This is a construction drawing set from the Kansas Department of Administration and Department for Aging & Disability Services for replacing fire hydrant assemblies and valves at Osawatomie State Hospital located at 500 State Hospital Drive in Osawatomie, KS. The project involves replacing multiple fire hydrant assemblies (FH1, FH7, FH11, FH14, FH15, FH21) and water main valves across the hospital campus, including removing existing hydrants, installing new hydrants with shutoff gate valves, and replacing underground piping back to the mains. Specific work includes installing a new shutoff valve in the utility tunnel for the Administration Building service line and replacing an underground 8" water main valve beneath concrete sidewalk. The drawings are dated January 31, 2025.

The drawings include detailed specifications for concrete thrust blocks, utility trench requirements, fire hydrant assembly installation, and waterline anchoring. The contractor must coordinate utility shutdowns with hospital maintenance staff at least 7 days in advance, locate all utilities before excavation, repair any damaged utilities at their expense, and restore disturbed areas with final grading and K-31 fescue seeding. All underground connections must use restrained mechanical joints with new hardware, and the contractor must submit plans for disinfecting and purging lines. All excavations must be covered and sealed when not actively being worked on.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BUILDING NO. BUILDING NAME

YEAR

BUILT

SHEET INDEX

OSAWATOMIE STATE HOSPITAL

49400-00003 49400-00004

49400-00005 49400-00006 49400-00007 49400-00008 49400-00009 49400-00010 49400-00011 49400-00012 49400-00013 49400-00014 49400-00016 49400-00017 49400-00018 49400-00019

49400-00020

49400-00021 49400-00022 49400-00023 49400-00024 49400-00025 49400-00026 49400-00027 49400-00028 49400-00029 49400-00030 49400-00031 49400-00032 49400-00033 49400-00034 49400-00035 49400-00036 49400-00037 49400-00038 49400-00039 49400-00040 49400-00041 49400-00042 49400-00043 49400-00044 49400-00045 49400-00046 49400-00047 49400-00048 49400-00049 49400-00050 49400-00051 49400-00052

CARMICHAEL

RUSH BUILDING

(VACANT/STORAGE)

WEST COTTAGE

SPECIAL SERVICES BUILDING

NURSES' COTTAGE (VACANT)

BIDDLE BUILDING

LIBRARY BUILDING

AUDITORIUM

POOL & GYMNASIUM

CENTRAL WORKSHOP

GEORGE A. YORK SCHOOL

INDUSTRIAL ARTS BUILDING

HORTICULTURE BUILDING

GREENHOUSE #2

FIRE & SECURITY STATION

MAINTENANCE SHOPS

& WAREHOUSE

MAINTENANCE STORAGE

& SHOP BUILDING

POWER PLANT

SUPPLY

LAUNDRY BUILDING

ADAIR "A"

ADAIR "B"

ADAIR "C"

SEDRIKS BUILDING (ADAIR "D")

ADAIR COTTAGE "E"

ADAIR COTTAGE "F"

ADAIR COTTAGE "G"

ADMINISTRATION BUILDING

STAFF COTTAGE #1

STAFF COTTAGE #2

STAFF COTTAGE #3

STAFF COTTAGE #4

STAFF COTTAGE #5

STAFF COTTAGE #6

STAFF COTTAGE #7

STAFF COTTAGE #8

STAFF COTTAGE #9

STAFF COTTAGE #10

GARAGE - STAFF COTTAGE #10

STAFF COTTAGE #11

STAFF COTTAGE #12

GARAGE - STAFF COTTAGE #12

BIDDLE ANNEX

EAST LIFT STATION

OIL PUMP HOUSE

WEST LIFT STATION

GREENHOUSE #1

VALLEY VIEW SHELTER HOUSE

FIRE TRAINING BUILDING

H O S P I T A L C A M P U S

NOT TO SCALESCALE

COVER

C-1 C-2

REPLACE FIRE HYDRANT

ASSEMBLIES AND VALVES

TITLE SHEET

DEMOLITION AND INSTALLATION PLAN

DETAILS

V I C I N I T Y M A P

SCALE NOT TO SCALE

N O R T H

44 40

32 47

35 36

19 22

HIGHWAY 279

AC

TIVITY D

R

O

SA

W

AT

O M

IE

R

D

BIDDLE RD.

