Attachment A_Maps.pdf
PDF 8 MB Posted
- Attached to
- King Beaver Road Decommisioning Federal contract opportunity
- Solicitation number
- 12363N24Q4058
- Issued by
- Department of Agriculture Forest Service
About this file
This document includes maps and details for a firm-fixed price service contract solicitation for road decommissioning work. The solicitation requires re-distribution of vegetation, full road re-contouring, removal of through-fill and turnpike road sections, de-compaction, stream channel restoration, removing ditch relief culverts, installing water bars and road closure devices, clump planting, and seeding and mulching disturbed areas. Additional requirements include furnishing labor, equipment, supervision, transportation, operating supplies, and incidentals. The work will be performed on the Coeur d'Alene River Ranger District in Idaho for the Department of Agriculture Forest Service. The contractor will be responsible for meeting end product specifications, with adjustments to payment if specifications are not met.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 003_King Beaver Road Decommisioning_.pdf | ||
| SiteLatLongTable20240227.docx | DOCX document | |
| Amendment 002_King Beaver Road Decommisioning_.pdf | ||
| 1505AandDCorrected.pdf | ||
| Attachment B_Typicals.pdf | ||
| King Beaver Road Obliteration_12363N24Q4058.docx | DOCX document | |
| Attachment F_Specifications.docx | DOCX document | |
| Attachment D_ FAR 52_212_3.docx | DOCX document | |
| Attachment E_Wage Determination 1995-0228.pdf | ||
| Attachment C_FAR 52_212_1 Commercial Items (Addenda).docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
der eer ec\ o � 8 3319
--'3 -101-2-l '
G.'J.\ ' �s "1\ oo e �1
I Hill F rguso
14.!.----..-..--.-t�t'f?--¼+�::;-;-;-�;----t-----------n L-����=;;�0�,--------;M-_ -.i-----4:;F--r----:-wr-T-i
• • . • .. R • ••• �2
King Beaver Road Decommissioning Coeur d'Alene River Ranger District
Idaho Panhandle National Forest a
EXHIBIT PAGE 1 OF 12
Coeur d'Alene
River Ranger District
MONTANA
Esri, TomTom, Garmin, SafeGraph, FAQ, METI/NASA, USGS, Burea, of Land
Management, EPA, NPS, SFWS
These maps are is produced from geospatial information prepared by the U.S. Department of Agriculture, Forest Service. GIS data and product accuracy may vary. This product may be developed from sources of differing accuracy, accurate only at certain scales, based on modeling or interpretation, incomplete while being created or revised, etc.
Using GIS products for purposes other than those for which they are created may yield inaccurate or misleading results .
The Forest Service reserves the right to correct, update, modify, or replace GIS products without notification.
Maps created by J. Gott-Benedetti, Restoration Technician, Coeur d'Alene Ranger District
= Potosi Gulch culvert on Kings Pass Road, contractor is advised to investigate prior to hauling equipment over this culvert jgottbenedetti Text Box jgottbenedetti Text Box
T 49 N R 4 E
1505UCA
1505UI
1505UIA
1505UCA
1505UI, 1505UIA, and 1505UCA
EXHIBIT PAGE 2 OF 12
F
0 0.05 0.1 0.15 0.2 Miles
No work on these segments
0.25
I
I
I
I
((14,�
I
I
I f
I I
I I
0.5 , ______ ,'0.75
1505A and 1505D
T 49 N R E
Mile
I
I
41'... .. ,I
I
EXHIBIT PAGE 3 OF 12
I
F
0 0.1 0.2 0.3 0.4 0.5 Miles
271UA, 271UAD and Associated Skid Trail
T 49 N R 4 E
T 48 N R 4 E
Skid Trail
271UAD
271UA
EXHIBIT PAGE 4 OF 12
T 49 N R 4 E
424ULA
424UL
F
0 0.1 0.2 0.3 0.4 0.5 Miles
424UL and 424ULA
EXHIBIT PAGE 5 OF 12
File details come from the government source that posted it. Updated .