Attachment 9 - Contractor Production Report Form.docx
DOCX document 23 KB Posted
- Solicitation number
- N64498-25-R-4009
About this file
This is a Contractor Production Report form template that contractors must complete to track daily construction activities for the Building 1000 Substations Ventilation and DDC Monitoring project. The form captures key information including weather conditions, work performed, safety meetings/incidents, work hours, equipment/materials received, and construction equipment used on site. Specific fields include contract number, location details, superintendent information, trade hours worked, cumulative work hours, safety actions taken, and required checkboxes for hazardous material handling, crane/lift operations, and OSHA incidents.
The form appears to be Attachment 9 of the solicitation package and serves as a standard daily reporting template, but does not contain any specific project requirements or actual completed information. It is designed to document construction progress, safety compliance, and resource utilization once work begins on the electrical substation and DDC monitoring system installation project.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACTOR PRODUCTION REPORT
(ATTACH ADDITIONAL SHEETS IF NECESSARY)
DATE
| CONTRACT NO |
| TITLE AND LOCATION |
REPORT NO
Building 1000 –Substations Ventilation and DDC Monitoring
CONTRACTOR
SUPERINTENDENT
AM WEATHER
PM WEATHER
| MAX TEMP (F) |
| MIN TEMP (F) |
WORK PERFORMED TODAY
Schedule Activity No.
| WORK LOCATION AND DESCRIPTION |
| EMPLOYER |
| NUMBER |
| TRADE |
| HRS |
JOB
SAFETY
WAS A JOB SAFETY MEETING HELD THIS DATE?
| |_| YES |
| |_| NO |
| TOTAL WORK HOURS ON JOB SITE, |
THIS DATE, INCL CON'T SHEETS
WERE THERE ANY LOST TIME ACCIDENTS THIS DATE?
(If YES attach copy of completed OSHA report)
| |_| YES |
| |_| NO |
| CUMULATIVE TOTAL OF WORK |
HOURS FROM PREVIOUS REPORT
WAS CRANE/MANLIFT/TRENCHING/SCAFFOLD/HV ELEC/HIGH WORK/ HAZMAT WORK DONE?
(If YES attach statement or checklist showing inspection performed.)
| |_| YES |
| |_| NO |
TOTAL WORK HOURS FROM
START OF CONSTRUCTION
WAS HAZARDOUS MATERIAL/WASTE RELEASED INTO THE ENVIRONMENT?
(If YES attach description of incident and proposed action.)
| |_| YES |
| |_| NO |
Schedule Activity No.
| LIST SAFETY ACTIONS TAKEN TODAY/SAFETY INSPECTIONS CONDUCTED |
| |_| |
| SAFETY REQUIREMENTS HAVE BEEN MET. |
EQUIPMENT/MATERIAL RECEIVED TODAY TO BE INCORPORATED IN JOB (INDICATE SCHEDULE ACTIVITY NUMBER)
Schedule Activity No.
| Submittal # |
| Description of Equipment/Material Received |
CONSTRUCTION AND PLANT EQUIPMENT ON JOB SITE TODAY. INDICATE HOURS USED AND SCHEDULE ACTIVITY NUMBER.
Schedule Activity No.
| Owner |
| Description of Construction Equipment Used Today (incl Make and Model) |
| Hours Used |
Schedule Activity No.
REMARKS
| CONTRACTOR/SUPERINTENDENT |
| DATE |
SOW Attachment 9 Contractor Production Report Form Bldg 1000 Substations Ventilation and DDC Monitoring Sheet 1 of 1