Schedule of Items

Schedule of Items
Solicitation No. 127EAX21R0004
PROJECTFSR 141H Reconditioning and Resurfacing
UNITMogollon Rim Ranger District
ITEM NO.DESCRIPTIONMethod of MeasureUNITQTYUNIT PRICETOTAL PRICE
BaseFSR 141H - MP 0.00 to M.P. 4.0
151(01)MobilizationLSQLS1.00$$
201(01)Clearing and De-LimbingCQMI4.00$$
211(01)Roadway Obliteration to Close RoadsCQEA2.00$$
301(01)4Load, Haul and Spread 4" aggregate base, compaction method A, (Government Source)CQMI3.92$$
301(01)6Load, Haul and Spread 6" aggregate base, compaction method A, (Government Source)CQMI0.08$$
303(01)Roadway and Ditch ReconditioningCQMI4.00$$
602(01)18Install 18in X 30ft Galvonized CMP, 16 GuageCQEA2.00$$
602(01)24Remove 18in X 30ft Galvonized CMP, 16 Guage and Replace with 24in x 30ft Galvonized CMP, 16 GuageCQEA1.00$$
301(02)10Load, Haul and Spread 10 yds of aggregate base, compaction method A, (Government Source) to obtain an additional 4" of cover over the installed culvert, tapering down to the original road grade over a length of 50' on each side of the culvert.CQEA3.00$$
Base Total w/ Mobilization$ - 0
Option 1FSR 141H - M.P. 4.0 to M.P. 4.5
301(02)4Load, Haul and Spread 4" aggregate base, compaction method A, (Government Source)CQMI0.50$$
303(02)Roadway and Ditch ReconditioningCQMI0.50$$
201(01)Clearing and De-LimbingCQMI0.50$$
Option 1 Total$ - 0
Option 2FSR 141H - M.P. 4.5 to M.P. 5.0
301(02)4Load, Haul and Spread 4" aggregate base, compaction method A, (Government Source)CQMI0.50$$
303(02)Roadway and Ditch ReconditioningCQMI0.50$$
201(01)Clearing and De-LimbingCQMI0.50$$
Option 2 Total$ - 0
Option 3FSR 141H - Culvert Installation MP 4.91
602(02)18Remove & Replace 18in X 30ft Galvonized CMP, 16 GuageCQEA1.00$$
301(02)10Load, Haul and Spread 10 yds of aggregate base, compaction method A, (Government Source) to obtain an additional 4" of cover over the installed culvert, tapering down to the original road grade over a length of 50' on each side of the culvert.CQEA1.00$$
Option 3 Total$ - 0
Option 4FSR 141H - M.P. 5.0 to M.P. 5.34 and FSR 123 from M.P. 0.11 to 0.0
301(02)4Load, Haul and Spread 4" aggregate base, compaction method A, (Government Source)CQMI0.50$$
303(02)Roadway and Ditch ReconditioningCQMI0.50$$
201(01)Clearing and De-LimbingCQMI0.34$$
Option 4 Total$ - 0
Option 5FSR 141H - Culvert Installation MP 5.29
602(01)30Remove & Replace 30in X 30ft Galvonized CMP, 16 GuageCQEA1.00$$
301(02)10Load, Haul and Spread 10 yds of aggregate base, compaction method A, (Government Source) to obtain an additional 4" of cover over the installed culvert, tapering down to the original road grade over a length of 50' on each side of the culvert.CQEA1.00$$
Option 5 Total$ - 0
Option 6FSR 141 - M.P. 7.48 to M.P. 7.98
301(02)4Load, Haul and Spread 4" aggregate base, compaction method A, (Government Source)CQMI0.50$$
303(02)Roadway and Ditch ReconditioningCQMI0.50$$
Option 6 Total$ - 0
Option 7FSR 141 - M.P. 6.98 to M.P. 7.48
301(03)4Load, Haul and Spread 4" aggregate base, compaction method A, (Government Source)CQMI0.50
303(03)Roadway and Ditch ReconditioningCQMI0.50
Option 7 Total$ - 0
Base + Options Total w/ Mobilization$ - 0