Attachment A - Base Proposal Item Price Breakdown.xlsx

XLSX spreadsheet 23 KB Posted

Attached to
Z2DA--Upgrade Water Distribution Legionella Prevention Project # 590-18-103
Solicitation number
36C24621R0084
Issued by

About this file

This document outlines requirements for an upgrade water distribution system project at the Hampton VA Medical Center to prevent Legionella. The solicitation will require installation of water quality and temperature monitoring systems, modification of existing piping systems to meet VA directives, addition of temperature control devices and injection ports, a new potable water booster pump and service line. Work must be completed within 730 days of NTP around an occupied healthcare facility. The total estimated value is between $2-5 million. The opportunity will be set aside for SDVOSBs and issued as an RFP on May 18, 2021 via SAM.gov. A site visit is scheduled for May 20, 2021. Interested parties must register in SAM and VIP and direct any questions to the point of contact provided.

View the file

Other files

File Type Posted
36C24621R0084 0002.docx DOCX document
CLC.pdf PDF
Bldg 137C Photos.pdf PDF
36C24621R0084 0001.docx DOCX document
Construction Safety Handbook.pdf PDF
Attachment C - Past Performance Questionnaire.docx DOCX document
Attachment B - Corp Experience Form.docx DOCX document
Hampton VAMC - Upgrade Water Distribution - Bid Specifications.pdf PDF
36C24621R0084_1.docx DOCX document
Hampton VAMC - Upgrade Water Distribution - Bid Drawings 051721.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Offer

Base Offer Cost Breakdown

Project Number:

Edward L Roy: VA assigned project #

Date:
Project Title
Edward L Roy: VA assigned Project TitleProject Location
Offeror Name
Offeror Street
Offeror CityStateZip

Item Description Labor Cost Edward L Roy: Enter all Labor Costs by Division

Material Cost
Edward L Roy: Enter all Material Costs by DivisionTotal Cost

Edward L Roy: This Column is the sum of the Division's Labor and Material Costs

Division 1General Requirements$ - 0$ - 0$ - 0
Division 2Existing Conditions- 0- 0- 0
Division 3Concrete- 0- 0- 0
Division 4Masonry- 0- 0- 0
Division 5Metals- 0- 0- 0
Division 6Wood and Plastic- 0- 0- 0
Division 7Thermal & Moisture Protect- 0- 0- 0
Division 8Doors and Windows- 0- 0- 0
Division 9Finishes- 0- 0- 0
Division 10Specialties- 0- 0- 0
Division 11Equipment- 0- 0- 0
Division 12Furnishings- 0- 0- 0
Division 13Special Construction- 0- 0- 0
Division 14Conveying Equipment- 0- 0- 0
Division 21Fire Suppression- 0- 0- 0
Division 22Plumbing- 0- 0- 0
Division 23HVAC- 0- 0- 0
Division 26Electrical- 0- 0- 0
Division 27Communications- 0- 0- 0
Division 28Electronic Safety & Security- 0- 0- 0
Division 31Earthwork- 0- 0- 0
Division 32Exterior Improvements- 0- 0- 0
Division 33Utilities- 0- 0- 0
Division 34Transportation Subtotal- 0- 0- 0
Division Subtotals :$ - 0$ - 0$ - 0

Overhead % 0.00% Edward L Roy: Enter Overhead % here. This % will be multiplied by the Division Total Cost Subtotal (cell F36).

Edward L Roy: Date Offer Prepared/Submitted

- 0
Profit %0.00%
Edward L Roy: Enter Profit % here.This % will be multiplied by the sum of the Division Total Cost subtotal (cell F36) plus the calculated Overhead (cell F38).- 0
Bond %0.00%

Edward L Roy: Enter Bond % here. This % will be multiplied by the sum of the Division Total Cost Subtotal (cell F36), the amount of calculated Overhead (cell F38) and the amount of calculated Profit (cell F39).

Edward L Roy: Enter all Labor Costs by Division

- 0
Overhead/Profit Subtotals :$ - 0

Edward L Roy: Sum of Overhead, Profit and Bond %.

Edward L Roy: Enter all Material Costs by Division Edward L Roy: This Column is the sum of the Division's Labor and Material Costs Total Base Offer Cost $ - 0 $ - 0 $ - 0

File details come from the government source that posted it. Updated .