This document is an Intent to Award notice for the OR 82 Culvert Project, a state and local contract opportunity in Oregon. The project consists of culvert work on OR82 (Wallowa Lake Highway), including supplying materials, labor, and incidentals required for work zone traffic control, constructing temporary water management facilities, cleaning and CCTV inspection of multiple culverts, installing CIPP liners, and performing additional work as specified. The contract will be awarded to HP Civil Inc., the lowest responsive bidder, with a total bid of $918,338.88. The project is located in Union County, Oregon, and the bid closing date was June 18, 2024, at 10:00 AM. Aggrieved bidders have 5 calendar days to protest the intent to award.
The contract includes a variety of bid items, such as mobilization, temporary work zone traffic control, flagger station lighting, pollution control, erosion control, health and safety plan, contaminated soil removal, asbestos material removal, construction survey work, and rehabilitation of various size culvert pipes. The project is funded by the state of Oregon and will be managed by the Oregon Department of Transportation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 00010117 Addendum_3~1.docx | DOCX document | |
| SP_10700-69213_Amd-2_GreenJanitorial(NASPO)PAs_Approved.pdf | ||
| ITB_PW_Final~6.docx | DOCX document | |
| 00010117 Addendum_1.docx | DOCX document | |
| Attachment C (Bid Pricing Form)Revised.xlsx | XLSX spreadsheet | |
| 00010117 Preliminary Results.xlsx | XLSX spreadsheet | |
| Attachment A (Plans)~9.pdf | ||
| Addendum 2~3.docx | DOCX document | |
| Attachment B (Special Provisions and Specifications)Revised2.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Date Issued: | 6/18/24 | |||||
| ITB No. | S-73000-00010117 | BIDDER | ||||
| NAME: | HP Civil Inc | JR Carlon Corp | Wildish Standard Paving Co. | Whitaker Construction Company | ||
| Bid Closing: | 06/18/2024 @ 10:00 AM | |||||
| Description: | OR 82 Culvert Project LaGrande To Minam | |||||
| This bid tabulation shall serve as ODOT's notice of intent to award a contract to (HP Civil Inc). Aggrieved Bidders have 5 calendar days from the issued date shown above to protest the intent to award. |
| Bid Item # | Description | Est | |
| QTY | UNIT | UNIT | |
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL |
PRICE
| 1 | Mobilization | 1 | LS | $ 91,833.88 | $ 91,833.88 | $86,756.41 | $ 86,756.41 | $108,000.00 | $ 108,000.00 | $210,000.00 | $ 210,000.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 2 | Temporary Work Zone Traffic Control, Complete | 1 | LS | $ 185,000.00 | $ 185,000.00 | $ 64,944.00 | $ 64,944.00 | $ 202,500.00 | $ 202,500.00 | $ 130,000.00 | $ 130,000.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 3 | Flagger Station Lighting | 2 | EACH | $ 2,000.00 | $ 4,000.00 | $ 1,804.18 | $ 3,608.36 | $ 1,500.00 | $ 3,000.00 | $ 1,000.00 | $ 2,000.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 4 | Pollution Control Plan | 1 | LS | $ 2,500.00 | $ 2,500.00 | $ 750.00 | $ 750.00 | $ 3000.00 | $ 3,000.00 | $ 1500.00 | $ 1,500.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 5 | Erosion Control | 1 | LS | $ 4,000.00 | $ 4,000.00 | $ 750.00 | $ 750.00 | $ 8,000.00 | $ 8,000.00 | $ 15,000.00 | $ 15,000.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 6 | Health and Safety Plan | 1 | LS | $ 2,000.00 | $ 2,000.00 | $ 750.00 | $ 750.00 | $ 3,000.00 | $ 3,000.00 | $ 2,000.00 | $ 2,000.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 7 | Contaminated Soil Removal | 7 | TON | $ 340.00 | $ 2,380.00 | $ 2,000.00 | $ 14,000.00 | $ 50.00 | $ 350.00 | $ 4,225.00 | $ 29,575.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 8 | Remove Asbestos Material, Friable | 75 | FOOT | $ 90.00 | $ 6,750.00 | $ 211.20 | $ 15,840.00 | $ 50.00 | $ 3,750.00 | $ 400.00 | $ 30,000.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 9 | Construction Survey Work | 1 | LS | $ 4,000.00 | $ 4,000.00 | $ 2,500.00 | $ 2,500.00 | $ 500.00 | $ 500.00 | $ 6,500.00 | $ 6,500.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 10 | Rehabilitate 18 inch pipe | 842 | FOOT | $ 270.00 | $ 227,340.00 | $ 333.96 | $ 281,194.32 | $ 340.00 | $ 286,280.00 | $ 335.00 | $ 282,070.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 11 | Rehabilitate 24 inch pipe | 350 | FOOT | $ 315.00 | $ 110,250.00 | $ 340.56 | $ 119,196.00 | $ 380.00 | $ 133,000.00 | $ 375.00 | $ 131,250.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 12 | Rehabilitate 36 inch pipe | 90 | FOOT | $ 480.00 | $ 43,200.00 | $ 549.12 | $ 49,420.80 | $ 760.00 | $ 68,400.00 | $ 660.00 | $ 59,400.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 13 | Rehabilitate 48 inch pipe | 84 | FOOT | $ 540.00 | $ 45,360.00 | $ 755.04 | $ 63,423.36 | $ 740.00 | $ 62,160.00 | $ 1,010.00 | $ 84,840.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 14 | Mainline Video inspection | 2732 | FOOT | $ 20.00 | $ 54,640.00 | $ 23.76 | $ 64,912.32 | $ 20.00 | $ 54,640.00 | $ 5.50 | $ 15,026.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 15 | 18 inch culvert pipe, 5 ft depth | 3 | FOOT | $ 800.00 | $ 2,400.00 | $ 2,341.51 | $ 7,024.53 | $ 900.00 | $ 2,700.00 | $ 1,000.00 | $ 3,000.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 16 | 18 inch culvert pipe, 10 ft depth | 12 | FOOT | $ 600.00 | $ 7,200.00 | $ 585.38 | $ 7,024.56 | $ 700.00 | $ 8,400.00 | $ 725.00 | $ 8,700.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 17 | 36 inch culvert pipe, 5 ft depth | 8 | FOOT | $ 500.00 | $ 4,000.00 | $ 357.52 | $ 2,860.16 | $ 850.00 | $ 6,800.00 | $ 700.00 | $ 5,600.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 18 | 36 inch culvert pipe, 20 ft depth | 75 | FOOT | $ 1,300.00 | $ 97,500.00 | $ 1,931.01 | $ 144,825.75 | $ 1,300.00 | $ 97,500.00 | $ 970.00 | $ 72,750.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 19 | Connect to existing pipe | 3 | EACH | $ 900.00 | $ 2,700.00 | $ 100.00 | $ 300.00 | $ 4,000.00 | $ 12,000.00 | $ 900.00 | $ 2,700.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 20 | Trench Resurfacing | 50 | SQYD | $ 275.00 | $ 13,750.00 | $ 200.00 | $ 10,000.00 | $ 300.00 | $ 15,000.00 | $ 340.00 | $ 17,000.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 21 | Culvert Drainage Marker, Type 1 | 19 | EACH | $ 100.00 | $ 1,900.00 | $ 232.50 | $ 4,417.50 | $ 200.00 | $ 3,800.00 | $ 190.00 | $ 3,610.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 22 | Culvert Drainage Marker, Type 2 | 19 | EACH | $ 225.00 | $ 4,275.00 | $ 232.50 | $ 4,417.50 | $ 200.00 | $ 3,800.00 | $ 250.00 | $ 4,750.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 23 | Permanent Seeding | 0.2 | ACRE | $ 6,800.00 | $ 1,360.00 | $ 1,500.00 | $ 300.00 | $ 9,000.00 | $ 1,800.00 | $ 45,000.00 | $ 9,000.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| TOTAL | $ 918,338.88 | $ 949,215.57 | $ 1,088,380.00 | $ 1,126,271.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |