This is a solicitation for construction services to reactivate a maintenance facility building at Chesapeake and Ohio Canal National Historical Park. The National Park Service seeks a contractor to demolish an existing 2000 square foot facility and rebuild a new single-story, 40' x 50' shop building with office space, restroom, and maintenance bay. Key requirements include installing new mechanical, electrical, plumbing and HVAC systems. The solicitation is set aside for total small business concerns and anticipates awarding a firm fixed price contract. The period of performance is from September 22, 2023 to August 31, 2024. Proposals are due by September 11, 2023. The solicitation includes pricing terms, wage determinations, experience requirements, and provides maps, photos and drawings of the project site.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140P3023R0016 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

PCR

Washington DC 20242-0001 1100 Ohio Drive SW Contracting Anne Acquisition Management Division NPS, NCR - Regional Contracting

08/08/20230001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

08/08/2023

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

This is a solicitation for construction service to Reactivate Monocacy Maintenance Facility

Building at C&O Canal National Historic Park in accordance with the statement of work, map, photos, drawings, solicitation and its attachments. This solicitation is a set-aside for total small business concern. The anticipated award will be a firm fixed price contract to one responsible offeror who meets the requirements in accordance with the solicitation.

The purpose of Amendment P00001 is to revise the solicitation and provide the following:

A) Revise Section C Statement of Work attached.

B) Revise Wage Determination. Replace Attachment 4 with DOL WD MD202300036 effective

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Bophany Drakeford

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 67

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140P3023R0016/0001

7-28-2023.

C) Add Attachment 11 RFI Response.

All other terms and conditions remain unchanged as a result of this Amendment P00001.

Proposals are due by September 11, 2023, at 3:00

PM ED to bophany_drakeford@nps.gov

Period of Performance: 09/22/2023 to 08/31/2024

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED

140P3023R0016

PAGE OF

4 | 71

PART I - THE SCHEDULE

SECTION B – PRICE SCHEDULE

National Park Service – National Capital Area

Chesapeake & Ohio Canal National Historical Park – Monocacy Maintenance Building

18027 Pleasantville Road Knoxville, MD 21758

CLIN 00010 BASE ITEMS – MAIN PROJECT (Firm-Fixed Price)

Item Description Unit Total No.

00010a Labor Lump Sum $ 00010b Equipment & Materials Lump Sum $ 00010c Mobilization Lump Sum $ 00010d Project Design Lump Sum $ 00010e ODC, Overhead & Profit Lump Sum $

TOTAL CLIN 00010 BASE ITEM $

(Add all Item No. 00010a thru 00010e for Total CLIN 00010 Base Item Total)

CLIN 00020 OPTIONAL LINE ITEM – INSTALL 40’ X 50’ X 16’ HIGH POLE BARN (Firm-Fixed Price)

Item Description Unit Total No.

00020a Labor Lump Sum $ 00020b Equipment & Materials Lump Sum $ 00020c ODC, Overhead & Profits Lump Sum $

TOTAL CLIN 00020 OPTIONAL LINE ITEM $

(Add all Item No. 00020a thru 00020c for Total CLIN 00020 Optional Line Item Total)

TOTAL BASE AND OPTIONAL LINE ITEM $

(Add CLIN 00010 and CLIN 00020 for Base and Optional Line Item Total)

FAR 36.204 Disclosure of the magnitude of construction projects

The Government’s estimate is:

Between $500,000 and $1,000,000

Fromm, Lisa J Add the actual CLINS and identified in BLUE Font. Also change the item #'s identified for break out pricing to match as SLINs. Also add the BLUE Font explanation under or above the Total CLIN Base Item to ensure Offerors understand how the pricing for each CLIN is developed and to avoid any possibility of mistakes. Also need to include instruction that the CLINs are FFP. Per F8.4004

5 | 71

SECTION C – STATEMENT OF WORK

C.0 NATIONAL PARK SERVICE

The National Park Service (NPS) is a bureau of the U.S. Department of the Interior (DOI) that has been entrusted with the care of our national parks since 1916. The NPS preserves unimpaired natural and cultural resources, and values of the National Park System for the enjoyment, education, and inspiration of this and future generations.

The NPS cooperates with partners to extend the benefits of natural and cultural resource conservation and outdoor recreation throughout this country and the world.

The NPS - National Capital Area (NCA) supports natural wonders to man-made marvels in Virginia, West Virginia, Maryland, and the District of Columbia. The NCA parks include Antietam National Battlefield, Catoctin Mountain Park, Chesapeake & Ohio Canal National Historical Park, George Washington Memorial Parkway, Harpers Ferry National Historical Park, Manassas National Battlefield Park, Monocacy National Battlefield, National Capital Parks - East, National Mall and Memorial Parks, Potomac Heritage National Scenic Trail, President’s Park, Prince William Forest Park, Rock Creek Park, and Wolf Trap National Park for the Performing Arts.

