The file's text, extracted by GovTribe without its formatting.
SUPPLIES OR SERVICES AND PRICES / COSTS
Ft. Devens Cemetery Base Year Period: From Date of Award Through One Year
| WAGE |
| Est. Qty |
| Unit |
| Unit Cost |
| Total Cost |
| grounds maintenance services |
| Construction/ |
service
DETERMINATION
| 0001 |
| A.1 General, on-going and recurring cemetery Grounds Maintenance to include a.1.a thru a.1.e |
A.1adaily policing of cemetery grounds to include collection & removal of leaves small brances &twigs, debris trash, floral arrangements, and empting trash receptacles, SWEEPING AND/OR BLOWING-FF ROADS AND WALKWAYS
A.1B fALL SEASON LEAF CLEAN UP
A.1C Mowing and Removal of debris/ grass clippings
A.1D Trimming of headstones, Trees, curbs and Fence Lines
A.1E Memorial Day Ceremony
S
SCA Wage Determination 2015-4055 Rev 34
| 12 |
| MO |
| $ _____ |
| $ _________ |
Interment Services
| 0002 |
| Grave Excavation & Backfilling: Cremated remains (second interments). Section A.2 |
| C |
| DBA Wage Determination MA20250008 |
| 3 |
| Ea. |
| $ _____ |
| $ _________ |
Headstone Maintenance
| 0003 |
| Clean Upright Headstones (1,229) before Memorial Day & Veterans Day Section A.3 |
| S |
| SCA Wage Determination 2015-4055 Rev 34 |
| 2,458 |
| Ea. |
| $ _____ |
| $ _________ |
| 0004 |
| Set & Align New-Initial and New-Replacement Upright Headstones Section A.4 |
| C |
| DBA Wage Determination MA20250008 |
| 13 |
| Ea. |
| $ _____ |
| $ _________ |
| 0005 |
| Remove, Break-up & Dispose of Unusable Replacement Upright Headstones and Markers Section A.5 |
| C |
| DBA Wage Determination MA20250008 |
| 5 |
| Ea. |
| $ _____ |
| $ ________ |
| 0006 |
| Raise, Realign, Reset, Backfill & Clean existing standard Upright Headstones. Section A.6 |
| C |
| DBA Wage Determination MA20250008 |
| 300 |
| Ea. |
| $ _____ |
| $ _________ |
| 0007 |
| Bump & Run: Realign headstones that have shifted out of alignment. Section A.7 |
| C |
| DBA Wage Determination MA20250008 |
| 1,229 |
| Ea. |
| $ _____ |
| $ _________ |
| 0008 |
| Refill Sunken Graves Section A.8 |
| S |
| SCA Wage Determination 2015-4055 Rev 34 |
| 100 |
| Ea. |
| $ _____ |
| $__________ |
Turf Fertilization & Weed Control
| 0009 |
| Turf Fertilization & Weed Control Applications Turf Application Schedule A.9 |
| S |
| SCA Wage Determination 2015-4055 Rev 34 |
| 8 |
| Job |
| $______ |
| $_________ |
| 0010 |
| Pest Control and Vertebrate and Invertebrate Section A.10 |
| S |
| SCA Wage Determination 2015-4055 Rev 34 |
| 1 |
| Job |
| $______ |
| $__________ |
| 0011 |
| Aerate & overseed entire Cemetery (September) / Done in conjunction with turf application #8 Section A.11 |
| S |
| SCA Wage Determination 2015-4055 Rev 34 |
| 1 |
| Job |
| $ _____ |
| $ _________ |
| 0012 |
| Irrigation System Maintenance including start up and shut down of the system. Section A.12 |
| S |
| SCA Wage Determination 2015-4055 Rev 34 |
| 5 |
| Mo |
| $______ |
| $__________ |
Tree, Shrub & Planting Bed Maintenance
| 0013 |
| Prune Cemetery Shrub and Tree maintenance Section A.13 |
| S |
| SCA Wage Determination 2015-4055 Rev 34 |
| 2 |
| Job |
| $ _____ |
| $ _________ |
| 0014 |
| Tree Removal/ Stump Grinding/ Deadwood Removal Section A.14 |
| S |
| SCA Wage Determination 2015-4055 Rev 34 |
| 2 |
| Job |
| $ _____ |
| $ _________ |
| 0015 |
| Maintain cemetery planting beds& tree rings including mulching and weed control. Section A.15 |
| S |
| SCA Wage Determination 2015-4055 Rev 34 |
| 2 |
| Job |
| $ _____ |
| $ _________ |
On-Call services
| 0016 |
| Snow & Ice Removal Section A.16 |
| S |
| SCA Wage Determination 2015-4055 Rev 34 |
| 10 |
| Job |
| $______ |
| $_______ |
| 0017 |
| Storm Damage Section A.17 |
| S |
| SCA Wage Determination 2015-4055 Rev 34 |
| 50 |
| Hr. |
| $ _____ |
| $ _________ |
| Total Estimated Cost: |
| $ ________ |
Ft. Devens Cemetery
Option Year I: From Date of Award Through One Year
| WAGE |
| Est. Qty |
| Unit |
| Unit Cost |
| Total Cost |
| grounds maintenance services |
| Type |
| DETERMINATION |
| 1001 |
| A.1 General, on-going and recurring cemetery Grounds Maintenance to include a.1.a thru a.1.e |
A.1adaily policing of cemetery grounds to include collection & removal of leaves small brances &twigs, debris trash, floral arrangements, and empting trash receptacles, SWEEPING AND/OR BLOWING-FF ROADS AND WALKWAYS a.1B fALL SEASON LEAF CLEAN UP
A.1C Mowing and Removal of debris/ grass clippings
A.1D Trimming of headstones, Trees, curbs and Fence Lines
A.1E Memorial Day Ceremony
| S |
| SCA Wage Determination 2015-4055 Rev 34 |
| 12 |
| MO |
| $ ______ |
| $ _________ |
Interment Services
| 1002 |
| Grave Excavation & Backfilling: Cremated remains (second interments). Section A..2 |
| C |
| DBA Wage Determination MA20250008 |
| 3 |
| Ea. |
| $ ______ |
| $ _________ |
Headstone Maintenance
| 1003 |
| Clean Upright Headstones (1,229) before Memorial Day & Veterans Day Section A.3 |
| S |
| SCA Wage Determination 2015-4191 |
| 2,458 |
| Ea. |
| $ _____ |
| $ _________ |
| 1004 |
| Set & Align New-Initial and New-Replacement Upright Headstones Section A.4 |
| C |
| DBA Wage Determination MA20250008 |
| 13 |
| Ea. |
| $ ______ |
| $ _________ |
| 1005 |
| Remove, Break-up & Dispose of Unusable Replacement Upright Headstones and Markers Section A.5 |
| C |
| DBA Wage Determination MA20250008 |
| 5 |
| Ea. |
| $ ______ |
| $ ________ |
| 1006 |
| Raise, Realign, Reset, Backfill & Clean existing standard Upright Headstones. Section A.6 |
| C |
| DBA Wage Determination MA20250008 |
| 300 |
| Ea. |
| $ ______ |
| $ _________ |
| 1007 |
| Bump & Run: Realign headstones that have shifted out of alignment. Section A.7 |
| C |
| DBA Wage Determination MA20250008 |
| 1,229 |
| Ea. |
| $ ______ |
| $ _________ |
| 1008 |
| Refill Sunken Graves Section A.8 |
| S |
| SCA Wage Determination 2015-4055 Rev 34 |
| 100 |
| Ea. |
| $ ______ |
| $__________ |
Turf Fertilization & Weed Control
| 1009 |
| Turf Fertilization & Weed Control Applications Turf Application Schedule A.9 |
| S |
| SCA Wage Determination 2015-4055 Rev 34 |
| 8 |
| Job |
| $______ |
| $_________ |
| 1010 |
| Pest Control and Vertebrate and Invertebrate Section A.10 |
| S |
| SCA Wage Determination 2015-4055 Rev 34 |
| 1 |
| Job |
| $______ |
| $__________ |
| 1011 |
| Aerate & overseed entire Cemetery (September) / Done in conjunction with turf application #8 Section A.11 |
| S |
| SCA Wage Determination 2015-4055 Rev 34 |
| 1 |
| Job |
| $ ______ |
| $ _________ |
| 1012 |
| Irrigation System Maintenance including start up and shut down of the system. Section A.12 |
| S |
| SCA Wage Determination 2015-4055 Rev 34 |
| 5 |
| Mo |
| $______ |
| $__________ |
Tree, Shrub & Planting Bed Maintenance
| 1013 |
| Prune Cemetery Shrub and Tree maintenance Section A.13 |
| S |
| SCA Wage Determination 2015-4055 Rev 34 |
| 2 |
| Job |
| $ ______ |
| $ _________ |
| 1014 |
| Tree Removal/ Stump Grinding/ Deadwood Removal Section A.14 |
| S |
| SCA Wage Determination 2015-4055 Rev 34 |
| 2 |
| Job |
| $ ______ |
| $ _________ |
| 1015 |
| Maintain cemetery planting beds& tree rings including mulching and weed control. Section A.15 |
| S |
| SCA Wage Determination 2015-4055 Rev 34 |
| 2 |
| Job |
| $ ______ |
| $ _________ |
On-Call services
| 1016 |
| Snow & Ice Removal Section A.16 |
| S |
| SCA Wage Determination 2015-4055 Rev 34 |
| 10 |
| Job |
| $______ |
| $_______ |
| 1017 |
| Storm Damage Section A.17 |
| S |
| SCA Wage Determination 2015-4055 Rev 34 |
| 50 |
| Hr. |
| $ ______ |
| $ _________ |
| Total Estimated Cost: |
| $ ________ |
Ft. Devens Cemetery
Option Year II: From Date of Award Through One Year
| WAGE |
| Est. Qty |
| Unit |
| Unit Cost |
| Total Cost |
| grounds maintenance services |
| Type |
| DETERMINATION |
| 2001 |
| A.1 General, on-going and recurring cemetery Grounds Maintenance to include a.1.a thru a.1.e |
A.1adaily policing of cemetery grounds to include collection & removal of leaves small brances &twigs, debris trash, floral arrangements, and empting trash receptacles, SWEEPING AND/OR BLOWING-FF ROADS AND WALKWAYS
A.1B fALL SEASON LEAF CLEAN UP
A.1C Mowing and Removal of debris/ grass clippings
A.1D Trimming of headstones, Trees, curbs and Fence Lines
A.1E Memorial Day Ceremony
| S |
| SCA Wage Determination 2015-4055 Rev 34 |
| 12 |
| MO |
| $ ______ |
| $ _________ |
Interment Services
| 2002 |
| Grave Excavation & Backfilling: Cremated remains (second interments). Section A.2 |
| C |
| DBA Wage Determination MA20250008 |
| 3 |
| Ea. |
| $ ______ |
| $ _________ |
Headstone Maintenance
| 2003 |
| Clean Upright Headstones (1,229) before Memorial Day & Veterans Day Section A.3 |
| S |
| SCA Wage Determination 2015-4055 Rev 34 |
| 2,458 |
| Ea. |
| $ _____ |
| $ _________ |
| 2004 |
| Set & Align New-Initial and New-Replacement Upright Headstones Section A.4 |
| C |
| DBA Wage Determination MA20250008 |
| 13 |
| Ea. |
| $ ______ |
| $ _________ |
| 2005 |
| Remove, Break-up & Dispose of Unusable Replacement Upright Headstones and Markers Section A.5 |
| C |
| DBA Wage Determination MA20250008 |
| 5 |
| Ea. |
| $ ______ |
| $ ________ |
| 2006 |
| Raise, Realign, Reset, Backfill & Clean existing standard Upright Headstones. Section A.6 |
| C |
| DBA Wage Determination MA20250008 |
| 300 |
| Ea. |
| $ ______ |
| $ _________ |
| 2007 |
| Bump & Run: Realign headstones that have shifted out of alignment. Section A.7 |
| C |
| DBA Wage Determination MA20250008 |
| 1,229 |
| Ea. |
| $ ______ |
| $ _________ |
| 2008 |
| Refill Sunken Graves Section A.8 |
| S |
| SCA Wage Determination 2015-4055 Rev 34 |
| 100 |
| Ea. |
| $ ______ |
| $__________ |
Turf Fertilization & Weed Control
| 2009 |
| Turf Fertilization & Weed Control Applications Turf Application Schedule A.9 |
| S |
| SCA Wage Determination 2015-4055 Rev 34 |
| 8 |
| Job |
| $______ |
| $_________ |
| 2010 |
| Pest Control and Vertebrate and Invertebrate Section A.10 |
| S |
| SCA Wage Determination 2015-4055 Rev 34 |
| 1 |
| Job |
| $______ |
| $__________ |
| 2011 |
| Aerate & overseed entire Cemetery (September) / Done in conjunction with turf application #8 Section A.11 |
| S |
| SCA Wage Determination 2015-4055 Rev 34 |
| 1 |
| Job |
| $ ______ |
| $ _________ |
| 2012 |
| Irrigation System Maintenance including start up and shut down of the system. Section A.12 |
| S |
| SCA Wage Determination 2015-4055 Rev 34 |
| 5 |
| Mo |
| $______ |
| $__________ |
Tree, Shrub & Planting Bed Maintenance
| 2013 |
| Prune Cemetery Shrub and Tree maintenance Section A.13 |
| S |
| SCA Wage Determination 2015-4055 Rev 34 |
| 2 |
| Job |
| $ ______ |
| $ _________ |
| 2014 |
| Tree Removal/ Stump Grinding/ Deadwood Removal Section A.14 |
| S |
| SCA Wage Determination 2015-4055 Rev 34 |
| 2 |
| Job |
| $ ______ |
| $ _________ |
| 2015 |
| Maintain cemetery planting beds& tree rings including mulching and weed control. Section A.15 |
| S |
| SCA Wage Determination 2015-4055 Rev 34 |
| 2 |
| Job |
| $ ______ |
| $ _________ |
On-Call services
| 2016 |
| Snow & Ice Removal Section A.16 |
| S |
| SCA Wage Determination 2015-4055 Rev 34 |
| 10 |
| Job |
| $______ |
| $_______ |
| 2017 |
| Storm Damage Section A.17 |
| S |
| SCA Wage Determination 2015-4055 Rev 34 |
| 50 |
| Hr. |
| $ ______ |
| $ _________ |
| Total Estimated Cost: |
| $ ________ |
Ft. Devens Cemetery Option Year III: From Date of Award Through One Year
| WAGE |
| Est. Qty |
| Unit |
| Unit Cost |
| Total Cost |
| grounds maintenance services |
| Type |
| DETERMINATION |
| 3001 |
| A.1 General, on-going and recurring cemetery Grounds Maintenance to include a.1.a thru a.1.e |
A.1adaily policing of cemetery grounds to include collection & removal of leaves small brances &twigs, debris trash, floral arrangements, and empting trash receptacles, SWEEPING AND/OR BLOWING-FF ROADS AND WALKWAYS
A.1B fALL SEASON LEAF CLEAN UP
A.1C Mowing and Removal of debris/ grass clippings
A.1D Trimming of headstones, Trees, curbs and Fence Lines
A.1E Memorial Day Ceremony
| S |
| SCA Wage Determination 2015-4055 Rev 34 |
| 12 |
| MO |
| $ ______ |
| $ _________ |
Interment Services
| 3002 |
| Grave Excavation & Backfilling: Cremated remains (second interments). Section A.2 |
| C |
| DBA Wage Determination MA20250008 |
| 3 |
| Ea. |
| $ ______ |
| $ _________ |
Headstone Maintenance
| 3003 |
| Clean Upright Headstones (1,229) before Memorial Day & Veterans Day Section A.3 |
| S |
| SCA Wage Determination 2015-4055 Rev 34 |
| 2,458 |
| Ea. |
| $ _____ |
| $ _________ |
| 3004 |
| Set & Align New-Initial and New-Replacement Upright Headstones Section 4A4 |
| C |
| DBA Wage Determination MA20250008 |
| 13 |
| Ea. |
| $ ______ |
| $ _________ |
| 3005 |
| Remove, Break-up & Dispose of Unusable Replacement Upright Headstones and Markers Section A.5 |
| C |
| DBA Wage Determination MA20250008 |
| 5 |
| Ea. |
| $ ______ |
| $ ________ |
| 3006 |
| Raise, Realign, Reset, Backfill & Clean existing standard Upright Headstones. Section A.6 |
| C |
| DBA Wage Determination MA20250008 |
| 300 |
| Ea. |
| $ ______ |
| $ _________ |
| 3007 |
| Bump & Run: Realign headstones that have shifted out of alignment. Section A.7 |
| C |
| DBA Wage Determination MA20250008 |
| 1,229 |
| Ea. |
| $ ______ |
| $ _________ |
| 3008 |
| Refill Sunken Graves Section A.8 |
| S |
| SCA Wage Determination 2015-4055 Rev 34 |
| 100 |
| Ea. |
| $ ______ |
| $__________ |
Turf Fertilization & Weed Control
| 3009 |
| Turf Fertilization & Weed Control Applications Turf Application Schedule A.9 |
| S |
| SCA Wage Determination 2015-4055 Rev 34 |
| 8 |
| Job |
| $______ |
| $_________ |
| 3010 |
| Pest Control and Vertebrate and Invertebrate Section A.10 |
| S |
| SCA Wage Determination 2015-4055 Rev 34 |
| 1 |
| Job |
| $______ |
| $__________ |
| 3011 |
| Aerate & overseed entire Cemetery (September) / Done in conjunction with turf application #8 Section A.11 |
| S |
| SCA Wage Determination 2015-4055 Rev 34 |
| 1 |
| Job |
| $ ______ |
| $ _________ |
| 3012 |
| Irrigation System Maintenance including start up and shut down of the system. Section A.12 |
| S |
| SCA Wage Determination 2015-4055 Rev 34 |
| 5 |
| Mo |
| $______ |
| $__________ |
Tree, Shrub & Planting Bed Maintenance
| 0013 |
| Prune Cemetery Shrub and Tree maintenance Section A.13 |
| S |
| SCA Wage Determination 2015-4055 Rev 34 |
| 2 |
| Job |
| $ ______ |
| $ _________ |
| 3014 |
| Tree Removal/ Stump Grinding/ Deadwood Removal Section A.14 |
| S |
| SCA Wage Determination 2015-4055 Rev 34 |
| 2 |
| Job |
| $ ______ |
| $ _________ |
| 3015 |
| Maintain cemetery planting beds& tree rings including mulching and weed control. Section A.15 |
| S |
| SCA Wage Determination 2015-4055 Rev 34 |
| 2 |
| Job |
| $ ______ |
| $ _________ |
On-Call services
| 3016 |
| Snow & Ice Removal Section A.16 |
| S |
| SCA Wage Determination 2015-4055 Rev 34 |
| 10 |
| Job |
| $______ |
| $_______ |
| 3017 |
| Storm Damage Section A.17 |
| S |
| SCA Wage Determination 2015-4055 Rev 34 |
| 50 |
| Hr. |
| $ ______ |
| $ _________ |
| Total Estimated Cost: |
| $ ________ |
Ft. Devens Cemetery
Option Year IV: From Date of Award Through One Year
| WAGE |
| Est. Qty |
| Unit |
| Unit Cost |
| Total Cost |
| grounds maintenance services |
| Type |
| DETERMINATION |
| 4001 |
| A.1 General, on-going and recurring cemetery Grounds Maintenance to include a.1.a thru a.1.e |
A.1adaily policing of cemetery grounds to include collection & removal of leaves small brances &twigs, debris trash, floral arrangements, and empting trash receptacles, SWEEPING AND/OR BLOWING-FF ROADS AND WALKWAYS
A.1B fALL SEASON LEAF CLEAN UP
A.1C Mowing and Removal of debris/ grass clippings
A.1D Trimming of headstones, Trees, curbs and Fence Lines
A.1E Memorial Day Ceremony
| S |
