This document is a set of plans for the OR 82 Culvert Project from La Grande to Minam in Union County, Oregon. The project consists of culvert work on the Wallowa Lake Highway (OR 82), including supplying materials, labor, and incidentals required for work zone traffic control, constructing temporary water management facilities as needed, cleaning and CCTV inspecting multiple culverts, installing multiple CIPP liners, and performing additional and incidental work as specified in the contract plans and specifications. The project spans approximately 26 miles from mile post 3.81 to 29.76. The document details the rehabilitation of existing culverts, installation of new culverts, and placement of culvert markers at various milepost locations along the highway.
The contract requires the contractor to apply permanent seeding in areas of soil disturbance and to verify culvert lengths prior to rehabilitation work. The document indicates this is a night work only project between Sunday night and Friday morning. Steel plates will be installed over the work area during non-work hours. The project is funded by the Oregon Department of Transportation and is scheduled for completion in January 2024.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 00010117 Addendum_3~1.docx | DOCX document | |
| SP_10700-69213_Amd-2_GreenJanitorial(NASPO)PAs_Approved.pdf | ||
| ITB_PW_Final~6.docx | DOCX document | |
| 00010117 Intent To Award.xlsx | XLSX spreadsheet | |
| 00010117 Addendum_1.docx | DOCX document | |
| Attachment C (Bid Pricing Form)Revised.xlsx | XLSX spreadsheet | |
| 00010117 Preliminary Results.xlsx | XLSX spreadsheet | |
| Addendum 2~3.docx | DOCX document | |
| Attachment B (Special Provisions and Specifications)Revised2.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADMINISTRATION
FEDERAL HIGHWAY
DIVISION
OREGON
PROJECT NUMBER
NO.
SHEET
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
M22079
DRAINAGE
56V-075
LA GRANDE TO MINAM
OR82: CULVERT PROJECT
WALLOWA LAKE HIGHWAY
JANUARY 2024
UNION COUNTY
UNION COUNTY
WALLOWA LAKE HIGHWAY
OR82: CULVERT PROJECT
LA GRANDE TO MINAM
T. 02 S., R. 38 E., W.M.
SHEET NO. DESCRIPTION
HYDRAULICS
Standard Drg. Nos.
- Culvert ID MarkerRD398
M C
M
PLANS FOR PROPOSED PROJECT
ST. HELENS
ASTORIA
TILLAMOOK
MCMINNVILLE
ALBANYNEWPORT
CORVALLIS
HOOD
RIVER
DALLES
THE
MADRAS
PRINEVILLE
BEND
COQUILLE
GRANTS
PASS
Ashland
BURNS
KLAMATH
FALLS
CONDON
MORO
PENDLETON
LA GRANDE
ENTERPRISE
VALE Ontario
PORTLAND
SALEM
MEDFORD
EUGENE
ROSEBURG
Athena
N. Powder
Unity Dayville
Sisters
Juntura
Frenchglen
Burns Jct.
McDermitt
Paisley
La Pine
Crescent
Biggs
Lexington
Hermiston Boardman
Ukiah
Arlington
Malin
Brookings
Coos Bay
Drain
Canyonvil le
Reedsport
Oakridge
Goshen Florence
Lincoln City
Waldport
Home Sweet
Detroit Antelope
Maupin
Forest Grove
Hebo
Cannon Beach
Seaside Rainier
Milton-Freewater
W
26 35 197
39519
3953197
Bonanza
Junction City
BAKER CITY
HEPPNER
Copperfield
Lake Silver
Junction CaveBEACH
GOLD
Orford Port
LAKEVIEW
CANYON
CITY
Day John
CITY
OREGON
HILLSBORO
DALLAS
Redmond
Val ley Jordan
STATE OF OREGON
DEPARTMENT OF TRANSPORTATION
ATTENTION:
The Oregon Utility Center Is (503) 232-1987.)
The Center. (Note: The Telephone Number For
You May Obtain Copies Of The Rules By Calling
OAR 952-001-0010 Through OAR 952-001-0090.