C.1 BACKGROUND

The NPS Chesapeake and Ohio Canal National Historic Park (CHOH) is situated along the Maryland bank of the Potomac River from Georgetown, Washington, DC to Cumberland, MD. Preserving America’s early transportation history, the C&O Canal began as a 184.5-mile dream of passage to Western wealth. Operating for nearly 100 years, the canal was a lifeline for communities along the Potomac River as coal, lumber, and agricultural products floated down the waterway to market. Today, it endures as a pathway for discovering historical natural, and recreational treasures. For more detailed and general information visit the park’s website at: Chesapeake & Ohio Canal National Historical Park (U.S. National Park Service) (nps.gov)

C.2 PURPOSE

The Chesapeake and Ohio Canal National Historical Park preserves the rich history of the canal. Within the canal, there are many structures. One of the structures is the Monocacy Maintenance Building, which is in need of demolishing and rebuilding. In its current configuration, approximately half of the building is resting on a concrete slab, and the other half of the building contains a basement, which rests upon a footing that supports the above grade section of the structure.

The DOI – NPS - NCA – C&O Canal has a new requirement for a single contractor with experience and structural engineer licensed in the state of Maryland to provide construction services to mechanically demolish and rebuild a new facility to replace the Monocacy District Maintenance Facility located at 18027 Pleasantville Road, Knoxville, Maryland 21758. New facility will match the old facility exactly in the footprint of its’ location, and square footage of footprint.

C.3 SCOPE OF WORK

C.3.1 SUMMARY

This project will remove the existing collapsed building structure and existing steel building to include the slab foundation for the old steel building. The new facility will include office space, restroom, common area, and a maintenance bay. New facility will have a new mechanical, electrical, plumbing and HVAC systems.

This is a base project with optional line item as listed below.

https://www.nps.gov/choh/index.htm

Remove the word additional and add the verbiage optional line item.

6 | 71

The base project includes:

The new facility will include a new water supply system with filtration, UV and Chlorination. Existing well and casing is to be re-used. Sanitary grout seal will be replaced. New pump will be installed. Existing waterline and electrical service will be replaced. New water line and electric service for the water pump will be replaced in the existing service trench.

Septic system to be replaced in the same footprint and disturbance of the existing system.

One complete pre-engineered metal shop facility to include office space, restroom, common area and maintenance bay. New building will rest on a new six-inch thick concrete foundation. Old foundation will be demoed.

New mechanical, electrical, plumbing, and HVAC systems to include Single Phase/ 300-amp electrical service, mini-split heat pump system for office area and ducted heat pump system for the maintenance bay.

• Optional Line Item : High Pole Barn - Subject to the availability of funding

The contractor shall provide for all labor, materials, supplies, equipment, transportation, supervision, ancillary services, and all other necessary items to complete this project, performing all work in complete compliance with this Statement of Work, and any plans, drawings, and specifications issued or directed through this solicitation and award in order to ensure quality workmanship. At a minimum, the supplies and materials shall be of a quality to conform to all applicable Federal specifications.

C.3.2 DEMOLITION OF MONOCACY SHOP FACILITY

A. Demolish and dispose of the existing 2000 square foot Monocacy District Maintenance Facility.

1. Contractor shall demo the existing brick and metal building and concrete slab, the wood framed addition and all electrical and mechanical components of the existing facility.

2. Contractor shall properly dispose of all waste material in accordance with local regulations.

B. Demo the existing septic system.

1. Contractor shall demo existing septic service lines, septic tank and drain field.

2. Contractor shall properly dispose of all waste material in accordance with local regulations.

C. Demo the existing well components.

1. Contractor shall demo the existing well and water system components to include electrical service, electric pump, drop pipe, sanitary grout seal, Pitless adapter and supply lines. The well casing should be left intact but all service items relating to the well and water system should be demoed.

2. Contractor shall properly dispose of all waste material in accordance with local regulations.

C.3.3 BUILD THE MONOCACY MAINTENANCE SHOP

Build the replacement Monocacy District Maintenance Facility Shop Building. Building shall be built in same footprint as removed building. Building will be same dimensions as removed building.

Foundation:

1. Contractor shall provide all grading, backfill, vapor barrier, insulation rebar and forms needed to install a

40’x50’ 6-inch-thick slab foundation for the new shop building.

Remove the word additional and add the verbiage optional line item. Also correct title to High pole barn and add "the availability of" to the subject to funding.

7 | 71

2. A 6-inch compacted gravel base shall be prepared and covered with a minimum 15 mil vapor barrier and 2 inches of polyisocyanurate foam insulation prior to pouring the slab.

3. Minimum 3500 PSI concrete shall be used to form the foundation slab. Concrete shall be reinforced with rebar. The foundation slab shall be 6 inches thick except for the outer 12 inches of the slab perimeter which shall include a footing that is 12 inches wide by 18 inches deep. This is in addition to the top 6-inch layer of concrete. The slab will be poured as a monolithic pour.

Steel Building:

1. Contractor shall provide and install one pre-engineered steel building measuring 40’Wx50’L x20’H (at the eaves).

2. Steel shall be made and sourced in the United States. Roof pitch shall be 2/12. The steel building shall meet a minimum roof snow load rating 30lbs per square foot and be able to withstand 120 MPH winds. Engineer stamps by a structural engineer licensed in the state of Maryland shall be provided to the park prior to commencement of construction.

3. Roofing and siding shall be a minimum of 26 gauge coated steel with a 30-year finish warranty. Colors to be selected by the park. Colors to be as natural or unobtrusive as possible. Building walls will be insulated to a minimum R-13 and the shop ceiling shall be insulated to a minimum R-38.

4. The contractor shall supply and install o six double paned 3’x6’ vinyl sliding windows o three 36”x84” man doors. Outswing, no window, steel. With deadbolt and panic bars o two 14’x14’ insulated overhead doors with a power operators

5. The contractor shall frame and build out:

o one 8’x10’ fully furnished, ADA/ABAS accessible restroom o one 8’ x 25’ employee area to include rough ins for a kitchenette and a 3 user Computer area.

o One 8’x12’ office with suitable electrical service.

o One 3’x8’ Electrical/ IT room where electrical service comes into building. Service shall include a

Transfer Switch so the building can be powered with use of a generator.

o Restroom, Break Room, and Office Spaces shall be insulated, and sound proofed and finished with primed and painted drywall.

Plumbing:

1. Contractor shall provide all materials and install all plumbing and fixtures for one bathroom, one breakroom and one water fountain with bottle fill station.

2. Contractor shall install a three-stage water filtration system and UV light for sanitation of the water.

3. Contractor shall install a pressure tank with sufficient capacity to suit the needs of the shop.

4. Contractor shall supply one 40-gallon hot water heater that is ENERGY STAR rated and install all lines needed to support one forty-gallon hot water heater.

5. Contractor shall supply and install a timer for the hot water heater that can interrupt power to the water heater during the hours the shop is not occupied.

6. Contractor shall install a minimum of one frost free hose bib on each exterior wall of the building.

Electrical:

1. Contractor shall provide single phase 300 amp electrical service to the new building and shall install an electrical panel equipped for 300 amp service with a main breaker shutoff.

2. Contractor shall install transfer switch, and clearly label circuits which are dedicated for use with a generator in the case of power outage.

3. 120 volt double gang receptacles shall be installed at a minimum of every ten feet on the shop walls and a minimum of twelve 240 volt outlets shall be placed in strategic locations throughout the shop to support a dust collection system, welders, a plasma cutter, a table saw, a wood planer, an air compressor and other shop equipment.

8 | 71

4. A minimum of four two gang outlets shall be installed in the floor for hooking up shop equipment.

Conduit and floor mounted gang boxes shall be installed prior to the pouring of the foundation to support installation of electrical outlets in the shop floor.

5. Outlets for a refrigerator and microwave shall be installed in the Employee room. All other outlets for office and breakroom space shall be installed to local code.

6. All lighting shall be installed to local code and shall be 3500 Kelvin. All lighting fixtures shall use high efficiency LED lighting.

7. Bathroom shall have 1 GFCI outlet.

Mechanical – HVAC:

1. Contractor shall install a high efficiency heat pump rated to provide heat down to 0 degrees in a size sufficient to heat and cool the shop space.

2. Office space break room and bathroom shall be heated and cooled with high efficiency mini split systems.

3. All thermostats installed for the HVAC systems shall be programable with 24/7/365 day programming capability.

Ancillary Equipment and Features:

1. Contractor shall supply and install one nine foot tall 12’x50’ steel mezzanine with removable safety rails, stair access and galvanized steel and plywood decking with a load rating of 125 PSF. Mezzanine shall be installed over the top of the office, break room and restroom spaces.

2. Contractor shall supply and install a minimum 10-HP 80-Gallon Two-Stage Air Compressor w/ Dryer (230V 1-Phase) and air supply lines throughout the shop to supply shop air. Contractor shall install 3 overhead mounted air hose reels.

C.3.4 REPLACE THE SEPTIC SYSTEM

A. Contractor shall provide and install a complete septic system. New system shall be installed in the same footprint as the old system.

1. Provide and install a 1000-gallon concrete septic tank with access riser. The new tank shall be installed in the same place the old tank was removed from.

2. Provide and install new sewer drains from the new shop building to the new septic tank. The new lines should be placed in the footprint of the old lines if possible. If new lines cannot go back in the same trench as the old lines, the park must be notified immediately before work continues.

3. Provide and install new leach field lines and bedding gravel as needed to properly install the new lines. The new lines should also be installed in the same footprint of the old leach field lines that were previously demoed.

C.3.5 REBUILD THE WELL AND WATER SYSTEM

A. Contractor shall provide and install a complete water system. New system shall be installed in the same footprint as the old system. Well casing may be reutilized if it is in good condition.

1. Contractor shall install new electrical lines for the well pump. New lines shall not be direct bury but shall be encased in appropriately sized PVC or HDPE conduit.

2. Contractor shall install a new electric well pump sufficient to meet the needs of the new shop building. Shop will support up to 6 staff and water service should be sufficient to support those staff.

3. Contractor shall install new drop pipe.

4. Contractor shall supply and install a new sanitary grout seal.

5. Contractor shall supply and install a new Pitless adapter.

9 | 71

6. Contractor shall supply and install new supply lines supply lines from the well to the building.

a. All supply lines shall be buried to a minimum depth of 36 inches.

7. The well and new supply lines shall be sanitized before the water system is put back into operation.

C.3.6 OPTIONAL LINE ITEM: BUILD A 40x60x16 HIGH POLE BARN

A. Install a 40’50’x16’ foot tall post and beam building with a 6-inch concrete foundation.

1. Post and Beam building should be constructed as what is commonly called a “pole barn”.

2. Pole barn bays should be 8 feet deep.

3. Pole barn uprights shall be 6”x6” pressure treated posts.

4. Buried sections of the post should be protected by PVC “Post Protector”, 60 inches in length.

5. Posts should be set to a depth of 48 inches and rest on a foot of compacted gravel. Native soil should be used to backfill and set the posts.

6. Non-Pressure Treated lumber should be used for the gerts on the pole barn.

7. Roof trusses shall be pre-fabricated steel clear span trusses set 8 foot on center lag screwed to the

6”x6” pressure treated uprights.

8. Purlins for the steel trusses shall be 2”x8” dimensional lumber and shall be lag bolted to the purlin cups on each steel truss

9. Building shall be insulated with a Prodex 10M plus 10 millimeter, dual foil sided reflective insulation or equivalent to prevent condensation.

10. Building shall have a minimum 12 inch soffit and drip edge and steel fascia shall be installed.

11. Gutters shall be installed on the building sufficient to provide drainage away from the foundation.

12. Roofing shall be minimum 26 gage coated 40 year warranty PBR panels. Standard Ridge vents shall be installed.

13. Siding shall be minimum 29 gage coated 40 year warranty PBR panels.

14. Roofing and siding screws shall be color matched to the building.

15. Two 12x12 overhead doors shall be installed and a minimum 36”x72” man door shall be installed.

16. Building will not have power or be a conditioned space.

C.4 PERIOD OF PERFORMANCE / DELIVERY DATE

The Period of Performance and Delivery Date is the anticipated Construction period for the Monocacy Maintenance Shop Base Project and the Build A High Pole Barn, Optional Line Item (subject to availability of funding) is approximately 180 days. See Section C.16. Construction Schedule below for submittal and formatting requirements.

Documents Required before and for the Pre-Construction Meeting in which it is anticipated the Notice to Proceed will be issued shortly thereafter.

Document Description Due Date 1 Performance and Payment Bonds 10 days after award 2 Certificate of Insurance (COI) 10 days after award 3 SF-1413 for each prime subcontractor 14 days after award 4 Project Manager Designation Letter 14 days after award 5 Site Safety Plan 18 days after award 6 Traffic Control Plan 18 days after award 7 Quality Control Plan 21 days after award 8 Waste Management Plan 21 days after award 9 Construction Schedule At preconstruction meeting 10 Schedule of Values At preconstruction meeting

Fromm, Lisa J Correct verbiage to match Optional line item above.

Why does this say 365 days when the PR says they need this work completed by 12/31/2023? We should say something similar to the following: The anticipated Construction period for the Monocacy Maintenance Shop Base Project and the Build A high Pole Barn, Optional Line Item (subject to funding) is approximately 180 days. See SECTION C.16 CONSTRUCTION SCHEDULE below for submittal and formatting requirements.

10 | 71

11 Product & Material Data Ongoing with long lead time items first 12 Construction Drawings Ongoing

C.5 SPECIAL PROJECT SPECIFICATIONS

All specific details, requirements, and drawings are listed in Section J and are considered part of the overall requirements, in addition to everything stated in Section A-J on the award, and K-M in the solicitation.

C.6 GOVERNMENT PROVIDED INFORMATION

• Quality Assurance

• Inspections and Government Acceptance

• CM-16 Submittal Form

• Maps and Pictures

• Specifications

• Product Specifications

• Submittal Log

• Wage Determinations

• Experience Form

• Reference Questionnaire

• Waste Tracking Sheet

C.7 CONTRACTOR AND PRODUCT ADDITIONAL REQUIREMENTS

• Engineer stamps by a structural engineer licensed in the State of Maryland shall be provided to the park prior to commencement of construction/Notice to Proceed issuance.

• The contractor is responsible for adherence to all Occupational Safety and Health Administration (OSHA) Regulation, specifically 29 CFR 1910 - General Industry and 29 CFR 1926 – Construction and applicable State Regulations.

• Contractor shall be responsible for obtaining all required permits, at no additional cost to the Government (if applicable) and scheduling all applicable inspections. All inspections must be signed off on by the COR and completed prior to receipt of final payment.

• All applicable submittals required, which may include warranty, production information, operation, and maintenance documentation, etc. as defined throughout various sections and specifications must be provided to COR, CS, and CO prior to submission of final invoice. Invoice will be rejected until the required documentation is submitted. Please refer to Section J for all additional documents.

• All trash and debris removal must be in accordance with local, state, and federal regulations.

• All materials and equipment are to be installed per manufacturer’s installation guidance.

• 50 year finish warranty on color coated surfaces. Colors to be selected by the Park.

• Construction drawings

C.8 GENERAL PLACE OF PERFORMANCE AND HOURS OF OPERATION

National Capital Area (NCA) C&O Canal National Historical Park Monocacy District Maintenance Facility 18027 Pleasantville Road, Knoxville, Maryland 21758

Normal operational hours are from 6:30 am to 4:00 PM ET, Monday through Friday.

