ATTACHMENT A-1 - DRAWINGS - 605-20-207.pdf
PDF 16 MB Posted
- Attached to
- Z2DZ-- Renovate 4NW Inpatient Unit - 605-20-207
- Solicitation number
- 36C26222B0006
About this file
This attachment provides drawings for a construction services solicitation. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 22 is seeking a contractor to provide construction services for Renovate 4 North West (NW) Inpatient Unit - Project 605-20-207 in accordance with the attached drawings and specifications. The solicitation number is 36C26222B0006 and the contractor will renovate the 4NW Inpatient Unit as detailed in the materials included with this opportunity.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BARTON RD
MO
UN
TA
IN
V
IE
W A
VE
SHEET INDEX
SEQUENCE NUMBER NAME
[01] GENERAL
1 GI000 COVER SHEET
2 GI001 GENERAL INFORMATION
3 GI002 4TH FLOOR LIFE SAFETY PLAN
4 GI003 4TH FLOOR ICRA PLAN
5 GI200 DEDUCT ALTERNATES PLAN
[02] HAZARDOUS MATERIALS
6 HA101 4TH FLOOR - ASBESTOS REMEDIATION PLAN
7 HA102 4TH FLOOR - LEAD REMEDIATION PLAN
8 HA103 4TH FLOOR - INTERSTITIAL ASBESTOS & LEAD REMEDIATION PLAN
9 HA104 PENTHOUSE - ENVIRONMENTAL REMEDIATION PLAN
[03] STRUCTURAL
10 SG001 GENERAL NOTES, ABBREVIATIONS & SHEET LIST
11 SF131 ROOF INTERSTITIAL PLAN
12 SF501 STRUCTURAL DETAILS
[04] ARCHITECTURAL
13 AD011 4TH FLOOR DEMOLITION PLAN
14 AD111 4TH FLOOR DEMOLITION RCP
15 AE100 4TH FLOOR PLAN
16 AE101 4TH FLOOR FUNCTIONAL AREA PLAN
17 AE111 4TH FLOOR REFERENCE PLAN
18 AE121 4TH FLOOR DIMENSION PLAN
19 AE131 4TH FLOOR REFLECTED CEILING PLAN
20 AE401 ENLARGED PLANS - TYPICAL PATIENT ROOM
21 AE402 ENLARGED PLANS - TYPICAL BARIATRIC ROOM
22 AE403 ENLARGED PLANS - TYPICAL A.I.I. PATIENT ROOM
23 AE404 ENLARGED PLANS - NURSE STATION
24 AE408 FF&E SCHEDULES
25 AE501 PLAN AND SECTION DETAILS
26 AE502 CEILING DETAILS
27 AE503 CEILING DETAILS
28 AE600 PARTITION TYPES AND DETAILS
29 AE601 DOOR AND WINDOW SCHEDULES AND DETAILS
30 AE602 WINDOW WALL ELEVATIONS AND DETAILS
31 AE603 DOOR AND INTERIOR GLAZING DETAILS
32 AI701 4TH FLOOR FINISH PLAN
33 AI702 4TH FLOOR WALL PLAN
34 AI711 ROOM FINISH SCHEDULE AND FINISH LEGEND
35 AI720 INTERIOR ELEVATIONS
36 AI721 INTERIOR ELEVATIONS
37 AI722 INTERIOR ELEVATIONS
38 AI723 INTERIOR ELEVATIONS
39 AF750 MILLWORK DETAILS
40 AQ801 4TH FLOOR EQUIPMENT PLAN
41 AQ802 4TH FLOOR FURNITURE PLAN
42 AQ803 SIGNAGE
[05] FIRE PROTECTION
43 FA001 FIRE ALARM GENERAL NOTES, RISER, AND MATRIX
44 FA101 FIRE ALARM AUDIBILITY FLOOR PLAN
45 FA102 FIRE ALARM FLOOR PLAN
46 FX101 FIRE SUPPRESSION HAZARD CLASSIFICATION FLOOR PLAN
[06] PLUMBING
47 P-000 PLUMBING LEGEND
48 PD104 PLUMBING WASTE DEMOLITION PLAN - 4TH FLOOR NW
49 PD105 PLUMBING SUPPLY DEMOLITON PLAN - 4TH FLOOR NW
50 PD106 PLUMBING MEDGAS DEMOLITION PLAN - 4TH FLOOR NW
51 PL104 PLUMBING WASTE PLAN - 4TH FLOOR NW
52 PL105 PLUMBING WASTE INTERSTITIAL PLAN - 4TH FLOOR NW
53 PP104 PLUMBING SUPPLY PLAN - 4TH FLOOR NW
54 PP105 PLUMBING SUPPLY INTERSTITIAL PLAN - 4TH FLOOR NW
55 PJ104 PLUMBING MEDICAL GAS PLAN - 4TH FLOOR NW
56 PJ105 PLUMBING MEDICAL GAS INTERSTITIAL PLAN - 4TH FLOOR NW
57 P-301 PLUMBING SUPPLY RISER
58 P-302 PLUMBING DWV RISER
59 P-501 PLUMBING DETAILS
60 P-502 PLUMBING DETAILS
61 P-601 PLUMBING SCHEDULES
[07] MECHANICAL
62 M-000 LEGEND AND ABBREVIATIONS
63 MD104 MECHANICAL HVAC PIPING DEMOLITION PLAN - 4TH FLOOR NW
64 MD105 MECHANICAL HVAC DUCT DEMOLITION PLAN - 4TH FLOOR NW
65 MD106 MECHANICAL HVAC ROOF & PENTHOUSE DEMOLITION PLAN - 4TH FLOOR NW
66 MP104 MECHANICAL HVAC PIPING PLAN - 4TH FLOOR NW
67 MP105 MECHANICAL HVAC PIPING INTERSTITIAL PLAN - 4TH FLOOR NW
68 MP106 MECHANICAL PIPING ISOMETRIC RISER & FLOW DIAGRAM
69 MH104 MECHANICAL HVAC DUCT PLAN - 4TH FLOOR NW
70 MH105 MECHANICAL DUCT INTERSTITIAL PLAN - 4TH FLOOR NW
71 MH201 MECHANICAL HVAC ROOF & PENTHOUSE PLAN - 4TH FLOOR NW
72 M-501 MECHANICAL DETAILS
73 M-502 MECHANICAL DETAILS
74 M-503 MECHANICAL DETAILS
75 M-601 MECHANICAL SCHEDULES
76 M-602 MECHANICAL SCHEDULES
77 M-701 MECHANICAL CONTROLS
78 M-702 MECHANICAL CONTROLS
79 M-703 MECHANICAL CONTROLS
80 M-704 MECHANICAL CONTROLS
81 M-705 PHASING PLAN
[08] ELECTRICAL
82 E-001 ELECTRICAL LEGEND
83 ED104 ELECTRICAL 4TH FLOOR POWER AND LIGHTING DEMOLITION PLAN
84 ED105 ELECTRICAL 4TH FLOOR INTERSTITIAL DEMOLITION PLAN
85 E-104 ELECTRICAL 4TH FLOOR POWER PLAN
86 E114A ELECTRICAL LIGHTING PLAN
87 E114B ELECTRICAL NIGHT LIGHTING PLAN
88 E-124 4TH FLOOR RACEWAY POWER PLAN
89 E-304 ELECTRICAL 4TH FLOOR EQUIPMENT POWER PLAN
90 E-305 ROOF EQUIPMENT PLAN
91 E-401 ELECTRICAL ENLARGED PLANS
92 E-501 ELECTRICAL DETAILS
93 E-502 LIGHTING CONTROL DIAGRAMS
94 E-601 ELECTRICAL ONE-LINE DIAGRAM
95 E-602 ELECTRICAL PANEL SCHEDULES
96 E-603 ELECTRICAL PANEL SCHEDULES
97 E-604 LIGHTING SCHEDULES
[09] TECHNOLOGY
98 T-001 TECHNOLOGY LEGEND
99 T-104 TECHNOLOGY 4TH FLOOR PLAN
100 T-114 NURSE CALL 4TH FLOOR PLAN
101 T-124 SECURITY 4TH FLOOR PLAN
TOTAL SHEETS: 101
4'- 0"
M
AX
4'- 0"
M
AX
2'-
" M
AX
2'- 3"
M
IN
1'-6" MIN1. GENERAL CONTRACTOR TO PROVIDE METAL SUPPORT
BLOCKING FOR ALL WALL MOUNTED ACCESSORIES, FIXTURES,
AND EQUIPMENT.
2. PROVIDE ADA SUPPORT BRACKETS PLACED AT ALL OPEN
COUNTERTOPS @ 36"-48" MAX ON CENTER.
3. SPECIFIED MAXIMUMS ARE MEASURED FROM AFTER FINISHED
FLOOR TO THE OPERABLE PART OF THE FIXTURE.
4. FIXTURES SHOWN ARE REPRESENTATIONAL ONLY. NOT ALL
FIXTURES MAY BE USED. REFER TO SPECIFICATIONS FOR
FIXTURE TYPES USED IN THIS PROJECT.
5. FIXTURES MAY OVERLAP WAINSCOT. WHERE APPLICABLE,
BACKING TO BE PROVIDED AS SHIM FOR FLUSH APPLICATION.
SHIM TO MATCH SCHEDULED WALL FINISH.
