Price Sheet Summary
This is a price sheet attachment for the East Central Canal Priority Navigational Dredging Project solicitation issued by Brevard County Purchasing Services on behalf of the Natural Resource Management Department in Florida. The project involves maintenance dredging services for the East Central Canal, with bidders required to provide pricing for general items, temporary handling site work, dredging and material handling operations, and offsite disposal services. The estimated dredging quantity is 3,200 cubic yards, with the same volume applicable to towing, offloading, dewatering, and final transport/disposal activities. The price sheet is structured to accommodate both lump sum fixed costs and estimated measured quantity costs, allowing contractors to bid on mobilization and demobilization, maintenance of traffic, surveys with photographic and video documentation, erosion controls, site preparation and restoration, turbidity barriers, environmental and hydrographic monitoring, and mechanical dredging operations.
The bid format requires licensed and qualified marine contractors to submit unit costs and lump sum amounts for each line item, with all costs to be consolidated into a total bid amount. The price sheet presents all bid items with blank cost fields, indicating this is a template for solicitation purposes rather than a completed bid. No specific pricing information, set-asides, contract term details, award dates, or response deadlines are included in this attachment. Contractors are expected to complete the pricing based on their proposed unit rates and lump sum estimates for the fixed and measured quantity work items.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Sheet East Central Canal Priority Navigational Dredging Project Attachment A - Price Sheet
| Lump Sum Fixed Costs | |||||
| Bid Item | Item Description | Est Qty. | Unit | Unit Cost | Lump Sum Total |
| General Items | |||||
| A1 | Mobilization and Demobilization | 1 | LS | $ - 0 | |
| A2 | Maintenance of Traffic | 1 | LS | $ - 0 | |
| Temporary Handling Site | |||||
| B1 | Surveys (Pre/Post, with Photo & Video) | 2 | LS | $ - 0 | |
| B2 | Erosion Controls and Devices | 1 | LS | $ - 0 | |
| B3 | Site Preparation | 1 | LS | $ - 0 | |
| B4 | Site Restoration | 1 | LS | $ - 0 | |
| Dredging and Material Handling | |||||
| C1 | Floating Turbitidy Barrier and Monitoring | 1 | LS | $ - 0 | |
| C2 | Environmental Monitoring | 1 | LS | $ - 0 | |
| C3 | Hydrygraphic Survey (Pre/Post) | 2 | LS | $ - 0 | |
| C4 | As-Built Survey | 1 | LS | $ - 0 |
| Estimated Measured Quantity Costs | ||||
| Bid Item | Item Description | Est Qty. | Unit | Estimated Total |
| Dredging and Material Handling | ||||
| C5 | Mechanical Dredging | 3,200 | CY | $ - 0 |
| C6 | Tow to Shore and Offloading | 3,200 | CY | $ - 0 |
| C7 | Dewatering | 3,200 | CY | $ - 0 |
| Offsite Disposal | ||||
| D1 | Final Transport of Sediment/Disposal | 3,200 | CY | $ - 0 |
| Summary of Costs | ||
| TOTAL LUMP SUM FIXED COSTS: | $0.00 | |
| ESTIMATED MEASURED QUANTITY COSTS: | $0.00 |
TOTAL BID: $0.00