Attachment_8_Price_Schedule.docx

DOCX document 27 KB Posted

Attached to
C&O Canal National Historic Park, Reactivate Monoc
Solicitation number
140P3023R0016
Issued by

About this file

This document is an attachment containing a price schedule for a federal solicitation seeking firms to reactivate a maintenance facility for the Chesapeake and Ohio Canal National Historical Park. The solicitation number is 140P3023R0016 issued by the National Park Service, Department of the Interior.

The price schedule outlines firm-fixed pricing for various line items associated with the base project and an optional line item. The base project line items include labor, equipment and materials, mobilization, project design, and overhead, profit and other direct costs. An optional line item is provided for installing a 40' x 50' x 16' high pole barn. Firms are to provide unit prices and estimated amounts for each line item. The total for the base project and optional line item are also calculated. A deadline for price validity and contact information for the preparer are requested at the bottom.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 8 - PRICE SCHEDULE

Project: C&O Canal National Historic Park – Reactivate Monocacy Maintenance Facility Solicitation 140P3023R0016

Date Proposed:

Name of Preparer:

Email and phone number of Preparer:

Price is valid through (date):

Item No.
Description
Estimated Quantity
Unit
Unit Price
Estimated Amount
00010
BASE ITEMS – MAIN PROJECT (Firm-Fixed Price)
00010a
Labor
1
Lump Sum
00010b
Equipment & Materials
1
Lump Sum
00010c
Mobilization
1
Lump Sum
00010d
Project Design
1
Lump Sum
00010e
ODC, Overhead & Profit
1
Lump Sum

TOTAL CLIN 00010 BASE ITEM

(Add all Item No. 00010a through 00010e for Total CLIN 00010 Base item total)

00020
OPTIONAL LINE ITEM – INSTALL 40’ x 50’x 16’ HIGH POLE BARN (Firm-Fixed Price)
00020a
Labor
1
Lump Sum
$
$
00020b
Equipment & Materials
1
Lump Sum
$
$
00020c
ODC, Overhead & Profit
1
Lump Sum
$
$

TOTAL OPTIONAL LINE ITEM

(Add all Item No. 00020a through 00020c for Total Optional Line item total)

TOTAL BASE AND OPTIONAL LINE ITEM

(Add CLIN 00010 and CLIN 00020 for Total Base and Optional Line Item total)