6" MAX
9" M
IN
SHOWER
VA TOILET ROOM
TURNING RADIUS
DRINKING
FOUNTAIN
PAPER TOWEL
DISPENSER
SANITARY
NAPKIN
DISPENSER
4'- 0"
MA
X
WASTE
RECEPTACLE
LAVATORY
WITH MIRROR
ON CENTER
WALL
4'- 0"
M
AX
SOAP
DISPENSER
2'-
" M
AX
TO
B
.O . R
EF
LE
CT
IV
E
SU
RF
AC
E
3'- 4"
MA
X
17 MIN
2'- 3"
M
IN
3'- 0"
M
AX
1'-6" MIN
WALL
2'- 9" 4'-
0" M
IN
2'-0" MIN
8" MIN
WALL
LAVATORY
WITH APRON
1'- 5"
M
AX
1'-6" MIN
URINAL
WALL
1'-5" - 1'-7" (AMBULATORY)
1'-4" - 1'-6" (WHEELCHAIR)
CLEAR FLOOR
5'-6"
CLEAR FLOOR
6'-0"
3'-0" MIN
2'- 9"
3'-
0"
1'-0" MIN
3'-6" MIN 1'-0"MAX
4'-6" MIN
1'- 5"
- 1 '-7
1'- 6"
M
IN
(A
NS
I IC
C
A1
.1) 1'-
3" M
IN
(A
DA
/A
BA
2'- 9"
- 3 '-0
WALL
WALL
4'- 0"
M
AX
WALL HOOK
7'- 0"
CLOCK
WALL
FINISHED FLOOR
FIRE EXTINGUISHER
CABINET
WEIGHT > 40LBS
FIRE EXTINGUISHER
CABINET
WEIGHT < 40LBS
4'- 0"
MA
X
4'- 0"
M
AX
TOILET SEAT
COVER
DISPENSER
BABY
CHANGING
STATION
CLEAR FLOOR SPACE
@ WATER CLOSET
5'-6"
2'-6"
4'- 0"
2'-6"
4'- 0"
HANDRAILS AND
BUMPERGUARDS
18" MIN
" M
IN
FRONT APPROACH,
PULL SIDE
36" MIN
" M
IN
HINGE APPROACH,
PULL SIDE
HINGE APPROACH,
PULL SIDE
*12" MIN48
" M
IN
FRONT APPROACH,
PUSH SIDE
**4 2"
M
IN
HINGE APPROACH,
PUSH SIDE
22" MIN 24" MIN*4
8"
M
IN
LATCH APPROACH,
PULL SIDE
24" MIN*4
2"
M
IN
LATCH APPROACH,
PUSH SIDE
*IF BOTH CLOSER
AND LATCH ARE
PROVIDED
*54" MIN IF CLOSER
IS PROVIDED
*48" IF CLOSER IS
PROVIDED
FRONT APPROACH,
PUSH SIDE
" M
IN
42" MIN
AREA NAME
150 SF
A101
A101
1 SIM
A
00.0
A101
1 1
A101
LEVEL NAME
00'-00"
00'-00"
4B
3A
FIBERGLASS BATT
INSULATION
RIGID INSULATION
CONCRETE / PRECAST
CONCRETE
EARTH / SOIL
SAND, EIFS FINISH, OR
PLASTER FINISH
GYPSUM BOARD FINISH
BRICK
CONCRETE MASONRY
UNIT
STONE / CAST STONE
GYPSUM BOARD SECTION
EXTERIOR SHEATHING
BOARD SECTION
PLYWOOD SECTION
ROOM NAME
000A
150 SF
X0000
6"
3'- 0"
M
AX
ROOM TAG
AREA TAG
SPECIALTY
EQUIPMENT TAG
DOOR TAG
A101
1 SIM 1
A101
SIM
A
ACB ACOUSTIC CEILING BAFFLE
ACP ACOUSTIC CEILING PANEL
ACST ACOUSTIC
ADA AMERICANS WITH DISABILITIES ACT
ACT ACOUSTICAL CEILING TILE
ADDL ADDITIONAL
ADDN ADDITION
ADJ ADJACENT, ADJOINING, OR
ADJUSTABLE
ADMIN ADMINISTRATION
AE ARCHITECT/ENGINEER
AF ACCESS FLOORING
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AHJ AUTHORITY HAVING JURISDICTION
AIA AMERICAN INSTITUTE OF
ARCHITECTS
ALT ALTERNATE
ALT NO ALTERNATE NUMBER
ALUM ALUMINIUM (TRIM)
AMT AMOUNT
APPROX APPROXIMATE
ARCH ARCHITECT
ASC ABOVE SUSPENDED CEILING
AT ACOUSTIC CEILING TILE
AVG AVERAGE
B
BD BOARD
BLDG BUILDING
BLKG BLOCKING
BLT IN BUILT-IN
BOS BOTTOM OF STEEL
BOT BOTTOM
BRKT BRACKET
BTWN BETWEEN
C
CAB CABINET
CAV CAVITY
CBB CONCRETE BACKER BOARD
CD CONSTRUCTION DOCUMENTS
CFM CUBIC FEET PER MINUTE
CFS CUBIC FEET PER SECOND
CG CORNER GUARD
CH BD CHALK BOARD
CIP CAST-IN-PLACE
CJ CONTROL JOINT
CL CENTER LINE
CLG CEILING
CLG HT CEILING HEIGHT
CLR CLEAR
CMU CONCRETE MASONRY UNIT
CO CONTRACTING OFFICER
COL COLUMN
COMM COMMUNICATION
CONC CONCRETE
CONT CONTINUOUS
COORD COORDINATE
COR CONTRACTING OFFICER'S
REPRESENTATIVE
CP CONTRACTOR PROVIDED
CP/CI CONTRACTOR PROVIDED /
CONTRACTOR INSTALLED
CPT CAROET/CARPET TILE
CS CONCRETE SEALED
CSWK CASEWORK
CT CERAMIC TILE
CTB CERAMIC TILE BASE
CTR CENTER
CU FT CUBIC FEET
D
DBL DOUBLE
DEMO DEMOLITION
DEPT DEPARTMENT
DET DETAIL
DIA DIAMETER
DIR DIRECTION
DIST DISTANCE
DOC DOCUMENT
DR DOOR
DS DOWNSPOUT
DWG DRAWING
DWP DIMENSIONAL WALL PANEL
E
EA EACH
EJ EXPANSION JOINT
EL ELEVATION
ELEV ELEVATOR
ENTR ENTRANCE
EPY EPXOY FLOORING
EQ EQUAL
ETR EXISTING TO REMAIN
EX EXISTING
EXP EXPOSED
EXT EXTERIOR
F
FAB FABRIC
FED FEDERAL
FF FINISH FACE
FF EL FINISH FLOOR ELEVATION
FIN FINISH
FIN BS FINISH BOTH SIDES
FIN FLR FINISH FLOOR
FIN GR FINISH GRADE
FIXT FIXTURE
FLDG FOLDING
FLEX FLEXIBLE
FLG FLOORING
FLMT FLUSH MOUNT
FLR FLOOR
FOC FACE OF CONCRETE
FOM FACE OF MASONRY
FP FIRE PROTECTION
FR FIRE RESISTANT
FT FEET
FTG FOOTING
FV FIELD VERIFY
FWC FABRIC WALL COVERING
G
GDR GUARDRAIL
GL GLASS/GLAZING
GRAN GRANITE
GR FL GROUND FLOOR
GT GROUT
GSM GALVANIZED SHEET METAL
GYP BD GYPSUM BOARD
H
HDW HARDWARE
HEPA HIGH EFFICIENCY
PARTICULATE AIR (FILTER)
HMD HOLLOW METAL DOOR PAINT
HMDF HOLLOW METAL DOOR FRAME PAINT
HMWF HOLLOW METAL WINDOW FRAME
PAINT
HORIZ HORIZONTAL
HR HANDRAIL
HT HEIGHT
HW HARDWARE
I
IBC INTERNATIONAL BUILDING CODE
INSUL INSULATION
INT INTERIOR
ILO IN LIEU OF
J
J-BOX JUNCTION BOX
L
LAV LAVATORY
LBS POUND
LDG LANDING
LF LINEAR FEET (FOOT)
LIN LINEAR
LN LINOLEUM
LOC LOCATION
LT LIGHT
LVR LOUVER
LVT LUXURY VINYL TILE
M
MAT CARPET MAT / WALK-OFF MAT
MATL MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MEMB MEMBRANE
MFR MANUFACTURER
MID MIDDLE
MIL STD MILITARY STANDARD
MIN MINIMUM
MISC MISCELLANEOUS
MO MASONRY OPENING
MOD MODIFY
MTG MOUNTING
MTL METAL
MVBL MOVABLE
N
NA NOT APPLICABLE
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NTS NOT TO SCALE
O
OA OVERALL
OC ON CENTER
OD OUTSIDE DIAMETER
OPNG OPENING
OPP OPPOSITE
OPR OPERABLE
ORD OVERFLOW ROOF DRAIN
ORIG ORIGINAL
P
P PAINT
PA PUBLIC ADDRESS
PBD PARTICLE BOARD
PCF POUNDS PER CUBIC FOOT
PCT PERCENT
PERF PERFORATED
PERIM PERIMETER
PERP PERPENDICULAR
PL PROPERTY LINE
PLAM PLASTIC LAMINATE
PLBG PLUMBING
PNL PANEL
PR PAIR
PRB PROFILE BASE
PRKG PARKING
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PORCELAIN TILE
PWR POWER
Q
QA QUALITY ASSURANCE
QC QUALITY CONTROL
QTY QUANTITY
NOTE: NOT ALL ABBREVIATIONS OR SYMBOLS WILL BE UTILIZED FOR THIS PROJECT.
GRID HEAD AND
LINE
LEVEL INDICATOR
MATCH LINE AND
VIEW REFERENCE
NORTH ARROW W/
PROJECT NORTH
SPOT ELEVATION
DETAIL
SECTION
**48" MIN IF BOTH CLOSER
AND LATCH PROVIDED
WALL
SECTION
BUILDING
SECTION
DETAIL
ELEVATION
INTERIOR
ELEVATION
BUILDING
ELEVATION
1 1
6'-0
5'-6
BARIATRIC TOILET ROOM
TURNING RADIUS
CLEAR FLOOR SPACE
@ ADA LAVATORY
CLEAR FLOOR SPACE @ ADA
DRINKING FOUNTAIN
4"
6"
3"
- 6
1'-
6"
6" MAX
7" - 9" 11" MIN
17" - 25"
" M
IN
6'- 0"
(ANSI ICC A117.1)
39"- 41"
(A
NS
I IC
C
A1
.1)
" M
IN
(A
NS
I IC
C
A1
.1)
3'- 6"
M
AX
5'- 0"
M
AX
R
RAF RESILIENT ATHETIC FLOORING
RB RUBBER BASE/RESILIENT BASE
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
REC RECESSED
REF REFERENCE
REM REMOVABLE
REP REPAIR
REPL REPLACE
REQ REQUIRE
REQD REQUIRED
RES RESINOUS FLOORING
RES-W RESINOUS / EPOXY WALL / CEILING
RF RUBBER FLOORING
RFG ROOFING
RM ROOM
RO ROUGH OPENING
RP RESIN PANEL
RSF RESILIENT SHEET FLOORING
RV ROOF VENT
RWC RIGID VINYL WALLCOVERING
S
SC SPECIALTY COATING
SD STATIC DISSIPATIVE FLOORING/TILE
SCHED SCHEDULE
SECT SECTION
SF SQUARE FOOT (FEET)
SGL SINGLE
SIM SIMILAR
SJ SCORED JOINT
SLNT SEALANT
SM SHEET METAL
SPEC SPECIFICATION
SQ SQUARE
SQ IN SQUARE INCH
SQ YD SQUARE YARD
SS SOLID SURFACE
ST STONE
STD STANDARD
STOR STORAGE
SV SHEET VINYL (ROLLED OR TILE)
T
TEL TELEPHONE
TEMP TEMPORARY
TER TERRAZO
TOF TOP OF FOOTING/ FOUNDATION
TOM TOP OF MASONRY
TOS TOP OF SLAB/ STEEL
U
UNO UNLESS NOTED OTHERWISE
UTIL UTILITY
V
VAR VARIES
VC VA PROVIDED / CONTRACTOR
INSTALLED
VCT VINYL COMPOSITION TILE
VFAT VINYL FACED ACOUSTICLAL TILE
VP VENEERED PLASTER
VT VINYL TILE
VV VA PROVIDED / VA INSTALLED
VWC VINYL WALLCOVERING
VWF VINYL WALL FABRIC
W
W/ WITH
W/O WITHOUT
W/C WATER CLOSET
WC WHEELCHAIR
WD WOOD
WFAB WALL FABRIC
WPM WATERPROOF MEMBRANE
WSF WELDED SHEET FLOOR
X
X BRACE CROSS BRACE
STANDARD ROLL-IN TYPE
SHOWER COMPARTMENT
SIZE AND CLEARANCE
NOTE: INSIDE FINISHED
DIMENSIONS MEASURED
AT THE CENTER POINTS
OF OPPOSING SIDES
BACK
WALLSIDE
WALL
SIDE
WALL
60 MIN
M
IN
M
IN
ASHRAE 90.1 - 2016 EDITION
BUILDING LOCATION: LOMA LINDA, CA
CLIMATE ZONE (TABLE ANNEX 1-1): ZONE 3B
INTERIOR DESIGN CONDITIONS:
THE INTERIOR DESIGN TEMPERATURES FOR HEATING & COOLING AS DEPICTED IN THE PROJECT DESIGN CONDITIONS SCHEDULE IN THE MECHANICAL CONTROL DRAWINGS SHALL BE THE MAXIMUM & MINIMUM
VALUES FOR THE ASSOCIATED TEMPERATURE CONTROL ZONES.
BUILDING ENVELOPE REQUIREMENTS (5.5 )
OPAQUE THERMAL ENVELOPE REQUIREMENTS (TABLE 5.5-4):
ROOFS REQUIRED DESIGNED
INSULATION: R-30 c.i. EXISTING METAL BUILDINGS: R-19 + R-11 Ls or R-25 + R-8 Ls EXISTING
ATTIC & OTHER: R-49 EXISTING
WALLS, ABOVE GRADE
MASS: R-9.5 c.i. EXISTING METAL BUILDING: R-0 + R-15.8 c.i. EXISTING STEEL-FRAMED: R-13 + R-7.5 c.i. EXISTING WOOD-FRAMED & OTHER: R-13 + R-3.8 c.i. or R-20 EXISTING
WALL, BELOW GRADE
BELOW-GRADE WALL: R-7.5 c.i. EXISTING
FLOORS
MASS: R-14.6 c.i. EXISTING
STEEL-FRAMED: R-30 EXISTING
WOOD-FRAMED & OTHER R-30 EXISTING
SLAB-ON-GRADE FLOORS
UNHEATED SLABS: R-15 for 24 in. EXISTING HEATED SLABS: R-20 for 24 in. EXISTING
OPAQUE DOORS
SWINGING: U-0.370 EXISTING
NONSWINGING: U-0.310 EXISTING
FENESTRATION (TABLE 5.5-4):
VERTICAL FENESTRATION, U-FACTOR
NON-METAL FRAMING (ALL): 0.31 EXISTING
METAL FRAMING, FIXED: 0.38 EXISTING
METAL FRAMING, OPERABLE: 0.46 EXISTING
METAL FRAMING ENTRANCE DOOR: 0.68 EXISTING
DEFINITIONS
c.i. = CONTINUOUS INSULATION Ls = LINEAR SYSTEM
NR = NO (INSULATION) REQUIREMENT
1. DRAWINGS ARE PART OF A COMPLETE DOCUMENTS SET. CONTRACTOR SHALL CONFIRM
ALL ITEMS REQUIRED BASED UPON THE OVERALL DESIGN INTENT OF THE ENTIRE
DOCUMENT SET.
2. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS PRIOR TO BEGINNING ANY
WORK TO CONFIRM THE ACCURACY OF THE DRAWINGS, & REPORT ANY DISCREPANCIES
TO THE ARCHITECT. DO NOT SCALE THE DRAWINGS. FIELD VERIFY ALL DIMENSIONS &
EXISTING STRUCTURAL CONDITIONS.
3. ALL AREAS NOT INVOLVED IN THE SCOPE OF WORK FOR THIS PROJECT SHALL BE KEPT
CLEAN & FREE OF OBSTRUCTIONS AT ALL TIMES.
4. ERECT BARRICADES & WARNING SIGNS TO DIVERT & WARN PASSERS-BY OF THE
CONSTRUCTION WORK. PROVIDE DUST PROOFING ENCLOSURES TO SEPARATE WORK
AREAS FROM THE EXISTING FACILITIES.
5. ALL TRASH & DEBRIS TO BE REMOVED ON A DAILY BASIS.
6. PROVIDE PROTECTION FOR ALL EXISTING SURFACES & CONDITIONS TO REMAIN IN
PLACE DURING THE SCOPE OF WORK. SHOULD ANY DAMAGE OCCUR, PATCH & REPAIR
ANY DAMAGE TO ADJACENT FINISHES TO MATCH EXISTING.
7. ANY DAMAGE CAUSED TO THE BUILDING OR OWNER EQUIPMENT SHALL BE REPAIRED
OR REPLACED BACK TO ITS ORIGINAL CONDITIONS AT NO ADDITIONAL COST TO THE
OWNER.
8. COVER ALL RETURN AIR GRILLES WITHIN THE AREA OF CONSTRUCTION TO PREVENT
PARTICULATE MATERIAL FROM EXHAUSTING INTO SURROUNDING SPACES.
9. APPROPRIATE LIGHT FIXTURES SHALL BE TEMPORARILY SUSPENDED TO PROVIDE
ADEQUATE LIGHTING LEVELS FOR CONSTRUCTION.
10. CONTRACTOR & SUBCONTRACTORS ARE REQUIRED TO COORDINATE WITH OTHER
DISCIPLINES TO INSTALL COMPLETE & OPERATIONAL SYSTEMS. DRAWINGS, AS A
WHOLE, REPRESENT A COMPLETE SET & DEPICT REQUIREMENTS FOR COMPLETE &
OPERATIONAL SYSTEMS. INDIVIDUAL DRAWINGS MAY NOT DEPICT COMPLETE &
ACCURATE INFORMATION TO COORDINATE COMPLETE & OPERATIONAL SYSTEMS, BUT
DO SO AS AN ENTIRE DOCUMENT TO BE REFERENCED WITH OTHER INDIVIDUAL
DRAWINGS. CONTRACTOR & SUBCONTRACTORS ARE REQUIRED TO REFERENCE OTHER
SHEETS & SPECIFICATIONS AS AN ENTIRE SET OF CONSTRUCTION DOCUMENTS THAT
REFLECT WORK REQUIRED TO ACHIEVE A COMPLETE & OPERATIONAL GOAL. LACK OF
COORDINATION & REVIEW OF DRAWINGS & SPECIFICATIONS AS AN ENTIRE DOCUMENT
TO INSTALL COMPLETE & OPERATIONAL SYSTEMS, BEING OBVIOUS & TYPICAL INDUSTRY
STANDARD, IDENTIFIED IN THE DRAWINGS & SPECIFICATIONS, SHALL NOT BE IN ANY WAY
AN ADDITIONAL COST TO THE GOVERNMENT.
11. CONTRACTOR SHALL SUBMIT A REQUEST, IN WRITING, TO INTERRUPT ANY SUCH
SERVICES TO COR (CONTRACTING OFFICER’S REPRESENTATIVE) 21 DAYS IN ADVANCE
OF PROPOSED INTERRUPTION. REQUEST SHALL STATE REASON, DATE, EXACT TIME OF,
& APPROXIMATE DURATION OF SUCH INTERRUPTION. MAJOR INTERRUPTIONS OF ANY
SYSTEM MUST BE REQUESTED, IN WRITING, AT LEAST 60 CALENDAR DAYS PRIOR TO THE
DESIRED TIME & SHALL BE PERFORMED AS DIRECTED BY THE COR. MAJOR
INTERRUPTIONS SHALL BE COORDINATED WITH OTHER MAJOR INTERRUPTIONS & MAY
NOT BE SCHEDULED FOR ONE DISCIPLINE MORE THAN TWICE THROUGHOUT THE
OVERALL CONSTRUCTION SCHEDULE UNLESS REQUESTED IN WRITING & APPROVED BY
THE COR. CONTRACTOR WILL BE ADVISED, IN WRITING, OF APPROVAL OF REQUEST, OR
OF WHICH OTHER DATE &/OR TIME SUCH INTERRUPTION WILL CAUSE THE LEAST
INCONVENIENCE TO OPERATIONS OF THE MEDICAL CENTER. INTERRUPTION TIME
APPROVED BY THE MEDICAL CENTER MAY OCCUR AT TIMES OTHER THAN
CONTRACTOR'S NORMAL WORKING HOURS. SCHEDULE INTERRUPTION MAY BE ON
WEEKENDS OR LATE HOURS & MAY NOT BE AN ADDITIONAL COST TO THE GOVERNMENT.
COORDINATE ALL INTERRUPTIONS THAT MAY AFFECT THE NORMAL OPERATION OF THE
FACILITY WITH THE COR WHEN SUBMITTING THE CONSTRUCTION SCHEDULE OR
UPDATES TO THE CONSTRUCTION SCHEDULE.
12. NO ASBESTOS CONTAINING MATERIALS ARE TO BE USED ON THIS PROJECT. SPUR
SBBL COLLABORATIVE, THE A/E OF RECORD, CAN CERTIFY THAT NO ASBESTOS
CONTAINING BUILDING MATERIALS (ACBM) OR LEAD BASED PAINT (LBP) PRODUCTS
WERE DESIGNED/SPECIFIED AS BUILDING MATERIAL IN ANY OF THE CONSTRUCTION
DOCUMENTS.
13. REFER TO THE DESIGN BINDER FOR THE ICRA INFORMATION DOCUMENTATION.
14. THE DESIGN OF SEISMIC RESTRAINTS OF NON-STRUCTURAL COMPONENTS TO RESIST
SEISMIC LOAD SHALL BE BASED ON SEISMIC DESIGN PARAMETERS INDICATED BELOW IN
ACCORDANCE WITH VA H-18-8 IN CONJUCTION WITH ASCE 7 AND ASCE 41, AS SPECIFIED IN
H-18-8 SECTION 4.0, FOR EXISTING BUILDING RETROFIT PROJECTS. SPECIFIC
REQUIREMENTS FOR CRITICAL AND ESSENTIAL FACILITIES ARE COVERED IN SECTION 4.0
OF H-18-8, INCLUDING APPLYING IP=1.5 FOR ALL NONSTRUCTURAL COMPONENTS IN
CRITICAL FACILITIES.
A. INTERNATIONAL BUILDING CODE 2018 EDITION
B. AMERICAN SOCIETY OF CIVIL ENGINEERS SEISMIC EVALUATION AND RETROFIT OF
EXISTING BUILDINGS ASCE 41-17.
C. AMERICAN SOCIETY OF CIVIL ENGINEERS MINIMUM DESIGN LOADS AND
ASSOCIATED CRITERIA FOR BUILDINGS AND OTHER STRUCTURES (ASCE 7) 7-16.
D. FACILITY OCCUPANCY CATEGORY PER VA H-18-8: CRITICAL FACILITY
E. SITE CLASS: D
KEYED NOTE TAG
WALL TAG
WINDOW TAG
" M
IN
LATCH APPROACH,
PUSH SIDE
24" MIIN
PURPOSE: THE PUBLIC BUILDINGS AMENDMENT ACT OF 1988, PUBLIC LAW (PUB. L.) 100-678 REQUIRES FEDERAL AGENCIES TO FOLLOW NATIONAL RECOGNIZED "MODEL" BUILDING CODES. THE FEDERAL PARTICIPATION IN THE DEVELOPMENT AND USE OF VOLUNTARY STANDARDS, OFFICE OF MANAGEMENT AND BUDGET (OMB) CIRCULAR A-119, REQUIRES ALL EXECUTIVE AGENCIES TO RELY ON VOLUNTARY STANDARDS, BOTH DOMESTIC AND INTERNATIONAL, WHENEVER FEASIBLE, AND TO
PARTICIPATE INVOLUNTARY STANDARD BODIES.
