Attachment A - Colocation Specifications Summary
This is a technical specifications document for the Illinois Department of Innovation and Technology (DoIT) and ICN (Illinois Century Network) colocation services procurement at the St. Louis Data Center. The specification details the physical and operational requirements for colocation space at either 900 Walnut Street or 210 North Tucker Street in St. Louis, Missouri. The contract seeks to establish a 10-year service agreement for data center colocation services to support DoIT Network Services and ICN operations. The specifications outline rack space requirements, power distribution needs, cooling capacity, security measures, physical access controls, monitoring systems, and environmental management standards that prospective vendors must meet to provide compliant colocation services.
The colocation specifications establish technical and operational performance standards including redundant power systems, adequate cooling infrastructure to maintain specific temperature ranges, fire suppression systems, 24/7 facility monitoring, restricted physical access with badge entry systems, video surveillance, backup power generation capacity, and regular maintenance protocols. Vendors responding to this solicitation must demonstrate their facility's ability to meet these technical specifications to ensure reliable, secure hosting of the state's critical network infrastructure. The specifications emphasize compliance with industry standards for data center operations and include requirements for disaster recovery capabilities, environmental monitoring, and documented procedures for facility management and emergency response.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| vendor-disclosure-formerly-forms-a-v26-2.docx | DOCX document | |
| IFB Contract B-52512 St. Louis Data Center.docx | DOCX document | |
| IFB Vendor Instructions B-52512 St. Louis Data Center Colocation Space for ICN.docx | DOCX document | |
| ipg-active-registered-vendor-disclosure-formerly-forms-b-v-26-1.docx | DOCX document | |
| IFB Offer Form B-52512 St. Louis Data Center Colocation Space for ICN.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment A: Colocation Specifications Colocation Specifications:
1. Colocation Facilities:
· The provider must be able to provide services at either Netrality Datacenter in the St. Louis area, specifically the following locations 210 North Tucker St. Louis Data Center 210 North Tucker Boulevard, St. Louis, MO, USA 900 Walnut St. Louis Data Center 900 Walnut St, St. Louis, MO, USA
2. DoIT Engineering Access:
· The provider shall ensure access to the facility and equipment for DOIT engineers as required on a 24/7 basis.
3. Letter of Authorization (LOA) for Cross Connects:
· The provider shall provide Letters of Authorization (LOAs) as required to authorize the installation of cross-connects, home run fibers, and other services as required.
4. Full Rack/Cabinets:
· The provider shall provide full racks or individual cabinets based on our equipment needs.
5. Power:
· The provider shall provide power options including -48V, 120V, 208V, and A+B Feeds including UPS and backup generators.
· The provider shall provide and ensure a Service Level Agreement (SLA) for power, guaranteeing 99.99% uptime and quick response times in the event of power outages.
· Provider shall support Uptime Institute Tier III and Tier IV practices (or similar best practices) for dual power path (A+B) Systems
6. 24x7 NOC/Support:
· The provider shall provide 24x7 Network Operations Center (NOC) support.
7. Environmental Control:
· The provider shall ensure adequate environmental control (ASHRAE or similar), including temperature and humidity regulation, fire suppression and smoke control, to maintain optimal operating conditions for our equipment.
8. On-site Technical Support Services:
· Vendor shall have on-site technical support (aka ‘Smart Hands’) such as hardware support, cabling and connectivity, device management, visual inspections.
9. Fabric Access:
· Detail Switch / Connectivity Fabric Access available, if any.
· Provide detail on connectivity offered via the fabric.
10. General Standards / Overarching Requirements for Data Center/Colocation Facilities.
· Recognize and support one or more National/International power standards IEEE, ASHRAE, NEC, NFPA, TIA, ANSI and ISO as appropriate, for Environmental Controls, UPS and Generator lifecycle management.
11. Third Party Provisions:
· If provider is a third party, provider must clarify what, if any, services are provided by provider directly, and what services are provided directly by the Data Center owner.