AMENDMENT 0004 - 36C26222B006 8-19-22.pdf
PDF 1 MB Posted
- Attached to
- Z2DZ-- Renovate 4NW Inpatient Unit - 605-20-207
- Solicitation number
- 36C26222B0006
About this file
This amendment modifies a solicitation for construction services to renovate an inpatient unit at a Department of Veterans Affairs medical center. The contractor will be responsible for providing all labor, materials, and equipment to complete the renovation as outlined in the attached drawings and specifications, including installation of a pneumatic tube system to connect to the existing building system. The amendment provides revised specifications and drawings for the pneumatic tube system and caption for another specification. No other terms or conditions of the original solicitation are changed. The response due date remains the same.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For the best experience, open this PDF portfolio in
Acrobat X or Adobe Reader X, or later.
Get Adobe Reader Now!
http://www.adobe.com/go/reader
AMENDMENT 0004 Air Link International www.airlinkint.com 800-388-8237
Section 149200 - Page 1 of 3
Section 149200 - Pneumatic Tube System
Part 1 General
1.01 RELATED DOCUMENTS
A. Drawings and general provisions of the contract including general and supplementary conditions of Division 1 of the Specifications sections apply to the work of this section.
1.02 Description of Work
A. Provide all engineering, labor and materials for the relocation of the existing Air Link System 5000 pneumatic tube station located on 4NW to connect to the existing building system.
B. All work shall be performed in a workmanlike manner. All materials and installation shall conform to applicable local, state and national codes.
C. The pneumatic tube system shall conform to the existing building system’s performance.
D. The Contractor shall work with the General Contractor and all trades to ensure coordination for System right-of-way.
1.03 Work Included in this Section
A. Provide all drawings and equipment detail for coordination with other trades.
B. Provide and install all low voltage control wiring for proper operation of the system.
1.04 Work Excluded from this Section
1.04.1 Items described herein relate to the installation of the system, but are excluded from this section of the specification.
The Contractor shall provide information as required to perform the work.
1.04.2 General Items
A. All architectural enclosures for the stations as shown on the drawings.
B. Equipment fur-in to match existing surroundings.
C. A clear and unobstructed right-of-way space for System equipment.
D. Furnish and install all access panels as required.
http://www.airlinkint.com/
Section 149200 - Page 2 of 3
E. Furnish and set any sleeves and cut sleeve openings as required.
F. Core drilling, cutting, patching, refurbishing or painting of floors, walls and ceilings, including removal or replacement of ceilings as required.
G. Paint any tube or unfinished equipment if required.
H. Provide elevator or hoist service if required.
I. Provide safe, dry storage for all materials on jobsite.
J. Furnish and install electrical power as follows;
a) 120 VAC single phase power to station location.
b) Any temporary power if required for testing system.
K. Asbestos abatement, fire protection and any sound proofing if required.
L. Obtain all necessary licenses and permits.
M. Dust protection if required N. Provide conduit for communication cable, if required. All cable is plenum rated.
O. Cleaning of all plaster, mortar, paint, and other debris in or on the System equipment resulting from other trades.
P. Repairing, replacing or repainting of equipment damages by other trades.
1.05 Submittals
A. Product Data: Manufacturer’s detailed data sheets on each component and description of system.
B. Shop Drawings: Detailed layout of tube routing and components, indicating the following:
a) Equipment locations and dimensioned layouts of major components.
b) Penetrations through floors and required clearances.
c) Electrical power requirements and locations needed.
1.06 Quality Assurance
A. Wiring shall conform with NEC requirements and shall be in compliance with local codes. Electrical components shall be UL listed.
1.07 Warranty
A. The Contractor shall guarantee all components to be free from defects in material and workmanship, under normal use, for a period of 12 months.
B. Defective material shall be repaired or replaced at the discretion of the Contractor free of charge.
C. Specifically excluded from this warranty are failures resulting from normal wear, improper operation, improper maintenance or lack of prescribed owner preventative maintenance of the system.
Section 149200 - Page 3 of 3
D. Signed acceptance or use of the system by the Owner shall commence the warranty period.
E. The Contractor’s liability shall not be enforceable until receipt of full payment for the System.
Part 2 Products
2.01 Manufacturers
A. Pneumatic Tube System (PTS) shall be the System5000 pneumatic transport system as manufactured by Air Link International to match existing system.
B. All Components are to be supplied by the same manufacturer.
2.02 Equipment
A. Line material:
1. Tubing shall be 6 inch (152.4 mm) outside diameter, 16 gauge, cold rolled, electric welded steel, flash removed, degreased and hot dip galvanized. (ASTM A787 light comm.)
2. Bends shall be formed of same material on a center line radius of not less than 36 inches or more than 48 inches. The cross-section shall be free from wrinkles and distortions. No expanded bends shall be allowed in the System.
3. All cut ends shall be square, deburred and mandreled round.
4. Tube and bends to be joined by solid slip or clamp sleeves or expanded end slip joints, sealed to prevent leaks.
5. Tubing shall be supported with suitable hangers and supports as follows:
a. Minimum every 10 feet (3.048 m) of straight tubing.
b. At every floor of vertical runs
c. At each end of bends.
d. At equipment connections.
6. Hangers shall be all-thread, zinc plated rod attached to the building structure. Pipe clamp hangers fastened to the rod shall support the tubing.
Part 3 Execution
A. Installation
1. The pneumatic tube system and components shall be assembled and installed in strict accordance with contract documents, applicable codes and regulations, approved shop drawings, and Manufacturer’s recommendations.
2. The System and components shall be anchored and fastened to building construction as required for a stable, secure installation. All exposed parts of the system and finish components shall be closely fit and joined to provide a neat uniform appearance.
B. System Testing and Acceptance
1. Prior to a formal System performance test, the manufacturer shall perform preliminary tests, verifying all components are in fully operational condition for carrier dispatch and receive.
END OF SECTION
j o b n u m b e r p o j e c t a n a g o j e c t e n g i n e d w y c h e c k e d v i s v s
L O
M A
I N
D
V s e e t n o j e e e t t i t l o j e c t i n f o i v i s i o n i n f o i
P
T
S
E q l
PT- 100-A
N.T.S.
Scale:
Y
R
C H
B
I
AMENDMENT 0004
AutoCAD SHX Text
WT.= 250# MAX
NOTE: SUPPORTS AT 10'-0" MAX O.C. AND EACH BEND **PIPE TO BE MOUNTED DIRECTLY TO DECK**
1 5/8"
MINERALAC, OR ROW CLAMP
CONNECTION TO DIVERTER,
90.0%%d
GAUGE
6"
48"
70-3/8"
4-3/4"
16 GA. (.0625)
6" STANDARD
STEEL BEND
THE STEEL TUBING, BENDS AND FITTINGS ARE MANUFACTURED TO THE
STANDARDS OF OUR INDUSTRY. STEEL TUBING IS PER ASTM 787,
USING A513 STEEL WITH FLASH CONTROLLED TO 0.010 INCH, COATED
PER A526 AND G60. THE BENDS ARE SMOOTH, WRINKLE FREE, MANDREL
FORMED BEDS, USING ROTARY DRAWN TOOLING TO 90 DEG. +- 1 DEGREE.
%%uNOTES:
%%uNOTE:
10'-0"
6" STANDARD
STEEL PIPE
IF DISTANCE IS LESS THAN 12" NO DIAGONAL SWAY
TRANSVERSE SWAY BRACE AT MINIMUM 20'-0" INTERVALS
LONGITUDINAL SWAY BRACE AT MINIMUM 40'-0" INTERVALS
6" PNEUMATIC TUBE
6" PNEUMATIC STRUT CLAMP
BRACING OR ROD STIFFNER IS REQUIRED
3/8" X 3 3/4" DIAMETER HILTI KB-TZ WEDGE ANCHOR
3/8" FLAT WASHER
3/8"-24 NUT
3/8"-24 ALL THREAD ROD
UNISTRUT P1000T 1 5/8" x 15/8"
UNISTRUT P1546 OR P1843 HING w/ 3/8" BOLT
6" HANGER CLAMP
3/8"-24 BOLT & NUT W/FLAT WASHER
%%uSYMBOL LEGEND
TYPICAL 2 PLACES AT DIVERTERS
(SEE LONGITUDINAL SWAY BRACING DETAIL)
TYPICAL 2 PLACES AT DIVERTERS
PROVIDE SUPPORT FOR VERTICAL LOAD AT 10'-0" O.C.
EXTENSION NUT
MINIMUM 2" EMBED (PER ICC ESR-1917)
P3008 CHANNEL NUT (TYP.)
DIM
F
H-max
H-min
62-1/4"
37-1/4"
71-1/4"
14-1/4"
5-1/8"
34-3/4"
32 1/4"
4-15/16"
6"
DIM. H ADJUSTABLE IN 1" INCREMENTS
120V-20A A.C. POWER REQUIRED
RECEIVE
G
44"
PLAN VIEW
FRONT VIEW
SIDE VIEW
ANAHEIM, CA. 92806
1189 N. GROVE STREET
714 632-3020
INTERNATIONAL
SCALE = N.T.S.
SINGLE ROD SUPPORT W/SWAY BRACING
6" HANGING LEGEND
MINERALAC SINGLE TUBE RUN
STATION ANCHORAGE DETAIL
LONGITUDNAL BRACE
6" PIPE AND BEND
Sheets and Views
Layout1
AMENDMENT 0004
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 1
08/19/2022
605-20-207
36C262
Department of Veterans Affairs Network Contracting Office 22 4811 Airport Plaza Drive Suite 600 Long Beach CA 90815
Department of Veterans Affairs Network Contracting Office 22 4811 Airport Plaza Drive Suite 600 Long Beach CA 90815
To all Offerors/Bidders
36C26222B0006
07-27-2022
X
X
NOT APPLICABLE
X 1
AMENDMENT 0004 IS ISSUED TO PROVIDE ATTACHMENT 1A - PNEUMATIC TUBE SYSTEM SPECS, ATTACHMENT 1B - PHEUMATIC TUBE SYSTEM DRAWING AND ATTACHMENT 2 - CLOSE CAPTION OF AE401 WHICH WERE INADVERTENTLY NOT INCLUDED IN AMENDMENT 0003.
***PLEASE BE ADVISED THAT THE HEADWALL ELEVATION FINISH LEGEND IS ON THE SAME PAGE OF AI711 - HRP1-BACKLIT
RESIN PANEL.***
ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
MARIA CRUZ-THOMPSON
CONTRACTING OFFICER
See attached document: ATTACHMENT 1A - PNEUMATIC TUBE SYSTEM SPEC 8-19-22.
See attached document: ATTACHMENT 1B - DRAWING - PNEUMATIC TUBE SYSTEM.
See attached document: ATTACHMENT 2 - AE401 CAPTION.
File details come from the government source that posted it. Updated .