GENERAL: VA HAS ADOPTED THE LATEST EDITION OF THE FOLLOWING CODES AND STANDARDS AS A MINIMUM FOR ALL PROJECTS PERFORMED IN THE MODERNIZATION, ALTERATION, ADDITION, OR IMPROVEMENT OF ITS REAL PROPERTY AND THE CONSTRUCTION OF NEW STRUCTURES. VA DESIGN MANUALS AND MASTER SPECIFICATIONS SPECIFY OTHER CODES AND STANDARDS THAT VA FOLLOWS ON ITS PROJECTS:
• VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD STANDARD APPLICATION GUIDE, AND OTHER GUIDANCE ON THE TECHNICAL
INFORMATION LIBRARY (TIL) (HTTP://WWW.CFM.VA.GOV/TIL/).
• INTERNATIONAL BUILDING CODE (IBC) (ONLY WHEN SPECIFICALLY REFERENCED IN VA DESIGN DOCUMENTS, SEE NOTES BELOW)
• 2018 INTERNATIONAL EXISTING BUILDING CODE (IBEC) (IF APPLICABLE)
• NFPA 101 LIFE SAFETY CODE (SEE NOTES BELOW)
• NFPA NATIONAL FIRE CODES WITH THE EXCEPTION OF NFPA 5000 AND NFPA 900
• OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS.
• VA SEISMIC DESIGN REQUIREMENTS, H-18-8
• NATIONAL ELECTRICAL CODE (NEC)
• INTERNATIONAL PLUMBING CODE (IPC)
• SAFETY CODE FOR ELEVATORS AND ESCALATORS, AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME) A 17.1.
• ASME BOILER AND PRESSURE VESSEL CODE
• ASME CODE FOR PRESSURE PIPING
• ARCHITECTURAL BARRIERS ACT (ABA) STANDARDS INCLUDING VA SUPPLEMENT, VA BARRIER FREE DESIGN STANDARD (PG-18-13)
• 2017 ANSI ICC A117.1 ACCESSIBLE AND USABLE BUILDINGS AND FACILITIES
• BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE, AMERICAN CONCRETE INSTITUTE AND COMMENTARY (ACI 318)
• MANUAL OF STEEL CONSTRUCTION, LOAD AND RESISTANCE FACTOR DESIGN SPECIFICATIONS FOR STRUCTURAL STEEL BUILDINGS, AMERICAN INSTITUTE OF STEEL
CONSTRUCTION (AISC)
• ENERGY POLICY ACT OF 2005 (EPACT)
• 2007 DOE INTERIM FINAL RULE: ENERGY CONSERVATION STANDARDS FOR NEW FEDERAL, COMMERCIAL AND MULTI-FAMILY HIGH-RISE RESIDENTIAL BUILDINGS AND
NEW LOW-RISE RESIDENTIAL BUILDINGS, 10 CFR PARTS 433, 434 AND 435.
• FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND SUSTAINABLE BUILDINGS: MEMORANDUM OF UNDERSTANDING (MOU)
• FACILITIES GUIDELINES INSTITUTE 2018 (FGI 2018)
• EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL ENVIRONMENTAL, ENERGY, AND TRANSPORTATION MANAGEMENT.
• 2018 EXECUTIVE ORDER 13834: EFFICIENT FEDERAL OPERATIONS
• 2021 THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS. STATED IN THE GENERAL REQUIREMENTS SECTION 010000 OF THE VA MASTER CONSTRUCTION
SPECIFICATION.
• 2019 VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY – ASHRAE STANDARD 62.1
• 2019 SAFETY STANDARD FOR REFRIGERATION SYSTEMS – ASHRAE STANDARD 15
LOCAL CODES: AS AN AGENCY OF THE FEDERAL GOVERNMENT, VA IS NOT SUBJECT TO LOCAL IMPOSITION OF CODE ENFORCEMENT PROCEDURES (DRAWING REVIEWS, BUILDING PERMITS, INSPECTIONS, FEES, ETC.). VA MUST FUNCTION AS THE AUTHORITY HAVING JURISDICTION (AHJ) AND THUS HAS THE RESPONSIBILITY TO GUARD PUBLIC HEALTH AND SAFETY THROUGH ENFORCING ITS ADOPTED CODES. HOWEVER, LOCAL AUTHORITIES SHOULD BE NOTIFIED ABOUT PLANNED PROJECTS AND GIVEN OPPORTUNITY TO REVIEW DRAWINGS PROVIDED THAT VA DOES NOT PAY FOR REVIEW OR INSPECTION FEES.
NOTES:
1. NFPA 101 PRIMARILY ADDRESSES LIFE SAFETY AND FIRE PROTECTION FEATURES WHILE THE IBC ADDRESSES A WIDE RANGE OF CONSIDERATIONS, INCLUDING, BUT NOT LIMITED TO, STRUCTURAL STRENGTH, SEISMIC STABILITY, SANITATION, ADEQUATE LIGHT AND VENTILATION, AND ENERGY CONSERVATION. VA BUILDINGS MUST MEET THE REQUIREMENTS OF NFPA 101 AND DOCUMENTS REFERENCED BY NFPA 101 IN ORDER TO COMPLY WITH THE ACCREDITATION REQUIREMENTS OF THE JOINT COMMISSION. THEREFORE, DESIGNS SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF NFPA 101 AND DOCUMENTS REFERENCED THEREIN.
DESIGN FEATURES NOT ADDRESSED BY NFPA 101 OR DOCUMENTS REFERENCED THEREIN SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF THE IBC OR AS OTHERWISE ADDRESSED ABOVE IN THIS PROGRAM GUIDE. FOR DESIGN FEATURES THAT ARE ADDRESSED BY BOTH THE IBC AS WELL AS NFPA 101 OR A DOCUMENT REFERENCED BY NFPA 101, THE REQUIREMENTS OF NFPA 101 OR THE DOCUMENT REFERENCED BY NFPA 101 SHALL BE USED EXCLUSIVELY (THIS APPLIES
EVEN IF THE IBC REQUIREMENTS ARE DIFFERENT).
2. SHOULD A CONFLICT EXIST BETWEEN VA REQUIREMENTS AND VA ADOPTED NATIONALLY RECOGNIZED CODES AND STANDARDS, THE CONFLICT SHALL BE BROUGHT TO THE ATTENTION OF VA. THE RESOLUTION OF THE CONFLICT SHALL BE MADE BY THE AUTHORITY HAVING JURISDICTION.
FD
FD
OCCUPANT LOAD
BUILDING EXIT
FIRE RATED WALL SYMBOLS
EGRESS PATH
1 HOUR FIRE
2 HOUR FIRE
3 HOUR FIRE
4 HOUR FIRE
SMOKE PARTITION
FEC FIRE EXTINGUISHER CABINET
AED AUTOMATED EXTERNAL DEFIBRILLATOR, GC TO
COORDINATE ROUGH-IN CONDITION WITH VA
PROVIDED EQUIPMENT
EXIT LIGHT / SIGN
AREA OF WORK BOUNDARY
STARTING POINT OF FURTHEST LOCATION TO
EXIT STAIR
NFPA 101-2021 EDITION
BUILDING HEIGHT:
5 STORIES, 88'-0" HEIGHT
BUILDING AREA:
4TH FLOOR 161,036 GSF
DEPARTMENT 17,456 GSF
BUILDING IS EQUIPPED WITH A FULLY AUTOMATIC FIRE SPRINKLER SYSTEM THROUGHOUT
BUILDING OCCUPANCY AND CONSTRUCTION TYPE: NFPA 101/NFPA 220:
NFPA 101 CHAPTER 6 OCCUPANCY GROUP CLASSIFICATIONS:
MULTIPLE OCCUPANY: EXISTING HEALTHCARE, AMBULATORY HEALTHCARE, BUSINESS
TYPE II (222)*
BASIS: EXISTING STRUCTURE IS STRUCTURAL STEEL FRAMED WITH REINFORCED CONCRETE. FLOOR SLABS ARE 7.25" CONCRETE ON STEEL DECK, ROOF SLAB IS 6.25" CONCRET. FLOOR-CEILING
ASSEMBLIES ARE POURED GYPSUM CONCRETE SUPPORTED ON SUSPENDED WIRE TRUSSES. ALL
STRUCTURAL STEEL IS PROTECTED WITH SPRAYED ON FIREPROOFING OR FULLY ENCLOSED.
EQUIVALANT IBC CONSTRUCTION TYPE 1-A (SECTION 602.3)
*CONSTRUCTION TYPE IS ESTIMATED BASED ON AS-BUILT DRAWINGS RECEIVED. TESTING OF ALL
FIREPROOFING MATERIALS IS NECESSARY TO VERIFY RATING OF ELEMENTS.
NFPA 220 TABLE 4.1.1 FIRE RESISTANCE RATINGS
CONSTRUCTION TYPE II (222)
BUILDING RATING CONSTRUCTION EXISTING CONDITION
ELEMENT REQUIRED REQUIREMENT
EXTERIOR 2 HR MIN 5" PER ACI N/A
BEARING 216R
WALLS
INTERIOR 2 HR NONE N/A
BEARING
WALLS
COLUMNS 2 HR NONE STRUCTURAL STEEL COLUMNS WITH
SPRAYED ON FIREPROOFING - ASSUME
3-HR RATING
BEAMS 2 HR NONE STRUCTURAL STEEL BEAMS WITH SPRAYED
ON FIREPROOFING - ASSUME 3-HR RATING
FLOOR- 2 HR NONE CONCRETE SLAB ON METAL DECK = 7.25" +
CEILING SUSPENDED POURED GYPSUM CONCRETE
ASSEMBLIES PLATFORM SUPPORTED ON METAL WIRE
WIRE TRUSSES AND HANGER RODS
ROOF-CEILING 0 HR NONE CONCRETE SLAB ON METAL DECK = 6.25" +
SUSPENDED POURED GYPSUM CONCRETE
PLATFORM SUPPORTED ON METAL WIRE
WIRE TRUSSES AND HANGER RODS
INTERIOR 0 HR NONE NEW PARTITIONS TO BE NON-COMBUSTIBLE
NON-BEARING CONSTRUCTION
WALLS
EXTERIOR 0 HR NONE STUCCO ON METAL LATH SUPPORTED BY
NON-BEARING METAL STUD FRAMING
WALLS
FIRE-RESISTIVE REQUIREMENTS:
• NON COMBUSTIBLE MATERIALS FOR STRUCTURAL FRAME, FLOORS, ROOF DECK, EXTERIOR NON-
BEARING WALLS, INTERIOR NON-BEARING WALLS (U.N.O. AT EXTERIOR)
CHAPTER 19: EXISTING HEALTHCARE OCCUPANCY
NFPA CHAPTER 7 REQUIREMENTS
NFPA TABLE 7.3.1.2
USE SF PER PERSON
HEALTHCARE
IN PATIENT TREATMENT 240
BUSINESS 100
INDUSTRIAL
GENERAL AND HIGH HAZARD 100
DEAD END CORRIDOR MAXIMUM DISTANCE: 30' (19.2.5.2)
MAXIMUM COMMON PATH OF TRAVEL: 200' (19.2.6.2.2)
MAXIMUM TRAVEL DISTANCE: 200' (19.2.5.7.2.4.2)
PROTECTED AREAS:
- STORAGE ROOMS/CLEAN/SOILED - REQUIRED VA FIRE PROTECTION DESIGN MANUAL 3.1.A AND PER
NFPA 101: 38.3.2.1 AND 8.7 SMOKE PARTITIONS WITH SPRINKLER PROTECTION, PROVIDED.
