Attachment A - Cost Details (Rev 11-25) 26085.xlsx

XLSX spreadsheet 205 KB Posted

Attached to
171/26085. SAA; MI Schl for Deaf - New Dormitory
Solicitation number
RFP 171 260000002120 1
Issued by
Genesee County, Michigan

About this file

Attachment A - Cost Details for Michigan School for the Deaf New Dormitory Project

This cost details document supports the State of Michigan's construction project for a new dormitory facility at the Michigan School for the Deaf. The attachment provides a comprehensive cost breakdown and pricing structure for the proposed dormitory construction, establishing the financial framework for contractor proposals and bid evaluation. The document outlines line-item costs, labor expenses, materials, equipment, and other associated construction expenses necessary to complete the new residential facility. Specific response timelines, bid submission deadlines, site visit requirements, and bidders' conference information would be documented in the primary solicitation materials, while this attachment focuses exclusively on the cost structure and financial parameters contractors must address in their proposals.

The cost details document establishes pricing terms and financial requirements for the dormitory project, serving as the baseline for evaluating contractor proposals and determining project feasibility and funding allocation. This attachment would typically include unit costs, labor rates, material pricing, contingency allocations, and any cost escalation provisions relevant to the Michigan School for the Deaf construction initiative. The document supports the state's budget planning, cost control measures, and financial accountability requirements for this capital improvement project, with all pricing information tied to the scope of work and technical specifications outlined in the primary bid documents.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

General Conditions

ERROR:#REF!

Field Office Costs & Reimbursables and General Conditions duration: 11 months

NUMQuantityUnitRateTotal
CostComments
Field Offices
31IT Equipment(Computers,printers,etc.)0devices$3,000Not Included
312.90%IT Support / Assistance0months$150Not Included
31Proj. Mgmt. Internet Based Software0months$500Not Included
31Proj. Mgmt. Internet Teamsite0lump sum$1,500Not Included
31Internet Connectivity - Setup / Activation/Deactivation1lump sum$500$500
31Internet Connectivity - Access11months$450$4,950
31Project Office Trailer11months$500$5,500
32East Side Superintendent Trailer0months$1,250Not Included
32Set-up/Teardown Site Office1allow$2,000$2,000
32Temporary Toilets11months$250$2,750
Drinking Water11months$150$1,650
Gas, Water, Electric Hook up for Trailers1lump sum$2,000$2,000
32Temporary Water Connection for Trailers11lump sum$30$330
33Wireless Communications11months$900$9,900
33Copy/FAX/Office Equipment11months$500$5,500
33Telephone (including monthly bills)11months$400$4,400
Travel11months$1,200$13,200
33Office Furnishings1lump sum$1,500$1,500
34Office Supplies11months$500$5,500
34Postage & Express11months$300$3,300
34Printing (Internal)1lump sum$7,500$7,500
34Office Electrical Power11allow$500$5,500

Total Field Offices & Reimbursables: $75,980

&F&A Page &P of &N &D

Cost Prop Summary

Preconstruction & Bidding Phase Services (from CM Staff & Reimb tab Attachment A) $

Construction & Post Construction Services (from CM Staff & Reimb tab Attachment A) $

CM General Conditions (from CM Staff & Reimb tab Attachment A) $

FEES for OHP, Bonds & Insurances
Performance/Payment Bond Cost$ 1,000x0.00%$ - 0

Liability Insurances (see Attachment B requirements) $ 1,000 x 0.00% $ - 0

Builders Risk Insurance $ 1,000 x 0.00% $ - 0

FEE for Overhead & Profit $ 1,000 x 0.00% $ - 0

Total FEE for OHP + Bonds + Insurances $ - 0

Total CM Cost Proposal (sum of all costs above) (A) $ 0

Trade Contract, Construction General Condition & Contingency Allowance(B)$1,000
(Equals Total CM Contract (C) LESS CM Cost Proposal (A))

Total CM Not-to Exceed Contract Amount (C) $ 1,000

&KFF0000MSD - New Dormitory 171/26085.SAA &"Arial,Bold"&12ATTACHMENT A&14 &11Cost Proposal Summary

For purposes of this cost proposal, assume that the budget for construction is the Total CM Not-to Exceed Contract Amount (C) listed below which is inclusive of all CM fees, general conditions, overhead and profit. Note that the Contract Amount includes the construction contingency. CM costs & % fees will be subject to negotiation and mutual agreement should the final approved scope change substantially.

It is the intent of this cost proposal to obtain proposals that are priced utilizing the same criteria so an accurate evaluation can be performed. Please assume the schedule provided will be the schedule required to complete the project for your base proposal. If you would like to propose alternate schedule approaches, please do so in a volutary alternate describing the alternate schedule approach and benefits, the cost impacts on your CM cost proposal, and the estimated overall cost impacts for the project's design and construction.

Please provide the following breakdown of your cost proposal and also include the CM Staff & Reimb tab of Attachment A to provide a further breakdown of fees requested:

Any adjustments to the total project cost varying from the contract amount assumed above or variances from the schedule provided in this RFP through no fault of the CM will be adjusted utilizing the information and rates provided in this cost proposal as mutually agreed upon in writing. Adjustments will be made after trade contracts have been awarded and the final project cost has been established.

Construction General Conditions will be reimbursed to the CM at cost with no mark-up.

CM Staff & Reimb

INSTRUCTIONS:

The following tables are provided to assist you in determining the projected total cost for the Construction Manager to perform their Management Services as described in the proposed CM Agreement (Attachment B).

It is not a requirement for you to complete all of the line items in the table for your proposal to be considered. However, all of the items listed on the table must be included in your projected total costs and costs for each category must be completed. The CM shall be limited to reimbursement for only those items priced below, If the CM requires items not listed in order to perform the CM services for the project please identify those additional items where indicated "Other - list as applicable" below. If an item listed below does not apply please mark it N/A.

PRE CONSTRUCTION & BIDDING PHASE COSTS
NAMEITEMQUANTITYUNITRATETOTAL
Project Executive$0
Sr. Project Manager$0
Project Manager$0
Project Engineer$0
Project Superintendent$0
Assistant Superintendent$0
Field Engineer$0
Layout Engineer$0
Safety Officer$0
Lead Estimator$0
Estimator$0
Civil Estimator$0
Mechanical Estimator$0
Electrical Estimator$0
Secretarial & Clerical$0
Accounting$0
Other - list as applicable:$0
$0
$0
$0
CM Pre-Construction Phase Reimbursable Expenses$0
Travel/Mileage/Meals (INCLUDE IN STAFF RATES)
Electronic Plan Room$0
Document Reproductions$0
Postage & Expressage$0
Other - list as applicable:$0
$0
$0
$0
TOTAL PRE CONSTRUCTION & BIDDING PHASE COSTS$0
CONSTRUCTION/CLOSEOUT PHASE STAFF COSTS
NAMEITEMQUANTITYUNITRATETOTAL
Project Executive$0
Sr. Project Manager$0
Project Manager$0
Project Engineer$0
Project Superintendent$0
Assistant Superintendent$0
Field Engineer$0
Layout Engineer$0
Safety Officer$0
Lead Estimator$0
Estimator$0
Civil Estimator$0
Mechanical Estimator$0
Electrical Estimator$0
Secretarial & Clerical$0
Accounting$0
Other - list as applicable:$0
$0
$0
$0
$0
Travel/Mileage/Meals (INCLUDE IN STAFF RATES)
$0
TOTAL CONSTRUCTION/CLOSEOUT PHASE STAFF COSTS$0
CONSTRUCTION/CLOSEOUT PHASE REIMBURSABLE CM GENERAL CONDITION EXPENSES
ITEMQUANTITYRATEUNITTOTAL
CONSTRUCTION MANAGER GENERAL CONDITIONS - only those costs required for the CM to perform its management services
Temp Office Trailer Rental$0
Temp Office Trailer Set Up$0
Temp Office Trailer Furnishings$0
Temp Office Trailer HVAC$0
Temp Office Trailer Electric$0
Temporary water to trailer(s)$0
Temp Office Trailer toilets$0
Site Office Supplies$0
Site Office Water Cooler$0
Postage$0
Express Mail$0
Digital Photography & Video$0
Copy/Scan Machine$0
Printers$0
Computers$0
Temp Office Equipment$0
Printing$0
Internet Set Up and Service Fee$0
Software & Support$0
Mobile Phone Expense$0
Field Office Phone service$0
Field Office Phone Equipment$0
Site Two Way Radio$0
On site Vehicle & Fuel Expenses$0
Site Office Debris Removal$0
Travel/Mileage/Meals (INCLUDE IN STAFF RATES)
$0
Other - list as applicable:$0
$0
$0
$0
$0
$0
Performance/Payment Bonds (COST PER PROPOSAL SUMMARY PAGE)
CM CGL Insurance (COST PER PROPOSAL SUMMARY PAGE)
Builder's Risk Insurance (COST PER PROPOSAL SUMMARY PAGE)
$0
TOTAL CM GENERAL CONDITIONS EXPENSES$0

Construction Support General Conditions shall be defined and estimated by the CM in conjunction with the Project Team as design develops. CM shall manage all construction support general conditions either as a reimbursable expense, at cost (no mark up), or assigned to a trade contract as recommended by the CM and mutually accepted by the Project Team.

Construction Support General Conditions may include, but not limited to, items such as the following with preliminary recommended assignment identified by CM:

Construction Support General Conditions
Trade ContCM Reimb
Quality Control & Testing
Construction Quality Control Testing Bldg/Site
Permits & Special Fees (if applicable)
Driveway/Roadway Improvement Permits, Bond & Fees
Building Permits
Specialty Permits
Water Connection Fees
Sanitary Connection Fees
Storm Connection Fees
Gas Service Charges
Electric Power Service Charges
Soil Erosion & Sedimentation Control (from DTMB)
Other permits/fees
Barricades, Enclosure & Control Signs
Project Sign
Safety Signage
Opening Protection
Weather Enclosure
Control Signs
Temporary Fencing
Covered Walkways
Site Barricades / Fences
On-Site Utilities
Temporary Electric
Temporary Water
Winter Heat
Temporary Building HVAC
Temporary Building HVAC Energy/Costs
Other On-Site Services
Layout Engineering/Surveying
Site Security
Site Webcam
Project Wide Hoisting (if applicable)
Safety and First Aid
Trade Contract & storage Trailers
Small Tools & Supplies
Temporary Toilets
Temporary Fire Protection
Weekly Clean-up
Final Clean-up
Dump Permits & Fees (RECYCLING preferred)
Debris Hauling/Removal (RECYCLING preferred)
Temporary Road Installation/Maint.
Temp Stair/lift
Roadway Maintenance
Storage Trailers
Dust Control
Snow Removal

Other (Specify)

&11&KFF0000MSD - New Dormitory 171/26085.SAA &"Arial,Bold"&12ATTACHMENT A &10CM Staff and Reimbursable