This document is a Weekly Status Meeting template from a Statement of Work (SOW) Attachment dated June 11, 2020, designed to track project progress and coordination. The template includes sections for standard distribution of meeting participants, safety discussions, operational constraints, outages, deviation waivers, requests for information (RFIs), technical notes (TNs), contract progress, and a sign-in sheet. The document requires the construction contractor to provide a two to three-week "look ahead" schedule and report on field work completion percentage, with specific focus on safety preparedness, including a weekly checklist for hazardous operations and a pre-task meeting requirement per KNPR 8715.7. The template is structured to facilitate comprehensive project tracking, communication, and risk management across multiple stakeholders, including the Contracting Officer, Project Manager, Construction Safety Specialist, and other key personnel.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOW Attachment _Technical Reference 002
<<PCN>> June 11, 2020
THE NEXT SCHEDULED STATUS MEETING WILL BE HELD ON: (DAY),
(DATE) , AT (TIME) A.M. OR P.M. AT (LOCATION)
WEEKLY STATUS MEETING
(REVISED 05.07.2020)
<< PROJECT TITLE>>
<<Contract Number>>
PCN <<--->>
<<Contractor Name>>
HELD Day, Date
STANDARD DISTRIBUTION MAILCODE DISTRIBUTION
Contracting Officer: <<NAME>> <<MAILCODE>> E-Mail STOCC COR <<NAME>> <<MAILCODE>> E-Mail STOCC Alt COR <<NAME>> <<MAILCODE>> E-Mail Project Manager: <<NAME>> <<MAILCODE>> E-Mail Field Inspector: <<NAME>> <<MAILCODE>> E-Mail EPOC: <<NAME>> <<MAILCODE>> E-Mail IH POC (EH-POC) <<MAILCODE>> E-Mail SME: <<NAME>> <<MAILCODE>> E-Mail Construction Safety Specialist (CSS):
<<NAME>>
<<MAILCODE>> E-Mail
Customer <<NAME>> <<MAILCODE>> E-Mail
NOTE: Please see the meeting sign-in sheet for a list of attendees
Safety (CSS Report)
- Weekly checklist discussion: (Contractor shall provide a “head’s up” for any planned hazardous operations for this work week and shall acknowledge that a pre-task meeting per KNPR 8715.7 will be held prior to the hazardous operation; a dated notation to this by the COR will be made in the Weekly Notes).
- Construction Safety Specialist (CSS) Report
Safety Specialist will state whether any new information has been entered in the safety database.
Security
Environmental & IH Compliance
Submittals (attach log)
Operational Constraints (O&M and SME) Identify any operations which may impact the construction contractors planned work at the facility site, including any specific contract scope of work that is required to be complete prior to the start of a particular operation.
Outages (O&M and SME) Review planned outages, including status of request, schedule, systems affected, duration, contingency plans, etc. Include ISC SMEs for outage review and assessments
Deviation Waivers (DWs) (Prime contractor shall communicate any items listed below to subcontractors, suppliers, vendors, and affected entities):
Review and discuss all D/W’s and their affect(s) in regards to Safety, Environmental, IH, O&M, and others who may be affected.
* DESIGNATES OPEN DWs
RFI’s
(Prime contractor shall communicate any items listed below to subcontractors, suppliers, vendors, and affected entities):
Review and discuss all RFI’s and their affect(s) in regards to Safety, Environmental, IH, O&M, and others who may be affected.
TN’s:
* DESIGNATES OPEN TNs
Comments Date Answered DW # Date Received Description
Comments Date Closed Description TN # RFP Date
REAs – No Open REAs
EO’s: (PM)
NCR’s
Withholding Tags – No Open REAs
Schedule: (Construction contractor shall provide a two or three week “look ahead” schedule. An overview of the schedule should be presented by the contractor representative.
-Contract Progress: Field Work Complete to Date: % Value Complete to Date: %
Performance Period Complete as of XX/XX/XX
General
Status Meeting Sign‐In Sheet
Project Title: “<<<< Insert Project Title>>>>” Date: 11‐Jun‐20 Meeting: <<<< Meeting Topic i.e. weekly status meeting>>> PCN:
Contractor: <<<<Contractor Name>>> Customer:
Initial Name Title Company Mail Code Phone E‐mail
Name Title Company Mail
Code Phone E‐mail
| << PROJECT TITLE>> |
| NOTE: Please see the meeting sign-in sheet for a list of attendees Safety (CSS Report) |
| - Construction Safety Specialist (CSS) Report |
| Security |
| RFI’s |
| TN’s: |
| NCR’s |
| -Contract Progress: Field Work Complete to Date: % Value Complete to Date: % Performance Period Complete as of XX/XX/XX |