Attachment 8 Legionella Water Testing Checklist.xlsx
XLSX spreadsheet 18 KB Posted
- Attached to
- F103--Solicitation Legionella Testing Federal contract opportunity
- Solicitation number
- 36C26125Q0768
About this file
Attachment 8 is a Legionella Water Testing Checklist that provides detailed guidelines for water sample collection in buildings. The checklist outlines seven key testing protocols, including requirements for the number and types of water sample sites per building. Specific guidelines mandate obtaining at least two samples per site, with the first sample dedicated to Legionella testing and the second sample measuring water temperature, pH, and biocide levels. The testing protocol requires sampling from diverse water sources, including at least two samples from ice machines or cold water sources and two samples from pure hot water sources without mixing valves. The document is associated with a Department of Veterans Affairs solicitation (Solicitation Number: 36C26125Q0768) for Legionella testing services within Veterans Health Administration's Veterans Integrated Service Network 21.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C26125Q0768 0002.docx | DOCX document | |
| 36C26125Q0768 0001.docx | DOCX document | |
| Attachment 7 Addendum B Cooling Towers.pdf | ||
| Attachment 4 Quality Assurance Surveillance Plan - Legionella Testing.pdf | ||
| Attachment 2 WD 2015-5623 Alameda County.pdf | ||
| Attachment 3 WD 2015-5637 San Mateo County.pdf | ||
| 36C26125Q0768.docx | DOCX document | |
| Attachment 5 VHA Directive 1061 - ammended 10-21-2024.pdf | ||
| Attachment 1 WD 2015-5641 Santa Clara County.pdf | ||
| Attachment 6 Addendum A.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Testing Guidelines Directions for Water Collection:
| 1. No less then the number of required water sample sites will be obtained for each building |
| 2. Each water sample site will have 2 samples obtained, with the first sample being for Legionella testing |
| 3. The second sample will be for water temperature, pH, and level of biocide |
| 4. At least 2 of the samples per building will be from an ice machine or pure cold water source |
| 5. At least 2 of the sample sites must be from a pure hot water source (i.e. no mixing valve present) |
| 6. If the builiding water outlet inventory incudes hot, cold, and mixed, each source shall be sampled |
| 7. If building water outlet inventory is <20 outlets then 50% of the potential locations shall be sampled |
| 8. Each quarter a sample shall be pulled from three sources: one (1) Each: cooling tower basin, chiller supply, and chiller return. (IF the chiller has a common header than one chiller sample can be taken. |
| MOST IMPORTANT - these must be random selections, meaning the same rooms should not be continually sampled each quarter unless there is no option due to the small number of outlets. |
Legionella Water Testing
| Legionella Water Testing Checklist | ||||||||||||
| Palo Alto Division (174 sample sites) | Menlo Park Division (164 sample sites) | Livermore Division (20 sample sites) | Cooling Tower & Chiller Checklist | |||||||||
| 7D | 7 | BLD. | MAKE | MODEL | SERIAL NO. | COMMENTS | ||||||
| 7F | 7 | 331B | 10 | 1st Floor | 10 | |||||||
| 7H | 7 | 331D | 10 | 2nd Floor | 10 | 615-1 | YORK | YKJPJPP9-ERGS | SAAM-531680 | water cooled, common header | ||
| Bldg 7 (Total) | 21 | 331 (Total) | 20 | Bldg 90 (Total) | 20 | 615-2 | YORK | YKJPJPP9-ERGS | SAAM-531870 | water cooled, common header | ||
| 615-3 | YORK | YKK8KRH9-EVGS | SHCM-306220 | water cooled, common header | ||||||||
| 2A | 4 | 360A | 4 | 615-4 | YORK | YKK8KRH9-EVGS | SHCM-306420 | water cooled, common header | ||||
| 2C | 4 | 360B | 4 | 100-1 | YORK | YKN8N4K1-CNF | SMBM-102300 | water cooled, common header | ||||
| 3A | 4 | 360D | 4 | 100-2 | YORK | YKN8N4K1-CZGS | SMBM102100 | water cooled, common header | ||||
| 2F | 4 | 360E | 4 | 100-3 | YORK | YKCFCFQ7-CZGS | SFRM-226700 | water cooled, common header | ||||
| 3C | 4 | 360F | 4 | 334-1 | York | YT G0 A2 B2-CF JS | SANM-215600 | Water cooled - Basement | ||||
| 3F | 4 | 360G | 4 | 334-2 | Trane | RTHB215FLF00NWP000UN4LF2LFV0QUC | U97J04960 | Water cooled - Basement | ||||
| 4A | 4 | 360 (Total) | 24 | 331-1 | Trane | RTWD 080F 2B02 D1A2 AA2A 1A1Y | ||||||
| 1E0A 4000 0000 100B 00A1 00D0 | UI2F04043 | Water Cooled | ||||||||||
| 4C | 4 | 331-2 | Trane | RTWA0804YE01C3D1WN | V00F01358 | Water Cooled | ||||||
| Bldg 100 (Total) | 32 | 1st Floor | 10 | 62-1 | YORK | YCWK1146PD | YFWM407827 | R-22, WATER COOLED | ||||
| 2nd Floor | 10 | 62-2 | YORK | YCWK1146PD | YBXM450870 | R-22, WATER COOLED | ||||||
| 520A | 6 | 347 (Total) | 20 | 62-3 | TRANE | RTWA1254YE01C3D1WT | U03B08706 | R-22, WATER COOLED | ||||
| 520B | 7 | 90-1 | TRANE | CGWF-0604--CB0U-AA1C-R1D1-NN00-NOXO | X-U05L04695 | R-22, WATER COOLED | ||||||
| 520C | 7 | 2nd Floor | 20 (10 each wing) | 90-2 | TRANE | CGWF-0604--CB0U-AA1C-L1D1-NN00-NOXO | X-U05L04696 | R-22, WATER COOLED | ||||
| Bldg 520 | 20 | 350 (Total) | 20 |
| 1st Floor | 10 | 2nd Floor | 20 (10 each wing) |
| 2nd Floor | 10 | 351 (Total) | 20 |
| Defender's Lodge (Total) | 20 | ||
| 2nd Floor | 20 (10 each wing) | ||
| 1st Floor | 10 | 352 (Total) | 20 |
| 2nd Floor | 10 | ||
| Fisher House 1 (Total) | 20 | Gilbert Street CWT home | 10 each home |
| 18th Street CWT home | 10 | ||
| 1st Floor | 10 | CWT home (Total) | 20 |
| 2nd Floor | 10 | ||
| Fisher House 2 (Total) | 20 | 365 (Total) | 20 |
| Modular Building 2 (MB) | 20 |
| MB 2 Ttotal) | 20 |
| 1st floor | 7 |
| 2nd floor | 7 |
| 3rd floor | 7 |
| Bldg 500 | 21 |
File details come from the government source that posted it. Updated .