Attachment A - Base Proposal Item Price Breakdown.xlsx
XLSX spreadsheet 11 KB Posted
- Solicitation number
- 36C24622R0007
About this file
This document outlines a federal contract opportunity for construction services to correct HVAC deficiencies at the Hampton VA Medical Center in Hampton, Virginia. The project includes general construction, alterations, architectural, interior finishes, and mechanical and electrical work to supplement the existing outdated and undersized HVAC system in Building 110A to maintain the required temperature and humidity levels. The solicitation will be set aside for Service-Disabled Veteran-Owned Small Businesses and is valued between $1,000,000 to $5,000,000. Interested offerors must be verified in the Vendor Information Pages database and the VA will issue a Request for Proposal on November 23, 2021 via beta.sam.gov. Offerors will be provided an opportunity to visit the site and the scope of work includes a performance period of 180 calendar days following notice to proceed.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24622R0007 0004.docx | DOCX document | |
| 36C24622R0007 0003.docx | DOCX document | |
| 36C24622R0007 0002.docx | DOCX document | |
| 36C24622R0007 0001.docx | DOCX document | |
| Sign-In Sheet Correct HVAC Def. 11-30-2021.pdf | ||
| 100 pct Drawings.pdf | ||
| Construction Safety Handbook.pdf | ||
| Attachment B - Corp Experience Form.docx | DOCX document | |
| 36C24622R0007_1.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base Proposal
| Project Number | Date | |
| Project Title | ||
| Project Location | ||
| Offeror Name | ||
| Offeror Street | ||
| Offeror City | State | Zip Code |
| Item | Description | Labor Cost | Material Cost | Total Cost |
| A | Substructure | $ - 0 | ||
| B | Shell | |||
| C | Interiors | |||
| D | Services | |||
| F | Special Construction & Demolition | |||
| Z | General | |||
| Division Subtotals: | $ - 0 | $ - 0 | $ - 0 |
| Overhead % | 0% | $ - 0 |
| Profit % | 0% | $ - 0 |
| Bond % | 0% | $ - 0 |
| Overhead/Profit Subtotals: | $ - 0 |
Total Base Offer Cost $ - 0
File details come from the government source that posted it. Updated .