Attachment A Price Cost Schedule Ft. Devens National Cemetery Grounds Maintenance.doc

DOC document 292 KB Posted

Attached to
Ft. Devens National Cemetery Grounds Maintenance -- S208
Solicitation number
QSE--36C78626Q50040
Issued by

About this file

This document is a Price Cost Schedule for the Ft. Devens National Cemetery Grounds Maintenance contract, detailing a comprehensive cemetery maintenance services solicitation by the Department of Veterans Affairs National Cemetery Administration. The contract covers a base year and four option years, with line items encompassing grounds maintenance, interment services, headstone maintenance, turf fertilization, pest control, irrigation system maintenance, tree and shrub maintenance, and on-call services such as snow removal and storm damage response.

The pricing schedule is structured with multiple Contract Line Item Numbers (CLINs) across different service categories, utilizing Service Contract Act (SCA) and Davis-Bacon Act (DBA) wage determinations. Estimated quantities include 12 months of monthly ground maintenance, 3 cremated remain interments, 2,458 headstone cleanings, 13 headstone installations, 300 headstone realignments, 8 turf fertilization applications, and 50 hours of storm damage services. The contract is an Indefinite Delivery, Indefinite Quantity (IDIQ) type for the Ft. Devens National Cemetery located at 85 Patton Road, Devens, Massachusetts, with unit prices to be filled in by the contractor.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUPPLIES OR SERVICES AND PRICES / COSTS

Ft. Devens Cemetery Base Year Period: From Date of Award Through One Year

CLIN
Description
WAGE
Est. Qty
Unit
Unit Cost
Total Cost
grounds maintenance services
Construction/

service

DETERMINATION

0001
A.1 General, on-going and recurring cemetery Grounds Maintenance to include a.1.a thru a.1.e

A.1adaily policing of cemetery grounds to include collection & removal of leaves small brances &twigs, debris trash, floral arrangements, and empting trash receptacles, SWEEPING AND/OR BLOWING-FF ROADS AND WALKWAYS

A.1B fALL SEASON LEAF CLEAN UP

A.1C Mowing and Removal of debris/ grass clippings

A.1D Trimming of headstones, Trees, curbs and Fence Lines

A.1E Memorial Day Ceremony

S

SCA Wage Determination 2015-4055 Rev 34

12
MO
$ _____
$ _________

Interment Services

0002
Grave Excavation & Backfilling: Cremated remains (second interments). Section A.2
C
DBA Wage Determination MA20250008
3
Ea.
$ _____
$ _________

Headstone Maintenance

0003
Clean Upright Headstones (1,229) before Memorial Day & Veterans Day Section A.3
S
SCA Wage Determination 2015-4055 Rev 34
2,458
Ea.
$ _____
$ _________
0004
Set & Align New-Initial and New-Replacement Upright Headstones Section A.4
C
DBA Wage Determination MA20250008
13
Ea.
$ _____
$ _________
0005
Remove, Break-up & Dispose of Unusable Replacement Upright Headstones and Markers Section A.5
C
DBA Wage Determination MA20250008
5
Ea.
$ _____
$ ________
0006
Raise, Realign, Reset, Backfill & Clean existing standard Upright Headstones. Section A.6
C
DBA Wage Determination MA20250008
300
Ea.
$ _____
$ _________
0007
Bump & Run: Realign headstones that have shifted out of alignment. Section A.7
C
DBA Wage Determination MA20250008
1,229
Ea.
$ _____
$ _________
0008
Refill Sunken Graves Section A.8
S
SCA Wage Determination 2015-4055 Rev 34
100
Ea.
$ _____
$__________

Turf Fertilization & Weed Control

0009
Turf Fertilization & Weed Control Applications Turf Application Schedule A.9
S
SCA Wage Determination 2015-4055 Rev 34
8
Job
$______
$_________
0010
Pest Control and Vertebrate and Invertebrate Section A.10
S
SCA Wage Determination 2015-4055 Rev 34
1
Job
$______
$__________
0011
Aerate & overseed entire Cemetery (September) / Done in conjunction with turf application #8 Section A.11
S
SCA Wage Determination 2015-4055 Rev 34
1
Job
$ _____
$ _________
0012
Irrigation System Maintenance including start up and shut down of the system. Section A.12
S
SCA Wage Determination 2015-4055 Rev 34
5
Mo
$______
$__________

