00010117 Preliminary Results.xlsx
XLSX spreadsheet 25 KB Posted
- Attached to
- OR 82 Culvert Project, La Grande to Minam
- Solicitation number
- S-73000-00010117
- Issued by
- Umatilla County, Oregon
About this file
This document is a bid tabulation for the OR 82 Culvert Project, La Grande to Minam, a state and local contract opportunity issued by the Oregon Department of Transportation. The project consists of culvert work on OR82, including supplying materials, labor, and incidentals for work zone traffic control, constructing temporary water management facilities, cleaning and CCTV-ing multiple culverts, installing CIPP liners, and performing additional incidental work. The bid closing date is June 18, 2024, at 10:00 AM. The bid tabulation includes bids from four contractors: HP Civil Inc, JR Carlon Corp, Wildish Standard Paving Co., and Whitaker Construction Company. The bid items cover a range of work, including mobilization, temporary traffic control, flagger station lighting, pollution control, erosion control, health and safety, contaminated soil removal, asbestos abatement, construction surveying, and various culvert rehabilitation and pipe installation activities.
The total bid prices from the four contractors range from $918,338.88 to $1,126,271.00. The bid tabulation does not indicate the award, and this is only a tabulation of the submitted bids. The project is located in Union County, Oregon, and is funded by state and local sources, but the specific funding requirements and sources are not provided in this document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 00010117 Addendum_3~1.docx | DOCX document | |
| SP_10700-69213_Amd-2_GreenJanitorial(NASPO)PAs_Approved.pdf | ||
| ITB_PW_Final~6.docx | DOCX document | |
| 00010117 Intent To Award.xlsx | XLSX spreadsheet | |
| 00010117 Addendum_1.docx | DOCX document | |
| Attachment C (Bid Pricing Form)Revised.xlsx | XLSX spreadsheet | |
| Attachment A (Plans)~9.pdf | ||
| Addendum 2~3.docx | DOCX document | |
| Attachment B (Special Provisions and Specifications)Revised2.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Date Issued: | 6/18/24 | |||||
| ITB No. | S-73000-00010117 | BIDDER | ||||
| NAME: | HP Civil Inc | JR Carlon Corp | Wildish Standard Paving Co. | Whitaker Construction Company | ||
| Bid Closing: | 06/18/2024 @ 10:00 AM | |||||
| Description: | OR 82 Culvert Project LaGrande To Minam | |||||
| This bid tabulation is not an indicator of award. It is only a tabulation of the bids submitted for consideration. |
| Bid Item # | Description | Est | |
| QTY | UNIT | UNIT | |
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL |
PRICE
| 1 | Mobilization | 1 | LS | $ 91,833.88 | $ 91,833.88 | $86,756.41 | $ 86,756.41 | $108,000.00 | $ 108,000.00 | $210,000.00 | $ 210,000.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 2 | Temporary Work Zone Traffic Control, Complete | 1 | LS | $ 185,000.00 | $ 185,000.00 | $ 64,944.00 | $ 64,944.00 | $ 202,500.00 | $ 202,500.00 | $ 130,000.00 | $ 130,000.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 3 | Flagger Station Lighting | 2 | EACH | $ 2,000.00 | $ 4,000.00 | $ 1,804.18 | $ 3,608.36 | $ 1,500.00 | $ 3,000.00 | $ 1,000.00 | $ 2,000.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 4 | Pollution Control Plan | 1 | LS | $ 2,500.00 | $ 2,500.00 | $ 750.00 | $ 750.00 | $ 3000.00 | $ 3,000.00 | $ 1500.00 | $ 1,500.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 5 | Erosion Control | 1 | LS | $ 4,000.00 | $ 4,000.00 | $ 750.00 | $ 750.00 | $ 8,000.00 | $ 8,000.00 | $ 15,000.00 | $ 15,000.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 6 | Health and Safety Plan | 1 | LS | $ 2,000.00 | $ 2,000.00 | $ 750.00 | $ 750.00 | $ 3,000.00 | $ 3,000.00 | $ 2,000.00 | $ 2,000.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 7 | Contaminated Soil Removal | 7 | TON | $ 340.00 | $ 2,380.00 | $ 2,000.00 | $ 14,000.00 | $ 50.00 | $ 350.00 | $ 4,225.00 | $ 29,575.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 8 | Remove Asbestos Material, Friable | 75 | FOOT | $ 90.00 | $ 6,750.00 | $ 211.20 | $ 15,840.00 | $ 50.00 | $ 3,750.00 | $ 400.00 | $ 30,000.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 9 | Construction Survey Work | 1 | LS | $ 4,000.00 | $ 4,000.00 | $ 2,500.00 | $ 2,500.00 | $ 500.00 | $ 500.00 | $ 6,500.00 | $ 6,500.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 10 | Rehabilitate 18 inch pipe | 842 | FOOT | $ 270.00 | $ 227,340.00 | $ 333.96 | $ 281,194.32 | $ 340.00 | $ 286,280.00 | $ 335.00 | $ 282,070.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 11 | Rehabilitate 24 inch pipe | 350 | FOOT | $ 315.00 | $ 110,250.00 | $ 340.56 | $ 119,196.00 | $ 380.00 | $ 133,000.00 | $ 375.00 | $ 131,250.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 12 | Rehabilitate 36 inch pipe | 90 | FOOT | $ 480.00 | $ 43,200.00 | $ 549.12 | $ 49,420.80 | $ 760.00 | $ 68,400.00 | $ 660.00 | $ 59,400.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 13 | Rehabilitate 48 inch pipe | 84 | FOOT | $ 540.00 | $ 45,360.00 | $ 755.04 | $ 63,423.36 | $ 740.00 | $ 62,160.00 | $ 1,010.00 | $ 84,840.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 14 | Mainline Video inspection | 2732 | FOOT | $ 20.00 | $ 54,640.00 | $ 23.76 | $ 64,912.32 | $ 20.00 | $ 54,640.00 | $ 5.50 | $ 15,026.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 15 | 18 inch culvert pipe, 5 ft depth | 3 | FOOT | $ 800.00 | $ 2,400.00 | $ 2,341.51 | $ 7,024.53 | $ 900.00 | $ 2,700.00 | $ 1,000.00 | $ 3,000.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 16 | 18 inch culvert pipe, 10 ft depth | 12 | FOOT | $ 600.00 | $ 7,200.00 | $ 585.38 | $ 7,024.56 | $ 700.00 | $ 8,400.00 | $ 725.00 | $ 8,700.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 17 | 36 inch culvert pipe, 5 ft depth | 8 | FOOT | $ 500.00 | $ 4,000.00 | $ 357.52 | $ 2,860.16 | $ 850.00 | $ 6,800.00 | $ 700.00 | $ 5,600.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 18 | 36 inch culvert pipe, 20 ft depth | 75 | FOOT | $ 1,300.00 | $ 97,500.00 | $ 1,931.01 | $ 144,825.75 | $ 1,300.00 | $ 97,500.00 | $ 970.00 | $ 72,750.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 19 | Connect to existing pipe | 3 | EACH | $ 900.00 | $ 2,700.00 | $ 100.00 | $ 300.00 | $ 4,000.00 | $ 12,000.00 | $ 900.00 | $ 2,700.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 20 | Trench Resurfacing | 50 | SQYD | $ 275.00 | $ 13,750.00 | $ 200.00 | $ 10,000.00 | $ 300.00 | $ 15,000.00 | $ 340.00 | $ 17,000.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 21 | Culvert Drainage Marker, Type 1 | 19 | EACH | $ 100.00 | $ 1,900.00 | $ 232.50 | $ 4,417.50 | $ 200.00 | $ 3,800.00 | $ 190.00 | $ 3,610.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 22 | Culvert Drainage Marker, Type 2 | 19 | EACH | $ 225.00 | $ 4,275.00 | $ 232.50 | $ 4,417.50 | $ 200.00 | $ 3,800.00 | $ 250.00 | $ 4,750.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 23 | Permanent Seeding | 0.2 | ACRE | $ 6,800.00 | $ 1,360.00 | $ 1,500.00 | $ 300.00 | $ 9,000.00 | $ 1,800.00 | $ 45,000.00 | $ 9,000.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| TOTAL | $ 918,338.88 | $ 949,215.57 | $ 1,088,380.00 | $ 1,126,271.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |