may trigger contract termination. The COR shall conduct monthly performance assessment meetings with the contractor and maintain a quality assurance file documenting all surveillance activities and results.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Site Visit - Trash Collection.pdf | ||
| 36C24626Q0421 0001.pdf | ||
| 36C24626Q0421_1.docx | DOCX document | |
| 36C24626Q0421.pdf | ||
| Attachment C - VAAR 852.219-75 VA Notice of Limitations on Subcontracting.pdf | ||
| Attachment B - WD 2015-4423 Rev. 32.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
The contractor shall be evaluated in accordance with the following QASP.
For: VAMC Salisbury, North Carolina
Contract Number:
Contract Description: TRASH WASTE REMOVAL SERVICES
Contractor’s name:
1. PURPOSE
This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:
What will be monitored?
How monitoring will take place?
Who will conduct the monitoring?
How monitoring efforts and results will be documented?
This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance.
This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with the contractor. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.
2. GOVERNMENT ROLES AND RESPONSIBILITIES
The following personnel shall oversee and coordinate surveillance activities.
a. Contracting Officer (CO) - The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.
Assigned Contract Specialist (CS): Kamilah Nye
Department of Veterans Affairs, VISN 6 Network Contract Activity 100 Emancipation Drive
Hampton, VA 23667 Fax:
Assigned Contracting Officer (CO): Jamie Sullivan Department of Veterans Affairs VISN 6 Network Contract Activity 100 Emancipation Drive
Hampton, VA 23667 Fax:
b. Contracting Officer’s Representative (COR) - The COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The COR shall keep a quality assurance file. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf.
Assigned COR: Jay Wallace
c. Other Key Government Personnel -
3. CONTRACTOR REPRESENTATIVES
The following employees of the contractor serve as the contractor’s program manager for this contract.
a. Program Manager -
b. Other Contractor Personnel - Title:
4. PERFORMANCE STANDARDS
Performance standards define desired services. The Government performs surveillance to determine if the contractor exceeds, meets or does not meet these standards.
The performance standards listed below shall be used to determine contractor performance and shall compare contractor performance to the Acceptable Quality Level (AQL).
ID
Performance Objective
Acceptable Quality Level
Method of Surveillance
Incentive/Disincentive
The Contractor shall adhere to Collection Requirements in accordance with (IAW) Statement of Work (SOW) Section 1.1
95%
CO/COR Periodic Surveillance
Periodic surveillances will be conducted on a scheduled basis (daily, weekly, monthly, quarterly, semi-annual or annually) and may be adjusted, based on quality trends.
Incentive: favorable contractor performance evaluation.
Disincentive:
A Contract Discrepancy Report (CDR) will be issued on the first instance of failure to provide the acceptable level of service Two or more issued CDRs may result in reduction of the monthly invoice of 5%.
adhere to the General Solid Waste IAW SOW Section 1.1.2
95% CO/COR Periodic Surveillance
Incentive: favorable contractor performance evaluation.
Disincentive:
A Contract Discrepancy Report (CDR) will be issued on the first instance of failure to provide the acceptable level of service Failure to provide the acceptable level of service may be grounds to terminate the contract
Objective
Acceptable Quality Level
Method of Surveillance adhere to Reports and Records Requirements IAW SOW Section 1.1.3
95% CO/COR Periodic Surveillance
Incentive: favorable contractor performance evaluation.
Disincentive:
A Contract Discrepancy Report (CDR) will be issued on the first instance of failure to provide the acceptable level of service Failure to provide the acceptable level of service may be grounds adhere to Disposal Requirements IAW SOW Section 2
95% CO/COR Periodic Surveillance
Incentive: favorable contractor performance evaluation.
Disincentive:
A Contract Discrepancy Report (CDR) will be issued on the first instance of failure to provide the acceptable level of service Failure to provide the acceptable level of service may be grounds adhere to Maintaining Containers and Collection Area Requirements IAW SOW Section 1.1.6
95% CO/COR Periodic Surveillance
Incentive: favorable contractor performance evaluation.