No work shall occur on weekends or the following Federal Holidays:

11 | 71

New Year’s Day – January 1st

Martin Luther King Junior’s Birthday – Third Monday in January President’s Day – Third Monday in February Memorial Day – Last Monday in May Juneteenth – June 19th Independence Day – July 4th Labor Day – First Monday in September Columbus Day/Indigenous Peoples Day – Second Monday in October Veteran’s Day – November 11th

Thanksgiving Day – Fourth Thursday in November Christmas Day – December 25th

Note - if any of the holidays stated above fall on a Saturday, the Friday before the actual day is the official day the Government takes for the holiday. If the holiday falls on a Sunday, the Monday after the actual day is the official day the Government takes for the holiday. These dates do not account for any other days or shorten days that may be added prior to any of the holidays mentioned above that may be added at the discretion of any Presidential Administration and implemented by the DOI.

C.9 SITE MANAGEMENT

Maintain walkways, driveways, roads, parking, and project site to be free of all construction debris, equipment, and materials on a daily basis. Maintain site free of hazards at all times. Occupancy access shall be negotiated on a project specific basis. Maintain the level of access provided to the facility through the project duration if tenant occupancy is retained. Safety equipment, fencing and barriers shall be installed per safety plan. Erosion control and sedimentation structures shall be constructed in according with EPA standards as needed. All historical and/or archeological issues shall be addressed as needed and stated in the contract and its attachments.

C.10 RECYCLING AND DISPOSAL OF REFUSE

Except for materials specifically indicated or specified to be salvaged for reuse in construction, or turned over to the Government; all refuse, excess or waste materials resulting from construction operations shall become the property of the contractor (excluding native vegetative and soil debris) and shall be recycled and/or disposed of.

All disposals shall be in accordance with federal, state, and local laws and regulations. No disposal, viewing or sale of materials and/or equipment shall be allowed on Government property.

C.11 SAFETY

During the execution of this contract, the Contractor must conform to the rules and regulations, as amended and as set forth by:

• 29 CFR 1910 – OSHA General Industry Regulations & Standards

• 29 CFR 1926 – OSHA Construction Industry Regulations & Standards

• US Army Corps of Engineers “Safety and Health Requirements” Manual No. 385-1-1 (free online -https://www.publications.usace.army.mil/USACE-Publications/Engineer-Manuals/ )

• National Park Service Occupational Safety and Health Program – Reference Manual 50B - Reference

Manual 50B: NPS Occupational Safety and Health Program

• Most Recent Superintendent’s Compendium

General Requirements:

Compliance with Reference Manual 50B (RM-50B), NPS Occupational Safety and Health Program, Section 7.0 Contractor Safety: Contractor Safety program responsibilities shall be considered during the requirements https://www.publications.usace.army.mil/USACE-Publications/Engineer-Manuals/ https://www.nps.gov/subjects/policy/upload/RM-50B_Contents.pdf?msclkid=621da23cc59111ec9bbf5daecf70f928 https://www.nps.gov/subjects/policy/upload/RM-50B_Contents.pdf?msclkid=621da23cc59111ec9bbf5daecf70f928 https://www.nps.gov/nama/learn/management/superintendent-s-compendium.htm

12 | 71 development phase of the acquisition. The Contracting Officer’s Representative (COR) and other park staff shall consult with certified Safety Officers for guidance on RM 50B requirements. A comprehensive safety assessment shall be performed to assure any necessary requirements above and beyond existing federal or state safety and health codes are written into the contract specifications. The COR or park representative shall provide the name of a certified Safety Officer to the CO. The CO will consult with the Safety Officer on contract clauses and special conditions. The COR shall ensure contractor compliance with all safety requirements throughout contract performance.

• Work area shall always be maintained in a clean and safe condition.

• All personnel providing service on-site shall have pictured identification and uniform displaying the name of the company (if appliable).

• All on-site vehicles will also be marked with the company name (if applicable).

• Use of barricades, ropes, signs, or audible signals is required, and the contractor must take all necessary precautions for the protection of the work, property, and safety of the public.

• Any accident or incident, regarding the work under this contract, shall be reported immediately, in writing, to the Contracting Officer.

• Smoking of any kind will not be permitted on premises. The COR/POC may authorize the use of a designated smoking if requested.

Working in a Federal building or federally controlled indoor workspaces:

In order to take steps to prevent the spread of COVID-19 and to protect the health and safety of all Federal employees, onsite contractors, visitors to Federal buildings or Federally controlled indoor workspaces, and other individuals interacting with the Federal workforce, employees under the subject contract who are required to work on site in Federal buildings or Federally controlled indoor worksites must comply with requirements located at https://www.saferfederalworkforce.gov/overview/

C.12 FIRE CONTROL

Contractor's Responsibility for Contractor-Caused Fires. The contractor, whether or not directed by the NPS, shall immediately extinguish, without expense to the Government, all fires on or in the vicinity of the project which are caused by contractor's employees, whether set directly or indirectly as a result of contractor operations.

The contractor may be held liable for all damages and costs of additional labor, subsistence, equipment, supplies, and transportation resulting from fires set or caused by the contractor's employees or resulting from contract operations.

(1) Storage of Petroleum and Other Highly Flammable Products. Gasoline, oil, grease, or other highly flammable material must be stored either in a separate building used exclusively for such storage, or at a site when all combustible debris and vegetation is cleared away within a radius of 25 feet. Fire extinguishers and/or sand barrels may be required at such locations specified by the NPS when unusually hazardous conditions exist.

(2) Welding. Welding or use of cutting torches will be permitted only in areas that have been cleared or are free of all material capable of carrying fire. Flammable debris and vegetation must be removed from within a minimum of 10 feet radius of all welding and cutting torch operations. A shovel and a 5-gallon standard backpack water container (filled) with handpump attached, shall be immediately available for use in the event of a fire start.

C.13 TEMPORARY FACILITIES

(a) STAGING AREA: The contractor shall arrange the location for exterior stockpiling of materials (i.e. storage) with the COR/POC. The contractor must be present when any materials are delivered to ensure proper placement https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.saferfederalworkforce.gov%2Foverview%2F&data=05%7C01%7CCraig_Madison%40nps.gov%7C017321ae3ce54b2e4c0b08da482089d1%7C0693b5ba4b184d7b9341f32f400a5494%7C0%7C0%7C637901601831734573%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=vS0Y1s9ZuYGaL%2BfGyy9vfOMdP5VDFAL1SffEADbd3qQ%3D&reserved=0

Formatting changes here and needs to match the rest of the document.

13 | 71 within the designated location. The Government will provide an adequate staging area as close to the construction site as practicable.

The Government will NOT provide any secured storage/staging areas for the contractor. The contractor shall be responsible for protecting materials stockpiled against adverse weather, damage, theft, and other risks of loss. The Government assumes no responsibility for material or equipment left in the storage area. Barbed wire nor razor wire is permitted to be used for security purposes for this requirement.

(b) SANITARY FACILITIES: Toilet facilities will not be provided by the Government.

(c) WATER, AND ELECTRICITY: Water is not available on site. Electricity will be temporary until it is converted to permanent inside the new building. Should water and electricity not be readily available, the contractor shall provide these services as needed to perform the required work.

(d) TELEPHONE: The Contractor may elect to hook-up commercial phone services using the local telephone service provider, at no cost to the Government. Cell phone or wireless access may or may not be available at the construction site.

C.14 LANDSCAPE PRESERVATION

A. The contractor shall confine operations to within the clearing limits or other areas designated in contract documents, and prevent the depositing of rocks, excavated materials, stumps, or other debris outside of these limits. Material which falls outside of these limits shall be retrieved, disposed of, or incorporated in the work as directed by the Contracting Officer.

B. Operation shall be scheduled and conducted to minimize erosion of soils and to prevent silting and muddying of streams, rivers, irrigation systems, and impoundments (lakes, reservoirs, etc.).

Pollutants such as fuels, lubricants, bitumens, raw sewage, and other harmful materials shall not be discharged into or near rivers, streams, and impoundments or into natural or manmade channels leading thereto. Wash water or wastewater from concrete or aggregate operations shall not be allowed to enter live streams prior to treatment by filtration, settling, or other means sufficient to reduce the sediment content to not more than that of the stream into which it is discharged.

C. Temporary Erosion and Sedimentation Control: Provide effective erosion control measures to prevent soil erosion and discharge of soil-bearing water runoff at the earliest feasible stage of construction. Regularly inspect and maintain the measures in effective working order. Promptly stop work in area(s) of any ineffective erosion control measures.

D. Tree and Plant Protection: Install temporary fencing located outside the drip line of trees to protect from damage from construction operations. Protect the tree root systems from damage, flooding, and erosion.

E. Dust: Utilize effective means to prevent generation of wind-borne dust (typically watering or application of other approved dust control measures) and to prevent sediment from leaving the work site and/or entering storm sewers and water bodies. Method must be approved by the COR.

G. Damage: Protect adjacent vegetation, property, structures, and improvements from damage.

H. Hazardous Materials: Perform any hazardous materials work in strict accordance with governing hazardous materials regulations. Workers shall be knowledgeable and well trained in the handling of project-specific hazardous materials.

14 | 71

I. Spill Control: Provide effective spill containment measures at the earliest feasible stage of construction.

Regularly inspect and maintain the measures in effective working order.

C.15 EXISTING UTILITIES

The contractor shall field verify all utility locations before digging or trenching. This shall include but not be limited to the use of sonic, electronic, or magnetic detection devices, by noting pull box and utility box locations at the surface, use of locator services, and by test pitting at no additional cost to the Government. The contractor shall be responsible for repairing any utilities damaged during construction at no additional cost to the Government.