G R

EE

N

H O

U

SE

S T.

SERVICE RD.

HOSPITAL RD.

Osawatomie State Hospital

W. 339TH ST.

O sa w at om ie

R d.

COVER

TITLE SHEET

Fi le

N am e:

2:

P

M Ti m e:

2/ 2/

D at e: CONSTRUCTION

DOCUMENTS

X-1484

C H

EC

KE

D B

Y:

D

R

AW

N B

Y:

D

AT

E:

G

AL

KH

D

/3

1/

R

EV

DE

PA

RT

ME

NT

O

F

AD

MI

NI

ST

RA

TI

ON

OF

FI

CE

O

F

PR

OC

UR

EM

EN

T

AN

D

CO

NT

RA

CT

S

0 S

W

JA

CK

SO

N, R

OO

M

TO

PE

KA

, K

AN

SA

S

2-

PH

ON

E

5-

6-

O

SA

W

AT

O M

IE

S

TA

TE

H O

SP

IT

AL

R

EP

LA

C

E

FI

R E

H

YD

R

AN

T

AS

SE

M

BL

IE

S

AN

D V

AL

VE

S

ST

AT

E H

O

SP

IT

AL

D R

IV

E, O

SA

W

AT

O M

IE

, K

S

Al fre d Be ne sc h

C om pa ny

H as ke ll Av e.

, S ui te

Ka ns as C ity , K an sa s

3-

1-

Y :\K an sa s\

X X

-1 3S

\0

0-

.4 1_

O S

H _F

H

V

LV

_R ep la ce

\E ng

_D oc s\ C

A D

D \S he et s\ C ov er

8.

.d w g]

[L as t S av ed : 2

/2 /2

2:

:3

P M

; G ly on s]

AJ

T

KA

NS

AS

D

EP

AR

TM

EN

T

FO

R

AG

IN

G

DI

SA

BI

LIT

Y

SE

RV

IC

ES

NE

W

E

NG

LA

ND

B

UI

LD

IN

G

3 S K

AN

SA

S

AV

EN

UE

TO

PE

KA

, K

AN

SA

S

PH

ON

E

5-

6-

BU

IL

D

IN

G

N U

M

BE

R

-0

SOUTH SANITARY

LIFT STATION

WEST SANITARY

LIFT STATION

SERVICE LINE TOSUNFLOWER

SERVICE LINE TOMIAMI RWD #1

WM

WM

10" Ø

FISH POND

ADMINISTRATION

BUILDING

8" Ø

8" Ø

10" Ø

STAFF

COTTAGE

NO. 12

8" Ø

CP

RUSH

4" Ø

4" Ø

6" Ø

8" Ø

4" Ø

8" Ø

BIDDLE

6" Ø

4" Ø 2" Ø

3" Ø 4" Ø

LIBRARY

2" Ø

SPECIAL SERVICE

BUILDING

AUDITORIUM POOL / GYM

2" Ø

8" Ø

6" Ø

6" Ø

8" Ø

A

B

C

D

E

FG

6" Ø

6" Ø

6" Ø

1" Ø

6" Ø

SCHOOL

ACTIVITIES

BUILDING

8" Ø

MAINTENANCE SUPPLY

POWER

PLANT

8" Ø

LAUNDRY

FIRE STATION

STAFF

COTTAGE

NO. 116" Ø

" Ø

GREENHOUSE

3 6

8" Ø

8" Ø

8" Ø

8" Ø

8" Ø WATER TOWER

4" Ø

10" Ø 8" Ø

2" Ø

C-1

DEMOLITION AND

INSTALLATION PLAN

Fi le

N am e:

2:

P

M Ti m e:

2/ 2/

D at e: CONSTRUCTION

DOCUMENTS

X-1484

C H

EC

KE

D B

Y:

D

R

AW

N B

Y:

D

AT

E:

G

AL

KH

D

/3

1/

R

EV

DE

PA

RT

ME

NT

O

F

AD

MI

NI

ST

RA

TI

ON

OF

FI

CE

O

F

PR

OC

UR

EM

EN

T

AN

D

CO

NT

RA

CT

S

0 S

W

JA

CK

SO

N, R

OO

M

TO

PE

KA

, K

AN

SA

S

2-

PH

ON

E

5-

6-

O

SA

W

AT

O M

IE

S

TA

TE

H O

SP

IT

AL

R

EP

LA

C

E

FI

R E

H

YD

R

AN

T

AS

SE

M

BL

IE

S

AN

D V

AL

VE

S

ST

AT

E H

O

SP

IT

AL

D R

IV

E, O

SA

W

AT

O M

IE

, K

S

Al fre d Be ne sc h

C om pa ny

H as ke ll Av e.

, S ui te

Ka ns as C ity , K an sa s

3-

1-

Y :\K an sa s\

X X

-1 3S

\0

0-

.4 1_

O S

H _F

H

V

LV

_R ep la ce

\E ng

_D oc s\ C

A D

D \S he et s\ D em o an d

In st al la tio n

P la n

.4 1.

dw g]

[L as t S av ed : 2

/2 /2

2:

:4

P M

; G ly on s]

AJ

T

KA

NS

AS

D

EP

AR

TM

EN

T

FO

R

AG

IN

G

DI

SA

BI

LIT

Y

SE

RV

IC

ES

NE

W

E

NG

LA

ND

B

UI

LD

IN

G

3 S K

AN

SA

S

AV

EN

UE

TO

PE

KA

, K

AN

SA

S

PH

ON

E

5-

6-

BU

IL

D

IN

G

N U

M

BE

R

-0

GENERAL NOTES:

1. WHERE FIRE HYDRANTS ARE SHOWN TO BE REPLACED,

REMOVE EXISTING FIRE HYDRANT ASSEMBLIES AND

SUPPLY PIPING BACK TO THE MAIN AND REPLACE WITH

NEW HYDRANT, SHUTOFF GATE VALVE, AND PIPING AS

INDICATED ON THESE PLANS.

2. PLANS FOR THE APPROXIMATE LOCATION OF BURIED

UTILITIES ON CAMPUS ARE AVAILABLE FOR REVIEW AT

THE OSAWATOMIE STATE HOSPITAL MAINTENANCE

OFFICE. UTILITIES CAN NOT BE LOCATED BY

1-800-DIG-SAFE OR LOCAL UTILITY COMPANIES DUE TO

BEING ON GOVERNMENT PROPERTY. THE

CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING

ALL UTILITIES WITHIN ANY AREAS OF EXCAVATION.

3. EXISTING UTILITIES DAMAGED DURING CONSTRUCTION

SHALL BE REPAIRED AND TESTED AT THE

CONTRACTOR’S EXPENSE. REPAIR TO DAMAGED

UTILITIES SHALL BE COMPLETED AS SOON AS UTILITY IS

DAMAGED. ALL UTILITIES, OTHER THAN THOSE IN THE

IMMEDIATE VICINITY OF THE WORK, SHALL REMAIN

OPERATIONAL DURING THIS PROJECT UNLESS A

SHUT-DOWN IS APPROVED BY THE OWNER.

4. FOLLOWING ANY EXCAVATION AND BACKFILLING, THE

DISTURBED AREA SHALL BE FINAL GRADED AND

SEEDED WITH K-31 FESCUE IN THE AMOUNT

RECOMMENDED BY THE PRODUCT MANUFACTURER.

FINAL GRADES TO MATCH ADJACENT GRADES. ADJUST

GRADES AS NEEDED TO PROVIDE PROPER DRAINAGE

AWAY FROM HYDRANT ASSEMBLY.

5. COORDINATE SHUT DOWN OF WATER LINES OR OTHER

UTILITIES WITH OSAWATOMIE STATE HOSPITAL

MAINTENANCE STAFF AT LEAST SEVEN DAYS IN

ADVANCE.

6. ALL EXCAVATIONS SHALL BE COVERED AND SEALED

WHEN CONTRACTOR IS NOT AT SITE, AT NIGHT, DURING

WEEKENDS OR WHEN WORKING OUT OF VISUAL SIGHT.

7. BURIED PIPING AND FITTINGS AFFECTED BY THIS WORK

SHALL BE EXCAVATED AND EXPOSED FOR

VERIFICATION PRIOR TO MATERIAL BEING PURCHASED

FOR REPLACEMENT OR FOR MAKING CONNECTION.

8. SUBMIT PLAN FOR DISINFECTING PIPING AND

PURGING/FLUSHING OF LINES FOR APPROVAL BY

AUTHORITY HAVING JURISDICTION. PROVIDE DRAIN

VALVE AT LOW POINTS AS NEEDED.

9. ALL UNDERGROUND CONNECTIONS SHALL BE MADE

WITH RESTRAINED MECHANICAL JOINTS.

10. DO NOT REUSE EXISTING HARDWARE. PROVIDE ALL

NEW NUTS AND BOLTS WHEN MAKING CONNECTIONS.

DEMOLITION AND INSTALLATION PLAN

REPLACE FIRE

HYDRANT

ASSEMBLY

REPLACE FIRE

HYDRANT

ASSEMBLY

REPLACE FIRE

HYDRANT

ASSEMBLY

REPLACE FIRE

HYDRANT

ASSEMBLY

REPLACE FIRE

HYDRANT

ASSEMBLY

FH 14

FH 11

FH 15

FH 21

FH 1

WV 7B-1 INSTALL NEW SHUTOFF VALVE IN

UTILITY TUNNEL FOR SERVICE LINE

TO ADMINISTRATION BUILDING.

REF. KEY NOTE 3 AND DETAIL.

WV 6-1

REPLACE UNDERGROUND 8"

WATER MAIN VALVE BENEATH

CONCRETE SIDEWALK. REF.

KEY NOTES 1 AND 2.

FH 7

REMOVE FIRE HYDRANT

ASSEMBLY BACK TO MAIN

AND INSTALL MECHANICAL

JOINT BLIND FLANGE AT TEE.

REF. KEY

NOTE 4

KEY NOTES:

1. CONTRACTOR SHOULD ANTICIPATE PROVIDING A NEW

RESTRAINED SLIP JOINT COUPLING FOR INSTALLATION

OF THE NEW VALVE, AND NEW PIPING FROM VALVE TO

EXISTING TEE.

2. REMOVE PAVEMENT BACK TO EXISTING JOINTS AND

REPLACE TO MATCH EXISTING.

3. NEW SHUTOFF VALVE TO BE 2” BRONZE FULL PORT

BALL VALVE, FNPT X FNPT, 600 PSI CWP. INCLUDE PIPE

UNION BELOW VALVE.

4. THE EXISTING SHUTOFF VALVE FOR THIS FIRE

HYDRANT IS LOCATED APPROXIMATELY 45’ FROM THE

HYDRANT. NEW HYDRANT TO BE IN THE SAME

LOCATION AS EXISTING. REPLACE ALL PIPING BACK TO

MAIN.