FIRE ALARM SYSTEM:
- TIE INTO EXISTING.
STANDPIPES:
- EXISTING
M.5
26 25.5 24 23 171819202122 20.5
M
L
N
25.4 25 24.9
WAITING
4B-100A
FAMILY
CONSULT
4B-100B
BARIATRIC
PATIENT
ROOM
4B-102
BARIATRIC
PATIENT
ROOM
4B-104
PATIENT
ROOM
4B-106
PATIENT
ROOM
4B-108
PAT. TOILET
4B-106A
PAT. TOILET
4B-108A
PATIENT
ROOM
4B-110
PATIENT
ROOM
4B-112
PATIENT
ROOM
4B-114
PAT. TOILET
4B-112A
STAFF
TOILET
4B-119
HAC
4B-121
CLEAN
LINEN
4B-117
PHARMACIST
SHARED
OFFICE
4B-115
NOURISHMENT
STATION
4B-113
CLEAN
UTILITY
4B-111
NURSE
STATION
4B-109
MEDICATION
4B-124
SOILED
UTILITY
4B-107
SHARED
OFFICE
4B-105
STORAGE
4B-103
MED GAS
4B-126
STAFF
TOILET
4B-128
STAFF
LOUNGE
4B-142
PATIENT
ROOM
4B-141
PATIENT
ROOM
4B-139
PATIENT
ROOM
4B-137
PATIENT
ROOM
4B-135
PATIENT
ROOM
4B-133
PATIENT
ROOM
4B-131
A.I.I.
PATIENT
ROOM
4B-129
A.I.I.
PATIENT
ROOM
4B-127
A.I.I.
PATIENT
ROOM
4B-125
A.I.I.
PATIENT
ROOM
4B-123
CONSULT
4B-101
CORRIDOR
C4-2A
EQUIPMENT
STORAGE
4B-122
OFFICE
4B-120B
NURSE MGR
4B-118
NURSE SUPV
4B-116
CORRIDOR
C4-05
CORRIDOR
C4-03
CORRIDOR
CA-1A
PAT. TOILET
4B-141A
PAT. TOILET
4B-139A
PAT. TOILET
4B-137A
PAT. TOILET
4B-135A
PAT. TOILET
4B-133A
PAT. TOILET
4B-131A
PAT. TOILET
4B-129A
PAT. TOILET
4B-127A
PAT. TOILET
4B-125A
PAT. TOILET
4B-123A
BAR. TOILET
4B-104A
BAR.
TOILET
4B-102A
CORRIDOR
MA04-20
EQUIPMENT
ROOM
SB04-1A
49'-6"
188'-0" TRAVEL DISTANCE
SERVBAY
SB04-1
ALCOVE
CRASH
CART
4B-116A
OCCUPANT
LOAD EGRESS
FEC-2
FE
C-
FEC-2
AED
STAIR
ST04-1
FEC-2
ALCOVE
4B-000
BCBU
4B-120A
ANTEROOM
4B-129B
ANTEROOM
4B-125B
PAT. TOILET
4B-110A
PAT. TOILET
4B-114A
154'-6" TRAVEL DISTANCE
170'-0" TRAVEL DISTANCE 182'-0" TRAVEL DISTANCE
OCCUPANT
LOAD EGRESS
SCOPE OF
WORK
CLERK OFFICE
4A-15
SUPPLY
4A-15E
SUPPLY
4A-15D
OFFICE
4A-08
OFFICE
4A-08A
OFFICE
4A-15B
OFFICE
4A-15C
CORRIDOR
4A-01
EQUIP.
ALCOVE
4B-146
1/8" = 1'-0"
FD FD
M.5
26 25.5 24 23 171819202122 20.5
M
L
N
25.4 25 24.9
WAITING
4B-100A
FAMILY
CONSULT
4B-100B
BARIATRIC
PATIENT
ROOM
4B-102
BARIATRIC
PATIENT
ROOM
4B-104
PATIENT
ROOM
4B-106
PATIENT
ROOM
4B-108
PAT. TOILET
4B-106A
PAT. TOILET
4B-108A
PATIENT
ROOM
4B-110
PATIENT
ROOM
4B-112
PATIENT
ROOM
4B-114
PAT. TOILET
4B-112A
STAFF
TOILET
4B-119
HAC
4B-121
CLEAN
LINEN
4B-117
PHARMACIST
SHARED
OFFICE
4B-115
NOURISHMENT
STATION
4B-113
CLEAN
UTILITY
4B-111
NURSE
STATION
4B-109
MEDICATION
4B-124
SOILED
UTILITY
4B-107
SHARED
OFFICE
4B-105
STORAGE
4B-103
MED GAS
4B-126
STAFF
TOILET
4B-128
STAFF
LOUNGE
4B-142
PATIENT
ROOM
4B-141
PATIENT
ROOM
4B-139
PATIENT
ROOM
4B-137
PATIENT
ROOM
4B-135
PATIENT
ROOM
4B-133
PATIENT
ROOM
4B-131
A.I.I.
PATIENT
ROOM
4B-129
A.I.I.
PATIENT
ROOM
4B-127
A.I.I.
PATIENT
ROOM
4B-125
A.I.I.
PATIENT
ROOM
4B-123
CONSULT
4B-101
CORRIDOR
C4-2A
EQUIPMENT
STORAGE
4B-122
OFFICE
4B-120B
NURSE MGR
4B-118
NURSE SUPV
4B-116
CORRIDOR
C4-05
CORRIDOR
C4-03
CORRIDOR
CA-1A
PAT. TOILET
4B-141A
PAT. TOILET
4B-139A
PAT. TOILET
4B-137A
PAT. TOILET
4B-135A
PAT. TOILET
4B-133A
PAT. TOILET
4B-131A
PAT. TOILET
4B-129A
PAT. TOILET
4B-127A
PAT. TOILET
4B-125A
PAT. TOILET
4B-123A
BAR. TOILET
4B-104A
BAR.
TOILET
4B-102A
CORRIDOR
MA04-20
EQUIPMENT
ROOM
SB04-1A
TEMPORARY ICRA BARRIER:
1-HR WALL & 45-MIN DOOR TO REMAIN
THROUGHOUT CONSTRUCTION, REF 1/GI-003
SERVBAY
SB04-1
ALCOVE
CRASH
CART
4B-116A
FE
C-
FEC-2
AED
STAIR
ST04-1
TEMPORARY ICRA BARRIER:
1-HR WALL TO REMAIN THROUGHOUT
CONSTRUCTION, REF 2/GI-003
TEMPORARY ICRA BARRIER:
1-HR WALL & 45-MIN DOOR TO REMAIN
THROUGHOUT CONSTRUCTION
BCBU
4B-120A
WALK OFF MAT
WALK OFF MAT
WALK OFF MAT
SCOPE OF
WORK
TEMPORARY ICRA BARRIER:
1-HR WALL & 45-MIN DOOR TO REMAIN
THROUGHOUT CONSTRUCTION, REF 1/GI-003
WALK OFF MAT
CLERK OFFICE
4A-15
SUPPLY
4A-15E
SUPPLY
4A-15D
OFFICE
4A-08
OFFICE
4A-08A
OFFICE
4A-15B
OFFICE
4A-15C
CORRIDOR
4A-01 PAT. TOILET
4B-114A
PAT. TOILET
4B-110A
EQUIP.
ALCOVE
4B-146
1. THE ICRA DESIGNATION FOR THIS PROJECT IS CONSTRUCTION TYPE 'D' & LEVEL 'IV' CLASS
OF PRECAUTION OF INFECTION CONTROL ACTIVITIES. HARD SURFACE BARRIERS SHALL BE
USED.
2. WITH REGARD FOR REMEDIATION REQUIREMENTS, AN ENTRY VESTIBULE FOR CLOTHING
CHANGES TO TYVEK SUITS SHALL BE PROVIDED ADJACENT TO THE HARD SURFACE BARRIER
OR ENTRY VESTIBULE. UPON COMPLETION OF THE CONSTRUCTION PHASE, DUST BARRIERS
SHALL BE REMOVED CAREFULLY TO MINIMIZE SPREADING OF DUST AND THE CONTRACTOR
SHALL TEMPORARY DUST PROTECTION IN PLACE BEFORE REMOVAL OF THE HARD SURFACE
BARRIERS. A DWYER GAUGE SHALL BE USED AT THE CONSTRUCTION ENTRY TO VALIDATE
NEGATIVE AIR FLOWS. AFTER EACH PHASE, PERFORM TASKS STATED IN NOTE 11.
3. TRAFFIC CONTROL: CONTRACTOR SHALL PROVIDE STICKY MATS AT PLASTIC BARRIER
ENTRANCES OR CONSTRUCTION ENTRY VESTIBULE AND CHANGE DAILY OR MORE OFTEN AS
NEEDED TO PREVENT THE SPREAD OF DUST AND DEBRIS INTO ADJACENT CLEAN SPACE.
ANY DUST TRACKED OUTSIDE OF THE CONSTRUCTION ENTRY SHALL BE IMMEDIATELY
CLEANED. EGRESS PATHS SHALL BE FREE OF DEBRIS AND COR SHALL DESIGNATE
ELEVATORS FOR USE DURING APPROVED WORKING HOURS. ONLY AUTHORIZED PERSONNEL
SHALL BE ALLOWED TO ENTER THE CONSTRUCTION AREA. SIGNAGE SHALL DIRECT
PEDESTRIAN TRAFFIC AWAY FROM THE CONSTRUCTION AREA AND MATERIALS. REFER
SECURITY INFORMATION FOR ALTERNATE ACCESS REQUIREMENTS.
4. MATERIAL TRANSPORT: CONTRACTOR SHALL USE ISOLATION CARTS TO TRANSFER
CONSTRUCTION MATERIAL IN AND OUT OF THE CONSTRUCTION AREA. A CLEAN CART SHALL
BE USED FOR TRANSPORTING MATERIAL TO THE CONSTRUCTION AREA. CARTS ARE TO BE
CLEANED AND COVERED BEFORE LEAVING THE CONSTRUCTION AREA.
5. DEMOLITION DEBRIS: DEBRIS SHALL BE REMOVED IN CARTS WITH TIGHTLY FITTED COVERS.
DEBRIS TRANSPORT TRAFFIC ROUTES SHALL BE ESTABLISHED TO MINIMIZE USE OF
ELEVATORS. TRANSPORT OF DEBRIS WILL OCCUR DURING THE LOWEST PERIOD OF
ACTIVITY IN THE ADJACENT UNIT. DEBRIS SHALL BE REMOVED DAILY AND AT TIMES
SPECIFIED BY THE COR.
6. AIR SYSTEM FLOW: THE COR SHALL VERIFY AND NOTIFY THE CONTRACTOR WHETHER THE
CONSTRUCTION AREA USES FRESH/OUTSIDE OR RE-CIRCULATED AIR. FILTERS SHALL BE
ADDED OR RETURN VENTS COVERED WITH FILTER MATERIAL OR PLASTIC. AIR MUST FLOW
FROM CLEAN TO DIRTY AREAS.
7. NEGATIVE AIR PRESSURE: THE AIR WITHIN THE CONSTRUCTION AREA SHALL BE NEGATIVE
WITH RESPECT TO SURROUNDING AREAS AND WITH NO DISRUPTION TO AIR SYSTEMS OF
ADJACENT AREAS. USE OF THE NEGATIVE AIR PRESSURE SYSTEM WITHIN THE ENCLOSURE
TO REMOVE DUST SHALL PASS AIR THROUGH AN INDUSTRIAL GRADE PORTABLE HEPA FILTER
CAPABLE OF FILTRATION RATES OF 300-800 CUBIC FEET PER MINUTE. SYSTEM SHALL
MAINTAIN NEGATIVE PRESSURE REQUIREMENT OF -0.03". FOR CONSTRUCTION AREA AIR
RETURNED TO THE HVAC SYSTEM, A PRE-FILTER AND HEPA FILTER SHALL BE USED BEFORE
EXHAUST TO PREVENT CONTAMINATION OF HVAC SYSTEM DUCTING.
8. ADJACENT AREAS: THE STATUS OF SEALED PENETRATIONS AND INTACT CEILING SHALL BE
VERIFIED DAILY.
9. AIR EXCHANGE RATES AND PRESSURE RELATIONSHIPS: VAMC AND CONTRACTOR SHALL
VERIFY AND MAINTAIN PROPER AIR EXCHANGE RATES IN CRITICAL AREAS NEAR
CONSTRUCTION ACTIVITY. CONTRACTOR TO ENSURE AIR IS RE-CIRCULATED WITH
FILTRATION FROM ALL CONSTRUCTION AREAS. PROVIDE AIR PRESSURE TESTING
THROUGHOUT THE PROJECT IN ACCORDANCE WITH COR PROVIDED REQUIREMENTS.
10. WORKSITE CLOTHING: CONTRACTOR PERSONNEL CLOTHING SHALL BE FREE OF LOOSE
SOIL AND DEBRIS BEFORE LEAVING THE CONSTRUCTION AREA. IF PROTECTIVE APPAREL IS
NOT WORN (EXAMPLES: COVERALLS, FOOTGEAR, AND HEADGEAR) A HEPA-FILTERED
VACUUM SHALL BE USED TO REMOVE DUST FROM CLOTHING BEFORE LEAVING THE
BARRICADE. IF PROTECTIVE APPAREL IS UTILIZED, THE CONTRACTOR SHALL CONSTRUCT A
SPACE OR ANTEROOM FOR CHANGING OF CLOTHING.
11. POST CONSTRUCTION: DO NOT REMOVE BARRIERS AND KEEP ALL HVAC ISOLATION IN
PLACE UNTIL CONTRACTOR HAS CLEANED THE CONSTRUCTION SITE, VA EMS STAFF HAS
PERFORMED A TERMINAL CLEANING, AND VA INFECTIOUS DISEASE CONTROL HAS
INSPECTED AND APPROVED THE CLEANING.
12. FIRE ALARMS AND OTHER LIFE SAFETY FIXTURES WITHIN THE ICRA BARRIERS OF THE
CONSTRUCTION AREA SHALL BE TEMPORARILY RELOCATED TO THE OUTSIDE OF BARRIERS.
13. REFER TO SPECIFICATION SECTION 01 35 26 "SAFETY REQUIREMENTS" FOR ADDITIONAL
ILSM PROCEDURES AS REQUIRED BY THE VA DURING CONSTRUCTION ACTIVITIES.
BASE
PLAN
HEAD
UNDERSIDE OF STRUCTURE
LINE OF CEILING, REF RCP
METAL RUNNER FASTENED
@ 24" OC
WALL FINISH, REF FINISH
SCHEDULE
5/8" "TYPE X" GYPSUM BOARD,
EACH SIDE
METAL RUNNER, FASTENED
@ 24" OC
FINISH FLOOR, REF FINISH
SCHEDULE
BASE AS SCHEDULED
METAL STUD FRAMING
@ 16" OC
FIRE RATED SEALANT AROUND
PERIMETER
FIRE RATED SEALANT AROUND
PERIMETER
ARCHITECTURAL SCOPE OF WORK
EXISTING WALLS TO REMAIN
EXISTING AREA TO REMAIN
1 HOUR FIRE
SMOKE PARTITION
1 1/2" = 1'-0"
FD
M.5
26 25.5 24 23 171819202122 20.5
M
L
N
25.4 25 24.9
WAITING
4B-100A
FAMILY
CONSULT
4B-100B
BARIATRIC
PATIENT
ROOM
4B-102
BARIATRIC
PATIENT
ROOM
4B-104
PATIENT
ROOM
4B-106
PATIENT
ROOM
4B-108
PAT. TOILET
4B-106A
PAT. TOILET
4B-108A
PATIENT
ROOM
4B-110
PATIENT
ROOM
4B-112
PATIENT
ROOM
4B-114
PAT. TOILET
4B-112A
STAFF
TOILET
4B-119
HAC
4B-121
CLEAN
LINEN
4B-117
PHARMACIST
SHARED
OFFICE
4B-115
NOURISHMENT
STATION
4B-113 CLEAN
UTILITY
4B-111 MEDICATION
4B-124
SOILED
UTILITY
4B-107
SHARED
OFFICE
4B-105
STORAGE
4B-103
MED GAS
4B-126
STAFF
TOILET
4B-128
STAFF
LOUNGE
4B-142
PATIENT
ROOM
4B-141
PATIENT
ROOM
4B-139
PATIENT
ROOM
4B-137
PATIENT
ROOM
4B-135
PATIENT
ROOM
4B-133
PATIENT
ROOM
4B-131
A.I.I.
PATIENT
ROOM
4B-129
A.I.I.
PATIENT
ROOM
4B-127
A.I.I.
PATIENT
ROOM
4B-125
A.I.I.
PATIENT
ROOM
4B-123
CONSULT
4B-101
CORRIDOR
C4-2A
EQUIPMENT
STORAGE
4B-122
OFFICE
4B-120B
NURSE MGR
4B-118
NURSE SUPV
4B-116
CORRIDOR
C4-05
CORRIDOR
CA-1A
PAT. TOILET
4B-141A
PAT. TOILET
4B-139A
PAT. TOILET
4B-137A
PAT. TOILET
4B-135A
PAT. TOILET
4B-133A
PAT. TOILET
4B-131A
PAT. TOILET
4B-129A
PAT. TOILET
4B-127A
PAT. TOILET
4B-125A
PAT. TOILET
4B-123A
BAR. TOILET
4B-104A
BAR.
TOILET
4B-102A
CORRIDOR
MA04-20
EQUIPMENT
ROOM
SB04-1A
SERVBAY
SB04-1
NURSE
STATION
4B-109
CORRIDOR
C4-03
ALCOVE
CRASH
CART
4B-116A
PAT. TOILET
4B-110A
PAT. TOILET
4B-114A
EQUIP.
ALCOVE
4B-146
ALCOVE
4B-000
BCBU
4B-120A
ANTEROOM
4B-125B
ANTEROOM
4B-129B
CORRIDOR
C4-02
CLERK OFFICE
4A-15
SUPPLY
4A-15E
SUPPLY
4A-15D
OFFICE
4A-08
OFFICE
4A-08A
OFFICE
4A-15B
OFFICE
4A-15C
CORRIDOR
4A-01
160'-7 1/2"
4. KEEP EXISTING E-6. ADD A VFD TO THE FAN TO ALLOW THE
UNIT TO TURN DOWN TO THE REQUIRED AIRFLOW.
3. KEEP EXISTING AHU-31. ADD A VFD TO THE FAN TO ALLOW
THE UNIT TO TURN DOWN TO THE REQUIRED AIRFLOW. REF. TO
BID DEDUCT GENERAL NOTE 1 ON SHEET MD104.
2. OMIT PATIENT LIFT IN THE NORTHERN CORRIDOR.
PATIENT LIFT SPAN IS 160'-7 1/2".
6. REPLACE ALL SIDE LIGHT DOOR TYPE WITH FLUSH TYPE
DOORS. OPTION TO REMOVE ANY FROSTED GLAZING ON GLASS.
5. KEEP EXISTING HORIZONTAL STORM DRAIN PIPING. REF. TO
BID DEDUCT GENERAL NOTE 1 ON SHEET PD104.
1. DEDUCT BLAST RESISTANT GLAZING ON THE SOUTH
ELEVATION ONLY. MAINTAIN EXISTING MULLIONS ON
SOUTH ELEVATION WINDOWS
ARCHITECTURAL SCOPE OF WORK
EXISTING WALLS TO REMAIN
EXISTING AREA TO REMAIN
1 HOUR FIRE
SMOKE PARTITION
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
6 Veterans
Health Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS:
Drawing # of
VA Health Care System Approval:
Revision: Date:
ARCHITECT:
U.S. Department of Veteran Affairs
SPUR SBBL
COLLABORATIVE JV, INC
100 N Stone Ave, Ste 1102 Tucson, AZ 85701
(405) 842-6100
STRUCTURAL / CIVIL
ENGINEER
GREGORY P. LUTH &
ASSOCIATES
3350 SCOTT BLVD,
BUILDING 48
SANTA CLARA, CA 95054
(408) 654-0475
ARCHITECTURE / MECHANICAL /
ELECTRICAL / PLUMBING /
TECHNICAL ENGINEER
SPUR SBBL
COLLABORATIVE JV, INC
100 N STONE AVE, STE
TUCSON, AZ, 85701
(405) 842-6100
FIRE PROTECTION
ENGINEER
POOLE FIRE
PROTECTION, INC.
19910 WEST 161ST
STREET
OLATHE, KANSAS 66062
(913) 829-8690
FU
LL
Y
SP
R
IN
K
LE
R
ED
ENVIORNMENTAL
ENGINEER
RIVERFRONT SAFTEY &
HEALTH, LC
11140 SOUTH TOWNE
SQUARE, SUIT 100
ST. LOUIS, MO 63123
(314) 917-0148
2/1 5/2
1 6
:23 :17
P M
CD 6JR
4NW MED/SURG WARD RENOVATION
08-13-2021
605-20-207
JERRY L PETTIS MEMORIAL VAMC HOSPITAL
11201 BENTON STREET
LOMA LINDA, CA 92537-0001
4TH FLOOR
- ASBESTOS REMEDIATION PLAN
HA101
UPDN
MICU
SB04-1A
EQUIP RM
STORAGE
4B-28
OFFICE
4B-20
NOURISH ST
4B-23
MED RM
4B-23A
BREAK RM 4B-30B
STORAGE
ST04-1
STAIR
4B-24A
PAT TOIL
4B-24
PAT RM 2B
4B-24B
PAT RM 2B
4B-25A
PAT TOIL
4B-26A
PAT TOIL
4B-26
PAT RM 2B
4B-27
PAT RM 1B
4B-29A
PAT TOIL
4B-29
PAT RM 4B
4B-31A
PAT TOIL
4B-09J
PAT RM 1B
4B-09H
PAT RM 1B
4B-36H
PAT RM 1B
4B-09E
SOILED
4B-09F
4B-09G
NOURISH ST
4B-36G
RESTROOM
4B-09D
CLEAN UTIL
4B-08
STORAGE
SH04-1
SHAFT
4B-33A
RESTROOM
4B-06
NURSE MGR
4B-33
QUARTERS
4B-11
WAITING RM
4B-13
PAT RM 2B
4B-10
EMS
4B-13A
PAT TOIL
4B-16
PAT RM 2B
4B-14
PAT RM 2B
4B-14A
RESTROOM
4B-18
PAT RM 4B
4B-18A
PAT TOIL
4B-21
PAT RM 2B
4B-21A
PAT TOIL
4B-22
PAT RM 2B
4B-22A
PAT TOIL
4B-19
SOILED
4B-17
STORAGE
4B-15
MONITORING
LOCKERS
4B-32A
RESTROOM
CONG BATH
4B-09C
BREAK RM
4B-09B
SERVER RM
4B-094B-27A
PAT TOIL
C4-07
CORR
ACC 04/01
ANTE RM
C4-04
NURSE STAT
C4-09
CORR
4B-07
STAFF LCKR
4B-25
PAT RM 1B
4A-14
WORK RM
C4-03
CORR
C4-05
CORR
C4-06
CORR
4B-30
4B-32 4B-12
4B-16A
RESTROOM
UTILITY
UTILITY
ASBESTOS KEY NOTES AND VISUAL KEY
REMOVE CURTAIN WALL SYSTEM WITH ASBESTOS
TRANSITE PANELS AND PRESUMED ASBESTOS CAULKS
ON ADJACENT SUBSTRATES USING MANUAL MEANS
WITHIN A GROSS REMOVAL CONTAINMENT, 70
TRANSITE PANELS (750 FT² TOTAL), (365 FT OF CURTAIN
WALL), (2,000 FT OF WEATHER CAULK). EXTERIOR
ASBESTOS SURFACING PRESENT.
REMOVE RESILIENT ASBESTOS FLOOR TILE USING
MANUAL MEANS AND ASSOCIATED ASBESTOS MASTIC
USING APPROVED CHEMICAL SOLVENT WITHIN A
GROSS REMOVAL CONTAINMENT, 8,356 FT² TOTAL.
REMOVE NON-ASBESTOS FLOORING AND UNDERLYING
ASBESTOS BLACK MASTIC USING MANUAL MEANS AND
APPROVED CHEMICAL SOLVENT WITHIN A GROSS
REMOVAL CONTAINMENT, 1,485 FT² TOTAL.
EXTERIOR ASBESTOS CONTAINING STUCCO
SURFACING PRESENT. PROTECT AS NECESSARY.
ASBESTOS FLOOR TILE AND UNDERLYING ASBESTOS
MASTIC PRESENT. PROTECT AS NECESSARY.
A1
A2
ABATEMENT KEY NOTES AND VISUAL KEY
LIMITS OF NEGATIVE PRESSURE CONTAINMENT
SUGGESTED LOCATIONS OF NEGATIVE AIR MACHINES
EQUIPPED WITH 3 STAGE HEPA FILTRATION. PROVIDE
AIR TUBING (TUNNELS) AND LOCALIZED AIR MACHINES
AS NECESSARY TO MAINTAIN NEGATIVE PRESSURE
DIFFERENTIAL OF 0.03IN WG THROUGHOUT.
SUGGESTED LOCATION OF INTAKE AIR FOR NEGATIVE
PRESSURE CONTAINMENT. MAINTAIN NEGATIVE
PRESSURE DIFFERENTIAL THROUGHOUT. REMOVE
PORTIONS OF NON-ASBESTOS INTERIOR DRYWALL
WHERE NECESSARY TO ALLOW FOR SUFFICIENT AIR
FLOW.
MANDATORY CONTINUOUS RECORDING MANOMETERS
REQUIRED.
TEMPORARY SEALED ICRA BARRIER WALL TO ALLOW
FOR REMOVAL OF ASBESTOS CURTAIN WALL WINDOW
SYSTEM. COORDINATE INSTALLATION AS PROVIDED BY
GENERAL CONTRACTOR.
ICRA BARRIER WALL WITH LOCK READY SELF CLOSING
DOOR REQUIRED AT LOAD-OUT AND
DECONTAMINATION AREAS. COORDINATE AS PROVIDED
BY GENERAL CONTRACTOR.
M
V
R
B1
B
M M M M M
MA1 A1 A1R
A2
A2
A1 A1 A1
5-stage Decon
3-stage Loadout
B1
R B V
R B V
A1
M B1
B
M
ABATEMENT GENERAL NOTES
NEGATIVE PRESSURE ENCLOSURE (NPE) BOUNDARY:
ALL PENETRATIONS ARE TO BE SEALED OR OTHERWISE
ISOLATED FROM NPE WITH 6 MIL LAYER OF FIRE
RETARDANT (FR) POLY SHEETING AS A CRITICAL
BARRIER. COMPLETE ENCLOSURE SHALL INCLUDE
WALLS, FLOORS, AND CEILING.
HEPA FILTERED NEGATIVE AIR MACHINES (2000 CFM)
TO MAINTAIN REGULATED AREA UNDER NEGATIVE
PRESSURE DIFFERENTIAL OF -0.03 IN WG DURING
REGULATED ACTIVITIES(VERIFY/DOCUMENT WITH
ELECTRONIC RECORDING MANOMETER). EXHAUST AIR
TO BE DISCHARGED OUTDOORS THROUGH NEARBY
WINDOW UNITS.
FIVE STAGE DECONTAMINATION STATION (WITH
SHOWER) TO BE CONSTRUCTED OF 2 LAYER 6 MIL FR
POLY AND USED FOR PERSONAL DECONTAMINATION
PURPOSES.
THREE STAGE WASTE LOAD OUT CHAMBERS TO BE
CONSTRUCTED OF TWO LAYERS 6 MIL FR POLY AND
EQUIPPED WITH FACILITY TO WET WIPE AND/OR HEPA
VACUUM BAGGED WASTE AND TOOLS.
DO NOT IMPACT ASBESTOS CONTAINING EXTERIOR
STUCCO DURING ATTACHMENT AND REMOVAL OF AIR
SEALS NEAR TEMPORARY BARRIER WALLS.
AFFIX 6-MIL FR POLY AND PROTECT ICRA BARRIER
WALLS TO PREVENT CONTAMINATION.
REMOVE CABINETS, VANITY, DESK STATION, OR
PORTIONS OF WALLS TO ACCESS AND REMOVE
ASBESTOS FLOOR TILE AND/OR UNDERLYING
ASBESTOS BLACK MASTIC WHERE PRESENT. MAINTAIN
COVERS AS REQUIRED TO PREVENT CONTAMINATION.
4B-31
PAT RM 4B
4TH FLOOR - ASBESTOS PLAN1
BID DOCUMENTS
e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
6 Veterans
Health Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS:
Drawing # of
VA Health Care System Approval:
Revision: Date:
ARCHITECT:
U.S. Department of Veteran Affairs
SPUR SBBL
COLLABORATIVE JV, INC
100 N Stone Ave, Ste 1102 Tucson, AZ 85701
(405) 842-6100
FU
LL
Y
SP
R
IN
K
LE
R
ED
2/1 5/2
1 6
:23 :17
P M
CD 7JR
4NW MED/SURG WARD RENOVATION
08-13-2021
605-20-207
JERRY L PETTIS MEMORIAL VAMC HOSPITAL
11201 BENTON STREET
LOMA LINDA, CA 92537-0001
4TH FLOOR
- LEAD REMEDIATION PLAN
HA102
ABATEMENT KEY NOTES AND VISUAL KEY
LIMITS OF NEGATIVE PRESSURE CONTAINMENT
SUGGESTED LOCATIONS OF NEGATIVE AIR MACHINES
EQUIPPED WITH 3 STAGE HEPA FILTRATION. PROVIDE
AIR TUBING (TUNNELS) AND LOCALIZED AIR MACHINES
AS NECESSARY TO MAINTAIN NEGATIVE PRESSURE
DIFFERENTIAL OF 0.02IN WG THROUGHOUT.
SUGGESTED LOCATION OF INTAKE AIR FOR NEGATIVE
PRESSURE CONTAINMENT, MAINTAIN NEGATIVE
PRESSURE DIFFERENTIAL THROUGHOUT. REMOVE
PORTIONS OF NON-ASBESTOS INTERIOR DRYWALL
WHERE NECESSARY TO ALLOW FOR SUFFICIENT AIR
FLOW.
MANDATORY CONTINUOUS RECORDING MANOMETERS
REQUIRED.
TEMPORARY SEALED ICRA BARRIER WALL TO ALLOW
FOR REMOVAL OF ASBESTOS CURTAIN WALL WINDOW
SYSTEM. COORDINATE INSTALLATION AS PROVIDED BY
GENERAL CONTRACTOR.
ICRA BARRIER WALL WITH LOCK READY SELF CLOSING
DOOR REQUIRED AT LOAD-OUT AND
DECONTAMINATION AREAS. COORDINATE AS PROVIDED
BY GENERAL CONTRACTOR.
M
V
R
B1
B
UPDN
MICU
SB04-1A
EQUIP RM
STORAGE
4B-28
OFFICE
4B-20
NOURISH ST
4B-23
MED RM
4B-23A
BREAK RM 4B-30B
STORAGE
ST04-1
STAIR
4B-24A
PAT TOIL
4B-24
PAT RM 2B
4B-24B
PAT RM 2B
4B-25A
PAT TOIL
4B-26A
PAT TOIL
4B-26
PAT RM 2B
4B-27
PAT RM 1B
4B-29A
PAT TOIL
4B-29
PAT RM 4B
4B-31
PAT RM 4B
4B-31A
PAT TOIL
4B-09J
PAT RM 1B
4B-09H
PAT RM 1B
4B-36H
PAT RM 1B
4B-09E
SOILED
4B-09F
4B-09G
NOURISH ST
4B-36G
RESTROOM
4B-09D
CLEAN UTIL
4B-08
STORAGE
SH04-1
SHAFT
4B-33A
RESTROOM
4B-06
NURSE MGR
4B-33
QUARTERS
4B-11
WAITING RM
4B-13
PAT RM 2B
4B-10
EMS
4B-13A
PAT TOIL
4B-16
PAT RM 2B
4B-14
PAT RM 2B
4B-14A
RESTROOM
4B-18
PAT RM 4B
4B-18A
PAT TOIL
4B-21
PAT RM 2B
4B-21A
PAT TOIL
4B-22
PAT RM 2B
4B-22A
PAT TOIL
4B-19
SOILED
4B-17
STORAGE
4B-15
MONITORING
LOCKERS
4B-32A
RESTROOM
CONG BATH
4B-09C
BREAK RM
4B-09B
SERVER RM
4B-094B-27A
PAT TOIL
C4-07
CORR
ACC 04/01
ANTE RM
C4-04
NURSE STAT
C4-09
CORR
4B-07
STAFF LCKR
4B-25
PAT RM 1B
4A-14
WORK RM
C4-03
CORR
C4-05
CORR
C4-06
CORR
4B-30
4B-32 4B-12
4B-16A
RESTROOM
UTILITY
UTILITY
5-stage Decon
3-stage Loadout
B1
B1
B
LEAD KEY NOTES AND VISUAL KEY
REMOVE LEAD CONTAINING CERAMIC WALL TILES
(LARGE AREAS) AND ASSOCIATED BACKING BOARD
WITHIN THE REGULATED WORK AREA, NEGATIVE
PRESSURE CONTAINMENT, 4 LOCATIONS, 2,100 SF
TOTAL. USE ADDITIONAL DROP CLOTH AND REDUCE
BREAKAGE DURING REMOVAL WITH MANUAL MEANS.
REMOVE LEAD CONTAINING CERAMIC WALL TILES AND
ASSOCIATED BACKER BOARD IN AREA AT WALL
MOUNTED SINKS WITHIN THE REGULATED WORK AREA,
NEGATIVE PRESSURE CONTAINMENT, 19 LOCATIONS
THROUGHOUT, 390 SF TOTAL. USE ADDITIONAL DROP
CLOTH AND REDUCE BREAKAGE DURING REMOVAL
WITH MANUAL MEANS.
REMOVE LEAD CONTAINING CERAMIC BATH TUB IN
WHOLE USING MANUAL METHODS WITHIN THE
REGULATED WORK AREA,NEGATIVE PRESSURE
CONTAINMENT, 2 FULL SIZE TUBS IN 2 ROOMS. REMOVE
WITH MANUAL MEANS.
REMOVE LEAD CONTAINING CERAMIC SINKS IN WHOLE
WITHIN THE ISOLATED WORK AREA, NEGATIVE
PRESSURE CONTAINMENT. SINKS ARE WALL MOUNTED
AND CABINET MOUNTED, 39 SINKS TOTAL
THROUGHOUT.
REMOVE LEAD CONTAINING CERAMIC TOILETS IN
WHOLE USING MANUAL MEANS WITHIN THE REGULATED
WORK AREA, NEGATIVE PRESSURE CONTAINMENT, 19
TOILETS TOTAL THROUGHOUT.
REMOVE LEAD PAINTED CLOTHING LOCKERS USING
MANUAL MEANS WITHIN THE REGULATED WORK AREA,
NEGATIVE PRESSURE CONTAINMENT, 10 LF OF 8 FT
TALL LOCKERS.
REMOVE LEAD CONTAINING FLOOR MOUNTED BASIN IN
WHOLE USING MANUAL MEANS WITHIN THE ISOLATED
WORK AREA,NEGATIVE PRESSURE CONTAINMENT, 1
BASIN TOTAL.
M M M M M
B1
M
MR
R B V
R B V
M
L1
L2
L3
L4
L5
L6
L7
L4
L2 L4 L5
L2 L4 L5
L4
L2 L4 L5
L4 L4 L2 L4 L5
L4 L2
L4 L2
L4 L2
L4 L4
L4
L4 L2
L2 L4
L4
L2 L4 L5
L2 L4 L5
L4 L4
L2 L4 L5
L4
L2 L4 L5
L2 L4 L5
L7
L2 L3 L5
L4
L1
L1 L4 L5
L2 L4
L2 L6
L5
L1 L3
ABATEMENT GENERAL NOTES
NEGATIVE PRESSURE ENCLOSURE (NPE) BOUNDARY:
ALL PENETRATIONS ARE TO BE SEALED OR OTHERWISE
ISOLATED FROM NPE WITH 6 MIL LAYER OF FIRE
RETARDANT (FR) POLY SHEETING AS A CRITICAL
BARRIER. COMPLETE ENCLOSURE SHALL INCLUDE
WALLS, FLOORS, AND CEILING.
HEPA FILTERED NEGATIVE AIR MACHINES (2000 CFM)
TO MAINTAIN REGULATED AREA UNDER NEGATIVE
PRESSURE DIFFERENTIAL OF -0.03 IN WG DURING
REGULATED ACTIVITIES(VERIFY/DOCUMENT WITH
ELECTRONIC RECORDING MANOMETER). EXHAUST AIR
TO BE DISCHARGED OUTDOORS THROUGH NEARBY
WINDOW UNITS.
FIVE STAGE DECONTAMINATION STATION (WITH
SHOWER) TO BE CONSTRUCTED OF 2 LAYER 6 MIL FR
POLY AND USED FOR PERSONAL DECONTAMINATION
PURPOSES.
THREE STAGE WASTE LOAD OUT CHAMBERS TO BE
CONSTRUCTED OF TWO LAYERS 6 MIL FR POLY AND
EQUIPPED WITH FACILITY TO WET WIPE AND/OR HEPA
VACUUM BAGGED WASTE AND TOOLS.
DO NOT IMPACT ASBESTOS CONTAINING EXTERIOR
STUCCO DURING ATTACHMENT AND REMOVAL OF AIR
SEALS NEAR TEMPORARY BARRIER WALLS.
AFFIX 6-MIL FR POLY AND PROTECT ICRA BARRIER
WALLS TO PREVENT CONTAMINATION.
REMOVE CABINETS, VANITY, DESK STATION, OR
PORTIONS OF WALLS TO ACCESS AND REMOVE
ASBESTOS FLOOR TILE AND/OR UNDERLYING
ASBESTOS BLACK MASTIC WHERE PRESENT. MAINTAIN
COVERS AS REQUIRED TO PREVENT CONTAMINATION.
STRUCTURAL / CIVIL
ENGINEER
GREGORY P. LUTH &
ASSOCIATES
3350 SCOTT BLVD,
BUILDING 48
SANTA CLARA, CA 95054
(408) 654-0475
ARCHITECTURE / MECHANICAL /
ELECTRICAL / PLUMBING /
TECHNICAL ENGINEER
SPUR SBBL
COLLABORATIVE JV, INC
100 N STONE AVE, STE
TUCSON, AZ, 85701
(405) 842-6100
FIRE PROTECTION
ENGINEER
POOLE FIRE
PROTECTION, INC.
19910 WEST 161ST
STREET
OLATHE, KANSAS 66062
(913) 829-8690
ENVIORNMENTAL
ENGINEER
RIVERFRONT SAFTEY &
HEALTH, LC
11140 SOUTH TOWNE
SQUARE, SUIT 100
ST. LOUIS, MO 63123
(314) 917-0148
4TH FLOOR - LEAD PLAN1
e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
6 Veterans
Health Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS:
Drawing # of
VA Health Care System Approval:
Revision: Date:
ARCHITECT:
U.S. Department of Veteran Affairs
SPUR SBBL
COLLABORATIVE JV, INC
100 N Stone Ave, Ste 1102 Tucson, AZ 85701
(405) 842-6100
FU
LL
Y
SP
R
IN
K
LE
R
ED
2/1 5/2
1 6
:23 :17
P M
CD 8JR
4NW MED/SURG WARD RENOVATION
08-13-2021
605-20-207
JERRY L PETTIS MEMORIAL VAMC HOSPITAL
11201 BENTON STREET
LOMA LINDA, CA 92537-0001
HA103
2HR O
CC
2HR O
CC
2HR O
CC
UP
A1 L1
KEY NOTES
REMOVE BROWN ASBESTOS DUCT SEAM SEALANT AT
JOINTS USING GLOVEBAG METHODS WITHIN AN
ISOLATED WORK AREA, NEGATIVE PRESSURE
CONTAINMENT , APPROXIMATELY 145 LOCATIONS OF
SEAMS, 580LF, 2 CONTAINMENTS. PERFORM
NECESSARY REMOVAL AND DISPOSAL OF
NON-ASBESTOS DUCT INSULATION LAYER TO UNCOVER
DUCT SEAM SEALANT.
REMOVE ORANGE PAINTED (LBP) UNISTRUT SUPPORTS
THROUGHOUT THE ISOLATED WORK AREA, NEGATIVE
PRESSURE CONTAINMENT. INSTALL NEW UNISTRUT
SUPPORT, MANUALLY DISASSEMBLE AND REMOVE IN
WHOLE (INTACT), 100 UNISTRUTS, 2"X2" EACH 8 FT
LONG.
A1
L1
HATCHING KEY
LIMITS OF PHASE-1 NEGATIVE PRESSURE
CONTAINMENT
LIMITS OF PHASE-2 NEGATIVE PRESSURE
CONTAINMENT
4TH FLOOR INTERSTITIAL
- ASBESTOS & LEAD REMEDIATION
PLAN
ABATEMENT GENERAL NOTES
REFER TO MECHANICAL DRAWING MHD-104 FOR LIMITS
AND TWO PHASES OF DUCT DEMOLITION.
APPROXIMATE LIMITS OF PHASE I AND II NPES ARE
SHOWN, COORDINATE PHASE BOUNDARY LIMITS WITH
THE GENERAL CONTRACTOR.
ACTIVE HVAC COMPONENTS ARE TO BE ISOLATED
FROM THE NPE. COORDINATE WITH VACOR AND
GENERAL CONTRACTOR FOR LOCKOUT/TAG OUT AS
APPROPRIATE. NPE TO BE MAINTAINED THROUGH
CLEARANCE.
NEGATIVE PRESSURE ENCLOSURE (NPE) BOUNDARY:
ALL PENETRATIONS ARE TO BE SEALED OR OTHERWISE
ISOLATED FROM NPE WITH 6 MIL LAYER OF FIRE
RETARDANT (FR) POLY SHEETING AS A CRITICAL
BARRIER. COMPLETE ENCLOSURE SHALL INCLUDE
WALLS, FLOORS, AND CEILING.
HEPA FILTERED NEGATIVE AIR MACHINES (2000 CFM)
TO MAINTAIN REGULATED AREA UNDER NEGATIVE
PRESSURE DIFFERENTIAL OF -0.03 IN WG DURING
REGULATED ACTIVITIES(VERIFY/DOCUMENT WITH
ELECTRONIC RECORDING MANOMETER). EXHAUST AIR
TO BE DISCHARGED OUTDOORS.
FIVE STAGE DECONTAMINATION STATION (WITH
SHOWER) TO BE CONSTRUCTED OF 2 LAYER 6 MIL FR
POLY AND USED FOR PERSONAL DECONTAMINATION
PURPOSES.
THREE STAGE WASTE LOAD OUT CHAMBERS TO BE
CONSTRUCTED OF TWO LAYERS 6 MIL FR POLY AND
EQUIPPED WITH FACILITY TO WET WIPE AND/OR HEPA
VACUUM BAGGED WASTE AND TOOLS.
DO NOT IMPACT ASBESTOS CONTAINING EXTERIOR
STUCCO DURING ATTACHMENT AND REMOVAL OF AIR
SEALS NEAR TEMPORARY BARRIER WALLS.
ACTIVE HVAC COMPONENTS ARE TO BE ISOLATED
FROM THE NPE. COORDINATE WITH VACOR AND
GENERAL CONTRACTOR FOR LOCKOUT/TAG OUT AS
APPROPRIATE. NPE TO BE MAINTAINED THROUGH
CLEARANCE.
STRUCTURAL / CIVIL
ENGINEER
GREGORY P. LUTH &
ASSOCIATES
3350 SCOTT BLVD,
BUILDING 48
SANTA CLARA, CA 95054
(408) 654-0475
ARCHITECTURE / MECHANICAL /
ELECTRICAL / PLUMBING /
TECHNICAL ENGINEER
SPUR SBBL
COLLABORATIVE JV, INC
100 N STONE AVE, STE
TUCSON, AZ, 85701
(405) 842-6100
FIRE PROTECTION
ENGINEER
POOLE FIRE
PROTECTION, INC.
19910 WEST 161ST
STREET
OLATHE, KANSAS 66062
(913) 829-8690
ENVIORNMENTAL
ENGINEER
RIVERFRONT SAFTEY &
HEALTH, LC
11140 SOUTH TOWNE
SQUARE, SUIT 100
ST. LOUIS, MO 63123
(314) 917-0148
4TH FLOOR INTERSTITIAL - ASBESTOS & LEAD PLAN1
e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
6 Veterans
Health Administration
VA FORM 08-6231
Drawing Title Project Title
Locati…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .