This document contains an Offeror Experience Form template requesting details of relevant past project experience for a solicitation seeking electrical reliability upgrades at Foster Dam and Powerhouse. Offerors are asked to provide the project title, contract number, location, award and final amounts, completion date, duration, scope and magnitude details, and specifics of the offeror's role as prime contractor, subcontractor or joint venture partner. The related solicitation seeks a contractor to replace aging electrical switchgear, transformers, motor control centers, and other electrical equipment over 40 years old at Foster Dam and Powerhouse for the U.S. Army Corps of Engineers, Portland District. Work includes replacing air blast main breakers with vacuum breakers, double-ended switchgear, station service transformers, powerhouse motor control centers, 480V panels, the DC system and batteries, ancillary preferred AC equipment, and related protection and controls and wiring.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOR OFFICIAL USE ONLY

SOURCE SELECTION SENSITIVE INFORMATION

Source Selection Information -- See FAR 2.101 and 3.104.

ATTACHMENT A

OFFEROR’S EXPERIENCE FORM

NAME OF OFFEROR: ____________________________________________________________________

PROJECT TITLE: ________________________________________________________________________

CONTRACT NUMBER: ___________________________________________________________________

GEOGRAPHIC LOCATION: _______________________________________________________________

CONTRACT AWARD AMOUNT (U.S. DOLLAR) $______________________________________________

FINAL CONTRACT AMOUNT (U.S. DOLLAR) $________________________________________________

CONTRACT COMPLETION DATE: __________________________________________________________

CONTRACT DURATION (PERIOD OF PERFORMANCE): ________________________________________

(If not complete, provide % currently complete)

DESCRIPTION OF THE PROJECT’S SCOPE AND MAGNITUDE: (The description should provide sufficient detail to demonstrate the similarities with the proposed project.)

DETAILS OF OFFEROR’S INVOLVEMENT IN THE PERFORMANCE OF THE PROJECT: (Include whether your firm participated as a prime, subcontractor, or joint-venture, and state percentage performed and whether performed as subcontractor or prime. Specifically describe your roles and responsibilities in the design/construction portion of the project and specific tasks accomplished that are similar to the solicitation requirement.

http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/far/02.htm#P10_600 http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/far/03.htm#P41_5833