Attachment 9 - Contractor Production Report Form.docx

DOCX document 23 KB Posted

Attached to
NSWCPD Bldg 1000 – Substations Ventilation and DDC Monitoring
Solicitation number
N64498-25-R-4009
Issued by

About this file

This is a Contractor Production Report form template that contractors must complete to track daily construction activities for the Building 1000 Substations Ventilation and DDC Monitoring project. The form captures key information including weather conditions, work performed, safety meetings/incidents, work hours, equipment/materials received, and construction equipment used on site. Specific fields include contract number, location details, superintendent information, trade hours worked, cumulative work hours, safety actions taken, and required checkboxes for hazardous material handling, crane/lift operations, and OSHA incidents.

The form appears to be Attachment 9 of the solicitation package and serves as a standard daily reporting template, but does not contain any specific project requirements or actual completed information. It is designed to document construction progress, safety compliance, and resource utilization once work begins on the electrical substation and DDC monitoring system installation project.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACTOR PRODUCTION REPORT

(ATTACH ADDITIONAL SHEETS IF NECESSARY)

DATE

CONTRACT NO
TITLE AND LOCATION

REPORT NO

Building 1000 –Substations Ventilation and DDC Monitoring

CONTRACTOR

SUPERINTENDENT

AM WEATHER

PM WEATHER

MAX TEMP (F)
MIN TEMP (F)

WORK PERFORMED TODAY

Schedule Activity No.

WORK LOCATION AND DESCRIPTION
EMPLOYER
NUMBER
TRADE
HRS

JOB

SAFETY

WAS A JOB SAFETY MEETING HELD THIS DATE?

|_| YES
|_| NO
TOTAL WORK HOURS ON JOB SITE,

THIS DATE, INCL CON'T SHEETS

WERE THERE ANY LOST TIME ACCIDENTS THIS DATE?

(If YES attach copy of completed OSHA report)

|_| YES
|_| NO
CUMULATIVE TOTAL OF WORK

HOURS FROM PREVIOUS REPORT

WAS CRANE/MANLIFT/TRENCHING/SCAFFOLD/HV ELEC/HIGH WORK/ HAZMAT WORK DONE?

(If YES attach statement or checklist showing inspection performed.)

|_| YES
|_| NO

TOTAL WORK HOURS FROM

START OF CONSTRUCTION

WAS HAZARDOUS MATERIAL/WASTE RELEASED INTO THE ENVIRONMENT?

(If YES attach description of incident and proposed action.)

|_| YES
|_| NO

Schedule Activity No.

LIST SAFETY ACTIONS TAKEN TODAY/SAFETY INSPECTIONS CONDUCTED
|_|
SAFETY REQUIREMENTS HAVE BEEN MET.

EQUIPMENT/MATERIAL RECEIVED TODAY TO BE INCORPORATED IN JOB (INDICATE SCHEDULE ACTIVITY NUMBER)

Schedule Activity No.

Submittal #
Description of Equipment/Material Received

CONSTRUCTION AND PLANT EQUIPMENT ON JOB SITE TODAY. INDICATE HOURS USED AND SCHEDULE ACTIVITY NUMBER.

Schedule Activity No.

Owner
Description of Construction Equipment Used Today (incl Make and Model)
Hours Used

Schedule Activity No.

REMARKS

CONTRACTOR/SUPERINTENDENT
DATE

SOW Attachment 9 Contractor Production Report Form Bldg 1000 Substations Ventilation and DDC Monitoring Sheet 1 of 1