Attachment A - MNC Valve Location Map.pdf
PDF 3 MB Posted
- Attached to
- Z2PZ--Replacement of inoperable irrigation system isolation valves at Miramar National Cemetery
- Solicitation number
- 36C78625B0023_1
About this file
The document is a utility plan index map and utility plan set for the Miramar National Cemetery, consisting of five detailed engineering drawings (sheets C-120 through C-124). The plans specifically highlight multiple valve replacement locations across the cemetery's infrastructure, including:
- Valve Replacement Specifications: The drawings indicate multiple locations for valve replacements, specifically noting "Replace One (1) Valve" and "Replace Three (3) Valves" at strategic points along the utility lines. Areas with valve replacements include the Memorial Plaza, Flag Assembly Area, and near the Maintenance Complex. The plans provide precise technical details such as pipe sizes, depths, and geographic positioning. The project appears to be part of the National Cemetery Administration's Phase 1 development, with involvement from engineering firms like BWE and Leighton Consulting, Inc.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AMENDMENT 1-36C78625B0023 0001.docx | DOCX document | |
| 36C78625B0023- IFB Miramar Isolation Valve.docx | DOCX document | |
| Wage determination.pdf | ||
| SOW.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CemRansoD Callout
REPLACE ONE (1) VALVE
CemRansoD Cloud+
CemRansoD Cloud+
REPLACE THREE (3) VALVES
CemRansoD Cloud+
CemRansoD Cloud+
REPLACE THREE (3) VALVES
REPLACE ONE (1) VALVE
CemRansoD
REPLACE ONE (1) VALVE
Cloud+
CemRansoD Cloud+
REPLACE THREE (3) VALVES
CemRansoD
REPLACE ONE (1) VALVE
File details come from the government source that posted it. Updated .