Tree, Shrub & Planting Bed Maintenance

0013
Prune Cemetery Shrub and Tree maintenance Section A.13
S
SCA Wage Determination 2015-4055 Rev 34
2
Job
$ _____
$ _________
0014
Tree Removal/ Stump Grinding/ Deadwood Removal Section A.14
S
SCA Wage Determination 2015-4055 Rev 34
2
Job
$ _____
$ _________
0015
Maintain cemetery planting beds& tree rings including mulching and weed control. Section A.15
S
SCA Wage Determination 2015-4055 Rev 34
2
Job
$ _____
$ _________

On-Call services

0016
Snow & Ice Removal Section A.16
S
SCA Wage Determination 2015-4055 Rev 34
10
Job
$______
$_______
0017
Storm Damage Section A.17
S
SCA Wage Determination 2015-4055 Rev 34
50
Hr.
$ _____
$ _________
Total Estimated Cost:
$ ________

Ft. Devens Cemetery

Option Year I: From Date of Award Through One Year

CLIN
Description
WAGE
Est. Qty
Unit
Unit Cost
Total Cost
grounds maintenance services
Type
DETERMINATION
1001
A.1 General, on-going and recurring cemetery Grounds Maintenance to include a.1.a thru a.1.e

A.1adaily policing of cemetery grounds to include collection & removal of leaves small brances &twigs, debris trash, floral arrangements, and empting trash receptacles, SWEEPING AND/OR BLOWING-FF ROADS AND WALKWAYS a.1B fALL SEASON LEAF CLEAN UP

A.1C Mowing and Removal of debris/ grass clippings

A.1D Trimming of headstones, Trees, curbs and Fence Lines

A.1E Memorial Day Ceremony

S
SCA Wage Determination 2015-4055 Rev 34
12
MO
$ ______
$ _________

Interment Services

1002
Grave Excavation & Backfilling: Cremated remains (second interments). Section A..2
C
DBA Wage Determination MA20250008
3
Ea.
$ ______
$ _________

Headstone Maintenance

1003
Clean Upright Headstones (1,229) before Memorial Day & Veterans Day Section A.3
S
SCA Wage Determination 2015-4191
2,458
Ea.
$ _____
$ _________
1004
Set & Align New-Initial and New-Replacement Upright Headstones Section A.4
C
DBA Wage Determination MA20250008
13
Ea.
$ ______
$ _________
1005
Remove, Break-up & Dispose of Unusable Replacement Upright Headstones and Markers Section A.5
C
DBA Wage Determination MA20250008
5
Ea.
$ ______
$ ________
1006
Raise, Realign, Reset, Backfill & Clean existing standard Upright Headstones. Section A.6
C
DBA Wage Determination MA20250008
300
Ea.
$ ______
$ _________
1007
Bump & Run: Realign headstones that have shifted out of alignment. Section A.7
C
DBA Wage Determination MA20250008
1,229
Ea.
$ ______
$ _________
1008
Refill Sunken Graves Section A.8
S
SCA Wage Determination 2015-4055 Rev 34
100
Ea.
$ ______
$__________

Turf Fertilization & Weed Control

1009
Turf Fertilization & Weed Control Applications Turf Application Schedule A.9
S
SCA Wage Determination 2015-4055 Rev 34
8
Job
$______
$_________
1010
Pest Control and Vertebrate and Invertebrate Section A.10
S
SCA Wage Determination 2015-4055 Rev 34
1
Job
$______
$__________
1011
Aerate & overseed entire Cemetery (September) / Done in conjunction with turf application #8 Section A.11
S
SCA Wage Determination 2015-4055 Rev 34
1
Job
$ ______
$ _________
1012
Irrigation System Maintenance including start up and shut down of the system. Section A.12
S
SCA Wage Determination 2015-4055 Rev 34
5
Mo
$______
$__________