| SCA Wage Determination 2015-4055 Rev 34 |
| 12 |
| MO |
| $ ______ |
| $ _________ |
Interment Services
| 4002 |
| Grave Excavation & Backfilling: Cremated remains (second interments). Section A.2 |
| C |
| DBA Wage Determination MA20250008 |
| 3 |
| Ea. |
| $ ______ |
| $ _________ |
Headstone Maintenance
| 4003 |
| Clean Upright Headstones (1,229) before Memorial Day & Veterans Day Section A.3 |
| S |
| SCA Wage Determination 2015-4055 Rev 34 |
| 2,458 |
| Ea. |
| $ _____ |
| $ _________ |
| 4004 |
| Set & Align New-Initial and New-Replacement Upright Headstones Section A.4 |
| C |
| DBA Wage Determination MA20250008 |
| 13 |
| Ea. |
| $ ______ |
| $ _________ |
| 4005 |
| Remove, Break-up & Dispose of Unusable Replacement Upright Headstones and Markers Section A.5 |
| C |
| DBA Wage Determination MA20250008 |
| 5 |
| Ea. |
| $ ______ |
| $ ________ |
| 4006 |
| Raise, Realign, Reset, Backfill & Clean existing standard Upright Headstones. Section A.6 |
| C |
| DBA Wage Determination MA20250008 |
| 300 |
| Ea. |
| $ ______ |
| $ _________ |
| 4007 |
| Bump & Run: Realign headstones that have shifted out of alignment. Section A.7 |
| C |
| DBA Wage Determination MA20250008 |
| 1,229 |
| Ea. |
| $ ______ |
| $ _________ |
| 4008 |
| Refill Sunken Graves Section A.8 |
| S |
| SCA Wage Determination 2015-4055 Rev 34 |
| 100 |
| Ea. |
| $ ______ |
| $__________ |
Turf Fertilization & Weed Control
| 4009 |
| Turf Fertilization & Weed Control Applications Turf Application Schedule A.9 |
| S |
| SCA Wage Determination 2015-4055 Rev 34 |
| 8 |
| Job |
| $______ |
| $_________ |
| 4010 |
| Pest Control and Vertebrate and Invertebrate Section A.10 |
| S |
| SCA Wage Determination 2015-4055 Rev 34 |
| 1 |
| Job |
| $______ |
| $__________ |
| 4011 |
| Aerate & overseed entire Cemetery (September) / Done in conjunction with turf application #8 Section A.11 |
| S |
| SCA Wage Determination 2015-4055 Rev 34 |
| 1 |
| Job |
| $ ______ |
| $ _________ |
| 4012 |
| Irrigation System Maintenance including start up and shut down of the system. Section A.12 |
| S |
| SCA Wage Determination 2015-4055 Rev 34 |
| 5 |
| Mo |
| $______ |
| $__________ |
Tree, Shrub & Planting Bed Maintenance
| 4013 |
| Prune Cemetery Shrub and Tree maintenance Section A.13 |
| S |
| SCA Wage Determination 2015-4055 Rev 34 |
| 2 |
| Job |
| $ ______ |
| $ _________ |
| 4014 |
| Tree Removal/ Stump Grinding/ Deadwood Removal Section A.14 |
| S |
| SCA Wage Determination 2015-4055 Rev 34 |
| 2 |
| Job |
| $ ______ |
| $ _________ |
| 4015 |
| Maintain cemetery planting beds& tree rings including mulching and weed control. Section A.15 |
| S |
| SCA Wage Determination 2015-4055 Rev 34 |
| 2 |
| Job |
| $ ______ |
| $ _________ |
On-Call services
| 4016 |
| Snow & Ice Removal Section A.16 |
| S |
| SCA Wage Determination 2015-4055 Rev 34 |
| 10 |
| Job |
| $______ |
| $_______ |
| 4017 |
| Storm Damage Section A.17 |
| S |
| SCA Wage Determination 2015-4055 Rev 34 |
| 50 |
| Hr. |
| $ ______ |
| $ _________ |
| Total Estimated Cost: |
| $ ________ |
SUMMARY GRAND TOTAL
| BASE PERIOD + ALL OPTION YEARS: |
| $ _____________________________ |
(End of Price Schedule)