02-MSD_Phasing_2024_06_25_v2.pdf

PDF 2 MB Posted

Attached to
171/26085. SAA; MI Schl for Deaf - New Dormitory
Solicitation number
RFP 171 260000002120 1
Issued by
Genesee County, Michigan

About this file

This is a conceptual construction phasing document for the Michigan School for the Deaf (MSD) Residence Hall project in Michigan. The project involves the construction of a new residence hall and apartments on the MSD campus, with a comprehensive phasing strategy designed to minimize disruption to ongoing operations. The project schedule spans from July 2025 through September 2027, beginning with the relocation of play areas and hazardous material abatement in July 2025. Subsequent phases include the razing of Gilbert Hall and relocation of utilities in December 2025, followed by the main construction of the residence hall and apartments from December 2025 through February 2027. The final phases include furniture installation and occupant move-in from March 2027 through July 2027, partial razing of Stevens Hall from June 2027 through August 2027, and exterior repairs with site landscaping completion from August 2027 through September 2027.

The document provides a conceptual overview of building massing, site location, and architectural elements including building entry and residence wings. No specific pricing, funding amounts, contract terms, or procurement details are included in this phasing document. The file serves as a planning and coordination tool to outline the sequential construction activities and site management strategies necessary to execute the residence hall project while maintaining campus functionality throughout the construction period.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

April 5, 2023

State of Michigan | Michigan School for the Deaf (MSD) – Residence Hall

SITE

BUILDING

tray Text Box Conceptual Construction Phasing Approach

MSD – Residence Hall | Existing Site Plan tray

Conceptual Building Massing and Site Location tray

Conceptual Building Massing and Site Location

MSD – Residence Hall | Project Phasing Strategy

Buildings to be affected

Conceptual Residence

Hall Overlay

MSD – Residence Hall | Project Schedule

July 2025

Relocate Play

Areas

Hazardous

Material

Abatement

December 2025

Raze Gilbert Hall

Relocate Utilities

Initial grading and sitework

December 2025 Thru

February 2027

Construct

Residence Hall and Apartments

March 2027 thru July 2027

Furniture and

Move-in

June 2027 thru

August 2027

Raze portion of

Stevens Hall

August 2027 thru

September 2027

Stevens Hall

Exterior Repairs

Site Landscaping and Plantings

MSD – Residence Hall | New Buildings tray

Conceptual Building Entry and Residence Wings