Tree, Shrub & Planting Bed Maintenance

1013
Prune Cemetery Shrub and Tree maintenance Section A.13
S
SCA Wage Determination 2015-4055 Rev 34
2
Job
$ ______
$ _________
1014
Tree Removal/ Stump Grinding/ Deadwood Removal Section A.14
S
SCA Wage Determination 2015-4055 Rev 34
2
Job
$ ______
$ _________
1015
Maintain cemetery planting beds& tree rings including mulching and weed control. Section A.15
S
SCA Wage Determination 2015-4055 Rev 34
2
Job
$ ______
$ _________

On-Call services

1016
Snow & Ice Removal Section A.16
S
SCA Wage Determination 2015-4055 Rev 34
10
Job
$______
$_______
1017
Storm Damage Section A.17
S
SCA Wage Determination 2015-4055 Rev 34
50
Hr.
$ ______
$ _________
Total Estimated Cost:
$ ________

Ft. Devens Cemetery

Option Year II: From Date of Award Through One Year

CLIN
Description
WAGE
Est. Qty
Unit
Unit Cost
Total Cost
grounds maintenance services
Type
DETERMINATION
2001
A.1 General, on-going and recurring cemetery Grounds Maintenance to include a.1.a thru a.1.e

A.1adaily policing of cemetery grounds to include collection & removal of leaves small brances &twigs, debris trash, floral arrangements, and empting trash receptacles, SWEEPING AND/OR BLOWING-FF ROADS AND WALKWAYS

A.1B fALL SEASON LEAF CLEAN UP

A.1C Mowing and Removal of debris/ grass clippings

A.1D Trimming of headstones, Trees, curbs and Fence Lines

A.1E Memorial Day Ceremony

S
SCA Wage Determination 2015-4055 Rev 34
12
MO
$ ______
$ _________

Interment Services

2002
Grave Excavation & Backfilling: Cremated remains (second interments). Section A.2
C
DBA Wage Determination MA20250008
3
Ea.
$ ______
$ _________

Headstone Maintenance

2003
Clean Upright Headstones (1,229) before Memorial Day & Veterans Day Section A.3
S
SCA Wage Determination 2015-4055 Rev 34
2,458
Ea.
$ _____
$ _________
2004
Set & Align New-Initial and New-Replacement Upright Headstones Section A.4
C
DBA Wage Determination MA20250008
13
Ea.
$ ______
$ _________
2005
Remove, Break-up & Dispose of Unusable Replacement Upright Headstones and Markers Section A.5
C
DBA Wage Determination MA20250008
5
Ea.
$ ______
$ ________
2006
Raise, Realign, Reset, Backfill & Clean existing standard Upright Headstones. Section A.6
C
DBA Wage Determination MA20250008
300
Ea.
$ ______
$ _________
2007
Bump & Run: Realign headstones that have shifted out of alignment. Section A.7
C
DBA Wage Determination MA20250008
1,229
Ea.
$ ______
$ _________
2008
Refill Sunken Graves Section A.8
S
SCA Wage Determination 2015-4055 Rev 34
100
Ea.
$ ______
$__________

Turf Fertilization & Weed Control

2009
Turf Fertilization & Weed Control Applications Turf Application Schedule A.9
S
SCA Wage Determination 2015-4055 Rev 34
8
Job
$______
$_________
2010
Pest Control and Vertebrate and Invertebrate Section A.10
S
SCA Wage Determination 2015-4055 Rev 34
1
Job
$______
$__________
2011
Aerate & overseed entire Cemetery (September) / Done in conjunction with turf application #8 Section A.11
S
SCA Wage Determination 2015-4055 Rev 34
1
Job
$ ______
$ _________
2012
Irrigation System Maintenance including start up and shut down of the system. Section A.12
S
SCA Wage Determination 2015-4055 Rev 34
5
Mo
$______
$__________

Tree, Shrub & Planting Bed Maintenance

2013
Prune Cemetery Shrub and Tree maintenance Section A.13
S
SCA Wage Determination 2015-4055 Rev 34
2
Job
$ ______
$ _________
2014
Tree Removal/ Stump Grinding/ Deadwood Removal Section A.14
S
SCA Wage Determination 2015-4055 Rev 34
2
Job
$ ______
$ _________
2015
Maintain cemetery planting beds& tree rings including mulching and weed control. Section A.15
S
SCA Wage Determination 2015-4055 Rev 34
2
Job
$ ______
$ _________

On-Call services

2016
Snow & Ice Removal Section A.16
S
SCA Wage Determination 2015-4055 Rev 34
10
Job
$______
$_______
2017
Storm Damage Section A.17
S
SCA Wage Determination 2015-4055 Rev 34
50
Hr.
$ ______
$ _________
Total Estimated Cost:
$ ________

Ft. Devens Cemetery Option Year III: From Date of Award Through One Year

CLIN
Description
WAGE
Est. Qty
Unit
Unit Cost
Total Cost
grounds maintenance services
Type
DETERMINATION
3001
A.1 General, on-going and recurring cemetery Grounds Maintenance to include a.1.a thru a.1.e

A.1adaily policing of cemetery grounds to include collection & removal of leaves small brances &twigs, debris trash, floral arrangements, and empting trash receptacles, SWEEPING AND/OR BLOWING-FF ROADS AND WALKWAYS

A.1B fALL SEASON LEAF CLEAN UP

A.1C Mowing and Removal of debris/ grass clippings

A.1D Trimming of headstones, Trees, curbs and Fence Lines

A.1E Memorial Day Ceremony

S
SCA Wage Determination 2015-4055 Rev 34
12
MO
$ ______
$ _________

Interment Services

3002
Grave Excavation & Backfilling: Cremated remains (second interments). Section A.2
C
DBA Wage Determination MA20250008
3
Ea.
$ ______
$ _________

Headstone Maintenance

3003
Clean Upright Headstones (1,229) before Memorial Day & Veterans Day Section A.3
S
SCA Wage Determination 2015-4055 Rev 34
2,458
Ea.
$ _____
$ _________
3004
Set & Align New-Initial and New-Replacement Upright Headstones Section 4A4
C
DBA Wage Determination MA20250008
13
Ea.
$ ______
$ _________
3005
Remove, Break-up & Dispose of Unusable Replacement Upright Headstones and Markers Section A.5
C
DBA Wage Determination MA20250008
5
Ea.
$ ______
$ ________
3006
Raise, Realign, Reset, Backfill & Clean existing standard Upright Headstones. Section A.6
C
DBA Wage Determination MA20250008
300
Ea.
$ ______
$ _________
3007
Bump & Run: Realign headstones that have shifted out of alignment. Section A.7
C
DBA Wage Determination MA20250008
1,229
Ea.
$ ______
$ _________
3008
Refill Sunken Graves Section A.8
S
SCA Wage Determination 2015-4055 Rev 34
100
Ea.
$ ______
$__________

Turf Fertilization & Weed Control

3009
Turf Fertilization & Weed Control Applications Turf Application Schedule A.9
S
SCA Wage Determination 2015-4055 Rev 34
8
Job
$______
$_________
3010
Pest Control and Vertebrate and Invertebrate Section A.10
S
SCA Wage Determination 2015-4055 Rev 34
1
Job
$______
$__________
3011
Aerate & overseed entire Cemetery (September) / Done in conjunction with turf application #8 Section A.11
S
SCA Wage Determination 2015-4055 Rev 34
1
Job
$ ______
$ _________
3012
Irrigation System Maintenance including start up and shut down of the system. Section A.12
S
SCA Wage Determination 2015-4055 Rev 34
5
Mo
$______
$__________

Tree, Shrub & Planting Bed Maintenance

0013
Prune Cemetery Shrub and Tree maintenance Section A.13
S
SCA Wage Determination 2015-4055 Rev 34
2
Job
$ ______
$ _________
3014
Tree Removal/ Stump Grinding/ Deadwood Removal Section A.14
S
SCA Wage Determination 2015-4055 Rev 34
2
Job
$ ______
$ _________
3015
Maintain cemetery planting beds& tree rings including mulching and weed control. Section A.15
S
SCA Wage Determination 2015-4055 Rev 34
2
Job
$ ______
$ _________

On-Call services

3016
Snow & Ice Removal Section A.16
S
SCA Wage Determination 2015-4055 Rev 34
10
Job
$______
$_______
3017
Storm Damage Section A.17
S
SCA Wage Determination 2015-4055 Rev 34
50
Hr.
$ ______
$ _________
Total Estimated Cost:
$ ________