C.16 CONSTRUCTION SCHEDULE

The Contractor shall submit for approval an initial practicable graphic construction schedule in PDF format at the preconstruction meeting as described in FAR 52.236-15 – Schedules for Construction Contracts. The Construction Schedule shall be in the form of a Progress Chart of suitable scale to indicate appropriately the percentage of the work schedule for completion by a given date. The Construction Schedule shall be replicated and associated with monetary values and titled Schedule of Values. The Schedule of Values shall be submitted to the COR and CO for review and approval at the preconstruction meeting. The Construction Schedule and Schedule of Values must include at least:

• Show the order in which the Contractor proposes to perform the work.

• Show the dates on which the Contractor contemplates starting and completing the several salient features of the project.

• Identify long lead items and Government furnished property (if applicable).

The Contractor must submit updated schedule at least bi-monthly to the COR depicting progress of the work completed to date. The Contractor must notify the COR/CO in writing whenever there are significant departures from the approved Construction Schedule. Any requests to modify the Construction Schedule, in writing to the Contracting Officer with an explanation for the deviation.

C.17 ENVIRONMENTAL REGULATIONS

All waste materials generated by any work under the contract performed on a Government installation shall at all times be handled, transported, stored, and disposed of by the contractor and by their subcontractors in accordance with all applicable Federal, state, and local laws, ordinances, regulations, court orders, and other types of rulings having the effect of the law, including, but not limited to:

• Executive Order 12088, 13 October 1978, Federal Compliance with Pollution Control Standards;

• Federal Water Pollution Control Act, as amended (33 U.S.C. 1251 ET SEQ);

• Clean Air Act as amended (42 U.S.C. Sec 7401 ET SEQ);

• Endangered Species Act, as amended (16 U.S.C. Sec 1531 ET SEQ);

• Toxic Substances Control Act, as amended (15 U.S.C. Sec 2601, ET SEQ);

• National Historic Preservation Act, as amended (16 U.S.C. Sec 470, ET SEQ);

• Solid Waste Disposal Act, as amended (42 U.S.C. 6901 ET SEQ);

• Archaeological and Historic Preservation Act, as amended (16 U.S.C. Sec 469, ET SEQ).

Should the United States Government be held liable for any neglect or improper actions by the contractor or any subcontractor regarding removal or disposal of any hazardous waste, the contractor shall reimburse the Government for all such liability.

C.18 PRESERVATION OF HISTORICAL/ARCHEOLOGICAL/CULTURAL RESOURCES

Formatting changes again and needs to be corrected.

15 | 71

A. Public Law 93-291, May 24, 1974, provides for the preservation of scientific, prehistorical, and archeological data (including relics and specimens) which might otherwise be lost due to alteration of terrain because of any Federal construction project.

B. The Contractor agrees that should any contractor employee, in the performance of this contract, discover evidence of possible scientific, prehistorical, historical, cultural, or archeological data the contractor must notify the CO and COR in writing within 24 hours of first discovery. The notification must indicate time of discovery, the nature of the findings and location.

C. Immediately stop work if paleontological, archaeological, or historical remains (including burials or skeletal material) are encountered, until work is permitted to resume by written order from the CO. the contractor must notify the CO and COR in writing within 24 hours of first discovery. The notification must indicate time of discovery, the nature of the findings and location. The CO and/or COR will notify the Regional Archaeologist, so the provisions of 36 CFR 800.7 (Resources Discovered During Construction) and other relevant laws are followed. Work in other areas may proceed as approved by the CO.

D. Where appropriate by reason of discovery, the CO may order delays in the time of performance and/or changes in the work. If such delays and/or changes are ordered, the time of performance and contract price shall be adjusted in accordance with the applicable clauses in the Contract Clauses Section of this contract which are incorporated by reference at the Task Order Level.

E. The Contractor must insert this requirement in all subcontracts which involve the performance of work on the terrain of the site.

C.19 HARARDOUS MATERIALS

Any material suspected of being hazardous that is encountered during performance of a project shall immediately be brought to the attention of the Contracting Officer, at which time a determination will be made as to whether hazardous material testing shall be performed.

If the Contracting Officer directs the contractor to perform tests, and/or the material is found to be of a hazardous nature requiring additional protective measures, a contract modification may be required, subject to equitable adjustment under the terms of the contract.

The contractor is advised that friable and/or non-friable asbestos-containing material may be encountered in project areas. Friable asbestos-containing material is any material that contains more than one percent asbestos by weight, and that hand pressure can crumble, pulverize, or reduce to powder when dry. Non-friable asbestos containing materials are materials in which asbestos fibers are bound by a matrix material, saturation, impregnation, or coating. Non-friable asbestos containing materials do not normally release airborne asbestos fiber during routine handling and end-use.

However, excessive fiber concentrations may be produced during uncontrolled abrading, sanding, drilling, cutting, machining, removal, demolition, or other similar activities. 29 CFR 1910.1001 shall be referenced in the event asbestos-containing materials are encountered. Friable asbestos-containing materials are not authorized for use in new construction or maintenance projects.

C.20 HAZARDOUS MATERIAL IDENTIFICATION

Submit Safety Data Sheet (SDS)’s as required per 29 CFR 1910.1200 as amended. The contractor must provide one digital copy of each SDS for applicable hazardous chemicals used and/or provided in performance of any work under this contract.

C.21 MATERIAL & EQUIPMENT TRANSPORTATION, HANDLING AND STORAGE

Format IAW whole document formatting.

16 | 71

A. Contactor shall have a representative on site to receive material deliveries, and the contractor shall remain responsible for all material deliveries whether their representative is on site at the time of delivery or not.

B. Government-owned equipment is not available for Contractor’s use to accomplish any Work, and Government buildings and other facilities are not available for storage of Contractor’s materials, equipment, and tools.

C. Transport, handle, and store materials and equipment in accordance with the manufacturer’s written instructions, and in a secure manner.

D. Store products that are subject to damage by the elements, under cover in a weathertight enclosure above ground, with ventilation adequate to prevent condensation. Protect liquids from freezing.

E. Promptly remove from the project site any materials or equipment that are damaged or are otherwise unsuitable.

F. Additional Permitting, fees, and coordination may be required working within the limits of Washington, DC.

Additional restrictions may be imposed due to unforeseen events or security threats in Washington, DC.

C.22 CONSTRUCTION QUALITY CONTROL PLAN

A. Designate in writing a single person to oversee and manage on-site quality control activities.

B. The Contractor is responsible for quality control of all project work including any sub-contracted work, and to submit thorough documentation that work fully complies with the construction documents and project permits.

C. Quality control processes include but are not limited to proactively:

1. Ensuring compliance with the construction documents and project permits.

2. Make vertical work plumb and make horizontal work level.

3. Managing specialty subcontractors.

4. Reviewing and processing samples, mock-ups, shop drawings and other construction submittals.

5. Ensuring that the workers have the appropriate expertise and proper equipment to perform the work.

6. Effectively utilizing third-party sampling & testing services (typically for earthwork gradation, compaction, concrete & asphalt testing, welding, pile driving and other specialty inspections).

7. Initialing timely reviews and corrective actions to substrates prior to proceeding with subsequent work.

8. Timely involvement of industry specialists such as manufacturer representatives.

9. Managing system commissioning.

10. Conceal pipes, ducts, and wiring in finished areas unless otherwise indicated, and maintain headroom clearance of 96” in occupied spaces and 90” in unoccupied spaces.

11. Training NPS personnel in system operation & maintenance.

12. Timely involvement of local authorities having jurisdiction.

13. Load-Limits: Heavy equipment operated on NPS roads and parking areas shall comply with highway-legal load limits unless explicitly approved otherwise.

D. Field-verify all dimensions and conditions prior to performing the work. Notify the COR of any conflicts.

E. Improvements shall be constructed in accordance with the product manufacturer’s written instructions and standards.

F. Welding shall be performed by licensed welders and in compliance with American Welding Society recommended practices, structurally sound, and shall be neat in appearance.

G. Any work that must be performed by a licensed/certified technician (i.e. Electricians, Plumbers, HVAC

Technicians, etc.) shall be performed by state-licensed/certified technicians. The applicable state-license/certification must be from the State where the work is performed, not exceptions.

H. All, telecommunication (included telephone, data, radio, TV, similar) systems shall be installed and comply with current NPS Policy – if applicable.

C.23 DAMAGES

17 | 71

The Contractor shall assume all risks of injury to persons or property in connection with the performance of work under this contract shall indemnify and save harmless the Government against all claims, causes of action, cost and expense, because of bodily injuries, death, or damages to Property arising from all work activities of the Contractor.

If due to fault, neglect, dishonesty of the contractor, his agency or employees, loss or damage to government property is incurred during the performance of this task order, the contractor shall be responsible for the same. The government, at its option, in lieu of repayment, may require the contractor to replace at his own expense, all property as directed by the Contracting Officer.

C.24 CONSTRUCTION/PROJECT MANAGER

The contractor shall provide a responsible Construction/Project Manager to represent the contractor in all matters pertaining to work under this contract. The Construction/Project Manager shall have the responsibility of overall supervision, quality control, cost estimating and be responsible for the management of all ongoing work. The Construction/Project Manager must be available in person, by telephone, or radio to respond to any and all problems during normal working hours. The response from the Project Manager must be within 1 hours after receiving the notification and should be in the same means as the request. Written follow up notification (via email is acceptable) must be provided to COR/POC within 24 hours, which confirms response.

The proposed Construction/Project Manager must be included in response to solicitation and must be the Construction/Project Manager responsible for the Contract after award throughout performance. If during the term of this contract, the contractor changes or replaces the Construction/Project Manager, the contractor must notify the COR and CO in writing within 3 business days of the proposed change, or as soon as possible if the departure was unplanned or unexpected.

C.25 SITE SUPERINTENDENT

The Contractor shall provide a responsible site superintendent to represent the contractor in the field in all matters pertaining under this contract including, but not limited to construction, day-to-day coordination of activities, control over employees and subcontractors, and coordination with local Government personnel. The site superintendent may also be designated the Construction/Project Manager.

The site superintendent must be onsite for at least three (3) hours per workday. When they are not on site, they must be available by telephone, radio or other means of communication in order to respond to any and all problems during normal working hours. The response from the Site Superintendent must be within 1 hour after receiving the notification and should be in the same means as the request.

The site superintendent shall be responsible for on-site Quality Control and shall sign all contract submittal transmittal sheets.