Attachment_A_-_Cost_Sheet.xlsx
XLSX spreadsheet 18 KB Posted
- Attached to
- HVAC Preventative Maintenance
- Solicitation number
- EVT0010032
- Issued by
- Rawlins County, Levant CDP, Kansas
About this file
This is a cost sheet listing HVAC equipment inspection requirements. The file details 17 pieces of equipment requiring quarterly, semiannual, and annual inspections, including five Superior Boilers, two RayPak Hot Water Heaters, two Marley Cooling Towers, two Trane Liquid Chillers, two Carrier Air-Cooled Chillers, and various Heat Transfer Group and Heat Craft cooling and freezer units.
The document appears to be a pricing template where vendors would input their unit costs for performing the required inspections on each piece of equipment. The spreadsheet is structured to capture individual pricing for each equipment inspection, though no actual cost figures are shown in the provided content.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_1_-_EVT0010032.docx | DOCX document | |
| HVAC_Preventative_Maintenance.pdf | ||
| EVT0010032_-_HVAC_Preventative_Maintenance.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Inspections Cost | |||
| Unit | Cost | ||
| 1 | Superior Boiler | Superior Boiler 1 | |
| quarterly, | |||
| semiannual | |||
| annual |
| 2 | Superior Boiler | Superior Boiler 2 |
| quarterly, | ||
| semiannual | ||
| annual |
| 3 | Superior Boiler | Superior Boiler 3 |
| quarterly, | ||
| semiannual | ||
| annual |
| 4 | Superior Boiler | Superior Boiler 4 |
| quarterly, | ||
| semiannual | ||
| annual |
| 5 | Superior Boiler | Superior Boiler 5 |
| quarterly, | ||
| semiannual | ||
| annual |
| 6 | RayPak | Hot Water Heater – 1 |
| quarterly, | ||
| semiannual | ||
| annual |
| 7 | RayPak | Hot Water Heater – 2 |
| quarterly, | ||
| semiannual | ||
| annual |
| 8 | Marley | Cooling Tower 1 |
| quarterly, | ||
| semiannual | ||
| annual |
| 9 | Marley | Cooling Tower 2 |
| quarterly, | ||
| semiannual | ||
| annual |
| 10 | Trane | Liquid Chiller 1 |
| quarterly, | ||
| semiannual | ||
| annual |
| 11 | Trane | Liquid Chiller 2 |
| quarterly, | ||
| semiannual | ||
| annual |
| 12 | Carrier | Air-Cooled Chiller 1 |
| quarterly, | ||
| semiannual | ||
| annual |
| 13 | Carrier | Air-Cooled Chiller 2 |
| quarterly, | ||
| semiannual | ||
| annual | ||
| 14 | Heat Transfer Group | Cooler 1 Interior Unit Evaporator |
| quarterly, | ||
| semiannual | ||
| annual |
| 15 | Heat Transfer Group | Cooler 2 Interior Unit Compressor |
| quarterly, | ||
| semiannual | ||
| annual |
| 16 | Heat Craft | Cooler 2 Exterior Unit Evaporator |
| quarterly, | ||
| semiannual | ||
| annual |
| 17 | Heat Craft | Freezer - South Unit |
| quarterly, | ||
| semiannual | ||
| annual |
File details come from the government source that posted it. Updated .