Disincentive:
A Contract Discrepancy Report (CDR) will be issued on the first instance of failure to provide the acceptable level of service Failure to provide the acceptable level of
Objective
Acceptable Quality Level
Method of Surveillance adhere to Cleaning and Disinfecting/Deodori zing Contractor owned Containers IAW SOW Section 1.1.7
95%
CO/COR 100%
review of monthly reports and invoices
Incentive: favorable contractor performance evaluation.
Disincentive:
A Contract Discrepancy Report (CDR) will be issued on the first instance of failure to provide the acceptable level of service Failure to provide the acceptable level of service may be grounds adhere to Equipment Maintenance Compactor IAW SOW Section 3.0
95% CO/COR Periodic Surveillance
Incentive: favorable contractor performance evaluation.
Disincentive:
A Contract Discrepancy Report (CDR) will be issued on the first instance of failure to provide the acceptable level of service Failure to provide the acceptable level of service may be grounds adhere to Safety IAW SOW Section 6.3
95% CO/COR Periodic Surveillance
Incentive: favorable contractor performance evaluation.
Disincentive:
A Contract Discrepancy Report (CDR) will be issued on the first instance of failure to provide the acceptable level of service Failure to provide the acceptable level of
5. INCENTIVES/DISINCENTIVES
The Government shall use favorable contractor performance evaluations as incentives.
The Government shall report unfavorable contractor performance as disincentives.
Disincentives shall include documentation of any performance issues and two or more issued CDRs may result in reduction of the monthly invoice of 5%. If repetitive or consistent the government shall take further corrective action or begin termination procedures.
Incentives/disincentives shall be based on exceeding, meeting, or not meeting performance standards.
6. METHODS OF QA SURVEILLANCE
Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP.
A. DIRECT OBSERVATION. Can be performed periodically or through 100% surveillance
B. PERIODIC INSPECTION. (Evaluates outcomes on a periodic basis. Inspections may be scheduled [Daily, Weekly, Monthly, Quarterly, or annually] or unscheduled, as required.)
C. VALIDATED USER/CUSTOMER COMPLAINTS. (Relies on the patient to identify deficiencies. Complaints are then investigated and validated.).
D. RANDOM SAMPLING. Contract employee files will be randomly selected for review of evidence of training, background investigation, random drug testing, and driving record reviews.
7. RATINGS
Metrics and methods are designed to determine if performance exceeds, meets, or does not meet a given standard and acceptable quality level. A rating scale shall be used to determine a positive, neutral, or negative outcome. The following ratings shall be used:
Positive outcome: No more than 1 incident of not meeting the performance standard during the period of performance.
Neutral outcome: No more than 3 incidents of not meeting the performance standard
Negative outcome: More than 3 incidents of not meeting the performance standard
8. DOCUMENTING PERFORMANCE
a. ACCEPTABLE PERFORMANCE The Government shall document positive performance. Any report may become a part of the supporting documentation for any contractual action.
b. UNACCEPTABLE PERFORMANCE When unacceptable performance occurs, the COR shall inform the Contracting Officer (CO). This will normally be in writing unless circumstances necessitate verbal communication. In any case the COR and the CO shall document the discussion and place it in their respective file.
When the COR determines formal written communication is required, the COR shall prepare a Contract Discrepancy Report (CDR), and present it to the CO. The CO will in turn review and submit to the contractor's program manager for corrective action.
The contractor shall acknowledge receipt of the CDR in writing. The CDR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CDR will also state how long after receipt the contractor has to present this corrective action plan to the COR. The Government shall review the contractor's corrective action plan to determine acceptability.
Any CDRs may become a part of the supporting documentation for any contractual action deemed necessary by the CO.
9. FREQUENCY OF MEASUREMENT
a. Frequency of Measurement.
During contract performance, the COR will periodically analyze whether the frequency of surveillance is appropriate for the work being performed.
b. Frequency of Performance Assessment Meetings.
The COR shall meet with the contractor monthly to assess performance and shall provide a written assessment.