Attachment A - FEMA R9 Presidio - Overview of Furniture Layout Required 002 (PDF).pdf
PDF 2 MB Posted
- Attached to
- Kitchen Millwood and Electrical
- Solicitation number
- 70FBR925Q00000007
About this file
This is a furniture layout diagram showing the floor plan for FEMA Region 9's Presidio facility. The drawing depicts an office space layout with various workstations, private offices, and meeting areas. The layout includes multiple individual workstations arranged in clusters (shown in yellow), several private offices along the perimeter, a large conference room with a rectangular table that seats approximately 8-10 people, and smaller meeting spaces. The floor plan also shows circulation paths and what appears to be support spaces in gray. The furniture arrangement suggests an open office concept with a mix of collaborative and private work areas.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2'-0"2'-0"2'-0"2'-0"
FEMA Region 9 Presidio Overview of Furniture Layout Required
| FEMA Region 9 Presidio - Overview of Furniture Layout Required 002 (VSDX).vsdx |
| Page-1 |
File details come from the government source that posted it. Updated .