Attachment_A_PISC_Cost_Estimate_Form.xlsx

XLSX spreadsheet 28 KB Posted

Attached to
HAFC PISC WAYSIDES
Solicitation number
140P2125Q0179
Issued by

About this file

This document is a cost estimate form (Attachment A) for a National Park Service project involving Wayside Planning, Design, Fabrication, and Installation Services. The detailed spreadsheet breaks down potential costs across three main categories: Services, Materials, and Travel, with granular line items for various project phases including Pre-Proposal, Wayside Proposal, Design Development, Pre-Production, Production, Audio Description, Installation & Removal, and Closeout.

The cost estimate template is structured to allow a contractor to input hourly rates, quantities, and associated expenses for different labor categories such as Project Manager, Planner, Designer, Fabrication Detailer, Installers, and Audio Describer. Currently, all line items show $0.00, indicating this is a blank template for potential bidders to complete. The solicitation (140P2125Q0179) is for the Department of the Interior's National Park Service, specifically for HAFC PISC Waysides, with the cost estimate form serving as a detailed pricing submission tool for interested contractors.

View the file

Other files

File Type Posted
Sol_140P2125Q0179_Amd_0001.pdf PDF
Sol_140P2125Q0179.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

1. SERVICES

HoursHourly RateTotal
Pre-Proposal
Project Manager$0.00
Planner$0.00
Designer$0.00
$0.00
Subtotal0$0.00
Wayside Proposal
Project Manager$0.00
Planner$0.00
Designer$0.00
Subtotal0$0.00
Wayside Design Development
Project Manager$0.00
Planner$0.00
Designer$0.00
Writer$0.00
Illustrator$0.00
Cartographer$0.00
$0.00
$0.00
Subtotal0$0.00
Pre-Production Phase
Project Manager$0.00
Designer$0.00
Fabrication Detailer$0.00
$0.00
Subtotal0$0.00
Production Phase
Project Manager$0.00
Fab Shop Supervisor$0.00
Fabrication Detailer$0.00
Subtotal0$0.00
Audio Description
Project Manager$0.00
Audio Describer$0.00
Subtotal0$0.00
Installation & Removal
Project Manager$0.00
Installer 1$0.00
Installer 2$0.00
Installer 3$0.00
Installer 4$0.00
Subtotal0$0.00
Closeout
Project Manager$0.00
Designer$0.00
Subtotal0$0.00

TOTAL FOR ALL SERVICES 0 $0.00

2. MATERIALS

Unit PriceQuantityTotal
Pre-Proposal
11 x 17 Color Prints$0.00
Shipping/Freight$0.00
Subtotal$0.00
Wayside Proposal
11 x 17 Color Prints$0.00
Shipping/Freight$0.00
Subtotal$0.00
Wayside Design Development
11 x 17 Color Prints$0.00
Shipping/Freight$0.00
Subtotal$0.00
Pre-Production Phase
Full Size Prints$0.00
Material Samples$0.00
$0.00
Shipping/Freight$0.00
Subtotal$0.00
Production Phase
Panels$0.00
Bases$0.00
Illustrations$0.00
Cartography$0.00
Graphics Acquisition$0.00
Shipping/Freight$0.00
Subtotal$0.00
Audio Description
Equipment$0.00
Shipping/Freight$0.00
Subtotal$0.00
Installation & Removal
Equipment Rental$0.00
Misc Materials$0.00
Shipping/Freight$0.00
Subtotal$0.00
Closeout
USB Drive$0.00
Shipping/Freight$0.00
Subtotal$0.00

TOTAL FOR ALL MATERIALS $0.00

3. TRAVEL

Trip 1 - Pre-Proposal for Project Manager, Designer, PlannerCostsDaysTotal
Labor - 1/2 hourly rate00$0.00
(List additional labor cat)
Travel - (air fare, train)0$0.00
Travel - (car rental & gas)00$0.00
Lodging00$0.00
Per Diem - Travel Days00$0.00
Per Diem - Meeting Days00$0.00
Trip 1 Total$0.00
Trip 2 - Installation for PM and Installers with consecutive AD Verification for PM and Audio DescriberCostsDaysTotal
Labor - 1/2 hourly rate00$0.00
(List additional labor cat)
Travel - (air fare, train)0$0.00
Travel - (car rental & gas)00$0.00
Lodging00$0.00
Per Diem - Travel Days00$0.00
Per Diem - Meeting Days00$0.00
Trip 2 Total$0.00

TOTAL FOR ALL TRAVEL $0.00

Total Labor$0.00
Total Materials$0.00
Total Travel$0.00
TOTAL PROJECT$0.00

&10 Wayside Planning, Design, Fabrication, and Installation Services&11 &"-,Bold"Attachment A: PISC COST ESTIMATE FORM&"Calibri,Bold"&12 &10- &"Calibri,Regular"Contractor shall enter amounts and confirm totals&"Calibri,Bold"&12 &10Page &P

Sheet2

Sheet3

File details come from the government source that posted it. Updated .