Center. Those Rules Are Set Forth In
Adopted By The Oregon Utility Notification
Oregon Law Requires You To Follow Rules
LET'S ALL
WORK TOGETHER
TO MAKE THIS
JOB SAFE
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
INDEX OF SHEETS
SHEET NO. DESCRIPTION
Title SheetA01
F
O T
N E
MTRAPED
N
O G
E R
O
N
OI
T
ATROPS
N A
R T
- Tables, Abrupt Edges, and PCMS DetailsTM800
- Temporary BarricadesTM820
- Temporary Sign SupportsTM821
- 2-Lane, 2-Way RoadwaysTM850
ELGIN
LA GRANDE
COVE
T. 01 N., R. 39 E., W.M.
T. 01 N., R. 40 E., W.M.
T. 01 N., R. 41 E., W.M.
Culverts HB10 incl.
HB01 thru
M.P. 3.81
BEGINNING OF PROJECT
M.P. 29.76
END OF PROJECT
Overall Length Of Project - 25.95 Miles
- Trench Backfill, Bedding, Pipe Zone And Multiple InstallationsRD300
- Coupling Bands For Corrugated Metal PipeRD325
- Coupling Bands For Corrugated Metal PipeRD326
- Coupling Bands For Corrugated Metal PipeRD327
- Pipe To Structure ConnectionsRD339
- Ditch Inlet Type DRD370
A01
R_M22079_ts_01.dgn :: A01 11/27/2023 10:19:48 AM hwye56x
OREGON
RE
GI
ST
ERE
D PROFESSIONALEN
GINEER
RENEWS: 6-30-2025
51 99
JU
LD
E R
HOLA
W A
19202
D A
Y
Y
YDER
56V-075
OF TRANSPORTATION
OREGON DEPARTMENT
Checker:Drafter:
Designer:
SHEET NO.
Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
UNION COUNTY
WALLOWA LAKE HIGHWAY
LA GRANDE TO MINAM
OR82: CULVERT PROJECT
F O
T N
E
MTRAPED
N
O G
E R
O
N
OI
T
ATROPS
N A
R T
Wade Holaday
Wade Holaday
Chris Diehl
Chris Diehl
CULVERTS
MP 3.81 MP 16.81
Sec. 35, T.2 S., R.38 E., W.M. Sec. 34, T.1 N., R.39 E., W.M.
Rehabilitate extg. 18" culvert - 122 LF
Install Type 2 culvert marker - 1 EA
Install Type 1 culvert marker - 1 EA
Rehabilitate extg. 18" culvert - 72 LF
(see dwg. no. RD398)
Install Type 2 culvert marker - 1 EA
Install Type 1 culvert marker - 1 EA
Apply Permanent Seeding in areas of soil disturbance or as directed.
Prior to rehabilitation, contractor to verify culvert lengths.
Notes:
Apply Permanent Seeding in areas of soil disturbance or as directed.
Prior to rehabilitation, contractor to verify culvert lengths.
Notes:
CULVERT ID MARKER TABLE
Check where appropriate
2 3.81
MPNote
Culvert Location Type 1 Marker Type 2 Marker
InletInlet OutletOutletNumber
DFI
Number
Structure
4 16.81
D041975
D041927
Type 1 marker
Type 1 marker
OR8
O R8
HB01
H_M22079_clpl_01.dgn :: HB01 11/27/2023 10:19:54 AM hwye56x
ST
ERE
JU
LD
E R
HOLA
W A
19202
D A
Y
Y
YDER
56V-075
OF TRANSPORTATION
OREGON DEPARTMENT
Checker:Drafter:
Designer:
SHEET NO.
Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
UNION COUNTY
WALLOWA LAKE HIGHWAY
LA GRANDE TO MINAM
OR82: CULVERT PROJECT
F O
T N
E
MTRAPED
N
O G
E R
O
N
OI
T
ATROPS
N A
R T
Wade Holaday
Wade Holaday
Chris Diehl
Chris Diehl
CULVERTS
Sec. 34, T.1 N., R.39 E., W.M.
MP 17.42 MP 17.64
Sec. 27, T.1 N., R.39 E., W.M.
Apply Permanent Seeding in areas of soil disturbance or as directed.
annulus.
culvert inlet. Remove liner from structure after installation and grout
Concrete manhole structure covered by ACP approximately 10' from
Prior to rehabilitation, contractor to verify culvert lengths.
Notes:
Apply Permanent Seeding in areas of soil disturbance or as directed.
Prior to rehabilitation, contractor to verify culvert lengths.
Notes:
CULVERT ID MARKER TABLE
Check where appropriate
2 17.42
MPNote
Culvert Location Type 1 Marker Type 2 Marker
InletInlet OutletOutletNumber
DFI
Number
Structure
4 17.64
D041932
D041933
Rehabilitate extg. 24" culvert- 100 LF
Install Type 2 culvert marker - 1 EA
Install Type 1 culvert marker - 1 EA
Type 1 marker Type 1 marker
Rehabilitate extg. 24" culvert- 92 LF
Install Type 2 culvert marker - 1 EA
Install Type 1 culvert marker - 1 EA
O R
O R
HB02
H_M22079_clpl_01.dgn :: HB02 11/27/2023 10:19:55 AM hwye56x
ST
ERE
JU
LD
E R
HOLA
W A
19202
D A
Y
Y
YDER
56V-075
OF TRANSPORTATION
OREGON DEPARTMENT
Checker:Drafter:
Designer:
SHEET NO.
Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
UNION COUNTY
WALLOWA LAKE HIGHWAY
LA GRANDE TO MINAM
OR82: CULVERT PROJECT
F O
T N
E
MTRAPED
N
O G
E R
O
N
OI
T
ATROPS
N A
R T
Wade Holaday
Wade Holaday
Chris Diehl
Chris Diehl
CULVERTS
MP 17.83 MP 21.18
Sec. 27, T.1 N., R.39 E., W.M. Sec. 14, T.1 N., R.39 E., W.M.
Rehabilitate extg. 18" culvert - 60'
Install Type 2 culvert marker - 1 EA
Install Type 1 culvert marker - 1 EA
Apply Permanent Seeding in areas of soil disturbance or as directed.
Prior to ordering rehabilitation, contractor to verify culvert lengths.
Notes:
CULVERT ID MARKER TABLE
Check where appropriate
2 17.83
MPNote
Culvert Location Type 1 Marker Type 2 Marker
InletInlet OutletOutletNumber
DFI
Number
Structure
4 21.18
D031104
D041938Apply Permanent Seeding in areas of soil disturbance or as directed.
Prior to rehabilitation, contractor to verify culvert lengths.
Notes:
Rehabilitate extg. 18" culvert - 102 LF
Install Type 2 culvert marker - 1 EA
Install Type 1 culvert marker - 1 EA
Type 1 marker
Type 1 marker
O R
O R8
HB03
H_M22079_clpl_01.dgn :: HB03 11/27/2023 10:19:55 AM hwye56x
ST
ERE
JU
LD
E R
HOLA
W A
19202
D A
Y
Y
YDER
56V-075
OF TRANSPORTATION
OREGON DEPARTMENT
Checker:Drafter:
Designer:
SHEET NO.
Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
UNION COUNTY
WALLOWA LAKE HIGHWAY
LA GRANDE TO MINAM
OR82: CULVERT PROJECT
F O
T N
E
MTRAPED
N
O G
E R
O
N
OI
T
ATROPS
N A
R T
Wade Holaday
Wade Holaday
Chris Diehl
Chris Diehl
CULVERTS
MP 21.38
Sec. 11, T.1 N., R.39 E., W.M.
MP 22.93
Sec. 12, T.1 N., R.39 E., W.M.
Rehabilitate extg. 18" culvert - 92 LF
Install Type 2 culvert marker - 1 EA
Install Type 1 culvert marker - 1 EA
Rehabilitate extg. 24" culvert - 70 LF
Install Type 2 culvert marker - 1 EA
Install Type 1 culvert marker - 1 EA
Apply Permanent Seeding in areas of soil disturbance or as directed.
Prior to rehabilitation, contractor to verify culvert lengths.
Notes:
Apply Permanent Seeding in areas of soil disturbance or as directed.
Prior to rehabilitation, contractor to verify culvert lengths.
Notes:
CULVERT ID MARKER TABLE
Check where appropriate
2 21.38
MPNote
Culvert Location Type 1 Marker Type 2 Marker
InletInlet OutletOutletNumber
DFI
Number
Structure
4 22.93
D041940
D041943
Type 1 marker
Type 1 marker
O R8
OR82
HB04
H_M22079_clpl_01.dgn :: HB04 11/27/2023 10:19:55 AM hwye56x
ST
ERE
JU
LD
E R
HOLA
W A
19202
D A
Y
Y
YDER
56V-075
OF TRANSPORTATION
OREGON DEPARTMENT
Checker:Drafter:
Designer:
SHEET NO.
Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
UNION COUNTY
WALLOWA LAKE HIGHWAY
LA GRANDE TO MINAM
OR82: CULVERT PROJECT
F O
T N
E
MTRAPED
N
O G
E R
O
N
OI
T
ATROPS
N A
R T
Wade Holaday
Wade Holaday
Chris Diehl
Chris Diehl
CULVERTS
MP 23.45
Sec. 6 & 7, T.1 N., R.40 E., W.M.
MP 23.37
Rehabilitate extg. 18" culvert - 68 LF
Install Type 2 culvert marker - 1 EA
Install Type 1 culvert marker - 1 EA
(see dwg. nos. RD325, RD326 & RD327) connect to extg. pipe - 1 EA
(see dwg. no. RD300)
Match extg. alignment and grade
Match extg. material
5' depth
Inst. 18" conc. culv. pipe - 3'
Remove 3' RT.
Extg. 18" conc. culvert Rehabilitate extg. 36" culvert - 90 LF
Install Type 2 culvert marker - 1 EA
Install Type 1 culvert marker - 1 EA
Apply Permanent Seeding in areas of soil disturbance or as directed.
culvert liner - Approx. 2 cuyd.
Grout invert of culvert after cleaning and prior to installation of
Prior to rehabilitation, contractor to verify culvert lengths.
Notes:
Apply Permanent Seeding in areas of soil disturbance or as directed.
Prior to rehabilitation, contractor to verify culvert lengths.
Notes:
Type 1 marker
CULVERT ID MARKER TABLE
Check where appropriate
3 23.37
MPNote
Culvert Location Type 1 Marker Type 2 Marker
InletInlet OutletOutletNumber
DFI
Number
Structure
6 23.45
D041944
D041945
Type 1 marker
OR82
M.P. 23.45 (D041945)
Point Repair - 1 EA
1 5
HB05
H_M22079_clpl_01.dgn :: HB05 11/27/2023 10:19:56 AM hwye56x
ST
ERE
JU
LD
E R
HOLA
W A
19202
D A
Y
Y
YDER
56V-075
OF TRANSPORTATION
OREGON DEPARTMENT
Checker:Drafter:
Designer:
SHEET NO.
Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
UNION COUNTY
WALLOWA LAKE HIGHWAY
LA GRANDE TO MINAM
OR82: CULVERT PROJECT
F O
T N
E
MTRAPED
N
O G
E R
O
N
OI
T
ATROPS
N A
R T
Wade Holaday
Wade Holaday
Chris Diehl
Chris Diehl
CULVERTS
Sec. 5, T.1 N., R.40 E., W.M.
MP 24.58
CULVERT ID MARKER TABLE
Check where appropriate
2 254.58
MPNote
Culvert Location Type 1 Marker Type 2 Marker
InletInlet OutletOutletNumber
DFI
Number
Structure
D041947
Apply Permanent Seeding in areas of soil disturbance or as directed.
Notes:
Trench resurf. - 50 sq. yd.
(see profile below)
Match extg. grade
20ft depth
Inst. 36" aluminized CMP culv. pipe - 75'
Remove Extg. 75' CMP culvert
Install Type 2 culvert marker - 1 EA
Install Type 1 culvert marker - 1 EA
PLAN
Scale: 1"=100'
PROFILE
OR82
Extg. ground
S=2.34 %
Extg. 36" culvert
10 20 30 40 50 60 70 80 90
Scale: 1"=20'
Type 1 marker
OR82
G o o d
R d
Elevations provided are for reference only.
Note:
finished AC grade during non-work hours.
Steel plates shall be installed flush with existing shifts Monday morning through Thursday night.
2. Steel plating over the work area allowed between through Friday morning, 7:00 p.m. to 6:00 a.m.
1. This location to be night work only Sunday night
General Notes:
HB06
H_M22079_clpl_01.dgn :: HB06 11/27/2023 10:19:56 AM hwye56x
ST
ERE
JU
LD
E R
HOLA
W A
19202
D A
Y
Y
YDER
56V-075
OF TRANSPORTATION
OREGON DEPARTMENT
Checker:Drafter:
Designer:
SHEET NO.
Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
UNION COUNTY
WALLOWA LAKE HIGHWAY
LA GRANDE TO MINAM
OR82: CULVERT PROJECT
F O
T N
E
MTRAPED
N
O G
E R
O
N
OI
T
ATROPS
N A
R T
Wade Holaday
Wade Holaday
Chris Diehl
Chris Diehl
CULVERTS
MP 25.97MP 25.85
Sec. 9, T.1 N., R.40 E., W.M.
Apply Permanent Seeding in areas of soil disturbance or as directed.
Prior to rehabilitation, contractor to verify culvert lengths.
Notes:
Apply Permanent Seeding in areas of soil disturbance or as directed.
Prior to rehabilitation, contractor to verify culvert lengths.
Notes:
Rehabilitate extg. 18" culvert - 70 LF
Install Type 2 culvert marker - 1 EA
Install Type 1 culvert marker - 1 EA
Rehabilitate extg. 18" culvert - 76 LF
Install Type 2 culvert marker - 1 EA
Install Type 1 culvert marker - 1 EA
CULVERT ID MARKER TABLE
Check where appropriate
2 25.85
MPNote
Culvert Location Type 1 Marker Type 2 Marker
InletInlet OutletOutletNumber
DFI
Number
Structure
4 25.97
D041950
D041951
Type 1 marker
Type 1 marker
OR82
2 3
HB07
H_M22079_clpl_01.dgn :: HB07 11/27/2023 10:19:57 AM hwye56x
ST
ERE
JU
LD
E R
HOLA
W A
19202
D A
Y
Y
YDER
56V-075
OF TRANSPORTATION
OREGON DEPARTMENT
Checker:Drafter:
Designer:
SHEET NO.
Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
UNION COUNTY
WALLOWA LAKE HIGHWAY
LA GRANDE TO MINAM
OR82: CULVERT PROJECT
F O
T N
E
MTRAPED
N
O G
E R
O
N
OI
T
ATROPS
N A
R T
Wade Holaday
Wade Holaday
Chris Diehl
Chris Diehl
CULVERTS
MP 26.13
Sec. 3 & 10, T.1 N., R.40 E., W.M.
MP 26.70
Sec. 9, T.1 N., R.40 E., W.M.
Apply Permanent Seeding in areas of soil disturbance or as directed.
Prior to rehabilitation, contractor to verify culvert lengths.
Notes:
Apply Permanent Seeding in areas of soil disturbance or as directed.
Prior to rehabilitation, contractor to verify culvert lengths.
Notes:
Rehabilitate extg. 24" culvert - 88 LF
Install Type 2 culvert marker - 1 EA
Install Type 1 culvert marker - 1 EA
Rehabilitate extg. 18" culvert - 76 LF
Install Type 2 culvert marker - 1 EA
Install Type 1 culvert marker - 1 EA
CULVERT ID MARKER TABLE
Check where appropriate
2 26.13
MPNote
Culvert Location Type 1 Marker Type 2 Marker
InletInlet OutletOutletNumber
DFI
Number
Structure
4 26.70
D041953
D041955
Type 1 marker
Type 1 marker
OR8
OR82
HB08
H_M22079_clpl_01.dgn :: HB08 11/27/2023 10:19:57 AM hwye56x
ST
ERE
JU
LD
E R
HOLA
W A
19202
D A
Y
Y
YDER
56V-075
OF TRANSPORTATION
OREGON DEPARTMENT
Checker:Drafter:
Designer:
SHEET NO.
Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
UNION COUNTY
WALLOWA LAKE HIGHWAY
LA GRANDE TO MINAM
OR82: CULVERT PROJECT
F O
T N
E
MTRAPED
N
O G
E R
O
N
OI
T
ATROPS
N A
R T
Wade Holaday
Wade Holaday
Chris Diehl
Chris Diehl
CULVERTS
MP 28.32 MP 28.44
Sec. 2, T.1 N., R.40 E., W.M.
Apply Permanent Seeding in areas of soil disturbance or as directed.
Prior to rehabilitation, contractor to verify culvert lengths.
Notes:
Apply Permanent Seeding in areas of soil disturbance or as directed.
Salvage and relay last two sections of concrete culvert at outlet.
Notes:
CULVERT ID MARKER TABLE
Check where appropriate
2 28.32
MPNote
Culvert Location Type 1 Marker Type 2 Marker
InletInlet OutletOutletNumber
DFI
Number
Structure
5 28.44
D041960
D041961
Rehabilitate extg. 18" culvert - 52 LF
Install Type 2 culvert marker - 1 EA
Install Type 1 culvert marker - 1 EA
Type 1 marker
Type 1 marker
Clean extg. culvert - 5 cuyd connect to extg. pipe - 1 EA
Match extg. grade
5' depth
Salvage and relay 36" CMP culv. pipe - 8'
Extg. 36" CMP culvert
OR82
Install Type 2 culvert marker - 1 EA
Install Type 1 culvert marker - 1 EA
HB09
H_M22079_clpl_01.dgn :: HB09 11/27/2023 10:19:57 AM hwye56x
ST
ERE
JU
LD
E R
HOLA
W A
19202
D A
Y
Y
YDER
56V-075
OF TRANSPORTATION
OREGON DEPARTMENT
Checker:Drafter:
Designer:
SHEET NO.
Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
UNION COUNTY
WALLOWA LAKE HIGHWAY
LA GRANDE TO MINAM
OR82: CULVERT PROJECT
F O
T N
E
MTRAPED
N
O G
E R
O
N
OI
T
ATROPS
N A
R T
Wade Holaday
Wade Holaday
Chris Diehl
Chris Diehl
CULVERTS
Sec. 1, T.1 N., R.40 E., W.M.
MP 29.71 & 29.76
Apply Permanent Seeding in areas of soil disturbance or as directed.
Prior to rehabilitation, contractor to verify culvert lengths.
pavement beyond outside edge of travel lane.
Cut ACP as needed to replace 12' section of culvert. Do not cut
Notes:
Rehabilitate extg. 48" culvert - 84 LF
Install Type 2 culvert marker - 1 EA
Install Type 1 culvert marker - 1 EA
Type 1 marker
CULVERT ID MARKER TABLE
Check where appropriate
2 29.71
MPNote
Culvert Location Type 1 Marker Type 2 Marker
InletInlet OutletOutletNumber
DFI
Number
Structure
5 29.76
D041968
D041969 connect to extg. pipe - 1 EA
Match extg. alignment and grade
Match extg. material
10' depth
Inst. 18" CMP culv. pipe - 12'
Remove 12' RT.
Extg. 18" CMP culvert
Rehabilitate extg. 18" culvert - 52 LF
Install Type 2 culvert marker - 1 EA
Install Type 1 culvert marker - 1 EA
Type 1 marker
OR82
HB10
H_M22079_clpl_01.dgn :: HB10 11/27/2023 10:19:58 AM hwye56x
| A - Title & Index |
| A01 |
| H - Hydraulic |
| HB01 |
| HB02 |
| HB03 |
| HB04 |
| HB05 |
| HB06 |
| HB07 |
| HB08 |
| HB09 |
| HB10 |
| 2024-05-28T09:08:59-0700 | |
| HOLADAY Wade |
| 2024-05-28T09:09:46-0700 | |
| HOLADAY Wade |
| 2024-05-28T09:11:09-0700 | |
| HOLADAY Wade |
| 2024-05-28T09:12:00-0700 | |
| HOLADAY Wade |
| 2024-05-28T09:12:38-0700 | |
| HOLADAY Wade |
| 2024-05-28T09:13:44-0700 | |
| HOLADAY Wade |
| 2024-05-28T09:14:31-0700 | |
| HOLADAY Wade |
| 2024-05-28T09:15:19-0700 | |
| HOLADAY Wade |
| 2024-05-28T09:16:01-0700 | |
| HOLADAY Wade |
| 2024-05-28T09:16:53-0700 | |
| HOLADAY Wade |
File details come from the government source that posted it. Updated .