Attachment 8 Legionella Water Testing Checklist.xlsx

XLSX spreadsheet 18 KB Posted

Attached to
F103--Solicitation Legionella Testing Federal contract opportunity
Solicitation number
36C26125Q0768
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 21

About this file

Attachment 8 is a Legionella Water Testing Checklist that provides detailed guidelines for water sample collection in buildings. The checklist outlines seven key testing protocols, including requirements for the number and types of water sample sites per building. Specific guidelines mandate obtaining at least two samples per site, with the first sample dedicated to Legionella testing and the second sample measuring water temperature, pH, and biocide levels. The testing protocol requires sampling from diverse water sources, including at least two samples from ice machines or cold water sources and two samples from pure hot water sources without mixing valves. The document is associated with a Department of Veterans Affairs solicitation (Solicitation Number: 36C26125Q0768) for Legionella testing services within Veterans Health Administration's Veterans Integrated Service Network 21.

View the file

Other files for this federal contract opportunity

Other files attached to F103--Solicitation Legionella Testing, newest first.
File Type Posted
36C26125Q0768 0002.docx DOCX document
36C26125Q0768 0001.docx DOCX document
Attachment 7 Addendum B Cooling Towers.pdf PDF
Attachment 4 Quality Assurance Surveillance Plan - Legionella Testing.pdf PDF
Attachment 2 WD 2015-5623 Alameda County.pdf PDF
Attachment 3 WD 2015-5637 San Mateo County.pdf PDF
36C26125Q0768.docx DOCX document
Attachment 5 VHA Directive 1061 - ammended 10-21-2024.pdf PDF
Attachment 1 WD 2015-5641 Santa Clara County.pdf PDF
Attachment 6 Addendum A.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Testing Guidelines Directions for Water Collection:

1. No less then the number of required water sample sites will be obtained for each building
2. Each water sample site will have 2 samples obtained, with the first sample being for Legionella testing
3. The second sample will be for water temperature, pH, and level of biocide
4. At least 2 of the samples per building will be from an ice machine or pure cold water source
5. At least 2 of the sample sites must be from a pure hot water source (i.e. no mixing valve present)
6. If the builiding water outlet inventory incudes hot, cold, and mixed, each source shall be sampled
7. If building water outlet inventory is <20 outlets then 50% of the potential locations shall be sampled
8. Each quarter a sample shall be pulled from three sources: one (1) Each: cooling tower basin, chiller supply, and chiller return. (IF the chiller has a common header than one chiller sample can be taken.
MOST IMPORTANT - these must be random selections, meaning the same rooms should not be continually sampled each quarter unless there is no option due to the small number of outlets.

Legionella Water Testing

Legionella Water Testing Checklist
Palo Alto Division (174 sample sites)Menlo Park Division (164 sample sites)Livermore Division (20 sample sites)Cooling Tower & Chiller Checklist
7D7BLD.MAKEMODELSERIAL NO.COMMENTS
7F7331B101st Floor10
7H7331D102nd Floor10615-1YORKYKJPJPP9-ERGSSAAM-531680water cooled, common header
Bldg 7 (Total)21331 (Total)20Bldg 90 (Total)20615-2YORKYKJPJPP9-ERGSSAAM-531870water cooled, common header
615-3YORKYKK8KRH9-EVGSSHCM-306220water cooled, common header
2A4360A4615-4YORKYKK8KRH9-EVGSSHCM-306420water cooled, common header
2C4360B4100-1YORKYKN8N4K1-CNFSMBM-102300water cooled, common header
3A4360D4100-2YORKYKN8N4K1-CZGSSMBM102100water cooled, common header
2F4360E4100-3YORKYKCFCFQ7-CZGSSFRM-226700water cooled, common header
3C4360F4334-1YorkYT G0 A2 B2-CF JSSANM-215600Water cooled - Basement
3F4360G4334-2TraneRTHB215FLF00NWP000UN4LF2LFV0QUCU97J04960Water cooled - Basement
4A4360 (Total)24331-1TraneRTWD 080F 2B02 D1A2 AA2A 1A1Y
1E0A 4000 0000 100B 00A1 00D0UI2F04043Water Cooled
4C4331-2TraneRTWA0804YE01C3D1WNV00F01358Water Cooled
Bldg 100 (Total)321st Floor1062-1YORKYCWK1146PDYFWM407827R-22, WATER COOLED
2nd Floor1062-2YORKYCWK1146PDYBXM450870R-22, WATER COOLED
520A6347 (Total)2062-3TRANERTWA1254YE01C3D1WTU03B08706R-22, WATER COOLED
520B790-1TRANECGWF-0604--CB0U-AA1C-R1D1-NN00-NOXOX-U05L04695R-22, WATER COOLED
520C72nd Floor20 (10 each wing)90-2TRANECGWF-0604--CB0U-AA1C-L1D1-NN00-NOXOX-U05L04696R-22, WATER COOLED
Bldg 52020350 (Total)20
1st Floor102nd Floor20 (10 each wing)
2nd Floor10351 (Total)20
Defender's Lodge (Total)20
2nd Floor20 (10 each wing)
1st Floor10352 (Total)20
2nd Floor10
Fisher House 1 (Total)20Gilbert Street CWT home10 each home
18th Street CWT home10
1st Floor10CWT home (Total)20
2nd Floor10
Fisher House 2 (Total)20365 (Total)20
Modular Building 2 (MB)20
MB 2 Ttotal)20
1st floor7
2nd floor7
3rd floor7
Bldg 50021