Attachment 7 - FSR 141H Drawings.pdf
PDF 3 MB Posted
- Solicitation number
- 127EAX21R0004
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
120°
60°
TYPICAL CROSS-SECTION WITH WITH CULVERT
TYPICAL CULVERT SKEW ON CENTER OF ROAD
5% GRADE MINIMUM
DO NOT RAISE OUTLET ABOVE
ORIGINAL GROUND OR STREAMBED.
CENTER LINE OF ROAD
NOTE :
AN ADDITIONAL 10 YARDS OF SURFACE MATERIAL WILL BE PLACED OVER EACH RECONSTRUCTED CULVERT PER THE
SCHEDULE. THE ADDITIONAL MATERIAL WILL HAVE A COMPACTED THICKNESS OF 4 INCHES OVER THE CULVERT AND
WILL BE EVENLY TAPERED OVER A LENGTH OF 50' ON EACH SIDE OF THE CULVERT BACK TO THE ORIGINAL ROAD
GRADE.
PROJECT LOCATION
PAGE OF1 9
RECOMMENDED BY:
APPROVED:
FOREST ENGINEER
DISTRICT RANGER DATE
DATE
DIRECTOR OF ENGINEERING
DATE
FOREST SUPERVISOR DATE
RO FACILITIES PROGRAM MANAGER
DATE
INDEX OF SHEETS
SHEET SHEET TITLE PAGE
G-01 COVER SHEET 1
G-02 VICINITY MAP 2
G-03 GENERAL NOTES 3
C-01 TYPICAL ROADWAY DETAILS 4
C-02 TYPICAL DITCH AND ROAD DETAILS 5
C-03 TYPICAL ROLLING DIP DETAILS 6
C-04 TYPICAL CULVERT DETAILS 7
C-05 WORK DESCRIPTION 8
C-06 WORK DESCRIPTION 9
N/A
N/A
N/A
N/A
N/A
N/A
N/A N/A
VICINITY MAP
TRAVEL DIRECTIONS:
UNITED STATES DEPARTMENT OF AGRICULTURE
FOREST SERVICE
FSR 141H: From Flagstaff, AZ (Coconino SO 1824 s. Thompson St.), From
Parking lot turn left toward S Thompson St. Travel 0.1 miles, and turn left on
University Ave. Travel 0.30 miles on University Ave, and turn right on S.
Woodland Village Blvd. Proceed on Woodlands Village for 0.8 miles. Turn
Right on Beulah Blvd., and continue for 0.3 miles. At Lake Mary Road (FH3) turn left and continue for 53.6 miles until you reach AZ-87 intersection. At the intersection turn right onto AZ-87 and proceed for 1.1 miles. Turn left onto FSR
141 and continue for 8 miles. FSR 141H and the Start of Contract will be on your left.
Pit: The proposed material source is the Cinch Hook Pit located off of AZ-87 and AZ-260 intersection (See attached map - Sheet G-03).
3/9 /21
:3
9 N W
AR
NK
E C:
\U
SE
RS
\N
W
AR
NK
E\
BO
X\
CO
NT
RA
CT
A
DM
IN
\C
OC
ON
IN
O\
FY
\W
PA
P
E
NG
M
RR
D
- C
ON
4F
RI
F
SR
H
RE
SU
RF
AC
IN
G\
AC
AD
-D
W
GS
\F
SR
1H
D
RA
W
IN
GS
.D
W G
FSR 141H RECONDITIONING
AND RESURFACING PROJECT
(R03) SOUTHWESTERN REGION
COCONINO NATIONAL FOREST
COCONINO COUNTY
ARIZONA
COC-3
I-40 FLAGSTAFF, AZ
I-40
I-17 nwarnke Typewritten Text for John O'Brien
DRAWING TITLE
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
3/9 /21
:3
9 N W
AR
NK
E C:
\U
SE
RS
\N
W
AR
NK
E\
BO
X\
CO
NT
RA
CT
A
DM
IN
\C
OC
ON
IN
O\
FY
\W
PA
P
E
NG
M
RR
D
- C
ON
4F
RI
F
SR
H
RE
SU
RF
AC
IN
G\
AC
AD
-D
W
GS
\F
SR
1H
D
RA
W
IN
GS
.D
W G;
R3
SOUTHWESTERN REGION
FSR 141H
RECONDITIONING AND
RESURFACING
PROJECT
COCONINO NATIONAL
FOREST
MOGOLLON RIM RANGER
DISTRICT
VICINITY MAP
12/8/2020
MARC BURKETT
MARC BURKETT
N. WARNKE
G-02
9 2
AutoCAD SHX Text
PROJECT NAME
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
3/9 /21
:3
9 N W
AR
NK
E C:
\U
SE
RS
\N
W
AR
NK
E\
BO
X\
CO
NT
RA
CT
A
DM
IN
\C
OC
ON
IN
O\
FY
\W
PA
P
E
NG
M
RR
D
- C
ON
4F
RI
F
SR
H
RE
SU
RF
AC
IN
G\
AC
AD
-D
W
GS
\F
SR
1H
D
RA
W
IN
GS
.D
W G;
R3
SOUTHWESTERN REGION
FSR 141H
RECONDITIONING AND
RESURFACING
PROJECT
COCONINO NATIONAL
FOREST
MOGOLLON RIM RANGER
DISTRICT
GENERAL NOTES
12/8/2020
MARC BURKETT
MARC BURKETT
N. WARNKE
G-03
GENERAL NOTES:
1. THE SPECIFIED SOURCE OF CRUSHED AGGREGATE SURFACING MATERIAL FOR THE FSR 141H
RECONDITIONING AND RESURFACING PROJECT WILL BE AVAILABLE AT CINCH HOOK PIT,
LOCATED AT THE JUNCTION OF AZ-87 AND AZ-260. THE PROJECT STARTS AT THE JUNCTION OF
FSR 141H AND FSR 141, MILE POINT (M.P.) 0.00. THE PROJECT CONTINUES EAST ON FSR 141H
FOR 4.00 MILES TO M.P. 4.00. OPTION 1 OF THE PROJECT BEGINS AT M.P. 4.00 OF FSR 141H AND
CONTINUES TO M.P. 4.50. OPTION 2 BEGINS AT M.P. 4.50 OF FSR 141H AND END AT M.P. 5.00.
OPTION 3 IS A CULVERT REMOVAL AND REPLACEMENT AT M.P. 4.91 OF FSR 141H. OPTION 4
BEGINS AT M.P. 5.00 ON FSR 141H, THEN AT M.P. 5.34 AND THE INTERSECTION OF FSR 123 AND
FSR 141H CONTINUES SOUTH FOR 0.11 MILES ON THE FSR 123 TO THE INTERSECTION OF FSR 123
AND FSR 300. OPTION 5 IS A CULVERT REMOVAL AND REPLACEMENT AT M.P. 5.29 OF FSR 141H.