AutoCAD SHX Text

SERVICE ROAD

AutoCAD SHX Text

STAFF DRIVE

AutoCAD SHX Text

STAFF DRIVE

AutoCAD SHX Text

OSAWATOMIE ROAD

AutoCAD SHX Text

STAFF DRIVE

AutoCAD SHX Text

STAFF ROAD

AutoCAD SHX Text

BIDDLE ROAD

AutoCAD SHX Text

GREENHOUSE STREET

AutoCAD SHX Text

ACTIVITY DRIVE

AutoCAD SHX Text

HOSPITAL ROAD

AutoCAD SHX Text

W 339TH STREET

AutoCAD SHX Text

OSAWATOMIE ROAD

AutoCAD SHX Text

BIDDLE ROAD

AutoCAD SHX Text

ACTIVITY DRIVE

AutoCAD SHX Text

N 1ST STREET

AutoCAD SHX Text

MAIN BUILDING DRIVE

AutoCAD SHX Text

SUNKEN GARDEN DRIVE

AutoCAD SHX Text

OSAWATOMIE ROAD

AutoCAD SHX Text

SUNKEN GARDEN DRIVE

AutoCAD SHX Text

CP CIRCLE

AutoCAD SHX Text

SOUTH AVENUE

AutoCAD SHX Text

SUNKEN GARDEN DRIVE

AutoCAD SHX Text

RUSH STREET

AutoCAD SHX Text

ADAIR CIRCLE

AutoCAD SHX Text

ADAIR CIRCLE

AutoCAD SHX Text

BIDDLE ROAD

AutoCAD SHX Text

AUDITORIUM PARKWAY

AutoCAD SHX Text Scale: 1" = 150' (Full Size)

SCALE: NTS

CONCRETE PAD DETAIL

1' -6

1'-6"x8" DEEP

(TYP.)

3"

(TYP.)

A C-2

EXISTING

SURFACE

O.D. + 2'

MAXIMUM

EXISTING

UNDISTURBED

BASE

MATERIAL

O.D.1'-0" 1'-0"

" M

IN

IM

U M

Scale: NTS

UTILITY TRENCH DETAIL (UNDER EARTH)

COMPACTED FILL

90% OUTSIDE R/W

95% WITHIN R/W

6" OF BEDDING MATERIAL

PER MANUFACTURER

12" OF COVER MATERIAL

PER MANUFACTURER

INITIAL FILL

OVER PIPE TO

BE SCREENED

OF ANY ROCKS

OR DEBRIS

D C-2

Scale: NTS

3-WAY 5 1/4" FIRE HYDRANT ASSEMBLY

CONCRETE THRUST BLOCK & SUPPORT

M

IN

D

EP

TH

'-6

MUELLER COMPANY OR

APPROVED EQUIVALENT

PRODUCTS ONLY 3-WAY

FIRE HYDRANT

BASE ELEVATION

TRENCH LINE

6" MINIMUM

TURN TO FACE

PERPENDICULAR TO STREET CURB

OR FIRE LANE

FINISH

GRADE

IRON VALVE BOX

MUELLER CO. OR APPROVED

EQUIVALENT VALVES ONLY

1 1/4" ROAD ROCK

LIMITS FOR DRAIN

DRAIN LOCATION

UNDISTURBED

SOIL

6" MINIMUM

UNLESS

OTHERWISE

SPECIFIED.

1' -3

"M

IN

'' T R

EN

C

H

6"

HYDRANT, TEE, & VALVE

SHALL BE MECHANICALLY

RESTRAINED

BURY LINE REF. PAD DETAIL

RELOCATE FIRE HYDRANT IF

NEEDED TO ACHIEVE 10'

SPACING FROM SHUTOFF VALVE.

COORDINATE LOCATION WITH

ENGINEER.

10'-0"

C C-2

TYPICAL BEND

B

EA

RIN

G

AREA

STANDARD TEE

BEARING AREA

VERTICAL CHANGE IN DIRECTION

ELEVATIONSECTION

MIN.

3"

M

IN

90° BEND 45° BEND 1 2/22 ° BEND 11 ° BEND1/4

CONCRETECONCRETE NO.NO.CONCRETE NO.NO.1 SQ. FT.

2 SQ. FT.

3 SQ. FT.

5 SQ. FT.

8 SQ. FT.3 SQ. FT.

2 SQ. FT.

1 SQ. FT.

1 SQ. FT.

1 SQ. FT.1 SQ. FT.

1 SQ. FT.

2 SQ. FT.

2 SQ. FT.

4 SQ. FT.7 SQ. FT.

4 SQ.FT.

3 SQ. FT.

2 SQ. FT.

1 SQ. FT.

1/2

12 SQ. FT.

7 SQ. FT.

5 SQ. FT.

3 SQ. FT.

2 SQ. FT.

4/1

12"

10"

8"

6"

4"

TEE11 ° BEND22 ° BEND45° BEND90° BENDPIPE SIZE

THRUST BLOCK BEARING AREA VERTICAL CHANGE ANCHORS

2.0 1.0 1.0 1.0

2.5 1.5 1.0 1.0

4.5 3.0 2.0 1.0

8.0 5.5 3.5 2.0

C.Y.C.Y.C.Y.C.Y. BARBARBARBAR

CONCRETE

12" 10" 8" 6"

SIZE

PIPE

BLOCKING OF TEES IS TO BE PLACED OPPOSITE THE BRANCH & AREA IS BASED ON BRANCH SIZE. THE CONCRETE AND STEEL REQUIRED FOR ALL FITTINGS NOT LISTED SHALL BE THE SAME AMOUNT AS REQUIRED FOR THE 22 1/2° BENDS. CONCRETE AND STEEL ARE SUBSIDIARY TO OTHER ITEMS OF

WORK. THE SPACING FOR MULTIPLE REBAR ANCHORS SHALL BE 2"C.C.

Scale: NTS

WATERLINE ANCHORING

#4 REBAR THRUST ANCHOR

(COAT EXPOSED SURFACE

WITH BITUMINOUS PAINT)

CONCRETE

THRUST BLOCK

UNDISTURBED

EARTH

CONCRETE

THRUST ANCHOR

CONCRETE

THRUST BLOCK

B C-2

SCALE: NTS

ADMINISTRATION BUILDING SERVICE LINE DETAIL EC-2

C-2

DETAILS

Fi le

N am e:

2:

P

M Ti m e:

2/ 2/

D at e: CONSTRUCTION

DOCUMENTS

X-1484

C H

EC

KE

D B

Y:

D

R

AW

N B

Y:

D

AT

E:

G

AL

KH

D

/3

1/

R

EV

DE

PA

RT

ME

NT

O

F

AD

MI

NI

ST

RA

TI

ON

OF

FI

CE

O

F

PR

OC

UR

EM

EN

T

AN

D

CO

NT

RA

CT

S

0 S

W

JA

CK

SO

N, R

OO

M

TO

PE

KA

, K

AN

SA

S

2-

PH

ON

E

5-

6-

O

SA

W

AT

O M

IE

S

TA

TE

H O

SP

IT

AL

R

EP

LA

C

E

FI

R E

H

YD

R

AN

T

AS

SE

M

BL

IE

S

AN

D V

AL

VE

S

ST

AT

E H

O

SP

IT

AL

D R

IV

E, O

SA

W

AT

O M

IE

, K

S

Al fre d Be ne sc h

C om pa ny

H as ke ll Av e.

, S ui te

Ka ns as C ity , K an sa s

3-

1-

Y :\K an sa s\

X X

-1 3S

\0

0-

.4 1_

O S

H _F

H

V

LV

_R ep la ce

\E ng

_D oc s\ C

A D

D \S he et s\ D et ai ls a nd S ch ed ul es

8.

.d w g]

[L as t S av ed : 2

/2 /2

2:

:5

P M

; G ly on s]

AJ

T

KA

NS

AS

D

EP

AR

TM

EN

T

FO

R

AG

IN

G

DI

SA

BI

LIT

Y

SE

RV

IC

ES

NE

W

E

NG

LA

ND

B

UI

LD

IN

G

3 S K

AN

SA

S

AV

EN

UE

TO

PE

KA

, K

AN

SA

S

PH

ON

E

5-

6-

BU

IL

D

IN

G

N U

M

BE

R

-0

AutoCAD SHX Text

VALVE BOX OPENING

AutoCAD SHX Text SET TOP OF BOX " 12" ABOVE GRADE AND SLOPE CONCRETE FROM EDGE OF BOX TO PERIMETER OF PAD FOR DRAINAGE.

AutoCAD SHX Text

#4 AT 3" OFF OUTSIDE EDGE

AutoCAD SHX Text

SET FLUSH WITH EXISTING GRADE

AutoCAD SHX Text

FIRE HYDRANT SHUT-OFF VALVE ONLY

AutoCAD SHX Text

INSTALL NEW 2" SHUTOFF VALVE IN SERVICE LINE RISER

File details come from the government source that posted it. Updated .