This document is an Amendment to a Solicitation for Legionella Testing services for the Department of Veterans Affairs Palo Alto Health Care System. The solicitation (36C26125Q0768) seeks a contractor to perform quarterly water sampling and testing at VA facilities in Palo Alto, Livermore, and Menlo Park, with an anticipated contract start date of November 1, 2025, through October 31, 2026, and four optional renewal years. Key requirements include collecting approximately 400 domestic water and cooling tower water samples quarterly, using trained personnel to collect samples that will be tested at a CDC Elite certified laboratory, and adhering to VHA Directive 1061 for Legionella disease prevention.
The amendment extends the solicitation response date to September 8, 2025, at 13:00 PDT and includes clarifications to the Performance Work Statement. Contractor responsibilities include sample collection from various water sources (hot, cold, mixed valve, ice machines), documenting water temperatures, pH levels, and biocide measurements, and providing comprehensive reporting within 5 days of lab testing. The contractor must have at least two years of experience in legionella sampling in hospital settings, be able to identify Legionella pneumophila and serotypes, and possess relevant certifications such as A2LA or NELAP accreditation. Contractor personnel will require background checks and temporary VA facility badges.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C26125Q0768 0002.docx | DOCX document | |
| Attachment 8 Legionella Water Testing Checklist.xlsx | XLSX spreadsheet | |
| Attachment 7 Addendum B Cooling Towers.pdf | ||
| Attachment 4 Quality Assurance Surveillance Plan - Legionella Testing.pdf | ||
| Attachment 2 WD 2015-5623 Alameda County.pdf | ||
| Attachment 5 VHA Directive 1061 - ammended 10-21-2024.pdf | ||
| Attachment 1 WD 2015-5641 Santa Clara County.pdf | ||
| Attachment 3 WD 2015-5637 San Mateo County.pdf | ||
| 36C26125Q0768.docx | DOCX document | |
| Attachment 6 Addendum A.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7.
ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF
PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED
STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF
CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF
SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 08-29-2025 640-26-1-5056-0001 None
612MCP
Department of Veterans Affairs Network Contracting Office (NCO) 21
612MCP
Department of Veterans Affairs Network Contracting Office (NCO) 21
To all Offerors/Bidders
36C26125Q0768 08-21-2025
X X X ** HOUR & DATE for Receipt of Offers is EXTENDED to: 09-08-2025 13:00 PDT X This amendment extends the date for questions to 9/03/2025 at 13:00 PDT and extends the solicitation response due date to 9/08/2025 at 13:00 PDT. Additionally, this amendment includes the Question and Answer (QA) response and updated Performance Work Statement below.
All other terms and conditions remain unchanged
Tim Smith Contracting Officer Continuation Page Question and Answer
1) We want to confirm that the vendor awarded this contract does not need to be a CDC Elite Lab. Our personnel can collect the samples and submit them to a 3rd party CDC Elite Lab for testing, correct?
VA Response – The vendor awarded to this contract does not need to be a CDC Elite Lab, but the sample collectors must be trained and certified to show their competence. Added to Performance Work Statement (PWS) 2.0.2)
2) Solicitation B.3 Performance Work Statement, General Information, Section 1.1 includes “incidental engineering services.” Can the government clarify what responsibility or tasks the Offeror is expected to perform for incidental engineering services? If this is not required, can the government remove this from the Performance Work Statement? If this is required, can the government provide a line item for pricing in the CLIN table or advise how the cost for these services will be handled?
VA Response – removed from PWS
3) Solicitation B.3 Performance Work Statement, Section 2.0 Quarterly Water Sampling and Field Testing, subsections 2.0.2 and 2.0.3 – these paragraphs refer to Section 2.1.3 – 2.1.8. The PWS does not include these sections/paragraphs. Can the government please provide the sections?
VA Response – The paragraph numbers under this section were numbered incorrectly. Attached is the revised PWS with corrected paragraph numbers. The corrected paragraph numbers have been highlighted.
4) Solicitation B.3 Performance Work Statement, Section 2.1 Shipping Samples to Laboratory and Lab Testing – Subsections are 2.21, 2.2.2, 2.2.3. Can the government clarify if this section is misnumbered or if sections are missing? If missing, can the government provide?
VA Response - The paragraph numbers under this section were numbered incorrectly. Attached is the revised PWS with corrected paragraph numbers. The corrected paragraph numbers have been highlighted.
PERFORMANCE WORK STATEMENT
Veteran’s Affairs Palo Alto Health Care System Legionella Testing of Potable Water and Cooling Towers
GENERAL INFORMATION
1.0 This Performance Work Statement (PWS) is to obtain Veteran’s Health Administration (VHA) Directive 1061 Legionella Disease and Scald Injury Prevention compliant sampling and testing services, including Cooling tower water and lab testing services, at the Veteran’s Affairs Palo Alto Health Care System (VAPAHCS).
1.1 The Contractor shall provide management, supervision, labor, parts, materials, tools, and transportation necessary to perform the services within this PWS. Modifications to perform deviations require written consent from the Government’s Contracting Officer.
1.2 Period of Performance: The Contract anticipated start date is November 1, 2025, through October 31, 2026, with 4 optional years based on performance.
1.3 Schedule/Work Hours: Due to the time sensitive nature of water sample analysis, work is required to be conducted during business hours (M-TH 8am-5:00pm, excluding federal holidays). Contractor is not required to perform services on holidays listed below. If these holidays fall on Saturday, the preceding Friday will be observed. If these holidays fall on Sunday, the following Monday will be observed. If a holiday falls on a scheduled service day, the Contractor will be responsible for rescheduling services for the first day post the holiday observance. Recognized Holidays:
| New Year’s Day | Labor Day |
| Martin Luther King Jr.’s Birthday | Columbus Day |
| President’s Day | Veteran’s Day |
| Memorial Day | Thanksgiving Day |
| Juneteenth Day | Christmas Day |
Independence Day
1.4 Contracting Officer Representative (COR): The COR will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract; perform inspections necessary in connection with contract performance; maintain written and oral communications with the Contractor concerning technical aspects of the contract; issue written interpretations of technical requirements, including Government drawings, designs, specifications: monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies; coordinate availability of government furnished property, and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially regarding changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting contract.
CONTRACTOR RESPONSIBILITIES:
Disclaimer: Work outside the scope of the contract shall not be performed unless authorized by the Contracting Officer (CO). The contractor shall communicate to COR, immediately, the occurrence of any event that may require a contract modification. The contractor shall submit a written request for modification to the Contracting Officer and COR no more than 10 days from initial notification. No contract modification will be effective until the Contracting Officer has approved the modification, in writing, and the modification has been signed by both parties.
2.0 Quarterly Water Sampling and Field Testing
2.0.1 The contractor shall be responsible for procurement of collection containers that meet VHA 1061 directive requirements for Legionella sampling and testing.
2.0.2 The contractor personnel must be trained and certified to show their competence in sample collection, preferably by a CDC Elite certified laboratory.
2.0.3 Collect an estimated 400 domestic water samples and non-domestic cooling tower & chiller water samples. The number of water samples includes routine, non-routine and retests if required. Sampling shall be done in compliance with VHA Directive 1061 and in compliance with sections 2.0.4- 2.0.9.
2.0.4 At the time each water sample is taken, test and document water temperature, level of residual biocide, and pH in compliance with section 2.0.9.
2.0.5 Routine sampling shall be performed in accordance with VHA Directive 1061 and conducted in the months of January, April, July, and October. Non-routine sampling shall be conducted within 3 business days upon request, and retests within 1 business day.
2.0.6 Locations are listed in the attached Addendums and in the attachment: “Legionella Water Testing Checklist.”.
2.0.7 The Government reserves the right to add or subtract testing locations and not limited to the locations listed in addendum A.
2.0.8 The Government can negotiate an addition or subtraction of total sampling/testing with the Contractor based on the needs of the VAPAHCS system only executable by the authorization of the CO or CO designated party.
2.0.9 Additional VHA Directive 1061 directions for water collection:
A. No less than the number of required water sample locations shall be obtained for each building.
B. Each water sample location shall have 2 samples obtained: first being for Legionella testing, second for water temperature, pH, and level of biocide measurements.
C. At least 2 samples per building shall be from an ice machine or pure cold-water source.
D. At least 2 sample locations per building shall be from a pure hot water source (i.e. no mixing valve present) E. If the building water outlet inventory includes hot, cold, and mixed valve sources, each source shall be sampled.
F. If the building water outlet inventory is less than 20 outlets then 50% of the total potential locations shall be sampled.
G. Each quarter samples shall be randomized and not repeated from the previous quarter sample locations.
H. Each quarter a non-potable water sample shall be pulled from each of the following sources: cooling tower basin & chiller common header.
2.1 Shipping Samples to Laboratory and Lab Testing
2.1.1 Lab Testing shall be performed at a CDC Elite certified analytical laboratory as stated in the VHA Directive 1061 requirements. (i.e. A2LA, NELAP accreditation).
2.1.2. The Contractor shall ensure that samples collected for laboratory analysis are maintained under positive control, have appropriate documented chain-of-custody, are packed in leak-proof containers, and are shipped overnight to the laboratory.
2.1.3 Samples shall arrive at the laboratory within two days of collection.
2.1.4 The contractor is responsible for all shipping/handling costs and materials.
2.2 Data Management and Reporting
2.2.1 Chain of Custody, Certified Laboratory Analysis, and Executive summary shall be type written and electronically submitted to the Engineering Compliance and other required recipients identified after award.
2.2.2 Chain of Custody shall provide all field obtained information, specific location information, and lab results. Only legible and type written reports will be accepted.
2.2.3 COR may make reasonable requests for hard copies as required and at no additional cost to the Government.
2.2.4 The contractor shall document all field test parameters, maintain sampling data electronically and in a format readily accessible.
2.2.5 If collection of samples and field testing occurs over more than one site visit per quarter, the contractor shall submit a quarterly summary report in addition to individual analysis reports.
2.2.6 The contractor shall submit an annual report summarizing the sample results over the previous four quarters of the fiscal year.
2.2.7 The contractor shall review the lab results and notify the VAPAHCS POCs immediately upon detectable legionella reported in the laboratory results by phone and email.
2.2.8 The contractor shall submit the reports within 5 days of lab testing completion.
2.3 Cooling Tower Legionella Testing
2.3.1 Quarterly legionella testing will be performed at all cooling towers at Palo Alto, Livermore, and Menlo Park Divisions (see addendum B “Cooling Towers)
2.3.2 Testing results will be provided to the COR, COR alternatives, and Engineering Compliance Office.
2.3.3 Contractor will notify individual HVAC supervisors at each station upon arrival for cooling tower sampling.
2.3.4 All sampling, field and lab testing, data management & reporting shall adhere to sections 2.1 through 2.3 requirements.
CONTRACTOR PERSONNEL REQUIREMENTS AND QUALIFICATIONS
3.0 The contractor must meet, at least, the minimal requirements for nationally certified competency of microbial testing of potable and non-potable water sources in a hospital environment.
3.1 The contractor must be able to identify Legionella pneumophila and serotypes by standard microbiology methods.
3.2 The contractor shall have a minimum of 2 years in legionella sampling and testing in a hospital setting, testing staff shall have experience in microbial testing of potable water and are proficient at performing the culture of Legionella species from environmental samples. (NOTE: Rapid testing methods, such as polymerase chain reaction (PCR) and direct fluorescent antibody (DFA), are not recommended for the detection of Legionella in environmental water samples)
3.3 The contractor shall be accredited or certified in environmental testing (i.e. A2LA, NELAP accreditation) and CDC Elite.
IDENTIFICATION BADGES, PARKING, AND SMOKING POLICY
4.0 Contractor staff performing work in and around the hospital shall have easily identifiable uniforms and company logos. Contractors are required to obtain temporary badges from the VA Police desk prior to conducting sampling and testing.
4.1 Contractor staff shall adhere to all VA policies related to road, pedestrian, and smoking policies.
4.2 Contractor and Subcontractor personnel working on VAPAHCS facilities must consent to Background Checks or shall be denied access to the VAPAHCS facilities. Information required to conduct a Background Check includes: full name, driver’s license number and/or social security number, date of birth, and completion of a background check questionnaire.
4.3 Contractors shall ensure their employees and those of their Subcontractors have the proper credentials allowing them to work in the United States. The Contractor shall not be entitled to any compensation for delay or expenses associated with this requirement and are not excused from proceeding with the Contract.
4.4 Department of Veterans Affairs regulations requires Contractor employees to have a VAPAHCS issued Identification Badge and always wear it while at VAPAHCS facilities. ID badges shall be issued by the VAPAHCS security office under its rules for issuance. Contractor personnel shall present a neat appearance and be easily recognized as a Contractor employee by wearing distinctive clothing bearing the name of the company and a VAPAHCS issued ID badge. When an employee leaves the Contractor’s employment, or the Contract is terminated, the employee’s badge shall be returned to COR within 3 working days.
INJURY and ACCIDENT REPORTS
5.0 Contractor shall immediately report to the CO/COR in a manner and on the forms prescribed by the Government, accidents resulting in injury, trauma, death, hazardous exposures, and occupational disease occurred on the VAPAHCS campuses.
5.1 Written reports for incidents shall be provided within five (5) working days and include the cause, what, where, and when the incident occurred.
SAFETY
6.0 During contract performance, the Contractor shall follow Government’s safety policy and standards for safe work practices and take such safety precautions as the VAPAHCS Safety Officer or designee or the CO/COR may determine to be reasonably necessary to protect the lives and health of occupants of the building. The Contractor shall comply with VAPAHCS smoking policy.
6.1 Contractor shall adhere to OSHA, EPA, NFPA Life Safety Codes, and other regulatory requirements. Safety shall be the Contractor’s highest priority. The Contractor shall be solely responsible for compliance with (Federal) OSHA regulations.