OPTION 6 OF THE CONTRACT BEGINS AT M.P. 7.48 OF FSR 141 AND CONTINUE SOUTH FOR 0.50
MILES TO M.P. 7.98. OPTION 7 OF THE CONTRACT BEGINS AT M.P. 6.98 OF FSR 141 AND
CONTINUES SOUTH FOR 0.50 MILES TO M.P. 7.48.
2. REMOVE ALL LOOSE ROCK FROM ROADWAY DITCHES. ROCK MAY BE USED AS RIPRAP IN
CULVERT CATCHMENTS, LOW WATER CROSSINGS, AND ROLLING DIP OUTLFOW.
3. CONTRACTOR IS RESPONSIBLE FOR MAINTENANCE OF ALL HAUL ROADS USED, BEFORE,
DURING, AND AFTER OPERATIONS. NO SEPARATE PAYMENT WILL BE MADE FOR THIS REQUIRED
MAINTENANCE.
4. CONTRACTOR SHALL MAINTAIN/CLEAN AND SHAPE ALL EXISTING LEAD-OFF DITCHES AND ALL
CULVERT RELIEF DITCHES FOR THEIR ENTIRE LENGTH. THIS WORK SHALL BE CONSIDERED
INCIDENTAL TO THE PROJECT.
5. CONTRACTOR SHALL MAINTAIN ALL EXISTING DRAINAGE FEATURES, (IE: LEAD OUTS, FURROW
DITCHES, DITCHES, ETC.) INCLUDING THOSE THAT ARE NOT FLAGGED OR SHOWN ON THE PLANS.
ALL USABLE MATERIAL SHALL BE PLACED ON THE ROAD.
6. CONTRACTOR SHALL NOT PLACE CRUSHED AGGREGATE IN THE FLOW LINE OF LOW WATER
CROSSINGS.
7. THE ROADWAY SPECIFIED FOR RESURFACING WILL BE RECONDITIONED PRIOR TO THE
PLACEMENT OF AGGREGATE SURFACING. ALL SEGMENTS OF THE RECONDITIONED ROAD SHALL
BE APPROVED IN WRITING BY THE COR PRIOR TO SURFACE PLACEMENT.
8. ALL CULVERTS SHALL HAVE A MINIMUM OF ONE FOOT OF COVER, NOT INCLUDING SURFACING, MEASURED FROM THE TOP OF THE CULVERT.
9. SUBMISSION OF A TRAFFIC CONTROL PLAN MUST BE REVIEWED AND APPROVED BY THE COR 10
BUSINESS DAYS PRIOR TO THE START OF EARTH MOVING CONSTRUCTION.
10. CONTRACTOR SHALL PROVIDE, ERECT, AND MAINTAIN ALL NECESSARY BARRICADES, SUITABLE
AND SUFFICIENT WARNING LIGHTS, DANGER SIGNALS, AND WARNING SIGNS AND FURNISH ALL
NECESSARY TRAFFIC CONTROL FLAGGING. ALL NECESSARY PRECAUTIONS SHALL BE TAKEN
FOR THE PROTECTION OF THE WORK AND SAFETY OF THE PUBLIC. ALL SIGNS AND DEVICES
REMAIN THE PROPERTY AND RESPONSIBILITY OF THE CONTRACTOR. THE CONTRACTOR IS
RESPONSIBLE FOR ALL TRAFFIC CONTROL SIGNS AS REQUIRED BY MUTCD STANDARDS.
11. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ANY NECESSARY PERMITS FOR THIS TYPE
OF CONSTRUCTION, INCLUDING ANY ASSOCIATED FEES.
12. NO GOVERNMENT WATER SOURCE IS AVAILABLE AT THE PROJECT SITE. THE NEAREST
SOURCE IS LOCATED IN THE CITY OF PAYSON.
13. VEHICULAR TRAFFIC SHALL NOT BE OBSTRUCTED FOR PERIODS IN EXCESS OF TWENTY
MINUTES.
14. BERMS OF MATERIALS OR OTHER OBSTRUCTIONS CAUSED BY MAINTENANCE OPERATIONS
SHALL BE REMOVED PRIOR TO THE END OF EACH DAY'S OPERATIONS AND ARE NOT TO REMAIN
OVERNIGHT, WEEKENDS, AND HOLIDAYS. IF, DUE TO WEATHER CONDITIONS OR EQUIPMENT
BREAKDOWNS, BERMS OR OBSTRUCTIONS CANNOT BE REMOVED, THEY SHALL BE SIGNED AS A
HAZARD AND VISIBLY ILLUMINATED AT NIGHT.
15. CONTRACTOR SHALL FURNISH ALL LABOR, EQUIPMENT, SUPERVISION, SIGNING, TRANSPORTATION, OPERATING SUPPLIES, AND INCIDENTALS NECESSARY TO PERFORM THE REQUIRED ROAD
MAINTENANCE.
16. ALL CONSTRUCTION VEHICLES SHALL BE CLEAN AND FREE OF WEEDS AND OTHER DELETERIOUS
MATERIALS.
17. CONTRACTOR SHALL FURNISH ALL EQUIPMENT/PERSONNEL AS REQUIRED BY THE FIRE PLAN(S).
18. CONTRACTOR'S EQUIPMENT PROVIDED FOR THE PERFORMANCE OF THE WORK SHALL BE OF THE
APPROPRIATE SIZE, TYPE AND NUMBER, AND IN GOOD WORKING CONDITION, SUITABLE FOR THE WORK
REQUIRED. OPERATORS SHALL BE COMPETENT AND EXPERIENCED IN THE OPERATION OF THE
EQUIPMENT. EQUIPMENT SHALL HAVE SAFETY SIGNING AND APPURTENANCES REQUIRED BY OSHA
SUCH AS ROLLOVER PROTECTION (ROPS), FIRE SUPPRESSION DEVICES, LIGHTS AND SLOW MOVING
VEHICLE SIGNS. GRADING EQUIPMENT MUST BE CAPABLE OF CUTTING, CROWNING AND SHAPING
OPERATIONS NECESSARY TO SUCCESSFULLY PERFORM THE TASKS OF THIS CONTRACT. THE
CONTRACTOR'S EQUIPMENT SHALL BE MADE AVAILABLE FOR INSPECITON PRIOR TO NOTICE TO
PROCEED. IF AT ANY TIME DURING THE COURSE OF THIS CONTRACT, THE EQUIPMENT IS DEEMED
UNSATISFACTORY OR UNSAFE, THE CONTRACTING OFFICER MAY REQUIRE REMOVAL AND A
SATISFACTORY REPLACEMENT AT NO EXPENSE TO THE GOVERNMENT. ANY MOVEMENT OR
TRANSPORTATION OF EQUIPMENT TO OR FROM WORK AREAS, TO REPAIR OR REPLACE EQUIPMENT, OR FOR THE CONTRACTOR'S CONVENIENCE SHALL BE AT THE CONTRACTOR'S EXPENSE.
19. PUBLIC AND PRIVATE PROPERTY ALONG AND ADJACENT TO THE PROJECT SHALL NOT BE DAMAGED.
ANY DAMAGED OR DESTROYED PROPERTY SHALL BE PROMPTLY REPAIRED OR REPLACED AT THE
CONTRACTOR'S EXPENSE. WHEN OPERATING ADJACENT TO RAILWAYS, TELEGRAPH, TELEPHONE,
POWER LINES OR ANY OTHER TYPE OF PUBLIC UTILITY, THE CONTRACTOR SHALL MAKE ALL
NECESSARY ARRANGEMENTS TO PREVENT DAMAGE AND SHALL ASSUME ALL RESPONSIBILITIES
SHOULD ANY DAMAGE OCCUR.
20. CONTRACTOR'S OPERATION SHALL BE CONDUCTED SO AS TO PREVENT SILTATION OF STREAM BEDS, LAKES, STOCK TANKS OR RESERVOIRS. POLLUTANTS SUCH AS FUELS, LUBRICANTS, BITUMEN, AND
ANY OTHER HARMFUL MATERIAL SHALL NOT BE DISCHARGED ON FOREST SERVICE LANDS.
21. CONTRACTOR IS RESPONSIBLE FOR CONTACTING BLUESTAKE (800-782-5348) PRIOR TO WORK IF
THERE IS ANY RISK OF HITTING UNDERGROUND UTILITIES WHILE PERFORMING ANY EXCAVATION
WORK REQUIRED AS PART OF THIS CONTRACT.
22. RESHAPE AGGREGATE SURFACE PER THE TYPICAL DETAILS. REMOVE AND/OR REPAIR
IRREGULARITIES IN THE SURFACE. COMPACT PER FSSS SECTION 301.05 METHOD “A” UNTIL ALL
VISUAL DISTURBANCES CEASE.
23. RECONDITIONING AT CURVES SHALL BE COMPLETE PER PAGE C-01 " TYPICAL CROSS-SECTION WITH
AGGREGATE SURFACING AND ROADWAY DITCH" TO ENSURE A MINIMUM CROSS SLOPE OF 3%.
24. CAUTION: ADDITIONAL ROCK HEADWALLS MAY EXIST THROUGHOUT THE PROJECT WORK AREA, PROTECT IN PLACE.
25. FEDERALLY THREATENED/ ENDANGERED SPECIES, FOREST SERVICE SENSITIVE SPECIES, OR BALD
OR GOLDEN EAGLES ARE NESTING WITHIN THE VICINITY OF 0.5 MILES OF THE PROJECT AREA.
SEASONAL RESTRICTIONS FOR OPERATIONS ARE EFFECTIVE DURING THE BREEDING SEASON (MARCH
1 TO SEPTEMBER 1) TO PREVENT DISTURBANCE OF THE AFFECTED SPECIES.
AutoCAD SHX Text
PROJECT NAME
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
NATURAL GROUND
ROAD TEMPLATE
TRAVELED WAY
12' MIN - 14' MAX
TYPICAL CROSS-SECTION WITH AGGREGATE SURFACING
AND WITHOUT ROADWAY DITCH
CLEARING WIDTH
CLEARING LIMITS WILL BE WHICHEVER IS
GREATER: SHOULDER +6 FT OR HEAL/TOE OF
SLOPE +3 FT.
M
I N
4" MIN. COMPACTED DEPTH
M
IN
O U
T S
L O
P E
TYPICAL CROSS-SECTION WITH AGGREGATE SURFACING
AND ROADWAY DITCH
NATURAL GROUND
4" MIN. COMPACTED DEPTH
ROAD TEMPLATE
M
IN 3%
INSLOPE
TRAVELED WAY
12' MIN - 14' MAX
3'
M
I N
TYPICAL CROSS-SECTION WITH AGGREGATE SURFACING,
CROWN, AND ROADWAY DITCH
CLEARING WIDTH
M
I
N TRAVELED WAY
12' MIN - 14' MAX
MIN 3% MIN 3%
NATURAL GROUND
ROAD TEMPLATE
4" MIN. COMPACTED DEPTH
3'
CLEARING LIMITS WILL BE WHICHEVER IS
GREATER: SHOULDER +6 FT OR HEAL/TOE OF
SLOPE +3 FT.
TYPICAL ROADWAY
DITCH
CLEARING WIDTH
TYPICAL ROADWAY
DITCH
CLEARING LIMITS WILL BE WHICHEVER IS
GREATER: SHOULDER +6 FT OR HEAL/TOE OF
SLOPE +3 FT.
INTERSECTION GRADING AND SHAPING
INTERSECTING ROAD
4" AGGREGATE SURFACE
DITCH FLOW LINE
C
L
MAINTAIN EXISTING DITCH FLOW LINES
TO ENSURE POSITIVE DRAINAGE AWAY
FROM THE EXISTING INTERSECTING
ROAD.
R O
A D
W I D
T H
DRAWING TITLE
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
3/9 /21
:3
9 N W
AR
NK
E C:
\U
SE
RS
\N
W
AR
NK
E\
BO
X\
CO
NT
RA
CT
A
DM
IN
\C
OC
ON
IN
O\
FY
\W
PA
P
E
NG
M
RR
D
- C
ON
4F
RI
F
SR
H
RE
SU
RF
AC
IN
G\
AC
AD
-D
W
GS
\F
SR
1H
D
RA
W
IN
GS
.D
W G;
R3
SOUTHWESTERN REGION
FSR 141H
RECONDITIONING AND
RESURFACING
PROJECT
COCONINO NATIONAL
FOREST
MOGOLLON RIM RANGER
DISTRICT
TYPICAL ROADWAY
DETAILS
12/8/2020
MARC BURKETT
MARC BURKETT
N. WARNKE
C-01
AutoCAD SHX Text
PROJECT NAME
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
* DITCH
TOP OF CUT
W
I
N
G
D
I
T
C
H
L
E
A
O
F
T
C
H
GRADE
B L O
C K
D I T
C H
W
I
N
G
D
I
T
C
H
F L O
W
T
L
L
GRADE
GRADE
E X
I S
T I N
G
D
R A
I N
T
L
L
T
P
C
U
T
F
L
O
W
25' TRANSITION
EX. SHOULDER
SHOULDER
3:1
SLOPE
2' MIN
INLET BASIN
G
R
A
T
R
A
I N
INSTALL DITCH BLOCK
(IF NECESSARY)
NATURAL GROUND
CLEARING & SEEDING
15' (TYP.)
ROADBED
CLEARING &
SEEDING
10'
WIDTH
12"
MIN
EXCAVATED
MATERIAL
CLEARING &
SEEDING
12"
8"
24"
MIN
24" MIN
OR 6"+D
ROADBED EDGE
COMPACTED
TO 95%±
LEAD OFF DITCH
FLAT BOTTOM DITCH
WING DITCH
DITCH BLOCK
SAMPLE DITCH TYPICAL
DITCH TYPICAL NOTES
1. THE SLOPE OF LEAD-OFF DITCHES SHALL BE CONSTRUCTED TO A MINIMUM OF -1% SLOPE WITHIN THE PREVIOUSLY
EXISTING DISTURBED SOIL.
2. DITCH BLOCK WILL NOT BE REQUIRED WHEN INLET BASIN IS IN A SAG.
3. DITCH BLOCK ELEVATION SHALL BE 4" LOWER THAN THE ADJACENT SUBGRADE ELEVATION.
FSR 123 AND 141H INTERSECTION GRADING AND SHAPING
INTERSECTING ROAD FSR 141H
4" AGGREGATE SURFACE
DITCH FLOW LINE
C
L
MAINTAIN EXISTING DITCH FLOW LINES
TO ENSURE POSITIVE DRAINAGE AWAY
FROM THE EXISTING INTERSECTING
ROAD.
R O
A D
W I D
T H
NOTE :
THE ENTIRE INTERSECTION WILL WILL BE GRAVELED TO ENSURE A SAFE TRANSITION CONTINUING NORTH ON THE FSR
123 ROAD.
FSR 123 ROAD
FSR 123 ROAD
TAPER GRAVEL 50' PAST THE
INTERSECTION TO CREATE A
SMOOTH TRANSITION PAST THE
INTERSECTION ON FSR 123.
DRAWING TITLE
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
3/9 /21
:3
9 N W
AR
NK
E C:
\U
SE
RS
\N
W
AR
NK
E\
BO
X\
CO
NT
RA
CT
A
DM
IN
\C
OC
ON
IN
O\
FY
\W
PA
P
E
NG
M
RR
D
- C
ON
4F
RI
F
SR
H
RE
SU
RF
AC
IN
G\
AC
AD
-D
W
GS
\F
SR
1H
D
RA
W
IN
GS
.D
W G;
R3
SOUTHWESTERN REGION
FSR 141H
RECONDITIONING AND
RESURFACING
PROJECT
COCONINO NATIONAL
FOREST
MOGOLLON RIM RANGER
DISTRICT
TYPICAL DITCH AND
ROAD DETAILS
12/8/2020
MARC BURKETT
MARC BURKETT
N. WARNKE
C-02
AutoCAD SHX Text
* DITCH
AutoCAD SHX Text
* DITCH
AutoCAD SHX Text
ROADBED
AutoCAD SHX Text
PROJECT NAME
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
M
X
X
X
SUBGRADE
0.5-2.5'
NOT TO SCALE
AB B
A
TOE
(H) INSIDE
10'
10'
START
DIP
END
DIP
CREST
DITCH/BOTTOM
MIDPOINT
DRAIN LINE
0-10% ANGLE
(H) OUTSIDE
L
STATIONED ON PLANS
P
D
O
W
N
G
R
A
D
E
ROLLING DIP NOTES:
1. THE CROSS SLOPE OF THE ROADBED SHALL BE MAINTAINED
THROUGH THE DIP.
2. THE DRAIN LINE SHALL BE SKEWED OFF OF THE ROADBED TO
ALLOW POSITIVE DRAINAGE, UNLESS OTHERWISE FLAGGED.
3. FOR DIPS ON AGGREGATE SURFACE ROADS, ADD DEPTH OF
COMPACTED SURFACE TO DIMENSION (H).
4. ROLLING DIP CONSTRUCTION, COMPACTION AND TOLERANCES
SHALL BE IN ACCORDANCE WITH FSSS SECTION 301.05, METHOD A.
5. ALL DITCHES ASSOCIATED WITH ROLLING DIP STRUCTURES SHALL
BE MAINTAINED WITHIN THE PROJECT SITE.
6. DIRECTION OF EXISTING WATER FLOW SHALL BE MAINTAINED.
NOT TO SCALE
ROLLING DIP CONSTRUCTION DIMENSIONS
TYPE "1"
%GRADE
LENGTH
DEPTH (H)
A B
OUTSIDE
EDGE
INSIDE
EDGE
0-4% 18 55 0.9' 0.4'
5-8% 16 85 0.8' 0.3'
9-12% 15 110 0.7' 0.3'
DRAWING TITLE
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
3/9 /21
:3
9 N W
AR
NK
E C:
\U
SE
RS
\N
W
AR
NK
E\
BO
X\
CO
NT
RA
CT
A
DM
IN
\C
OC
ON
IN
O\
FY
\W
PA
P
E
NG
M
RR
D
- C
ON
4F
RI
F
SR
H
RE
SU
RF
AC
IN
G\
AC
AD
-D
W
GS
\F
SR
1H
D
RA
W
IN
GS
.D
W G;
R3
SOUTHWESTERN REGION
FSR 141H
RECONDITIONING AND
RESURFACING
PROJECT
COCONINO NATIONAL
FOREST
MOGOLLON RIM RANGER
DISTRICT
TYPICAL ROLLING DIP
DETAILS
12/8/2020
MARC BURKETT
MARC BURKETT
N. WARNKE
C-03
AutoCAD SHX Text
ROAD GRADE LINE
AutoCAD SHX Text
GRAVEL SURFACE
AutoCAD SHX Text
ROLLING DRAINAGE DIP PROFILE
AutoCAD SHX Text
ROLLING DRAINAGE DIP PERSPECTIVE
AutoCAD SHX Text
PROJECT NAME
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
120°
60°
TYPICAL CROSS-SECTION WITH WITH CULVERT
TYPICAL CULVERT SKEW ON CENTER OF ROAD
ORIGINAL GROUND
OR STREAM BED
ORIGINAL GROUND
OR STREAM BED
5% GRADE MINIMUM
DO NOT RAISE OUTLET ABOVE
ORIGINAL GROUND OR STREAMBED.
CENTER LINE OF ROAD
ROAD SURFACE
SUBGRADE MUST BE
12" ABOVE THE
HIGHEST EXPOSED
EDGE OF THE
CULVERT.
NOTE :
AN ADDITIONAL 10 YARDS OF SURFACE MATERIAL WILL BE PLACED OVER EACH RECONSTRUCTED CULVERT PER THE
SCHEDULE. THE ADDITIONAL MATERIAL WILL HAVE A COMPACTED THICKNESS OF 4 INCHES OVER THE CULVERT AND
WILL BE EVENLY TAPERED OVER A LENGTH OF 50' ON EACH SIDE OF THE CULVERT BACK TO THE ORIGINAL ROAD
GRADE.
DRAWING TITLE
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
3/9 /21
:3
9 N W
AR
NK
E C:
\U
SE
RS
\N
W
AR
NK
E\
BO
X\
CO
NT
RA
CT
A
DM
IN
\C
OC
ON
IN
O\
FY
\W
PA
P
E
NG
M
RR
D
- C
ON
4F
RI
F
SR
H
RE
SU
RF
AC
IN
G\
AC
AD
-D
W
GS
\F
SR
1H
D
RA
W
IN
GS
.D
W G;
R3
SOUTHWESTERN REGION
FSR 141H
RECONDITIONING AND
RESURFACING
PROJECT
COCONINO NATIONAL
FOREST
MOGOLLON RIM RANGER
DISTRICT
TYPICAL CULVERT
DETAILS
12/8/2020
MARC BURKETT
MARC BURKETT
N. WARNKE
C-04
AutoCAD SHX Text
PROJECT NAME
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
3/9 /21
:3
9 N W
AR
NK
E C:
\U
SE
RS
\N
W
AR
NK
E\
BO
X\
CO
NT
RA
CT
A
DM
IN
\C
OC
ON
IN
O\
FY
\W
PA
P
E
NG
M
RR
D
- C
ON
4F
RI
F
SR
H
RE
SU
RF
AC
IN
G\
AC
AD
-D
W
GS
\F
SR
1H
D
RA
W
IN
GS
.D
W G;
R3
SOUTHWESTERN REGION
FSR 141H
RECONDITIONING AND
RESURFACING
PROJECT
COCONINO NATIONAL
FOREST
MOGOLLON RIM RANGER
DISTRICT
WORK DESCRIPTION
12/8/2020
MARC BURKETT
MARC BURKETT
N. WARNKE
C-05
WORK DESCRIPTION - FSR 141H
MILE POINT 0.00 - 5.57: RECONDITION ROAD IN ACCORDANCE WITH FP-14 SECTION 303. RESURFACE
ROAD IN ACCORDANCE WITH THE FP-14 SPECIFICATION SECTION 301, LOAD, HAUL, SPREAD, AND
COMPACT AGGREGATE (USING COMPACTION METHOD A) TO A MINIMUM DEPTH OF 4" IN ACCORDANCE
WITH THE FP-14 AND FSSS SPECIFICATIONS SECTION 301 UTILIZING CINCH HOOK PIT AGGREGATE
STOCKPILE, LOCATED SOUTH OF THE AZ-87 AND AZ-260 JUNCTION.
M.P WORK DESCRIPTION.
0.00 BEGIN RECONDITIONING OF ROAD AND RESURFACING WITH 4” (COMPACTED DEPTH) OF CRUSHED AGGREGATE SURFACING ACROSS A ROAD WIDTH OF 12' to 14' MAX AND CLEANING AND SHAPING OF ROADSIDE DITCHES ON BOTH SIDES, STARTING AT THE JUNCTION OF FSR 141 AND FSR 141H.
0.00 BEGIN CLEARING AND DE-LIMBING 5' FROM THE EDGE OF THE TRAVELED WAY FOLLOWING PARALLEL TO
THE TRAVELED WAY ON THE LEFT AND THE RIGHT.
0.03 MAINTAIN EXISTING LEAD OFF DITCH ON THE LEFT.
0.09 PROTECT IN PLACE EXISTING 18" CMP CULVERT. MAINTAIN INLET, OUTLET, AND LEAD OFF DITCH.
0.16 PROTECT IN PLACE EXISTING 18" CMP CULVERT. MAINTAIN INLET, OUTLET, AND LEAD OFF DITCH.
0.29 MAINTAIN EXISTING LEAD OFF DITCH ON THE RIGHT.
0.34 MAINTAIN EXISTING LEAD OFF DITCH ON THE RIGHT.
0.44 PROTECT IN PLACE EXISTING 18" CMP CULVERT. MAINTAIN INLET, OUTLET, AND LEAD OFF DITCH.
0.60 PROTECT IN PLACE EXISTING 18" CMP CULVERT. MAINTAIN INLET, OUTLET, AND LEAD OFF DITCH.
0.60 BEGIN INCREASE OF AGGREGATE SURFACING TO 6" COMPACTED.
0.65 END INCREASE OF AGGREGATE SURFACING TO 6" COMPACTED. CONTINUE AGGREGATE SURFACING WITH
4" COMPACTED.
0.73 BEGIN INCREASE OF AGGREGATE SURFACING TO 6" COMPACTED.
0.75 END INCREASE OF AGGREGATE SURFACING TO 6" COMPACTED. CONTINUE AGGREGATE SURFACING WITH
4" COMPACTED.
0.82 MAINTAIN EXISTING LEAD OFF DITCH ON THE LEFT.
0.83 MAINTAIN EXISTING LEAD OFF DITCH ON THE RIGHT.
0.84 MAINTAIN EXISTING LEAD OFF DITCH ON THE LEFT.
0.85 PROTECT IN PLACE EXISTING 18" CMP CULVERT. MAINTAIN INLET, OUTLET, AND LEAD OFF DITCH.
0.92 PROTECT IN PLACE EXISTING 18" CMP CULVERT. MAINTAIN INLET, OUTLET, AND LEAD OFF DITCH.
1.08 PROTECT IN PLACE EXISTING 18" CMP CULVERT. MAINTAIN INLET, OUTLET, AND LEAD OFF DITCH.
1.17 PROTECT IN PLACE EXISTING 18" CMP CULVERT. MAINTAIN INLET, OUTLET, AND LEAD OFF DITCH.
1.36 PROTECT IN PLACE EXISTING 18" CMP CULVERT. MAINTAIN INLET, OUTLET, AND LEAD OFF DITCH
1.46 PROTECT IN PLACE EXISTING 18" CMP CULVERT. MAINTAIN INLET, OUTLET, AND LEAD OFF DITCH
1.55 PROTECT IN PLACE EXISTING 18" CMP CULVERT. MAINTAIN INLET, OUTLET, AND LEAD OFF DITCH
1.63 PROTECT IN PLACE EXISTING 18" CMP CULVERT. MAINTAIN INLET, OUTLET, AND LEAD OFF DITCH
1.65 PROTECT IN PLACE EXISTING 18" CMP CULVERT. MAINTAIN INLET, OUTLET, AND LEAD OFF DITCH.
1.70 INSTALL 18" x 32' GALVANIZED CMP CULVERT PIPE AND LEAD OFF DITCH.
1.74 PROTECT IN PLACE EXISTING 18" CMP CULVERT. MAINTAIN INLET, OUTLET, AND LEAD OFF DITCH
1.81 PROTECT IN PLACE EXISTING 18" CMP CULVERT. MAINTAIN INLET, OUTLET, AND LEAD OFF DITCH
1.82 MAINTAIN EXISTING LEAD OFF DITCH ON THE RIGHT.
1.93 PROTECT IN PLACE EXISTING 18" CMP CULVERT. MAINTAIN INLET, OUTLET, AND LEAD OFF DITCH
2.00 MAINTAIN EXISTING LEAD OFF DITCH ON THE LEFT.
2.03 MAINTAIN EXISTING LEAD OFF DITCH ON THE RIGHT.
2.07 MAINTAIN EXISTING LEAD OFF DITCH ON THE LEFT.
2.12 MAINTAIN EXISTING LEAD OFF DITCH ON THE LEFT.
2.19 MAINTAIN EXISTING LEAD OFF DITCH ON THE RIGHT.
2.22 MAINTAIN EXISTING LEAD OFF DITCH ON THE LEFT.
2.28 MAINTAIN EXISTING LEAD OFF DITCH ON THE LEFT.
2.30 MAINTAIN EXISTING LEAD OFF DITCH ON THE RIGHT.
2.33 MAINTAIN EXISTING LEAD OFF DITCH ON THE LEFT.
2.35 MAINTAIN EXISTING LEAD OFF DITCH ON THE LEFT.
2.37 MAINTAIN EXISTING LEAD OFF DITCH ON THE RIGHT.
2.39 PROTECT IN PLACE EXISTING CATTLEGUARD, CLEAN AND MAINTAIN VAULT.
2.41 MAINTAIN EXISTING LEAD OFF DITCH ON THE RIGHT.
2.45 MAINTAIN EXISTING LEAD OFF DITCH ON THE RIGHT.
2.47 MAINTAIN EXISTING LEAD OFF DITCH ON THE LEFT.
2.51 MAINTAIN EXISTING INTERSECTION OF FSR 141H AND FSR 320 ON THE LEFT.
2.56 MAINTAIN EXISTING LEAD OFF DITCH ON THE RIGHT.
2.59 MAINTAIN EXISTING LEAD OFF DITCH ON THE LEFT.
2.63 MAINTAIN EXISTING LEAD OFF DITCH ON THE RIGHT.
2.66 MAINTAIN EXISTING LEAD OFF DITCH ON THE LEFT.
WORK DESCRIPTION - FSR 141H CONTINUED
2.71 MAINTAIN EXISTING INTERSECTION FOR FSR 141H AND FSR 320A ON THE RIGHT.
2.77 MAINTAIN EXISTING INTERSECTION FOR FSR 141H AND FSR 9369T ON THE LEFT.
2.80 MAINTAIN EXISTING LEAD OFF DITCH ON THE RIGHT.
2.81 PROTECT IN PLACE EXISTING 18" CMP CULVERT. MAINTAIN INLET, OUTLET, AND LEAD OFF DITCH.
2.88 PROTECT IN PLACE EXISTING 18" CMP CULVERT. MAINTAIN INLET, OUTLET, AND LEAD OFF DITCH.
2.97 PROTECT IN PLACE EXISTING 18" CMP CULVERT. MAINTAIN INLET, OUTLET, AND LEAD OFF DITCH.
3.02 MAINTAIN EXISTING LEAD OFF DITCH ON THE RIGHT.
3.05 MAINTAIN EXISTING LEAD OFF DITCH ON THE LEFT.
3.07 PROTECT IN PLACE EXISTING 24" CMP CULVERT. MAINTAIN INLET, OUTLET, AND LEAD OFF DITCH.
3.08 MAINTAIN EXISTING LEAD OFF DITCH ON THE RIGHT.
3.09 MAINTAIN EXISTING LEAD OFF DITCH ON THE LEFT.
3.18 PROTECT IN PLACE EXISTING 24" CMP CULVERT. MAINTAIN INLET, OUTLET, AND LEAD OFF DITCH.
3.25 INSTALL ADDITIONAL 18" x 32' GALVANIZED CMP CULVERT PIPE AND LEAD OFF DITCH NEXT TO EXISTING
18" CULVERT.
3.35 PROTECT IN PLACE EXISTING 18" CMP CULVERT. MAINTAIN INLET, OUTLET, AND LEAD OFF DITCH.
3.41 PROTECT IN PLACE EXISTING 18" CMP CULVERT. MAINTAIN INLET, OUTLET, AND LEAD OFF DITCH.
3.56 PROTECT IN PLACE EXISTING 18" CMP CULVERT. MAINTAIN INLET, OUTLET, AND LEAD OFF DITCH.
3.68 REMOVE AND REPLACE EXISTING 18" CMP PIPE WITH A 24" X 36' GALVANIZED CMP PIPE, MAINTAIN
INLET, OUTLET, AND LEAD OFF DITCH.
3.83 PROTECT IN PLACE EXISTING 18" CMP CULVERT. MAINTAIN INLET, OUTLET, AND LEAD OFF DITCH.
3.89 PROTECT IN PLACE EXISTING 18" CMP CULVERT. MAINTAIN INLET, OUTLET, AND LEAD OFF DITCH.
3.97 PROTECT IN PLACE EXISTING 18" CMP CULVERT. MAINTAIN INLET, OUTLET, AND LEAD OFF DITCH.
4.00 END OF BASE CONTRACT. END ROAD RECONDITIONING. END AGGREGATE RESURFACING. END OF
CLEARING AND DE-LIMBING.
MILE POINT 4.00 - 4.50: RECONDITION ROAD IN ACCORDANCE WITH FP-14 SECTION 303. RESURFACE
ROAD IN ACCORDANCE WITH THE FP-14 SPECIFICATION SECTION 301, LOAD, HAUL, SPREAD, AND
COMPACT AGGREGATE (USING COMPACTION METHOD A) TO A MINIMUM DEPTH OF 4" IN ACCORDANCE
WITH THE FP-14 AND FSSS SPECIFICATIONS SECTION 301 UTILIZING CINCH HOOK PIT AGGREGATE
STOCKPILE, LOCATED SOUTH OF THE AZ-87 AND AZ-260 JUNCTION.
M.P WORK DESCRIPTION.
4.00 BEGIN RECONDITIONING OF ROAD AND RESURFACING WITH 4” (COMPACTED DEPTH) OF CRUSHED AGGREGATE SURFACING ACROSS A ROAD WIDTH OF 12' to 14' MAX AND CLEANING AND SHAPING OF ROADSIDE DITCHES ON BOTH SIDES, STARTING AT THE JUNCTION OF FSR 141 AND FSR 141H.
4.00 BEGIN CLEARING AND DE-LIMBING 5' FROM THE EDGE OF THE TRAVELED WAY FOLLOWING PARALLEL TO
THE TRAVELED WAY ON THE LEFT AND THE RIGHT.
4.14 PROTECT IN PLACE EXISTING 36" CMP CULVERT. MAINTAIN INLET, OUTLET, AND LEAD OFF DITCH.
4.22 PROTECT IN PLACE EXISTING 18" CMP CULVERT. MAINTAIN INLET, OUTLET, AND LEAD OFF DITCH.
4.25 END REMOVAL OF BERM OF MATERIAL ON LEFT SIDE OF ROAD CAUSING DRAINAGE OBSTRUCTION.
4.29 MAINTAIN EXISTING INTERSECTION OF FSR 141H AND FSR 501 ON THE LEFT AND THE RIGHT.
4.31 PROTECT IN PLACE EXISTING 18" CMP CULVERT. MAINTAIN INLET, OUTLET, AND LEAD OFF DITCH.
4.43 BEGIN BRUSHING OF CANOPY ON LEFT SIDE TO INCREASE VERTICAL CLEARANCE TO 14'.
4.50 END OF OPTION 1. END ROAD RECONDITIONING. END AGGREGATE RESURFACING. END OF
CLEARING AND DE-LIMBING.
NOTE: ALL CLEANING OF DITCH-LINES, PIPE INLET/OUTLETS ARE INCIDENTAL TO ROAD
RECONDITIONING PER FP-14 SECTION 303 "ROAD RECONDITIONING". ALL USABLE MATERIAL SHALL BE
PLACE ON THE ROAD BED.
WORK DESCRIPTION - FSR 141H OPTION 1
AutoCAD SHX Text
PROJECT NAME
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
3/9 /21
:3
9 N W
AR
NK
E C:
\U
SE
RS
\N
W
AR
NK
E\
BO
X\
CO
NT
RA
CT
A
DM
IN
\C
OC
ON
IN
O\
FY
\W
PA
P
E
NG
M
RR
D
- C
ON
4F
RI
F
SR
H
RE
SU
RF
AC
IN
G\
AC
AD
-D
W
GS
\F
SR
1H
D
RA
W
IN
GS
.D
W G;
R3
SOUTHWESTERN REGION
FSR 141H
RECONDITIONING AND
RESURFACING
PROJECT
COCONINO NATIONAL
FOREST
MOGOLLON RIM RANGER
DISTRICT
WORK DESCRIPTION
12/8/2020
MARC BURKETT
MARC BURKETT
N. WARNKE
C-06
WORK DESCRIPTION - FSR 141H OPTION 2
MILE POINT 4.50 - 5.00: RECONDITION ROAD IN ACCORDANCE WITH FP-14 SECTION 303. RESURFACE
ROAD IN ACCORDANCE WITH THE FP-14 SPECIFICATION SECTION 301, LOAD, HAUL, SPREAD, AND
COMPACT AGGREGATE (USING COMPACTION METHOD A) TO A MINIMUM DEPTH OF 4" IN ACCORDANCE
WITH THE FP-14 AND FSSS SPECIFICATIONS SECTION 301 UTILIZING CINCH HOOK PIT AGGREGATE
STOCKPILE, LOCATED SOUTH OF THE AZ-87 AND AZ-260 JUNCTION.
M.P WORK DESCRIPTION.
4.50 BEGIN RECONDITIONING OF ROAD AND RESURFACING WITH 4” (COMPACTED DEPTH) OF CRUSHED AGGREGATE SURFACING ACROSS A ROAD WIDTH OF 12' to 14' MAX AND CLEANING AND SHAPING OF
ROADSIDE DITCHES ON BOTH SIDES.
4.50 BEGIN CLEARING AND DE-LIMBING 5' FROM THE EDGE OF THE TRAVELED WAY FOLLOWING PARALLEL TO THE TRAVELED WAY ON THE LEFT AND THE RIGHT.4.14 PROTECT IN PLACE EXISTING 36" CMP CULVERT.
MAINTAIN INLET, OUTLET, AND LEAD OFF DITCH.
4.53 PROTECT IN PLACE EXISTING 18" CMP CULVERT. MAINTAIN INLET, OUTLET, AND LEAD OFF DITCH.
4.60 PROTECT IN PLACE EXISTING 24" CMP CULVERT. MAINTAIN INLET, OUTLET, AND LEAD OFF DITCH.
4.64 MAINTAIN EXISTING LEAD OFF DITCH ON THE RIGHT.
4.67 PROTECT IN PLACE EXISTING 18" CMP CULVERT. MAINTAIN INLET, OUTLET, AND LEAD OFF DITCH.
4.68 MAINTAIN EXISTING LEAD OFF DITCH ON THE RIGHT.
4.74 PROTECT IN PLACE EXISTING 18" CMP CULVERT. MAINTAIN INLET, OUTLET, AND LEAD OFF DITCH.
4.99 PROTECT IN PLACE EXISTING 18" CMP CULVERT. MAINTAIN INLET, OUTLET, AND LEAD OFF DITCH.
5.00 END OF OPTION 2. END ROAD RECONDITIONING. END AGGREGATE RESURFACING. END OF
CLEARING AND DE-LIMBING.
MILE POINT 4.91: RECONSTRUCT CULVERT IN ACCORDANCE WITH FP-14 SECTION 602.
M.P WORK DESCRIPTION.
4.91 REMOVE AND REPLACE EXISTING 18" CMP PIPE WITH A 18" X 30' GALVANIZED CMP PIPE, MAINTAIN
INLET, OUTLET, AND LEAD OFF DITCH.
FSR 141H MILE POINT 5.00 - 5.34 AND FSR 123 MILE POINT 0.00 TO 0.11: RECONDITION ROAD IN
ACCORDANCE WITH FP-14 SECTION 303. RESURFACE ROAD IN ACCORDANCE WITH THE FP-14
SPECIFICATION SECTION 301, LOAD, HAUL, SPREAD, AND COMPACT AGGREGATE (USING COMPACTION
METHOD A) TO A MINIMUM DEPTH OF 4" IN ACCORDANCE WITH THE FP-14 AND FSSS SPECIFICATIONS
SECTION 303 AND 301 UTILIZING CINCH HOOK PIT AGGREGATE STOCKPILE, LOCATED SOUTH OF THE
AZ-87 AND AZ-260 JUNCTION.
M.P. WORK DESCRIPTION
4.50 BEGIN RECONDITIONING OF ROAD AND RESURFACING WITH 4” (COMPACTED DEPTH) OF CRUSHED AGGREGATE SURFACING ACROSS A ROAD WIDTH OF 12' to 14' MAX AND CLEANING AND SHAPING OF
ROADSIDE DITCHES ON BOTH SIDES.
5.13 PROTECT IN PLACE EXISTING 18" CMP CULVERT. MAINTAIN INLET, OUTLET, AND LEAD OFF DITCH.
5.34 END CLEARING AND DE-LIMBING 5' FROM THE EDGE OF THE TRAVELED WAY FOLLOWING PARALLEL TO
THE TRAVELED WAY ON THE LEFT AND THE RIGHT.
5.34 MAINTAIN EXISTING INTERSECTION OF FSR 141H AND FSR 123. CONTINUE RECONDITIONING OF ROAD
AND RESURFACING WITH 4” (COMPACTED DEPTH) OF CRUSHED AGGREGATE SURFACING ACROSS A ROAD WIDTH OF 12' to 14' MAX AND CLEANING AND SHAPING OF ROADSIDE DITCHES ON BOTH SIDES, HEADING SOUTH ON FSR 123.
0.00 CONTINUE RECONDITIONING OF ROAD AND RESURFACING WITH 4” (COMPACTED DEPTH) OF CRUSHED AGGREGATE SURFACING ACROSS A ROAD WIDTH OF 12' to 14' MAX AND CLEANING AND SHAPING OF ROADSIDE DITCHES ON BOTH SIDES, STARTING AT THE INTERSECTION OF FSR 123 AND FSR 141H.
0.11 MAINTAIN EXISTING INTERSECTION OF FSR 123 AND FSR 300 ON THE RIGHT AND LEFT. END OF OPTION 4.
END OF RECONDITIONING. END OF AGGREGATE RESURFACING.
WORK DESCRIPTION - FSR 141H OPTION 5
MILE POINT 5.29: RECONSTRUCT CULVERT IN ACCORDANCE WITH FP-14 SECTION 602.
M.P WORK DESCRIPTION.
5.29 REMOVE AND REPLACE EXISTING 30" CMP PIPE WITH A 30" X 34' GALVANIZED CMP PIPE, MAINTAIN
INLET, OUTLET, AND LEAD OFF DITCH.
MILE POINT 7.48 - 7.98: RECONDITION ROAD IN ACCORDANCE WITH FP-14 SECTION 303. RESURFACE
ROAD IN ACCORDANCE WITH THE FP-14 SPECIFICATION SECTION 301, LOAD, HAUL, SPREAD, AND
COMPACT AGGREGATE (USING COMPACTION METHOD A) TO A MINIMUM DEPTH OF 4" IN ACCORDANCE
WITH THE FP-14 AND FSSS SPECIFICATIONS SECTION 303 AND 301 UTILIZING CINCH HOOK PIT
AGGREGATE STOCKPILE, LOCATED SOUTH OF THE AZ-87 AND AZ-260 JUNCTION. START OF WORK IS
APPROXIMATELY 0.50 MILES BEFORE THE JUNCTION OF FSR 141H AND FSR 141.
M.P. WORK DESCRIPTION
7.48 BEGIN RECONDITIONING OF ROAD AND RESURFACING WITH 4” (COMPACTED DEPTH) OF CRUSHED AGGREGATE SURFACING ACROSS A ROAD WIDTH OF 12' to 14' MAX AND CLEANING AND SHAPING OF ROADSIDE DITCHES ON BOTH SIDES, STARTING AT MILE POINT 7.48, APPROXIMATELY 0.50 MILES BEFORE
THE JUNCTION OF FSR 141H AND FSR 141.
7.51 MAINTAIN EXISTING LEAD OFF DITCH ON THE RIGHT.
7.53 PROTECT IN PLACE EXISTING 18" CMP CULVERT. MAINTAIN INLET, OUTLET, AND LEAD OFF DITCH.
7.57 MAINTAIN EXISTING LEAD OFF DITCH ON THE RIGHT.
7.62 MAINTAIN EXISTING LEAD OFF DITCH ON THE RIGHT.
7.65 MAINTAIN EXISTING LEAD OFF DITCH ON THE RIGHT AND THE LEFT.
7.69 MAINTAIN EXISTING LEAD OFF DITCH ON THE LEFT.
7.74 MAINTAIN EXISTING LEAD OFF DITCH ON THE LEFT.
7.81 MAINTAIN EXISTING INTERSECTION OF FSR AND FSR 4443 ON THE RIGHT.
7.88 MAINTAIN EXISTING LEAD OFF DITCH ON THE LEFT.
7.98 MAINTAIN EXISTING INTERSECTION OF FSR 141 AND FSR 141H ON THE LEFT. END OF OPTION 6.
END OF RECONDITIONING. END OF AGGREGATE RESURFACING.
MILE POINT 6.98 - 7.48: RECONDITION ROAD IN ACCORDANCE WITH FP-14 SECTION 303. RESURFACE
ROAD IN ACCORDANCE WITH THE FP-14 SPECIFICATION SECTION 301, LOAD, HAUL, SPREAD, AND
COMPACT AGGREGATE (USING COMPACTION METHOD A) TO A MINIMUM DEPTH OF 4" IN ACCORDANCE
WITH THE FP-14 AND FSSS SPECIFICATIONS SECTION 303 AND 301 UTILIZING CINCH HOOK PIT
AGGREGATE STOCKPILE, LOCATED SOUTH OF THE AZ-87 AND AZ-260 JUNCTION. START OF WORK IS
APPROXIMATELY 1.00 MILES BEFORE THE JUNCTION OF FSR 141H AND FSR 141.
M.P. WORK DESCRIPTION
6.98 BEGIN RECONDITIONING OF ROAD AND RESURFACING WITH 4” (COMPACTED DEPTH) OF CRUSHED AGGREGATE SURFACING ACROSS A ROAD WIDTH OF 12' to 14' MAX AND CLEANING AND SHAPING OF ROADSIDE DITCHES ON BOTH SIDES, STARTING AT MILE POINT 6.98, APPROXIMATELY 1.00 MILES BEFORE
THE JUNCTION OF FSR 141H AND FSR 141.
7.02 MAINTAIN EXISTING LEAD OFF DITCH ON THE LEFT.
7.07 MAINTAIN EXISTING LEAD OFF DITCH ON THE RIGHT AND THE LEFT.
7.08 MAINTAIN EXISTING LEAD OFF DITCH ON THE RIGHT AND THE LEFT.
7.15 MAINTAIN EXISTING LEAD OFF DITCH ON THE RIGHT.
7.22 MAINTAIN EXISTING INTERSECTION OF FSR 141 AND FSR 9398 ON THE LEFT.
7.22 MAINTAIN EXISTING LEAD OFF DITCH ON THE RIGHT.
7.25 MAINTAIN EXISTING LEAD OFF DITCH ON THE RIGHT.
7.31 MAINTAIN EXISTING LEAD OFF DITCH ON THE RIGHT.
7.36 MAINTAIN EXISTING LEAD OFF DITCH ON THE RIGHT.
7.42 MAINTAIN EXISTING LEAD OFF DITCH ON THE RIGHT.
7.45 MAINTAIN EXISTING LEAD OFF DITCH ON THE RIGHT.
7.48 END OF OPTION 7. END OF RECONDITIONING. END OF AGGREGATE RESURFACING.
WORK DESCRIPTION - FSR 141 OPTION 7
WORK DESCRIPTION - FSR 141H OPTION 3
WORK DESCRIPTION - FSR 141H OPTION 4
WORK DESCRIPTION - FSR 141 OPTION 6
AutoCAD SHX Text
PROJECT NAME
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
| Sheets and Views |
| FSR 141H Drawings-Cover |
| FSR 141H Drawings-MAP |
| FSR 141H Drawings-GN |
| FSR 141H Drawings-TYP1 |
| FSR 141H Drawings-TYP2 |
| FSR 141H Drawings-TYP3 |
| FSR 141H Drawings-TYP4 |
| FSR 141H Drawings-WD1 |
| FSR 141H Drawings-WD2 |
| 2021-03-09T12:46:00-0700 | |
| NICHOLAS WARNKE |
File details come from the government source that posted it. