This is a Performance Work Statement (PWS) for Graywater Removal Services during Exercise Northern Strike 25-2 at Camp Grayling Joint Maneuver Training Center (CGJMTC) and Grayling Army Airfield in Michigan. The contract requires a contractor to provide professional services including equipment, vehicles, labor, and transportation for daily graywater collection and removal from up to 5 locations, with an estimated daily usage of 4,000-5,000 gallons and a maximum daily capacity of 5,000 gallons. The performance period is from 03 August to 13 August 2025, with setup from 01-02 August and equipment removal on 13-14 August.
Key requirements include supplying clean potable water, collecting and transporting graywater to a treatment plant, providing containers with 10% extra capacity, and obtaining proper HAZMAT waste certification. The contractor must comply with base security regulations, complete various training requirements (AT Level I, iWatch, OPSEC), and have the means to traverse Camp Grayling's training areas. The solicitation is a 100% small business set-aside with a NAICS code of 562998 and a small business size standard of $16.5M, with the government intending to award a firm-fixed price contract to the lowest-priced technically acceptable quote.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions Answered.pdf | ||
| Attachment C Synopsis Solicitation-Grey Water Removal NORTHERN STRIKE-25.pdf | ||
| Attachment B Wage Det Alpena 8 May 25.pdf | ||
| Attachment D Clin.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Ver. October 2022
DESCRIPTION OF SERVICE
FOR
GRAY WATER REMOVAL FOR EXERCISE NORTHERN STRIKE 25-2
CAMP GRAYLING JOINT MANUEVER TRAINING CENTER (CGJTMC), MICHIGAN
Northern Strike Plans Group (NSPG) Graywater Removal Services
1.1 The Contractor shall provide professional services, supervision, equipment, vehicles, labor, tools, quality control, storage, transportation, and furnish all supplies and materials, not provided by the Government, required for the supply and removal of Graywater from various training sites to a water treatment plant.
1.1.1 Period of Performance: 03 August – 13 Aug 2025. This contract is in support of Exercise
Northern Strike (NS) 25-2 in and around Camp Grayling, MI (CGJMTC) and Grayling Army Air
Field (GAAF). Set up between 01 August 2025 and 02 August 2025. 03 August 25 through 13
August 2025 services outlined in this PWS shall be required. Tear down and pack up equipment on 13-14 August 2025.
1.1.2 Place of Performance: CGJMTC, MI; GAAF, MI. Services for daily graywater storage and removal are estimated to support out of no more than 5 locations. Missing Grid Coordinates shall be rectified NLT seventy-two (72) hours prior to placement.
2.0 General
2.1 Base Access/Security. The award of this contract does not create a right to access any military installation. The contractor shall appoint a single individual to coordinate base access with the Government Point of Contact (POC) for all contractor employees, subcontractor employees, and delivery drivers. Prior to access to this installation the contractor shall coordinate with the COR, SSG Benjamin Rimatzki, 2LT Samuel Misak, or MAJ
Nicholas Fiebke no later than ten (10) business days prior to commencement of work.
2.1.1 Contractor employees shall comply with adjudication standards and procedures using the
National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist
Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by Government representative), or, at OCONUS locations, IAW status of forces agreements and other theater regulations.
2.1.2 Unscheduled gate closure by the Security Police may occur at any time causing all personnel entering or exiting a closed installation to experience a delay. This cannot be predicted or prevented. Contractors are not compensated for unexpected closures or delays.
2.1.3 The contractor and its employees shall comply with all base security and traffic regulations.
Vehicles operated by contractor personnel are subject to search pursuant to applicable regulations. Any moving violation of any applicable motor vehicle regulation may result in the termination of the contractor employee’s installation driving privileges. All contractor employees shall carry proper identification with them at all times while on Camp Grayling Joint Maneuver
Training Center.
2.1.4 Contractor employees must be able to pass all security requirements IAW the Provost
Marshall’s Policy to gain access to the installation to include providing all information required for background checks to meet installation access requirements which will be conducted by the installation Provost Marshall Office, Director of Emergency Services, or Security Office.
2.1.5 All Contactors requiring access to Army Installations shall complete AR Level I awareness training withing ten (10) calendar days after employee start date. Certificates of completion shall be submitted to the COR. AT Level I awareness training is available at Level I Antiterrorism
Awareness Training (jten.mil)
2.1.6 All Contractors shall attend iWatch training. The training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the
COR. This training shall be completed within ten (10) calendar day of start of work. The iWatch
Training is available at: IWatch, If you See Something, Say Something – YouTube
2.1.7 Per AR 350-1 the Contractor shall complete Level I OPSEC Awareness training available at https://securityawareness.usalearning.gov/. Employees must be trained within ten (10) calendar days of their reporting to duty.
2.2 Physical Security. The contractor shall ensure all government equipment and materials in their possession are secured.
2.3 Safety/Environmental: The contractor shall comply with all federal and state Occupational
Safety and Health Administration (OSHA) requirements and standards, technical orders, regulations, and referenced publications as published in the OSHA 29 CFR.
2.3.1 Contactor shall comply with the guidelines outlined in CG Regulation 200-1, Department of Health Services, and Department of Transportation for the transportation of Graywater on public roadways.
3.0 Government Property, Material, Equipment and Services:
3.1 The contractor shall furnish everything required to perform the services as indicated in
Section 1.
4.0 Contractor Furnished Property, Materials, and Equipment (CFP/M/E):
https://securityawareness.usalearning.gov/
4.1 General: Except for those items specifically stated to be Government-Furnished in Paragraph
3.0, the contractor shall furnish everything required to perform these services as indicated in
Paragraph 1.1
4.2 Containers to capture Graywater.
4.3 Fresh potable water.
4.4 The means to collect and transport water to a Water Treatment facility.
4.5 HAZMAT Waste Certification as outlined by the Department of Health Services and Camp
Grayling Environmental Office.
5.0 Requirements: The contractor shall:
5.1 Daily supply clean potable water, collect and transport Graywater to Government identified locations on Camp Grayling and Grayling Airforce Base.
5.2 Dispose of collected Graywater at a water treatment plant available on Camp Grayling.
5.2.1 Estimated 4,000-5,000 gallons/day with a maximum of 5,000 gallons for one day.
5.2.2 Site activities that produce Graywater include Field Feeding, Water Purification and
Shower and Laundry.
5.3 Provide containers at each site that are at a minimum 10% larger capacity than the estimated gallons to be removed each day.
5.4 Contractor shall be required to have proper HAZMAT waste certification as outlined by the
Department of Health Services and Camp Grayling Environmental Office in order to transport
Graywater over public roads. Publication CG Regulation 200-1 Environmental Protection and
Enhancement will be provided.
5.5 Contractor shall possess the equipment means to traverse Camp Grayling cantonment and training areas to provide collection containers, deliver potable water, and remove Graywater from requesting units.
TECHNICAL EXHIBIT 1
Performance Requirements Summary
PWS
Section
Task Performance Standard Acceptable Quality
Levels (AQL)
Surveillance
Method by
COR
1.1.1
Equipment delivery and set up; 01 to 03
August 2025
All equipment is delivered, in place, in good condition and without defect, meeting timelines and requirements specified in
PWS.
No more than 1 minor defect at end of set up 03
August 2025.
Contractor corrects within 24 hours
Inspection by
5.1
Daily supplying of potable water
Supply of fresh water is as specified in the DOS, meeting all schedules, quantities, and quality of service.
No more than 7 units daily found that are not serviced properly.
Vendor corrects within 2 hours of notification.
Inspection by
COR &
Customer
Feedback
5.2-5.2.2
Daily disposal of graywater
Gray water is collected and disposed daily from all locations
All locations have gray water collected.
Vendor corrects any locations within 2 hours of notification
Inspection by
COR &
Customer
Feedback
5.3
Provision of holding tanks/graywater containers
Provide containers at each site, capacity must be at least 10% larger than the estimated total gallons to be removed each day.
All locations have a suitably sized holding tank.
1.1.1
Removal of contractor units between 13-14
August
50% of units are removed by end of day 13 Aug
100% of remaining units removed by end of day
14 Aug
TECHNICAL EXHIBIT 2
Deliverables Schedule
PWS Reference / Deliverable Title
Frequency Number of Copies
Medium/Format Submit To
2.1 Base Access Information
NLT 10 days prior to start of work
Electronic
Submission
POC identified in para 2.1
5.4
HAZMAT
Certification
Certification provided
NLT
30 days prior to start of performance period.
Electronic or Hard Copy
Identification Media
Return upon completion of contract performance.
Original(s)
Hard Copy
2.1.5 AT Level I Training
Certificate provided to COR within 10 days of employees start date
1 Electronic or Hard Copy
COR
2.1.6 iWatch Training
Proof of training provided to COR within 10 calendar days of employees start date
1 Electronic or Hard Copy
COR
2.1.7 Level I OPSEC
Certificates provided to COR within 10 calendar days of employees start date
1 Electronic or Hard Copy
TECHNICAL EXHIBIT 3
Historical / Estimated Workload Data
This estimate is not a definitive list of actions to be taken, only an estimate of the work that may be required.
1 Max number of locations
5 total locations located at both Camp Grayling and Grayling Army Airfield
2 Average Daily Usage
4,000-5,000 Gallons
3 Max Daily Usage
5,000 Gallons