Attachment A_5 SEED Project Task Order CLINs.pdf

PDF 246 KB Posted

Attached to
Solicitation Notice (IDIQ) Contract for Airfield Rubber Removal and Maintain Markings on the Airfield, Roads and Parking Lots on Dobbins ARB, GA.
Solicitation number
FA670322B0004
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CLIN NO SUPPLIES/SERVICES QUANTITY UNIT

RUBBER REMOVAL - R/W 360,000

SF

0002 RUBBER REMOVAL - VEDA ALS 72,000 SF

CLEAN, LAYOUT, AND PAINT RUNWAY

CENTER LINE 3' WIDE (WITH 6" BLACK BORDER) (TYPE I BEADS) 16,920

SF

CLEAN, LAYOUT, AND PAINT RUNWAY

EDGE LINE 3' WIDE (WITH 6" BLACK BORDER) (TYPE I BEADS) 59,760

SF

CLEAN, LAYOUT, AND PAINT CMA

LINES (4.5 FT WIDE: 6" BLACK- 6"

YELLOW- 6" BLACK- 6" YELLOW -6"

BLACK -6" YELLOW - 6" BLACK-6" YELLOW - 6" BLACK) (TYPE I BEADS)

1,130

SF

CLEAN, LAYOUT, AND PAINT THRESHOLD (WITH 6" BLACK BORDER)

(TYPE I BEADS) 20,700 SF

CLEAN, LAYOUT, AND PAINT NUMBERS

(#29 AND #11) (WITH 6" BLACK BORDER) (TYPE I BEADS) 4 EA

CLEAN, LAYOUT, AND PAINT VFR HOLD

LINES (4.5 FT WIDE: 6" BLACK- 6"

YELLOW- 6" BLACK- 6" YELLOW -6"

BLACK -6" YELLOW - 6" BLACK-6" YELLOW - 6" BLACK) (TYPE I BEADS)

2,214

SF

CLEAN, LAYOUT, AND PAINT TAXIWAY

LINES (CENTERLINE: 1.5 FT WIDE: 6"

BLACK- 6" YELLOW- 6"

BLACK)(EDGELINE: 2.5 FT WIDE: 6"

49,205 SF

0024 PAINT REMOVAL - 100% 1,380 SF

0025 PAINT REMOVAL - 80% 23,103 SF

0026 CLEAN, LAYOUT, AND PAINT

INSTRUMENT LINE (TYPE I BEADS)

1,287

SF

0028 CLEAN, LAYOUT, AND PAINT FIXED

DISTANCE MARKERS (TYPE I BEADS)

18,000

SF

CLEAN, LAYOUT, AND PAINT TOUCHDOWN ZONE MARKINGS (TYPE I

BEADS) 16,200 SF

CLEAN, LAYOUT, AND PAINT STOP CONTACT TOWER MARKINGS (TYPE I

BEADS) 1 EA

0036 CLEAN, LAYOUT, AND PAINT FOD

CHECKPOINT LINE (TYPE I BEADS)

SF

0038 CLEAN, LAYOUT, AND 'PAINT CHECK

FOR FOD' (TYPE I BEADS)

EA

0040 CLEAN, LAYOUT, AND PAINT INS

CHECKPOINTS (TYPE I BEADS)

EA

0043 CLEAN, LAYOUT, AND PAINT 6" RESTRICTED AREA LINE (TYPE I BEADS) 2,580 SF

CLEAN, LAYOUT, AND PAINT RESTRICTED AREA SIGNAGE (TYPE I

BEADS) 66 EA

0053 CLEAN, LAYOUT, AND PAINT ENTRY

CONTROL POINTS (TYPE I BEADS)

EA

CLEAN, LAYOUT, AND PAINT PARKING STOP BAR (3 FT WIDE X 1 FT LONG)

(TYPE I BEADS) 15 EA

0063 CLEAN, LAYOUT, AND PAINT ACCESS

ROAD STOP MARKINGS

EA

0064 CLEAN, LAYOUT, AND PAINT

ROADWAY MARKINGS WHITE

SF

0066 CLEAN, LAYOUT, AND PAINT WINGTIP

CLEARANCE LINES (6" WHITE, 6" SPACE,

6" WHITE)

1,187

SF

0067 MOBILIZE 1 EA

0068 DEMOBILZE 1 EA

Attachment A_5 SEED Project Task Order CLINs

The SEED Project Task Order includes the following CLINs in the estimated quantities specified. The Unit Prices submitted for the Base Period CLINs will be used to price the SEED Project Task Order requirement CLINs. For example, the Unit Price submitted for the Base Period CLIN 0001 will be used to price the SEED Project Task Order CLIN 0001. Therefore, it is not necessary to submit Unit Prices on Attachment A_5 SEED Project Task Order CLINs.

The SEED Project Task Order will be awarded at the same time the Base Period contact is awarded.

Quantities and CLINS may be adjusted based on operational needs and available funding. The awardee must be prepared to execute the SEED Project Task Order the same day the Base Period contract is awarded. The actual start date of the SEED Project Task Order will follow the instructions in Section G, f) Ordering Procedures.

File details come from the government source that posted it. Updated .