Ft. Devens Cemetery

Option Year IV: From Date of Award Through One Year

CLIN
Description
WAGE
Est. Qty
Unit
Unit Cost
Total Cost
grounds maintenance services
Type
DETERMINATION
4001
A.1 General, on-going and recurring cemetery Grounds Maintenance to include a.1.a thru a.1.e

A.1adaily policing of cemetery grounds to include collection & removal of leaves small brances &twigs, debris trash, floral arrangements, and empting trash receptacles, SWEEPING AND/OR BLOWING-FF ROADS AND WALKWAYS

A.1B fALL SEASON LEAF CLEAN UP

A.1C Mowing and Removal of debris/ grass clippings

A.1D Trimming of headstones, Trees, curbs and Fence Lines

A.1E Memorial Day Ceremony

S
SCA Wage Determination 2015-4055 Rev 34
12
MO
$ ______
$ _________

Interment Services

4002
Grave Excavation & Backfilling: Cremated remains (second interments). Section A.2
C
DBA Wage Determination MA20250008
3
Ea.
$ ______
$ _________

Headstone Maintenance

4003
Clean Upright Headstones (1,229) before Memorial Day & Veterans Day Section A.3
S
SCA Wage Determination 2015-4055 Rev 34
2,458
Ea.
$ _____
$ _________
4004
Set & Align New-Initial and New-Replacement Upright Headstones Section A.4
C
DBA Wage Determination MA20250008
13
Ea.
$ ______
$ _________
4005
Remove, Break-up & Dispose of Unusable Replacement Upright Headstones and Markers Section A.5
C
DBA Wage Determination MA20250008
5
Ea.
$ ______
$ ________
4006
Raise, Realign, Reset, Backfill & Clean existing standard Upright Headstones. Section A.6
C
DBA Wage Determination MA20250008
300
Ea.
$ ______
$ _________
4007
Bump & Run: Realign headstones that have shifted out of alignment. Section A.7
C
DBA Wage Determination MA20250008
1,229
Ea.
$ ______
$ _________
4008
Refill Sunken Graves Section A.8
S
SCA Wage Determination 2015-4055 Rev 34
100
Ea.
$ ______
$__________

Turf Fertilization & Weed Control

4009
Turf Fertilization & Weed Control Applications Turf Application Schedule A.9
S
SCA Wage Determination 2015-4055 Rev 34
8
Job
$______
$_________
4010
Pest Control and Vertebrate and Invertebrate Section A.10
S
SCA Wage Determination 2015-4055 Rev 34
1
Job
$______
$__________
4011
Aerate & overseed entire Cemetery (September) / Done in conjunction with turf application #8 Section A.11
S
SCA Wage Determination 2015-4055 Rev 34
1
Job
$ ______
$ _________
4012
Irrigation System Maintenance including start up and shut down of the system. Section A.12
S
SCA Wage Determination 2015-4055 Rev 34
5
Mo
$______
$__________

Tree, Shrub & Planting Bed Maintenance

4013
Prune Cemetery Shrub and Tree maintenance Section A.13
S
SCA Wage Determination 2015-4055 Rev 34
2
Job
$ ______
$ _________
4014
Tree Removal/ Stump Grinding/ Deadwood Removal Section A.14
S
SCA Wage Determination 2015-4055 Rev 34
2
Job
$ ______
$ _________
4015
Maintain cemetery planting beds& tree rings including mulching and weed control. Section A.15
S
SCA Wage Determination 2015-4055 Rev 34
2
Job
$ ______
$ _________

On-Call services

4016
Snow & Ice Removal Section A.16
S
SCA Wage Determination 2015-4055 Rev 34
10
Job
$______
$_______
4017
Storm Damage Section A.17
S
SCA Wage Determination 2015-4055 Rev 34
50
Hr.
$ ______
$ _________
Total Estimated Cost:
$ ________

SUMMARY GRAND TOTAL

BASE PERIOD + ALL OPTION YEARS:
$ _____________________________

(End of Price Schedule)

File details come from the government source that posted it. Updated .