This document is a Performance Work Statement (PWS) for the Deschutes National Forest Boat Dock Replacement project. The key objectives are to replace approximately 6-8 boat dock sections, including anchoring equipment and hardware such as cables, chains, and concrete anchors. The new dock sections must be 6'x20' and adhere to Forest Service and Oregon State Marine Board guidelines. The project also requires the installation of an aluminum gangway. The performance period is from September 1, 2024 to October 31, 2024. The contractor must provide a quality control plan, work plan, and after-action report. Pricing is on a per-job basis. The work will be performed at the Crane Prairie Boating Site in Deschutes National Forest, Oregon. The solicitation number is 1240BE24Q0107.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 1240BE24Q0107 A0004.pdf | ||
| 1240BE24Q0107 A0003.pdf | ||
| 1240BE24Q0107 A0002.pdf | ||
| 1240BE24Q0107 Amendment 0001.pdf | ||
| 1240BE24Q0107.pdf | ||
| Attachment D CranePrairie_Project Area.pdf | ||
| Attachment F Wage Determination Deschutes County.pdf | ||
| Attachment C OSMB DesignGuidelines.pdf | ||
| Attachment E CranePrairie_Vicinity.pdf | ||
| Attachment B FSORAG-2013-Update.1.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Department of Agriculture (USDA)
Performance Work Statement
Deschutes National Forest
Boat Dock Replacement
Contents Project Title General Information
1.0 Background and Purpose
2.0 Definitions
Contractor Requirements
3.0 Technical Requirements / Tasks
Attachment
Project Title Deschutes National Forest Boat Dock Replacement (Crane Prairie)
General Information
1.0 Background and Purpose
The Deschutes National Forest has need for the replacement of the boat docks located at the Crane Prairie Boating Site. New docks should consist of approximately 6-8 6’x20’ boat dock sections (“Transient Floats”), and coinciding equipment/fasteners to anchor docks in the water. This to include cables/chains and concrete anchors (“Deadmen”) or means of attachment to existing “Piling”.
Boat dock sections are to be of a standard and interchangeable design as to be used in any variation/location throughout the forest.
This dock should also include any hardware to affix to existing bulkhead (“Abutment”) or include an associated aluminum gangplank (“Gangway”) to be used in conjunction with the new dock sections if needed. All docks and gangways are to adhere to those applicable guidelines as stated in Attachments A and B. All materials to be delivered and installed at the Crane Prairie Boat Site Located at Lat./Long. (43.7978105, -121.7612765). Deschutes National Forest Supervisors office located at 63095 Deschutes Market Road Bend, OR. 97701..
2.0 Definitions
Abutment A cast-in-place block of concrete that provides pedestrian access to a boarding float or gangway.
Deadman A heavy anchor used to tie or cable floating structures to, ensuring they stay immobile and secure. Can be used in lieu of pilings.
Gangway A bridge-like structure with a variable slope that provides pedestrian access between a land connection and a transient float.
Pile A slender steel or wood member driven into the ground and used to maintain horizontal position/location of a float by resisting an applied lateral load or to support an axial load of a pier.
Piling A collective term for a group of piles.
Transient Float A platform-type floating structure secured by piling or deadmen that provides short-term tie-up, usually for larger cruising boats. Upland access is provided via a gangway.
Contractor Requirements
3.0 Technical Requirements
Dock Sections All dock sections shall be in alignment with Forest Service Outdoor Recreation Accessibility Guidelines as well as Oregon State Marine Board Design Guidelines for Recreational Boating Facilities as laid out in Attachments A & B. Dock sections, or “Transient Floats” shall be 20’ in length and 6’ wide. The frame of each dock section should be constructed of a minimum of 4”x 8” Douglas Fir timbers (or equivalent). Each dock section should have a minimum of 3 floats per section. Floats should be 96”x 48”x 16” Polyethylene HDPE floats (or equivalent). The deck of each dock section should be constructed of Thru-Flow panels (or equivalent).
Each dock section should also have a 2”x 6” Composite boards lining the outside edges of the dock to act as a bumper for ADA compliance. A minimum of 4 ea. 8” galvanized cleats should line each edge along the top of composite bumpers (8 total tie points per dock section). Each dock section should be equipped with consistent male/female mounting hardware/couplers to allow additional dock sections or gangplanks to be attached to either end of the section. Dock sections should also have hardware/attachment points to allow for the attachment of chains/cables for anchoring. The above requirements are in alignment with boat docks already existing on the forest. This is a proven design and will provide consistency across the forest.
Anchors/Deadmen All equipment shall be included to anchor each dock section securely in the water, without the use of pilings. This should include all concrete anchors and associated chains/cables to affix the dock to the anchors. Chains/cable fasteners should allow for the adjustment of length depending on changes to water levels.
Gangways
All gangways shall be in alignment with Forest Service Outdoor Recreation Accessibility Guidelines as well as Oregon State Marine Board Design Guidelines for Recreational Boating Facilities as laid out in Attachments B & C. Gangways shall have an aluminum frame construction.
4.0 Deliverables/Schedule
Performance Period starts September 1st, 2024 and ends October 31st, 2024.
Deliverables due as defined in PRS.
5.0 Performance Requirements Summary (PRS)
PERFORMANCE OBJECTIVE PERFORMANCE STANDARD PERFORMANCE
THRESHOLD/ACCEPTABLE
QUALITY LEVELS (AQLs)*
3.0 Quality Control Plan (QCP).
The Contractor must provide the QCP to the COR
Maintain quality control program as accepted by the COR.
100% Acceptable
3.1 Work Plan
The Contractor must provide the Work plan to the COR
Within 14 calendar days of notice to proceed the contractor shall provide COR with work plan for the building and installation of docks.
100% Acceptable
3.2 Installation
Boat docks and associated hardware should be installed as per PWS. 3.0.
Work shall be complete by the end of the Performance Period as identified in PWS.
100% Acceptable
3.5 Reports Within 5 working days of installation
and project completion, the contractor shall submit an after-action report to the COR so that final walkthrough can be completed.
100% Acceptable
*Calculating Acceptable Quality Level, AQL
Calculating Acceptable Quality Level, AQL: Acceptable quality levels AQL will be calculated by dividing the number of acceptable occurrences observed by the number of possible occurrences observed. For example:
Attachment
List of Attachments
Attachment B: Forest Service Outdoor Recreation Accessibility Guidelines
Attachment C: Oregon State Marine Board Design Guidelines for Recreational Boating Facilities
Attachment D: Crane Prairie Project Area
Attachment E: Crane Prairie Vicinity
Attachment F: Wage Determination Deschutes County
| Project Title |
| General Information |
| 1.0 Background and Purpose |
| 2.0 Definitions |
| Contractor Requirements |
| 3.0 Technical Requirements |
| 4.0 Deliverables/Schedule |
| 5.0 Performance Requirements Summary (PRS) |
| Attachment |
File details come from the government source that posted it. Updated .