2__Revised_Project_Plans_Sheets_G001_C301.pdf
PDF 12 MB Posted
- Solicitation number
- B-8-26-19
- Issued by
- Brevard County, Florida
About this file
Summary
This is a Revised Project Plans document prepared by WSP USA, Inc. for Brevard County Natural Resources Management Department regarding the East Central Channel & Canals Priority Maintenance Navigational Dredging Project located in the Banana River, Brevard County, Florida (Section 19, Township 24 South, Range 37 East). The project involves dredging approximately 3,200 cubic yards of sediments from designated areas within the East Central Channel and Canals to maintain navigational depth. The work encompasses four primary dredge zones: South Shelter Trail, Main Channel, Bayside Street, and Coquina Drive. All dredging activity must maintain a minimum 10-foot buffer from docks, seawalls, structures, mangroves, and identified natural resources, with exceptions for a 5-foot minimum buffer from structures only with explicit documentation in bid documents, individual resident consent, and county approval. Dredged material will be transported directly to a designated Dredged Material Management Area (DMMA) with final disposal at 555 Camp Road, Cocoa, Florida 32927. The project plans include comprehensive sheets detailing existing and proposed site conditions, cross-sections showing target dredge depths of -5.0 feet (MLW/NAVD88 datum), dewatering procedures, erosion and sedimentation control measures, and turbidity management requirements.
The contractor is responsible for verifying estimated quantities prior to bidding, obtaining any additional required federal, state, and local permits, performing project layout and stakeout operations, and ensuring strict compliance with manatee construction conditions, turbidity controls, and all regulatory permit requirements. All disturbed areas must be restored to original conditions within 48 hours of project completion, and the contractor shall provide pre- and post-construction video documentation. The contractor must comply with FDOT Standard Indices 600 Series for maintenance of traffic, notify the U.S. Coast Guard for publication of Notice to Mariners, obtain approval for all buoys and markers, and implement comprehensive quality assurance/quality control procedures. Any native vegetation or seagrass damaged outside the dredge template must be restored by the contractor at contractor expense, and any misplaced dredged material must be removed and re-deposited at the approved disposal site without additional compensation or time extension.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Notice_of_Award.pdf | ||
| Bid_Tabulation.pdf | ||
| Bid_Tabulation__Names_Only.pdf | ||
| Addendum_3.pdf | ||
| 1__Revised_Project_Plans_Sheets_G001_C301.pdf | ||
| Addendum_2.pdf | ||
| Addendum_1.pdf | ||
| Addendum_1__Response.pdf | ||
| B-8-26-19_INV_&_SPECS.pdf | ||
| Attachment_A_-_Price_Sheet.xlsx | XLSX spreadsheet | |
| Attachment_B_-Tech_Specs_with_Permits.pdf | ||
| Attachment_C_-_Construction_Plans.pdf | ||
| Attachment_D_-_Draft_Contract.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REV. #SHEET NUMBER:
IN CHARGE:
DESIGNED BY:
DATE:
DRAWN BY:
SHEET TITLE:
CHECKED BY:
APPROVEDDATENO.
WSP PROJECT No:
PROJECT:
REVISIONS
BY
US0043684.8228
7/28/2025
F. DELORRIO
BREVARD COUNTY
DISTRICT 2
EAST CENTRAL CHANNEL
& CANALS PRIORITY
MAINTENANCE
NAVIGATIONAL
DREDGING
BREVARD COUNTY
NATURAL RESOURCES
2725 JUDGE FRAN JAMIESON
WAY
VIERA, FL 33940
L. LUMBARD
P R
O
JE
C T
N U
M B
E R
: 6
5.
.0
C
IT
Y : T
A M
P A
C :\U se rs
\U S
FD
\W S
P O
5\
To rr es , L ea h
- E as t C en tr al
C ha nn el s\ U
S
4.
E as t C en tr al C an al s P rio rit y M ai nt en an ce D re dg in g\
W or ki ng s et
\D w g\
-C ov er .d w g
L A
Y O
U T:
G -0
S A
V E
D : 6
/1 6/
:0
M
P
LO
TS
TY
LE
TA
B
LE
P
LO
TT
E D
: 6 /1
6/
:0
D
R A
W N
B Y
: D E
LO
R
R
IO
, F
LO
R E
N C
IA
L. LUMBARD
L. TORRES
LEAH G. TORRES, P.E.
FLORIDA P.E. LICENCE NO. 86641
WSP USA Inc.
550 Northlake Blvd, Suite 1000 Altamonte Springs, FL 32701 www.wsp.com
PROJECT LOCATIONS
JACKSONVILLE
DAYTONA BEACH
MELBOURNE -
COCOA
FT PIERCE
WEST
PALM
BEACH
FT LAUDERDALE
MIAMI
FT MYERS
NAPLES
SARASOTA -
BRADENTON
ST PETERSBURG
TAMPA
LAKELAND
ORLANDO
NEW PORT RICHEY
OCALA
GAINESVILLE
TALLAHASSEE
PANAMA
CITY
FORT WALTON
BEACHPENSACOLA
TURNPIKE
BEE LINE
EXPRESSWAY
FLORIDA S
LAKE CITY
BARTOW
ST AUGUSTINE
KEY WEST
CHIPLEY
DELAND
BREVARD COUNTRY DISTRICT 2
EAST CENTRAL CHANNEL & CANALS
PRIORITY MAINTENANCE NAVIGATIONAL DREDGING
BANANA RIVER, BREVARD COUNTY, FLORIDA
WSP PROJECT NUMBER: US0043684.8228
SITE LOCATION
COVER
G-001
S I T E L O C A T I O N M A P
SCALE: 1" = 1500'
SECTION 19, TOWNSHIP 24 SOUTH, RANGE 37 EAST
BREVARD COUNTY, FLORIDA
PLANS PREPARED BY:
WSP USA, INC.
550 Northlake Boulevard, Suite 1000
Altamonte Springs, FL 32701 Phone: 1.407.522.7570 www.wsp.com
NOTICE
THE INFORMATION IN THIS DOCUMENT WAS PREPARED BY WSP. WHILE WSP HAS TAKEN ALL REASONABLE STEPS TO ASSURE THE ACCURACY OF THE INFORMATION CONTAINED IN THIS DOCUMENT, IT CANNOT GUARANTEE THAT CHANGES OR ALTERATIONS TO THIS DOCUMENT WILL NOT BE MADE BY PERSONS OTHER THAN WSP PERSONNEL AFTER THE DOCUMENT LEAVES THE POSSESSION OF WSP. CHANGES OR ALTERATIONS MAY BE SAFETY RELATED AND RESULT IN DAMAGE TO PROPERTY, PERSONAL INJURY OR DEATH. IF VERIFICATION OF THE INFORMATION
CONTAINED IN THIS DOCUMENT IS NEEDED, CONTACT SHOULD BE MADE DIRECTION WITH WSP.
N
S
W E
INDEX OF DRAWINGS
Sheet Number Sheet Title
G-001 COVER
G-002 GENERAL NOTES
G-003 DREDGING ZONES PLAN
C-101 EXISTING SITE PLAN - S. SHELTER TRAIL
C-102 EXISTING SITE PLAN - MAIN CHANNEL
C-103 EXISTING SITE PLAN - BAYSIDE ST
C-104 EXISTING SITE PLAN - COQUINA DR
C-201 PROPOSED SITE PLAN - S. SHELTER TRAIL
C-202 PROPOSED SITE PLAN - MAIN CHANNEL
C-203 PROPOSED SITE PLAN - BAYSIDE ST
C-204 PROPOSED SITE PLAN - COQUINA DR
C-301 DEWATERING AND DREDGED MATERIAL PLACEMENT
C-401 EROSION AND SEDIMENTATION CONTROL DETAILS
GENERAL NOTES
1. THE PURPOSE OF THIS PROJECT IS TO DREDGE APPROXIMATELY 3,200 CUBIC YARDS OF SEDIMENTS FROM THE EAST CENTRAL CHANNEL AND CANALS PRIORITY DREDGE PROJECT AREA. ALL QUANTITIES ARE APPROXIMATE, AND THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING ESTIMATED QUANTITIES PRIOR TO BIDDING.
2. ALL DREDGING ACTIVITY WILL MAINTAIN A MINIMUM 10' BUFFER FROM ALL DOCKS, SEAWALLS, STRUCTURES, MANGROVES, AND ALL IDENTIFIED NATURAL RESOURCES. EXCEPTIONS FOR THE REDUCTION TO A 5' MINIMUM BUFFER FROM STRUCTURES ARE EXPLICITLY LISTED IN THE BID DOCUMENTS, ON THE BASIS OF INDIVIDUAL RESIDENT CONSENT, AND COUNTY APPROVAL. A 10' BUFFER FROM MANGROVE TRANKS AND PROP ROOTS SHALL
BE OBSERVED DURING ALL DREDGING ACTIVITIES.
3. DREDGING ACTIVITY WILL BE CONDUCTED IN DESIGNATED AREAS ONLY AND IN ACCORDANCE WITH THE PERMITS, PLANS AND SPECIFICATIONS. NO WORK SHALL OCCUR OUTSIDE OF THE PERMITTED WORK AREA IN
ACCORDANCE WITH ISSUED PERMITS.
4. THE CONTRACTOR WILL STRICTLY COMPLY WITH STANDARD MANATEE CONSTRUCTION CONDITIONS FOR
IN-WATER WORK, BUFFERS FROM NATURAL RESOURCES, AND ALL OTHER PERMIT CONDITIONS.
5. THE CONTRACTOR IS RESPONSIBLE FOR RESTORING ANY DISTURBED AREAS OF THE OFFLOADING AREA, SHORELINE, UPLAND, AND TEMPORARY HANDLING AREA TO ORIGINAL CONDITIONS WITHIN 48 HOURS OF
PROJECT COMPLETION.
6. TOPOGRAPHIC/BATHYMETRIC DATA (AUGUST 2018), AND VIBRACORE SAMPLES (NOVEMBER 2018 - JANUARY 2019) COLLECTED BY LAND & SEA SURVEYING CONCEPTS, INC. FOR THE DREDGE AREA HAVE BEEN INCORPORATED INTO THIS DESIGN AND UPDATED BY A WSP SURVEY CONDUCTED UNDER THE SUPERVISION OF LICENSED FL LAND SURVEYOR MAX RAMOS (PSM NO. 6458) ON 6/3/2025. INFORMATION DEPICTED WITHIN
THESE PLANS REPRESENT THE EXISTING CONDITIONS AT THE TIME OF DATA COLLECTION.
7. GRID COORDINATES ARE IN FEET AND ARE REFERENCED TO THE FLORIDA STATE PLANE COORDINATE SYSTEM, EAST ZONE, NORTH AMERICAN DATUM OF 1983 (NAD 83).
8. ELEVATIONS SHOWN WITHIN THIS PLAN SET ARE IN FEET AND ARE REFERENCED NAVD88 DATUM. TO CONVERT A PROJECT ELEVATION TO MLW DATUM, ADD 0.6 FEET TO CORRESPONDING NAVD88 ELEVATIONS PER NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION NOAA TIDAL V-DATUM VERTICAL DATUMS TRANSFORMATION SOFTWARE (4.7.1) REFERENCING THE PROJECT LOCATION. AERIAL PHOTOGRAPHS PREPARED BY FLORIDA
DEPARTMENT OF TRANSPORTATION, DATED 2017.
9. THE BANANA RIVER IS A DESIGNATED AQUATIC PRESERVE, OUTSTANDING FLORIDA WATER, CLASS II. NO DEGRADATION OF WATER QUALITY IS PERMITTED. TURBIDITY SHALL NOT EXCEED NATURAL BACKGROUND
CONDITIONS. NO OVERDREDGE IS PERMITTED.
LAYOUT OF THE WORK:
1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LAYOUT OF THE WORK AND FOR MAINTAINING THE POSITION OF DREDGING OR EXCAVATING EQUIPMENT WITHIN THE PRESCRIBED LIMITS AT ALL TIMES. THE CONTRACTOR SHALL CONTINUOUSLY MONITOR WATER LEVELS AND DREDGING DEPTHS TO ENSURE THE DESIGNED DEPTH IS ACHIEVED AND SHALL HAVE ADEQUATE PERSONNEL ON SITE CAPABLE OF SETTING ACCURATE CONTROLS FOR
ONGOING DREDGE OPERATIONS.
2. THE FOLLOWING HORIZONTAL DREDGING LIMITS SHALL APPLY UNLESS MODIFIED BY WRITTEN INSTRUCTION
FROM THE COUNTY AND THE ENGINEER FOR SITE-SPECIFIC LOCATIONS:
2.1 ENDS OF CANALS: NO DREDGING SHALL OCCUR WITHIN 10 FEET OF THE SHORELINE AT THE CANAL ENDS, INCLUDING THE BRIDGE STRUCTURE AT THE WEST END. THE CONTRACTOR IS RESPONSIBLE FOR IDENTIFYING BRIDGE FOOTINGS AND MAINTAINING A 10-FOOT SETBACK FROM STRUCTURES AND FOUNDATIONS. THE EXISTING BOAT RAMP GRADE AT THE EAST END SHALL BE MAINTAINED, WITH ALL SEDIMENTS GRADED TO THE
DREDGE TEMPLATE BOTTOM ELEVATION WITHOUT DAMAGING OR UNDERMINING THE BOAT RAMP.
2.2 SEAWALLS ALONG CANALS: NO DREDGING SHALL OCCUR WITHIN 10 FEET OF ANY SEAWALL. WHERE SIDE SLOPES FALL WITHIN 10 FEET OF A SEAWALL, A BOX CUT MAY BE MADE AT THE 10-FOOT SETBACK, NO DEEPER
THAN THE DREDGE LIMIT.
2.3 PILING AND BOAT SLIPS: NO DREDGING SHALL OCCUR WITHIN 10 FEET OF ANY FIXED BOAT SLIP OR MOORING PILE. WHERE THE DREDGE TEMPLATE SHOWS SIDE SLOPES WITHIN 10 FEET OF A BOAT SLIP OR MOORING PILE, A BOX CUT AT THE 10-FOOT SETBACK MAY BE MADE, NO DEEPER THAN THE DREDGE LIMIT.
2.4 NATURAL RESOURCES: NO DREDGING SHALL OCCUR WITHIN 10 FEET OF MANGROVES OR OTHER IDENTIFIED NATURAL RESOURCES. ACTUAL LIMITS MAY VARY FROM PLAN SHEETS; HORIZONTAL DREDGING LIMITS SHALL
BE ADJUSTED TO MATCH FIELD CONDITIONS AT THE TIME OF DREDGING.
3. THE CONTRACTOR SHALL PROVIDE PROJECT LAYOUT IN ACCORDANCE WITH THE CONSTRUCTION PLANS, INCLUDING STAKEOUT BY PLACING VERTICAL STAKES OR BUOYS EVERY 50 FEET ALONG THE DREDGE FOOTPRINT TO OUTLINE THE CHANNEL BOTTOM WIDTH. STAKING MAY BE LIMITED TO ACTIVE WORK AREAS AND SHALL BE MAINTAINED THROUGHOUT THE PROJECT. THE CONTRACTOR IS RESPONSIBLE FOR REMOVING ALL STAKES FROM
THE WATER UPON PROJECT COMPLETION.
4. THE CONTRACTOR SHALL UTILIZE SOFTWARE TO MAP THE PROJECT AREA AND SHALL CONTINUOUSLY MONITOR DREDGING COORDINATES AND DEPTHS TO ENSURE ACCURACY WITHIN THE DREDGE TEMPLATE AND IN MAINTAINING REQUIRED SETBACKS AS SPECIFIED IN THE CONSTRUCTION DRAWINGS, SPECIFICATIONS, AND
REGULATORY PERMITS.
OBSTRUCTION OF CHANNEL:
1. THE CONTRACTOR MAY TEMPORARILY CLOSE THE CANALS TO NAVIGATION, WITHIN WHICH WORK IS ACTIVELY TAKING PLACE. THE CONTRACTOR SHALL ALLOW FOR THE SAFE PASSAGE OF MANATEES AT ALL TIMES DURING CONSTRUCTION. OUTSIDE THE TEMPORARILY CLOSE AREAS, IN CASES WHERE THE CONTRACTOR'S EQUIPMENT OPERATION MAY OBSTRUCT NAVIGATION OR MAY ENDANGER THE PASSAGE OF VESSELS, SAID EQUIPMENT OR OPERATION SHALL BE MOVED AS SOON AS PRACTICAL ON THE APPROACH OF ANY VESSEL TO SUCH EXTENT AS MAY BE NECESSARY TO AFFORD SAFE PASSAGE. OUTSIDE THE TEMPORARILY CLOSED AREAS, SCOW BARGES SHALL BE SECURED IN A POSITION WHERE IT DOES NOT IMPEDE NAVIGATION OR ACCESS TO NAVIGATIONAL
CHANNELS, DOCKS, MOORINGS, OR OTHER WATERFRONT PROPERTY.
2. WITHIN 48 HOURS OF COMPLETION OF THE WORK, THE CONTRACTOR SHALL PROMPTLY REMOVE EQUIPMENT
INCLUDING, MARKERS, BUOYS, SCOW BARGES, AND TURBIDITY CURTAINS.
SITE CONDITIONS:
1. THE WORK IS LOCATED IN THE BANANA RIVER, THEREFORE EXPOSED TO WEATHER CONDITIONS WHICH AT TIMES MAY INCLUDE STORMS AND ROUGH SEA CONDITIONS REQUIRING TEMPORARY SUSPENSION OF MARINE CONSTRUCTION ACTIVITIES. ADDITIONALLY, THE WORK AREA MAY BE SUBJECT TO WAKES GENERATED BY PASSING VESSELS. THE CONTRACTOR IS RESPONSIBLE FOR BEING FAMILIAR WITH THESE CONDITIONS AND TO
TAKE THEM UNDER CONSIDERATION.
2. IT IS THE CONTRACTOR'S RESPONSIBILITY TO TAKE PRECAUTIONS TO ENSURE THAT PARTIALLY COMPLETE WORK IS NOT SUBJECT TO DISPLACEMENT OR DAMAGE DUE TO NATURAL SITE CONDITIONS OR VESSEL WAKES. SHOULD ANY SUCH DAMAGE OR DISPLACEMENT OF PARTIALLY COMPLETED WORK OCCUR, THE CONTRACTOR IS RESPONSIBLE FOR REPAIRING ANY SUCH DAMAGE OR DISPLACEMENT OF PARTIALLY COMPLETED WORK AT NO
ADDITIONAL COST TO THE COUNTY.
3. INFORMATION AND DATA FURNISHED OR REFERRED TO HEREIN IS PROVIDED FOR THE CONTRACTOR'S
ADDITIONAL COST TO THE COUNTY.
3. INFORMATION AND DATA FURNISHED OR REFERRED TO HEREIN IS PROVIDED FOR THE CONTRACTOR'S
INFORMATION, HOWEVER IT IS EXPRESSLY UNDERSTOOD THAT THE COUNTY AND ENGINEER SHALL NOT BE RESPONSIBLE FOR ANY INTERPRETATION OR CONCLUSION MADE BY THE CONTRACTOR. IT IS THE CONTRACTOR'S RESPONSIBILITY TO BE FAMILIAR WITH LOCAL CONDITIONS THAT MAY IN ANY MANNER AFFECT PERFORMANCE
OF THE WORK.
SITE PREPARATION:
1. THE SEDIMENTS REMOVED FROM THE DREDGE TEMPLATE MUST BE TRANSPORTED DIRECTLY TO THE
DESIGNATED DMMA AS PER THE TECHNICAL SPECIFICATIONS AND PLANS.
2. THE CONTRACTOR WILL COMPLY WITH ALL DMMA SITE PREPARATION SPECIFIED BY REGULATORY PERMITS. THE CONTRACTOR WILL COMPLY WITH ALL TURBIDITY MANAGEMENT AND MONITORING REQUIREMENTS SPECIFIED BY REGULATORY PERMITS INCLUDING INSTALLATION AND MAINTENANCE OF TURBIDITY CURTAINS.
3. UPON COMPLETION AND ACCEPTANCE OF THE DREDGING, THE CONTRACTOR SHALL RESTORE THE DMMA TO
PRE-CONSTRUCTION CONDITIONS.
4. PRIOR TO RESTORATION OF THE TEMPORARY HANDLING AND OFFLOADING AREA THE CONTRACTOR SHALL MEET WITH THE COUNTY AND THE ENGINEER ON SITE TO DISCUSS THE SPECIFICS OF SITE RESTORATION.
NOTICE TO MARINERS:
1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING THE COAST GUARD IN SUFFICIENT TIME TO ALLOW
FOR PUBLICATION OF A NOTICE TO MARINERS. THE LOCAL COAST GUARD IS:
COAST GUARD SECTOR MIAMI
WATERWAYS MANAGEMENT DIVISION
ATTN: (LNM)
TELEPHONE: (305) 535-4317
2. THE CONTRACTOR SHALL OBTAIN APPROVAL FROM THE U.S. COAST GUARD FOR ALL BUOYS, MARKERS, AND OTHER DREDGING AIDS PRIOR TO INSTALLATION. DREDGING AIDS, LIGHTS OR TARGETS SHALL NOT BE PLACED OR
COLORED IN A MANNER THAT THEY WILL OBSTRUCT OR BE CONFUSED WITH NAVIGATION AIDS.
ENVIRONMENTAL PROTECTION:
1. CONTRACTOR SHALL EXERCISE DUE CAUTION SO AS NOT TO DAMAGE EXISTING NATIVE VEGETATION ALONG THE SHORELINE WITHIN AND AROUND THE PROJECT AREA, ACCESS WAYS, HANDLING AREAS, AND STAGING AREAS.
ANY NATIVE VEGETATION OR SEAGRASS OUTSIDE THE DREDGED TEMPLATE DAMAGED BY THE CONTRACTOR DURING THE COURSE OF WORK SHALL BE RESTORED BY CONTRACTOR AT THE CONTRACTOR'S EXPENSE.
2. IN ORDER TO ENSURE THAT MANATEES ARE NOT ADVERSELY AFFECTED BY CONSTRUCTION ACTIVITIES AS DESCRIBED BY THESE SPECIFICATIONS, THE CONTRACTOR IS REQUIRED TO STRICTLY ADHERE TO THE FDEP, AND USACE PERMIT STANDARD MANATEE CONSTRUCTION CONDITIONS FOR IN-WATER WORK WHICH IDENTIFY
SPECIFIC REQUIREMENTS FOR THE PROTECTION OF MANATEES.
3. THE CONTRACTOR IS RESPONSIBLE FOR THE INSTALLATION FLOATING TURBIDITY BARRIERS AROUND THE DREDGE AREA AND ADHERING TO ALL TURBIDITY CONTROLS AND MONITORING AS SPECIFIED BY REGULATORY PERMITS.
4. CONTRACTOR SHALL MAINTAIN EROSION CONTROL AND TURBIDITY CONTROL MEASURES THROUGHOUT THE PROJECT IN CONFORMANCE WITH CONDITIONS FOR TURBIDITY AND WATER QUALITY, AS SPECIFIED BY PERMIT
CONDITIONS.
5. CONTRACTOR SHALL CONFORM TO ALL TURBIDITY SAMPLING, CONTINUOUS MONITORING, AND REPORTING CONDITIONS PRESCRIBED BY THE FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION. CONTRACTOR
SHALL COMPLY WITH ALL APPLICABLE PERMITS.
PERMITS:
1. THE CONTRACTOR IS REQUIRED TO OBTAIN ANY PERMIT (FEDERAL, STATE, AND LOCAL) REQUIRED TO COMPLETE THE PROJECT AS THEIR OPERATIONS DICTATE, WHICH HAS NOT BEEN PREVIOUSLY OBTAINED BY THE COUNTY.
2. COPIES OF PREVIOUSLY OBTAINED PERMITS ARE INCLUDED WITH THE BID DOCUMENTS.
3. A PERMIT MODIFICATION FOR THE EXISTING FDEP AND USACE PERMITS WILL BE REQUIRED TO ACCOMMODATE
ANY DEVIATIONS FROM AUTHORIZED DEWATERING METHODS, DMMA, AND FINAL DISPOSAL LOCATION AUTHORIZED BY ISSUED PERMITS (INCLUDING FEDERAL, STATE AND LOCAL PERMITS). THE CONTRACTOR IS
RESPONSIBLE FOR SECURING PERMIT MODIFICATIONS.
CONSTRUCTION NOTES:
1. THE CONTRACTOR WILL MAKE A DETERMINATION OF THE QUANTITIES OF WORK REQUIRED TO COMPLETE THE CONSTRUCTION SHOWN ON THE PLANS. THE CONTRACTOR WILL ALSO MAKE AN INDEPENDENT ASSESSMENT OF THE SITE AND WORK REQUIRED PRIOR TO BIDDING AND ANY DISCREPANCIES, ERRORS OR OMISSIONS, WILL BE
BROUGHT TO THE ATTENTION OF THE COUNTY REPRESENTATIVE BEFORE THE DUE DATE.
2. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING THE LOCATION OF ALL UNDERGROUND UTILITIES OR OTHER OBJECTS PRIOR TO COMMENCING WORK AT THE SITE. ANY UTILITIES OR OTHER ITEMS DAMAGED DURING
CONSTRUCTION SHALL BE REPAIRED BY THE CONTRACTOR AT NO COST TO THE COUNTY.
3. ALL AREAS OR ITEMS THAT ARE DAMAGED OR DISTURBED BY THE CONTRACTOR SHALL BE RESTORED TO THE
ORIGINAL CONDITION OR BETTER CONDITION AT NO COST TO THE COUNTY.
4. THE CONTRACTOR SHALL CHECK PLANS FOR CONFLICTS AND DISCREPANCIES PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL NOTIFY THE ENGINEER OF RECORD OF ANY CONFLICT BEFORE PERFORMING ANY WORK IN
THE AFFECTED AREA.
5. THE CONTRACTOR IS RESPONSIBLE FOR REPAIRING ANY DAMAGE TO EXISTING FACILITIES, ABOVE OR BELOW GROUND, WHICH MAY OCCUR AS A RESULT OF THE WORK PERFORMED BY THE CONTRACTOR AT NO COST TO
THE COUNTY.
6. IT IS THE CONTRACTOR'S RESPONSIBILITY TO BECOME FAMILIAR WITH THE PERMIT, SAMPLING, MONITORING, AND INSPECTION REQUIREMENTS OF THE VARIOUS GOVERNMENTAL AGENCIES.
7. ALL SPECIFICATIONS AND DOCUMENTS REFERRED TO SHALL BE OF LATEST REVISIONS AND/OR LATEST EDITION
UNLESS OTHERWISE NOTED.
8. THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING HORIZONTAL AND VERTICAL ACCURACY DURING DREDGING, QA/QC PROCEDURES MUST BE SUBMITTED AND APPROVED BY THE COUNTY AND ENGINEER.
9. ALL WORK PERFORMED SHALL COMPLY WITH THE REGULATIONS AND ORDINANCES OF THE VARIOUS
GOVERNMENTAL AGENCIES HAVING JURISDICTION OVER THE WORK.
10. REPAIR AND REPLACEMENT OF ALL PRIVATE AND PUBLIC PROPERTY AFFECTED BY THIS WORK SHALL BE
RESTORED TO A CONDITION OF EQUAL TO, OR BETTER THAN EXISTING CONDITIONS.
11. CONSTRUCTION TRAFFIC SHALL NOT IMPEDE THE SAFE AND EFFICIENT USE OF THE SURROUNDING ROADWAYS.
THE CONTRACTOR SHALL FOLLOW FDOT STANDARD INDICES 600 SERIES FOR MAINTENANCE OF TRAFFIC DURING
CONSTRUCTION.
12. CONTRACTOR SHALL BE RESPONSIBLE FOR THE TIMELY REMOVAL OF ANY FUGITIVE DUST, SAND, OR DEBRIS
WHICH MAY BE CAUSED BY CONTRACTOR'S OPERATIONS.
13. ANY DREDGED MATERIALS DEPOSITED AT LOCATIONS OTHER THAN AS DESIGNATED OR APPROVED BY THE COUNTY SHALL BE CONSIDERED MISPLACED MATERIAL AND SHALL NOT BE PAID FOR UNTIL THE CONTRACTOR, AT THE CONTRACTOR'S EXPENSE, REMOVES AND RE-DEPOSITS SUCH MISPLACED MATERIAL TO THE APPROVED DISPOSAL SITE. THIS REQUIRED REMOVAL AND REDEPOSIT OF THE MISPLACED MATERIAL AND ANY NECESSARY DISPOSAL SITE RESTORATION WORK SHALL NOT BE THE BASIS FOR A TIME EXTENSION OR ADDITIONAL
COMPENSATION UNDER THIS CONTRACT.
14. DEBRIS, SUCH AS STUMPS, ROCKS ROCK FRAGMENTS, ROOTS, LOGS, TRASH, VEGETATION, ETC. AND ANY OTHER
COMPENSATION UNDER THIS CONTRACT.
14. DEBRIS, SUCH AS STUMPS, ROCKS ROCK FRAGMENTS, ROOTS, LOGS, TRASH, VEGETATION, ETC. AND ANY OTHER
OBJECTS (EXCEPT ARCHEOLOGICAL OR HISTORICAL RESOURCES) THAT EXIST WITHIN THE PROJECT AREA OR ARE UNEARTHED DURING THE DREDGING OPERATIONS, SHALL BE REMOVED, TRANSPORTED, AND DISPOSED OF AT AN APPROPRIATE DISPOSAL SITE AND WILL NOT CONSTITUTE A CHANGE OF CONDITION TO THE
CONTRACT/AGREEMENT.
15. CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL OF ANY MATERIAL THAT ACCUMULATES IN THE DREDGED CHANNEL OR OTHER AREAS AS A RESULT OF THE CONTRACTOR'S ACTIVITY AND/OR OPERATIONS.
16. THE WORK IS TO BE COMPLETED WITHIN THE AREA SHOWN ON THE PLANS. IF ADDITIONAL AREA IS REQUIRED FOR STORAGE OF EQUIPMENT OR MATERIALS, ARRANGEMENTS FOR SUCH STORAGE FACILITIES SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. NO STAGING, OFFLOADING, OR PARKING MAY OCCUR ON VACANT LOTS WITHIN THE RESIDENTIAL NEIGHBORHOODS (PER COUNTY CODE) WITHOUT WRITTEN PERMISSION FROM THE
LAND OWNER AND COUNTY FOR APPROVAL.
17. SPECIAL MEASURES SHALL BE TAKEN TO PREVENT BILGE PUMP WASTE, OR EFFLUENT, CHEMICALS, FUELS, OILS, GREASES, AND BITUMINOUS MATERIALS FROM ENTERING THE WATER.
18. DISPOSAL OF ANY MATERIALS, WASTES, EFFLUENT, TRASH, GARBAGE OIL, GREASE, CHEMICAL, ETC., IN AND ADJACENT TO THE PROJECT SITE SHALL NOT BE PERMITTED. IF ANY WASTE MATERIALS ARE DUMPED IN UNAUTHORIZED AREAS THE CONTRACTOR SHALL REMOVE THE MATERIAL AND RESTORE THE AREA TO THE ORIGINAL CONDITION. IF NECESSARY, CONTAMINATED GROUND SHALL BE EXCAVATED, DISPOSED OF AS
DIRECTED BY THE ENGINEER OF RECORD, AND REPLACED WITH SUITABLE FILL MATERIAL.
19. DREDGED MATERIAL WILL BE TRANSPORTED OFFSITE TO THE PRE-APPROVED LOCATION.
20. CONTRACTOR SHALL COORDINATE TEMPORARY REMOVAL AND REINSTALLATION OF ALL AIDS TO NAVIGATION
WITHIN DREDGE TEMPLATE WITH THE ASSET OWNER.
SAFETY NOTES:
1. IT SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO COMPLY WITH AND ENFORCE ALL APPLICABLE SAFETY REGULATIONS. THE INFORMATION HEREIN HAS BEEN PROVIDED FOR THE CONTRACTOR'S INFORMATION ONLY AND DOES NOT IMPLY THAT THE OWNER, OWNER'S ENGINEER, OR ENGINEER OF RECORD WILL INSPECT
AND/OR ENFORCE SAFETY REGULATIONS.
2. DURING THE CONSTRUCTION AND/OR MAINTENANCE OF THE PROJECT, ALL SAFETY REGULATIONS ARE TO BE ENFORCED. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONTROL AND SAFETY OF PERSONNEL. LABOR SAFETY REGULATIONS SHALL CONFORM TO THE PROVISIONS SET FORTH BY OSHA IN THE FEDERAL REGISTER OF
THE DEPARTMENT OF TRANSPORTATION.
3. IT IS THE CONTRACTOR'S RESPONSIBILITY TO ENSURE THAT ALL PERSONNEL IN THE PROJECT AREA WEAR PROPER PERSONAL PROTECTION EQUIPMENT, INCLUDING BUT NOT LIMITED TO SAFETY VESTS, HARD HATS, SAFETY
BOOTS, EYE PROTECTION, HEARING PROTECTION, AND PERSONAL FLOATATION DEVICES.
DEWATERING SITE CONSTRUCTION NOTES:
1. NO EQUIPMENT OR PERSONNEL MAY OCCUPY ANY LANDS OR EASEMENTS AT THE DEWATERING AREA NOT
SPECIFIED FOR USE BY THE COUNTY.
2. CONTRACTOR SHALL INSTALL A FDOT APPROVED SILT FENCE AND CONSTRUCTION FENCING AROUND DMMA
AREAS. THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING THIS FENCING AT ALL TIMES.
3. CONTRACTOR SHALL IMPLEMENT AND MAINTAIN THOSE MEASURES NECESSARY TO PREVENT, CONTROL AND ABATE ANY EROSION OF THE GROUND SURFACE OR SHORELINE BANKS CAUSED BY THE WORK. THE USE OF BEST MANAGEMENT PRACTICES SUCH AS STRAW BALES, EROSION SCREENS AND TURBIDITY SCREENS SHALL BE USED FOR THIS PORTION OF THE WORK. THE CONTRACTOR SHALL CONSTRUCT OR INSTALL TEMPORARY AND PERMANENT EROSION AND SEDIMENT CONTROL MEASURES DICTATED BY SPECIFICATIONS, CONTRACT DRAWINGS, AND PERMIT AUTHORIZATIONS. TURBIDITY, EROSION AND SEDIMENT CONTROL MEASURES SHALL BE
MAINTAINED UNTIL THE COMPLETION OF WORK.
REV. #SHEET NUMBER:
IN CHARGE:
DESIGNED BY:
DATE:
DRAWN BY:
SHEET TITLE:
CHECKED BY:
APPROVEDDATENO.
WSP PROJECT No:
PROJECT:
REVISIONS
BY
US0043684.8228
6/16/2026
F. DELORRIO
BREVARD COUNTY
DISTRICT 2
EAST CENTRAL CHANNEL
& CANALS PRIORITY
MAINTENANCE
NAVIGATIONAL
DREDGING
BREVARD COUNTY
NATURAL RESOURCES
2725 JUDGE FRAN JAMIESON
WAY
VIERA, FL 33940
L. LUMBARD
P R
O
JE
C T
N U
M B
E R
: 6
5.
.0
C
IT
Y : T
A M
P A
C :\U se rs
\U S
FD
\W S
P O
5\
To rr es , L ea h
- E as t C en tr al
C ha nn el s\ U
S
4.
E as t C en tr al C an al s P rio rit y M ai nt en an ce D re dg in g\
W or ki ng s et
\D w g\
-G en
N ot es .d w g
L A
Y O
U T:
G
V E
D : 1
1/
/2
:3
TS
TY
LE
TA
B
LE
: C
IV
IL
-S
TD
.C
TB
TT
E D
: 6 /1
6/
:0
A
W N
B Y
: D E
LO
R
R
IO
FL
O R
E N
C
IA
L. LUMBARD
L. TORRES
LEAH G. TORRES, P.E.
FLORIDA P.E. LICENCE NO. 86641
WSP USA Inc.
550 Northlake Blvd, Suite 1000 Altamonte Springs, FL 32701 www.wsp.com
GENERAL NOTES
G-002 1
BAYSIDE ST.
E CENTRAL AVE.
ROCHELLE PKWY
S SHELTER TRAIL
W
ES
TP
O
R T
R D
BANANA
RIVER
WAVECREST ST.
HARBOR DR.
SHORE DR.
NEPTUNE DR.
SEASHELL DR.
N B
AN
AN
A R
IV
ER
D R
COQUINA DR.
REV. #SHEET NUMBER:
IN CHARGE:
DESIGNED BY:
DATE:
DRAWN BY:
SHEET TITLE:
CHECKED BY:
APPROVEDDATENO.
WSP PROJECT No:
PROJECT:
REVISIONS
BY
US0043684.8228
6/16/2026
F. DELORRIO
BREVARD COUNTY
DISTRICT 2
EAST CENTRAL CHANNEL
& CANALS PRIORITY
MAINTENANCE
NAVIGATIONAL
DREDGING
BREVARD COUNTY
NATURAL RESOURCES
2725 JUDGE FRAN JAMIESON
WAY
VIERA, FL 33940
L. LUMBARD
P R
O
JE
C T
N U
M B
E R
: 6
5.
.0
C
IT
Y : T
A M
P A
C :\U se rs
\U S
FD
\W S
P O
5\
To rr es , L ea h
- E as t C en tr al
C ha nn el s\ U
S
4.
E as t C en tr al C an al s P rio rit y M ai nt en an ce D re dg in g\
W or ki ng s et
\D w g\
-D re dg eZ on es
O ve rv ie w .d w g
L A
Y O
U T:
G
V E
D : 1
0/
/2
:1
TS
TY
LE
TA
B
LE
: C
IV
IL
-S
TD
TT
E D
: 6 /1
6/
:0
A
W N
B Y
D
E
LO
R R
IO
, F
LO
R
E N
C
IA
L. LUMBARD
L. TORRES
LEAH G. TORRES, P.E.
FLORIDA P.E. LICENCE NO. 86641
WSP USA Inc.
550 Northlake Blvd, Suite 1000 Altamonte Springs, FL 32701 www.wsp.com
Scale: 1' = 200'
PROJECT OVERVIEW - DREDGING ZONES PLAN1
N
S
W E
LEGEND
PROJECT AREA
DREDGE TEMPLATE DREDGING ZONES
PLAN
G-003 1
S SHELTER TRAIL
BANANA
RIVER
-10
-10
-1
-9
-9
-8
-8
-7
-7
-6
-6
-6
-5
-5
-5
-5
-4-4
-4
-4
-4
-6-6
-6 -5
-5
-4
-4
-4
-3
-5
-5 -4
REV. #SHEET NUMBER:
IN CHARGE:
DESIGNED BY:
DATE:
DRAWN BY:
SHEET TITLE:
CHECKED BY:
APPROVEDDATENO.
WSP PROJECT No:
PROJECT:
REVISIONS
BY
US0043684.8228
6/16/2026
F. DELORRIO
BREVARD COUNTY
DISTRICT 2
EAST CENTRAL CHANNEL
& CANALS PRIORITY
MAINTENANCE
NAVIGATIONAL
DREDGING
BREVARD COUNTY
NATURAL RESOURCES
2725 JUDGE FRAN JAMIESON
WAY
VIERA, FL 33940
L. LUMBARD
P R
O
JE
C T
N U
M B
E R
: 6
5.
.0
C
IT
Y : T
A M
P A
C :\U se rs
\U S
FD
\W S
P O
5\
To rr es , L ea h
- E as t C en tr al
C ha nn el s\ U
S
4.
E as t C en tr al C an al s P rio rit y M ai nt en an ce D re dg in g\
W or ki ng s et
\D w g\
-E xi st in gS ite
P la n.
dw g L
A Y
O U
T:
S
. S H
E
LT
E R
T R
IL
V
E D
: 1 0/
/2
:1
TS
TY
LE
TA
B
LE
: C
IV
IL
-S
TD
TT
E
D : 6
/1 6/
:0
A W
N B
Y
D E
LO
R
R
IO
, F
LO
R E
N C
IA
L. LUMBARD
L. TORRES
LEAH G. TORRES, P.E.
FLORIDA P.E. LICENCE NO. 86641
WSP USA Inc.
550 Northlake Blvd, Suite 1000 Altamonte Springs, FL 32701 www.wsp.com
Scale: 1' = 20'
EXISTING SITE PLAN - S. SHELTER TRAIL1
NOTES:
1. ELEVATIONS SHOWN HEREON ARE RELATIVE TO THE NORTH AMERICAN VERTICAL DATUM OF 1988 (NAVD 88).
2. THE BATHYMETRIC DATA FOR PROJECT WAS OBTAINED BY WSP USA, INC. ON JUNE 23, 2025, SEE SIGNED AND SEALED SURVEY FOR ADDITIONAL NOTES. ELECTRONIC FILES OF THE DATA WILL BE
SUPPLIED TO CONTRACTORS FOR BIDDING PURPOSES.
3. CONTRACTOR TO PROVIDE THE COUNTY WITH A PRE AND POST CONSTRUCTION VIDEO, AS DETAILED IN THE TECHNICAL SPECIFICATIONS. DAMAGE TO ANY SEAWALLS, BOAT LIFTS AND OTHER PRIVATE
PROPERTY DURING CONSTRUCTION SHALL BE REPLACED BY CONTRACTOR AT NO COST TO THE COUNTY TO MATCH EXISTING CONDITIONS. IF THE CONTRACTOR REQUIRES USE OF A PRIVATE HOMEOWNER LOT OR COUNTY RIGHT OF WAY FOR STORAGE OF EQUIPMENT, THE CONTRACTOR MUST OBTAIN COUNTY PERMISSION AND THE STORAGE MAY NOT BE ALLOWED UNTIL A PROPOSED
TEMPORARY USE ORDINANCE IS APPROVED AND BECOMES EFFECTIVE.
4. THE CONTRACTOR SHALL LOCATE AND IDENTIFY ALL UNDER GROUND AND ABOVE GROUND UTILITIES WITHIN THE PROJECT BOUNDARY. IN THE EVENT, THE UTILITIES ARE IMPACTED THE CONTRACTOR SHALL NOTIFY THE UTILITY COMPANY AND COUNTY IMMEDIATELY AND REPLACE TO MATCH EXISTING CONDITIONS.
LEGEND
MAJOR CONTOUR
MINOR CONTOUR3
N
S
W E
EXISTING
SITE PLAN -
S. SHELTER
TRAIL
C-101
PROJECT AREA
RIVER
-11
-1
-9
-8 -7
-6
-5
-4 -3
-5 -4
-4
-4
-4
-3
-3 -3
-3
-4
-4
-4
-4
-5
-5
-4
-4
-4-3 -3
-4 -4
-3
-3 -4
-3
-4
-4
-5 -5
-4
-4
-3
-6-5-4
-5
-9
-8
-7
-6
-5
REV. #SHEET NUMBER:
IN CHARGE:
DESIGNED BY:
DATE:
DRAWN BY:
SHEET TITLE:
CHECKED BY:
APPROVEDDATENO.
WSP PROJECT No:
PROJECT:
REVISIONS
BY
US0043684.8228
6/16/2026
F. DELORRIO
BREVARD COUNTY
DISTRICT 2
EAST CENTRAL CHANNEL
& CANALS PRIORITY
MAINTENANCE
NAVIGATIONAL
DREDGING
BREVARD COUNTY
NATURAL RESOURCES
2725 JUDGE FRAN JAMIESON
WAY
VIERA, FL 33940
L. LUMBARD
P R
O
JE
C T
N U
M B
E R
: 6
5.
.0
C
IT
Y : T
A M
P A
C :\U se rs
\U S
FD
\W S
P O
5\
To rr es , L ea h
- E as t C en tr al
C ha nn el s\ U
S
4.
E as t C en tr al C an al s P rio rit y M ai nt en an ce D re dg in g\
W or ki ng s et
\D w g\
-E xi st in gS ite
P la n.
dw g L
A Y
O U
T:
M
A
IN
C H
A N
N E
L S
A V
E D
: 1 0/
/2
:1
TS
TY
LE
TA
B
LE
: C
IV
IL
-S
TD
TT
E
D : 6
/1 6/
:0
A W
N B
Y
D E
LO
R
R
IO
, F
LO
R E
N C
IA
L. LUMBARD
L. TORRES
LEAH G. TORRES, P.E.
FLORIDA P.E. LICENCE NO. 86641
WSP USA Inc.
550 Northlake Blvd, Suite 1000 Altamonte Springs, FL 32701 www.wsp.com
Scale: 1' = 30'
EXISTING SITE PLAN - MAIN CHANNEL1
NOTES:
1. ELEVATIONS SHOWN HEREON ARE RELATIVE TO THE NORTH AMERICAN VERTICAL DATUM OF 1988 (NAVD 88).
2. THE BATHYMETRIC DATA FOR PROJECT WAS OBTAINED BY WSP USA, INC. ON JUNE 23, 2025, SEE SIGNED AND SEALED SURVEY FOR ADDITIONAL NOTES. ELECTRONIC FILES OF THE DATA WILL BE
SUPPLIED TO CONTRACTORS FOR BIDDING PURPOSES.
3. CONTRACTOR TO PROVIDE THE COUNTY WITH A PRE AND POST CONSTRUCTION VIDEO, AS DETAILED IN THE TECHNICAL SPECIFICATIONS. DAMAGE TO ANY SEAWALLS, BOAT LIFTS AND OTHER PRIVATE
PROPERTY DURING CONSTRUCTION SHALL BE REPLACED BY CONTRACTOR AT NO COST TO THE COUNTY TO MATCH EXISTING CONDITIONS. IF THE CONTRACTOR REQUIRES USE OF A PRIVATE HOMEOWNER LOT OR COUNTY RIGHT OF WAY FOR STORAGE OF EQUIPMENT, THE CONTRACTOR MUST OBTAIN COUNTY PERMISSION AND THE STORAGE MAY NOT BE ALLOWED UNTIL A PROPOSED
TEMPORARY USE ORDINANCE IS APPROVED AND BECOMES EFFECTIVE.
4. THE CONTRACTOR SHALL LOCATE AND IDENTIFY ALL UNDER GROUND AND ABOVE GROUND UTILITIES WITHIN THE PROJECT BOUNDARY. IN THE EVENT, THE UTILITIES ARE IMPACTED THE CONTRACTOR SHALL NOTIFY THE UTILITY COMPANY AND COUNTY IMMEDIATELY AND REPLACE TO MATCH EXISTING CONDITIONS.
N
S
W E
EXISTING
SITE PLAN -
MAIN
CHANNEL
C-102
LEGEND
MAJOR CONTOUR
MINOR CONTOUR3
BAYSIDE ST.
RIVER
-9
-9
-8
-8
-7
-7
-6
-6
-5
-5
-4
-4
-4 -4
-3
-3
-3
-3
-6
-3
-3
-3
-9
-9
-8
-8
-7
-7
-6
-6
-5 -4
-4 -1
-9
-9
-9
-8
-7
-6
-5
-4
REV. #SHEET NUMBER:
IN CHARGE:
DESIGNED BY:
DATE:
DRAWN BY:
SHEET TITLE:
CHECKED BY:
APPROVEDDATENO.
WSP PROJECT No:
PROJECT:
REVISIONS
BY
US0043684.8228
6/16/2026
F. DELORRIO
BREVARD COUNTY
DISTRICT 2
EAST CENTRAL CHANNEL
& CANALS PRIORITY
MAINTENANCE
NAVIGATIONAL
DREDGING
BREVARD COUNTY
NATURAL RESOURCES
2725 JUDGE FRAN JAMIESON
WAY
VIERA, FL 33940
L. LUMBARD
P R
O
JE
C T
N U
M B
E R
: 6
5.
.0
C
IT
Y : T
A M
P A
C :\U se rs
\U S
FD
\W S
P O
5\
To rr es , L ea h
- E as t C en tr al
C ha nn el s\ U
S
4.
E as t C en tr al C an al s P rio rit y M ai nt en an ce D re dg in g\
W or ki ng s et
\D w g\
-E xi st in gS ite
P la n.
dw g L
A Y
O U
T:
B
A Y
S
ID
E S
T S
A V
E D
: 1 0/
/2
:1
TS
TY
LE
TA
B
LE
: C
IV
IL
-S
TD
TT
E
D : 6
/1 6/
:0
A W
N B
Y
D E
LO
R
R
IO
, F
LO
R E
N C
IA
L. LUMBARD
L. TORRES
LEAH G. TORRES, P.E.
FLORIDA P.E. LICENCE NO. 86641
WSP USA Inc.
550 Northlake Blvd, Suite 1000 Altamonte Springs, FL 32701 www.wsp.com
Scale: 1' = 20'
EXISTING SITE PLAN - BAYSIDE ST1
NOTES:
1. ELEVATIONS SHOWN HEREON ARE RELATIVE TO THE NORTH AMERICAN VERTICAL DATUM OF 1988 (NAVD 88).
2. THE BATHYMETRIC DATA FOR PROJECT WAS OBTAINED BY WSP USA, INC. ON JUNE 23, 2025, SEE SIGNED AND SEALED SURVEY FOR ADDITIONAL NOTES. ELECTRONIC FILES OF THE DATA WILL BE
SUPPLIED TO CONTRACTORS FOR BIDDING PURPOSES.
3. CONTRACTOR TO PROVIDE THE COUNTY WITH A PRE AND POST CONSTRUCTION VIDEO, AS DETAILED IN THE TECHNICAL SPECIFICATIONS. DAMAGE TO ANY SEAWALLS, BOAT LIFTS AND OTHER PRIVATE
PROPERTY DURING CONSTRUCTION SHALL BE REPLACED BY CONTRACTOR AT NO COST TO THE COUNTY TO MATCH EXISTING CONDITIONS. IF THE CONTRACTOR REQUIRES USE OF A PRIVATE HOMEOWNER LOT OR COUNTY RIGHT OF WAY FOR STORAGE OF EQUIPMENT, THE CONTRACTOR MUST OBTAIN COUNTY PERMISSION AND THE STORAGE MAY NOT BE ALLOWED UNTIL A PROPOSED
TEMPORARY USE ORDINANCE IS APPROVED AND BECOMES EFFECTIVE.
4. THE CONTRACTOR SHALL LOCATE AND IDENTIFY ALL UNDER GROUND AND ABOVE GROUND UTILITIES WITHIN THE PROJECT BOUNDARY. IN THE EVENT, THE UTILITIES ARE IMPACTED THE CONTRACTOR SHALL NOTIFY THE UTILITY COMPANY AND COUNTY IMMEDIATELY AND REPLACE TO MATCH EXISTING CONDITIONS.
N
S
W E
EXISTING
SITE PLAN -
BAYSIDE ST
C-103
LEGEND
MAJOR CONTOUR
MINOR CONTOUR3
COQUINA DR.
RIVER-4
-4
-4
-4
-4
4-4
-3
-3 -4
-4
-3
-3
-2-2
-2
-2
-4
-3
-4
-4
-3
-4
-3
-4
-3 -2
-3-3
-3
-5-4-3
-8
-8 -7
-7
-6
-6 -5
-4
REV. #SHEET NUMBER:
IN CHARGE:
DESIGNED BY:
DATE:
DRAWN BY:
SHEET TITLE:
CHECKED BY:
APPROVEDDATENO.
WSP PROJECT No:
PROJECT:
REVISIONS
BY
US0043684.8228
6/16/2026
F. DELORRIO
BREVARD COUNTY
DISTRICT 2
EAST CENTRAL CHANNEL
& CANALS PRIORITY
MAINTENANCE
NAVIGATIONAL
DREDGING
BREVARD COUNTY
NATURAL RESOURCES
2725 JUDGE FRAN JAMIESON
WAY
VIERA, FL 33940
L. LUMBARD
P R
O
JE
C T
N U
M B
E R
: 6
5.
.0
C
IT
Y : T
A M
P A
C :\U se rs
\U S
FD
\W S
P O
5\
To rr es , L ea h
- E as t C en tr al
C ha nn el s\ U
S
4.
E as t C en tr al C an al s P rio rit y M ai nt en an ce D re dg in g\
W or ki ng s et
\D w g\
-E xi st in gS ite
P la n.
dw g L
A Y
O U
T:
C
O Q
U
IN
A
V E
D : 1
0/
/2
:1
TS
TY
LE
TA
B
LE
: C
IV
IL
-S
TD
TT
E D
: 6 /1
6/
:0
A
W N
B Y
D
E
LO
R R
IO
, F
LO
R
E N
C
IA
L. LUMBARD
L. TORRES
LEAH G. TORRES, P.E.
FLORIDA P.E. LICENCE NO. 86641
WSP USA Inc.
550 Northlake Blvd, Suite 1000 Altamonte Springs, FL 32701 www.wsp.com
Scale: 1' = 20'
EXISTING SITE PLAN - COQUINA DR1
NOTES:
1. ELEVATIONS SHOWN HEREON ARE RELATIVE TO THE NORTH AMERICAN VERTICAL DATUM OF 1988 (NAVD 88).
2. THE BATHYMETRIC DATA FOR PROJECT WAS OBTAINED BY WSP USA, INC. ON JUNE 23, 2025, SEE SIGNED AND SEALED SURVEY FOR ADDITIONAL NOTES. ELECTRONIC FILES OF THE DATA WILL BE
SUPPLIED TO CONTRACTORS FOR BIDDING PURPOSES.
3. CONTRACTOR TO PROVIDE THE COUNTY WITH A PRE AND POST CONSTRUCTION VIDEO, AS DETAILED IN THE TECHNICAL SPECIFICATIONS. DAMAGE TO ANY SEAWALLS, BOAT LIFTS AND OTHER PRIVATE
PROPERTY DURING CONSTRUCTION SHALL BE REPLACED BY CONTRACTOR AT NO COST TO THE COUNTY TO MATCH EXISTING CONDITIONS. IF THE CONTRACTOR REQUIRES USE OF A PRIVATE HOMEOWNER LOT OR COUNTY RIGHT OF WAY FOR STORAGE OF EQUIPMENT, THE CONTRACTOR MUST OBTAIN COUNTY PERMISSION AND THE STORAGE MAY NOT BE ALLOWED UNTIL A PROPOSED
TEMPORARY USE ORDINANCE IS APPROVED AND BECOMES EFFECTIVE.
4. THE CONTRACTOR SHALL LOCATE AND IDENTIFY ALL UNDER GROUND AND ABOVE GROUND UTILITIES WITHIN THE PROJECT BOUNDARY. IN THE EVENT, THE UTILITIES ARE IMPACTED THE CONTRACTOR SHALL NOTIFY THE UTILITY COMPANY AND COUNTY IMMEDIATELY AND REPLACE TO MATCH EXISTING CONDITIONS.
N
S
W E
EXISTING
SITE PLAN -
COQUINA DR
C-104
LEGEND
MAJOR CONTOUR
MINOR CONTOUR3
1+
0+
1+
BANANA
RIVER
A C-201
A C-201
B C-201
B C-201
-10
-10
-1
-9
-9
-8
-8
-7
-7
-6
-6
-6
-5
-5
-5
-5
-4-4
-4
-4
-4
-6-6
-6 -5
-5
-4
-4
-4
-3
-5
-5 -4
-10
-10
-9
-9
-8
-7
-6
-11
-11
REV. #SHEET NUMBER:
IN CHARGE:
DESIGNED BY:
DATE:
DRAWN BY:
SHEET TITLE:
CHECKED BY:
APPROVEDDATENO.
WSP PROJECT No:
PROJECT:
REVISIONS
BY
US0043684.8228
6/16/2026
F. DELORRIO
BREVARD COUNTY
DISTRICT 2
EAST CENTRAL CHANNEL
& CANALS PRIORITY
MAINTENANCE
NAVIGATIONAL
DREDGING
BREVARD COUNTY
NATURAL RESOURCES
2725 JUDGE FRAN JAMIESON
WAY
VIERA, FL 33940
L. LUMBARD
P R
O
JE
C T
N U
M B
E R
: 6
5.
.0
C
IT
Y : T
A M
P A
C :\U se rs
\U S
FD
\W S
P O
5\
To rr es , L ea h
- E as t C en tr al
C ha nn el s\ U
S
4.
E as t C en tr al C an al s P rio rit y M ai nt en an ce D re dg in g\
W or ki ng s et
\D w g\
-P ro po se dD re dg eP la n.
dw g
L A
Y O
U T:
S . S
H E
LT
E
R T
R
IL
V E
D : 1
0/
/2
:1
TS
TY
LE
TA
B
LE
: C
IV
IL
-S
TD
TT
E D
: 6 /1
6/
:0
A
W N
B Y
: D E
LO
R
R
IO
, F
LO
R E
N C
IA
L. LUMBARD
L. TORRES
LEAH G. TORRES, P.E.
FLORIDA P.E. LICENCE NO. 86641
WSP USA Inc.
550 Northlake Blvd, Suite 1000 Altamonte Springs, FL 32701 www.wsp.com10
Scale: 1' = 20'
PROPOSED DREDGE PLAN - S. SHELTER TRAIL1
NOTES:
1. NO DREDGING SHALL OCCUR WITHIN 10 FEET OF EXISTING
STRUCTURES (SEE SHEET G-002, GENERAL NOTE NO. 2).
2. FINAL SIDE SLOPES SHALL NOT EXCEED A MAXIMUM SLOPE OF
2H:1V (SEE SHEET G-002 LAYOUT OF WORK, NOTE NO. 2 FOR
EXCEPTIONS).
3. CONTRACTOR SHALL MAINTAIN 10-FOOT SETBACKS FROM ALL
NATURAL RESOURCES INCLUDING, BUT NOT LIMITED TO,
MANGROVES AND SEAGRASS.
4. NATURAL RESOURCES SHOWN REPRESENT THE CONDITION
OF THE SITE AT THE TIME OF SURVEY.
5. THE DREDGE TEMPLATE IS DEPICTED CONCEPTUALLY, THE
CONTRACTOR SHALL VERIFY DISTANCES FROM STRUCTURES
IN THE FIELD TO COMPLY WITH MINIMUM SETBACKS FROM
STRUCTURES. SETBACKS DEFINED IN WRITING, GOVERN.
6. ALL ELEVATIONS SHOWN REFERENCE NAVD88 DATUM.
7. FOR CONVERSION BETWEEN MLW TO NAVD88 DATUM, SEE
SHEET G-002.
8. ALL CROSS-SECTIONS SHOW DREDGE DEPTHS OF -5.0' (MLW).
LEGEND
MAJOR CONTOUR
MINOR CONTOUR3
N
S
W E
PROPOSED
SITE PLAN -
S. SHELTER
TRAIL
C-201
Scale: 1' = 20'
STA 0+50 CROSS SECTIONA Scale: 1' = 20'
STA 1+00 CROSS SECTIONB
DREDGE TEMPLATE
DREDGE
LIMITS
EXISTING
GRADE
DREDGE
LIMITS
EXISTING
GRADE
0+
1+
2+
3+
4+
5+
6+
6+
C C-202
C C-202
D C-202
D C-202
E C-202
E C-202
-1
-9
-8
-7 -6
-4 -3
-5 -4
-4
-4
-4
-3
-3 -3
-3
-4
-4
-4
-4
-5
-5
-4
-4
-4-3 -3
-4 -4
-3
-3 -4
-3
-4
-4
-5 -5
-4
-4
-3
REV. #SHEET NUMBER:
IN CHARGE:
DESIGNED BY:
DATE:
DRAWN BY:
SHEET TITLE:
CHECKED BY:
APPROVEDDATENO.
WSP PROJECT No:
PROJECT:
REVISIONS
BY
US0043684.8228
6/16/2026
F. DELORRIO
BREVARD COUNTY
DISTRICT 2
EAST CENTRAL CHANNEL
& CANALS PRIORITY
MAINTENANCE
NAVIGATIONAL
DREDGING
BREVARD COUNTY
NATURAL RESOURCES
2725 JUDGE FRAN JAMIESON
WAY
VIERA, FL 33940
L. LUMBARD
P R
O
JE
C T
N U
M B
E R
: 6
5.
.0
C
IT
Y : T
A M
P A
C :\U se rs
\U S
FD
\W S
P O
5\
To rr es , L ea h
- E as t C en tr al
C ha nn el s\ U
S
4.
E as t C en tr al C an al s P rio rit y M ai nt en an ce D re dg in g\
W or ki ng s et
\D w g\
-P ro po se dD re dg eP la n.
dw g
L A
Y O
U T:
M A
IN
C
H A
N N
E L
S A
V E
D : 1
0/
/2
:1
TS
TY
LE
TA
B
LE
: C
IV
IL
-S
TD
TT
E D
: 6 /1
6/
:0
A
W N
B Y
: D E
LO
R
R
IO
, F
LO
R E
N C
IA
L. LUMBARD
L. TORRES
LEAH G. TORRES, P.E.
FLORIDA P.E. LICENCE NO. 86641
WSP USA Inc.
550 Northlake Blvd, Suite 1000 Altamonte Springs, FL 32701 www.wsp.com
Scale: 1' = 30'
PROPOSED DREDGE PLAN - MAIN CHANNEL2
N
S
W E
PROPOSED
SITE PLAN -
MAIN
CHANNEL
C-202
Scale: 1' = 20'
STA 1+00 CROSS SECTIONC Scale: 1' = 20'
STA 3+00 CROSS SECTIOND Scale: 1' = 20'
STA 5+00 CROSS SECTIONE
10 NOTES:
1. NO DREDGING SHALL OCCUR WITHIN 10 FEET OF EXISTING STRUCTURES (SEE SHEET G-002, GENERAL NOTE NO. 2).
2. FINAL SIDE SLOPES SHALL NOT EXCEED A MAXIMUM SLOPE OF 2H:1V (SEE SHEET G-002 LAYOUT OF WORK, NOTE
NO. 2 FOR EXCEPTIONS).
3. CONTRACTOR SHALL MAINTAIN 10-FOOT SETBACKS FROM ALL NATURAL RESOURCES INCLUDING, BUT NOT LIMITED
TO, MANGROVES AND SEAGRASS.
4. NATURAL RESOURCES SHOWN REPRESENT THE CONDITION OF THE SITE AT THE TIME OF SURVEY.
5. THE DREDGE TEMPLATE IS DEPICTED CONCEPTUALLY, THE CONTRACTOR SHALL VERIFY DISTANCES FROM
STRUCTURES IN THE FIELD TO COMPLY WITH MINIMUM SETBACKS FROM STRUCTURES. SETBACKS DEFINED IN
WRITING, GOVERN.
6. ALL ELEVATIONS SHOWN REFERENCE NAVD88 DATUM.
7. FOR CONVERSION BETWEEN MLW TO NAVD88 DATUM, SEE SHEET G-002.
8. ALL CROSS-SECTIONS SHOW DREDGE DEPTHS OF -5.0' (MLW).
LEGEND
MAJOR CONTOUR
MINOR CONTOUR3
DREDGE TEMPLATE
DREDGE
LIMITS
EXISTING
GRADE
DREDGE
LIMITS
EXISTING
GRADE
DREDGE
LIMITS
EXISTING
1+
0+
1+
BANANA
RIVER
-9
-9
-8
-8
-7
-7
-6
-6
-5
-5
-4
-4
-4
-4
-3
-3
-3
-3
-6
-3
-3
-3
REV. #SHEET NUMBER:
IN CHARGE:
DESIGNED BY:
DATE:
DRAWN BY:
SHEET TITLE:
CHECKED BY:
APPROVEDDATENO.
WSP PROJECT No:
PROJECT:
REVISIONS
BY
US0043684.8228
6/16/2026
F. DELORRIO
BREVARD COUNTY
DISTRICT 2
EAST CENTRAL CHANNEL
& CANALS PRIORITY
MAINTENANCE
NAVIGATIONAL
DREDGING
BREVARD COUNTY
NATURAL RESOURCES
2725 JUDGE FRAN JAMIESON
WAY
VIERA, FL 33940
L. LUMBARD
P R
O
JE
C T
N U
M B
E R
: 6
5.
.0
C
IT
Y : T
A M
P A
C :\U se rs
\U S
FD
\W S
P O
5\
To rr es , L ea h
- E as t C en tr al
C ha nn el s\ U
S
4.
E as t C en tr al C an al s P rio rit y M ai nt en an ce D re dg in g\
W or ki ng s et
\D w g\
-P ro po se dD re dg eP la n.
dw g
L A
Y O
U T:
B A
Y S
ID
E
S T
S A
V E
D : 1
0/
/2
:1
TS
TY
LE
TA
B
LE
: C
IV
IL
-S
TD
TT
E D
: 6 /1
6/
:0
A
W N
B Y
D
E
LO
R R
IO
, F
LO
R
E N
C
IA
L. LUMBARD
L. TORRES
LEAH G. TORRES, P.E.
FLORIDA P.E. LICENCE NO. 86641
WSP USA Inc.
550 Northlake Blvd, Suite 1000 Altamonte Springs, FL 32701 www.wsp.com
Scale: 1' = 20'
PROPOSED DREDGE PLAN - BAYSIDE ST3
N
S
W E
PROPOSED
SITE PLAN -
BAYSIDE ST
C-203
Scale: 1' = 20'
STA 0+55 CROSS SECTIONF Scale: 1' = 20'
STA 1+50 CROSS SECTIONG
G C-203
G C-203
F C-203
F C-203
NOTES:
1. NO DREDGING SHALL OCCUR WITHIN 10 FEET OF EXISTING
STRUCTURES (SEE SHEET G-002, GENERAL NOTE NO. 2).
2. FINAL SIDE SLOPES SHALL NOT EXCEED A MAXIMUM SLOPE OF
2H:1V (SEE SHEET G-002 LAYOUT OF WORK, NOTE NO. 2 FOR
EXCEPTIONS).
3. CONTRACTOR SHALL MAINTAIN 10-FOOT SETBACKS FROM ALL
NATURAL RESOURCES INCLUDING, BUT NOT LIMITED TO,
MANGROVES AND SEAGRASS.
4. NATURAL RESOURCES SHOWN REPRESENT THE CONDITION
OF THE SITE AT THE TIME OF SURVEY.
5. THE DREDGE TEMPLATE IS DEPICTED CONCEPTUALLY, THE
CONTRACTOR SHALL VERIFY DISTANCES FROM STRUCTURES
IN THE FIELD TO COMPLY WITH MINIMUM SETBACKS FROM
STRUCTURES. SETBACKS DEFINED IN WRITING, GOVERN.
6. ALL ELEVATIONS SHOWN REFERENCE NAVD88 DATUM.
7. FOR CONVERSION BETWEEN MLW TO NAVD88 DATUM, SEE
SHEET G-002.
8. ALL CROSS-SECTIONS SHOW DREDGE DEPTHS OF -5.0' (MLW).
LEGEND
MAJOR CONTOUR
MINOR CONTOUR3
DREDGE TEMPLATE
DREDGE
LIMITS
EXISTING
GRADE
DREDGE
LIMITS
EXISTING
0+
1+
2+
2+
H C-204
H C-204
I C-204
I C-204
J C-204
J C-204
-4
-4
-4
-4
-4
4-4
-3
-3 -4
-4
-3
-3
-2-2
-2
-2
-4
-3
-4
-4
-3
-4
-3
-4
-3 -2
-3-3
-3
-5-4
-3
REV. #SHEET NUMBER:
IN CHARGE:
DESIGNED BY:
DATE:
DRAWN BY:
SHEET TITLE:
CHECKED BY:
APPROVEDDATENO.
WSP PROJECT No:
PROJECT:
REVISIONS
BY
US0043684.8228
6/16/2026
F. DELORRIO
BREVARD COUNTY
DISTRICT 2
EAST CENTRAL CHANNEL
& CANALS PRIORITY
MAINTENANCE
NAVIGATIONAL
DREDGING
BREVARD COUNTY
NATURAL RESOURCES
2725 JUDGE FRAN JAMIESON
WAY
VIERA, FL 33940
L. LUMBARD
P R
O
JE
C T
N U
M B
E R
: 6
5.
.0
C
IT
Y : T
A M
P A
C :\U se rs
\U S
FD
\W S
P O
5\
To rr es , L ea h
- E as t C en tr al
C ha nn el s\ U
S
4.
E as t C en tr al C an al s P rio rit y M ai nt en an ce D re dg in g\
W or ki ng s et
\D w g\
-P ro po se dD re dg eP la n.
dw g
L A
Y O
U T:
C O
Q U
IN
A
V
E D
: 1 0/
/2
:1
TS
TY
LE
TA
B
LE
: C
IV
IL
-S
TD
TT
E
D : 6
/1 6/
:0
A W
N B
Y
D E
LO
R
R
IO
, F
LO
R E
N C
IA
L. LUMBARD
L. TORRES
LEAH G. TORRES, P.E.
FLORIDA P.E. LICENCE NO. 86641
WSP USA Inc.
550 Northlake Blvd, Suite 1000 Altamonte Springs, FL 32701 www.wsp.com
Scale: 1' = 20'
PROPOSED DREDGE PLAN - COQUINA DR4
N
S
W E
PROPOSED
SITE PLAN -
COQUINA DR
C-204
Scale: 1' = 20'
STA 0+50 CROSS SECTIONH Scale: 1' = 20'
STA 1+50 CROSS SECTIONI Scale: 1' = 20'
STA 2+50 CROSS SECTIONJ
NOTES:
1. NO DREDGING SHALL OCCUR WITHIN 10 FEET OF EXISTING
STRUCTURES (SEE SHEET G-002, GENERAL NOTE NO. 2).
2. FINAL SIDE SLOPES SHALL NOT EXCEED A MAXIMUM SLOPE OF
2H:1V (SEE SHEET G-002 LAYOUT OF WORK, NOTE NO. 2 FOR
EXCEPTIONS).
3. CONTRACTOR SHALL MAINTAIN 10-FOOT SETBACKS FROM ALL
NATURAL RESOURCES INCLUDING, BUT NOT LIMITED TO,
MANGROVES AND SEAGRASS.
4. NATURAL RESOURCES SHOWN REPRESENT THE CONDITION
OF THE SITE AT THE TIME OF SURVEY.
5. THE DREDGE TEMPLATE IS DEPICTED CONCEPTUALLY, THE
CONTRACTOR SHALL VERIFY DISTANCES FROM STRUCTURES
IN THE FIELD TO COMPLY WITH MINIMUM SETBACKS FROM
STRUCTURES. SETBACKS DEFINED IN WRITING, GOVERN.
6. ALL ELEVATIONS SHOWN REFERENCE NAVD88 DATUM.
7. FOR CONVERSION BETWEEN MLW TO NAVD88 DATUM, SEE
SHEET G-002.
8. ALL CROSS-SECTIONS SHOW DREDGE DEPTHS OF -5.0' (MLW).
LEGEND
MAJOR CONTOUR
MINOR CONTOUR3
DREDGE TEMPLATE
DREDGE
LIMITS
EXISTING
GRADE
DREDGE
LIMITS
EXISTING
GRADE
DREDGE
LIMITS
EXISTING
MAIN CHANNEL
BAYSIDE STREET
COQUINA DRIVE
S. SHELTER TRAIL
TEMPORARY DREDGED
MATERIAL HANDLING AREA
BENNETT CAUSEWAY / SR528
BANANA
RIVER
REV. #SHEET NUMBER:
IN CHARGE:
DESIGNED BY:
DATE:
DRAWN BY:
SHEET TITLE:
CHECKED BY:
APPROVEDDATENO.
WSP PROJECT No:
PROJECT:
REVISIONS
BY
US0043684.8228
6/16/2026
F. DELORRIO
BREVARD COUNTY
DISTRICT 2
EAST CENTRAL CHANNEL
& CANALS PRIORITY
MAINTENANCE
NAVIGATIONAL
DREDGING
BREVARD COUNTY
NATURAL RESOURCES
2725 JUDGE FRAN JAMIESON
WAY
VIERA, FL 33940
L. LUMBARD
P R
O
JE
C T
N U
M B
E R
: 6
5.
.0
C
IT
Y : T
A M
P A
C :\U se rs
\U S
FD
\W S
P O
5\
To rr es , L ea h
- E as t C en tr al
C ha nn el s\ U
S
4.
E as t C en tr al C an al s P rio rit y M ai nt en an ce D re dg in g\
W or ki ng s et
\D w g\
-D ew at er in gP la n.
dw g
L A
Y O
U T:
C -3
V E
D : 6
/1 6/
:2
TS
TY
LE
TA
B
LE
P
LO
TT
E D
: 6 /1
6/
0:
A
W N
B Y
: D E
LO
R
R
IO
, F
LO
R E
N C
IA
L. LUMBARD
L. TORRES
LEAH G. TORRES, P.E.
FLORIDA P.E. LICENCE NO. 86641
WSP USA Inc.
550 Northlake Blvd, Suite 1000 Altamonte Springs, FL 32701 www.wsp.com
NOTES:
1. DREDGED MATERIAL STOCKPILING IS LIMITED TO THE
AREA UPLAND OF THE EXISTING ACCESS ROAD. NO
STOCKPILING WATERWARD OF THE ACCESS ROAD IS
PERMITTED.
2. FINAL DREDGED MATERIAL DISPOSAL LOCATION:
555 CAMP ROAD,
COCOA, FL 32927
N
S
W E
PROJECT OVERVIEW MAP
SCALE: 1" = 600'
DEWATERING
AND DREDGED
MATERIAL
PLACEMENT
C-301
EXPLANATION OF FEATURES
SILT FENCE
TEMPORARY DREDGED MATERIAL HANDLING AREA - SR528
SCALE: 1" = 80'
N
S
W E
TEMPORARY BARGE ACCESS
CORRIDOR
CAMP ROAD
FINAL DREDGED MATERIAL DISPOSAL LOCATION
SCALE: 1" = 400'
N
S
W EDREDGE BARGE
E R
AILR
O
AD
AVEN
U
E
6" MIN
4'
16" MIN
Flow
Straw Bale
Flow
4" D ee p
Ve rti ca l F ac e
Stake
2 Re-Bars, Steel Pickets Or 2"x 2" Stakes Driven 1.5 Ft. To 2 Ft. Into Ground. Drive Stakes Flush With Bales.
Bound Bales Placed On Contour.
Angle First Stake Toward Previously Laid Bale
ANCHORING DETAIL
BEDDING DETAIL
STAKED TURBIDITY BARRIER
FLOATING TURBIDITY BARRIERS
TYPE II TYPE I
NOTICE:
COMPONENTS OF TYPES I AND II MAY BE SIMILAR OR IDENTICAL TO PROPRIETARY DESIGNS. ANY INFRINGEMENT ON THE PROPRIETARY RIGHTS OF THE DESIGNER SHALL BE THE SOLE RESPONSIBILITY OF THE USER. SUBSTITUTIONS FOR TYPES I AND II SHALL BE AS APPROVED BY THE ENGINEER.
D¹ = 5' STD. (SINGLE PANEL FOR DEPTHS 5' OR LESS).
D² = 5' STD. (ADDITIONAL PANEL FOR DEPTHS >5' ).
CURTAIN TO REACH BOTTOM UP TO DEPTHS OF 10 FEET. TWO
(2) PANELS TO BE USED FOR DEPTHS GREATER THAN 10 FEET
UNLESS SPECIAL DEPTH CURTAINS ARE SPECIFICALLY CALLED
FOR IN THE PLANS OR AS DETERMINED BY THE ENGINEER.
TYPE III
Not To Scale
TYPICAL HAY/STAW BALE DETAIL2
Not To Scale
TYPICAL SILT FENCE DETAIL1
REV. #SHEET NUMBER:
IN CHARGE:
DESIGNED BY:
DATE:
DRAWN BY:
SHEET TITLE:
CHECKED BY:
APPROVEDDATENO.
WSP PROJECT No:
PROJECT:
REVISIONS
BY
US0043684.8228
6/16/2026
F. DELORRIO
BREVARD COUNTY
DISTRICT 2
EAST CENTRAL CHANNEL
& CANALS PRIORITY
MAINTENANCE
NAVIGATIONAL
DREDGING
BREVARD COUNTY
NATURAL RESOURCES
2725 JUDGE FRAN JAMIESON
WAY
VIERA, FL 33940
L. LUMBARD
P R
O
JE
C T
N U
M B
E R
: 6
5.
.0
C
IT
Y : T
A M
P A
C :\U se rs
\U S
FD
\W S
P O
5\
To rr es , L ea h
- E as t C en tr al
C ha nn el s\ U
S
4.
E as t C en tr al C an al s P rio rit y M ai nt en an ce D re dg in g\
W or ki ng s et
\D w g\
-D et ai ls
.d w g L
A Y
O U
T:
C
-4
V
E D
: 1 0/
/2
:1
TS
TY
LE
TA
B
LE
: C
IV
IL
-S
TD
TT
E
D : 6
/1 6/
:0
A W
N B
Y : D
E
LO
R R
IO
FL
O
R E
N C
IA
L. LUMBARD
L. TORRES
LEAH G. TORRES, P.E.
FLORIDA P.E. LICENCE NO. 86641
WSP USA Inc.
550 Northlake Blvd, Suite 1000 Altamonte Springs, FL 32701 www.wsp.com
Not To Scale
TURBIDITY BARRIERS DETAIL3
EROSION AND
SEDIMENTATION
CONTROL DETAILS
C-401 1
| Sheets and Views |
| G-001 COVER |
| G-002 GENERAL NOTES |
| G-003 DREDGING ZONES PLAN |
| C-101 EXISTING SITE PLAN - S. SHELTER TRAIL |
| C-102 EXISTING SITE PLAN - MAIN CHANNEL |
| C-103 EXISTING SITE PLAN - BAYSIDE ST |
| C-104 EXISTING SITE PLAN - COQUINA DR |
| C-201 PROPOSED SITE PLAN - S. SHELTER TRAIL |
| C-202 PROPOSED SITE PLAN - MAIN CHANNEL |
| C-203 PROPOSED SITE PLAN - BAYSIDE ST |
| C-204 PROPOSED SITE PLAN - COQUINA DR |
| C-301 DEWATERING AND DREDGED MATERIAL PLACEMENT |
| C-401 EROSION AND SEDIMENTATION CONTROL DETAILS |
| 2026-06-16T15:24:54+0000 | |
| Leah G. Torres, P.E. |
File details come from the government source that posted it. Updated .