Attachment 8 Proposal Submission Checklist.pdf

PDF 128 KB Posted

Attached to
NASA / John F. Kennedy Space Center_ Small Task Order Construction Contract (STOCC) II
Solicitation number
80KSC025R0008
Issued by

About this file

This document is a Proposal Submission Checklist for NASA Kennedy Space Center (KSC) Solicitation 80KSC025R0008, outlining the required components and page limitations for proposal submission. The checklist is divided into three volumes: Volume I (Administrative Documentation), Volume II (Technical Approach), and Volume III (Past Performance). Volume I requires a 3-page Executive Summary, 2-page Solicitation SF 1442, completed Section K Representations and Certifications, Section G Contract Administration Data, and Bonding Capacity documentation. Volume II focuses on the technical approach, with 25 total pages covering Program Management and Planning/Execution sub-factors, incorporating a Design-Build approach. Volume III requires 25 pages of Past Performance documentation, including 5 recent and relevant projects, performance evaluation questionnaires, and a Safety and Health Program with no page limit. Proposals are to be emailed to KSC-IDIQbids@mail.nasa.gov.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Item Description Page Limitation

C om pl et ed

1 Executive Summary 3 pages 2 Solicitation SF 1442 – Completed and Acknowledgement of All

Amendments; Cage code & DUNS number from block 14, page 2 2 Pages

3 Completed Section K Reps and Certs Unlimited 4 Section G – Contract Admin Data 1 Page 5 Bonding Capacity 1 Page

1 Sub-factor 1 – Program Management

Element 1 – Overall Management Approach

Element 2 – Management Organization

Element 3 – Quality Control

2 Sub- Factor 2 – Planning and Execution

Element 1 – Workload Management

Element 2 – Subcontract Management

Note Design-Build Approach Is Incorporated into the Sub-factors

1 Past Performance (5 recent and relevant and entire project listing for last 5 years) Summary (Prime)

2 Past Performance Evaluation Questionnaires Contact Lists

3 Teaming Partners Project Listing (If Teaming)

Note Design-Build Past Performance Is Incorporated into the Recent/Relevant Projects

4 Safety and Health Program (Attachment 9) No Limit

25 Pages Total

VOLUME III – Past Performance

25 Pages Total

80KSC025R0008 – ATTACHMENT 8

Email Transmission to KSC-IDIQbids@mail.nasa.gov

PROPOSAL SUBMISSION CHECKLIST

VOLUME I – Administrative (Required Documentation)

VOLUME II – Technical Approach

Table 1