Attachment A_2_SOW FGWB 22-0001 Rubber Removal 2.pdf

PDF 187 KB Posted

Attached to
Solicitation Notice (IDIQ) Contract for Airfield Rubber Removal and Maintain Markings on the Airfield, Roads and Parking Lots on Dobbins ARB, GA.
Solicitation number
FA670322B0004
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DOBBINS ARB

Statement of Work

AIRFIELD RUBBER AND MAINTAIN MARKINGS

Project: FGWB 22-0001

7 June 2022

GENERAL REQUIREMENTS

1.00 LOCATION: The work location is at Dobbins Air Reserve Base, Georgia.

2.00 SCOPE OF WORK:

2.01 General Scope: Provide all labor, equipment, transportation and all materials to remove built-up rubber accumulations on the main runway and Veda Assault Landing Zone; Repaint runway centerline, Runway Edge Lines, Thresholds, Touchdown, Distance markers, and Taxiway Lead In/Lead out lines up to runway edge only, Visual Flight Rules hold lines, Assault Landing Zone striping, and other airfield markings as required. Remove and install thermoplastic striping and arrows on base roads. View plans for specific details.

3.0 General:

3.01 Measurements: The contractor shall confirm all measurements with the contracting officer’s representative to insure proper use and application of materials. This process shall not release the contractor from providing all requirements.

3.02 Other: Contractor shall adhere to and shall perform all work in accordance with the requirements contained in the contract, specifications and attached drawing. Conflict between the stated requirements of the SOW, specifications or drawings, the more stringent shall apply.

3.03 References: The contractor shall use/follow/implement the following references. Latest versions of UFC 3-260-04 (Airfield and Heliport Marking), FAA AC 150/5340-1 (Standards for Airport Markings), UFGS 32 01 11.51 (Rubber and Paint Removal from Airfield Pavements), UFGS 32 17 23 (Pavement Markings), and MUTCD. The contractor shall keep itself apprised of any changes/updates to the references.

END OF STATEMENT OF WORK

Attachment 2 FA670322B0004

File details come from the government source that posted it. Updated .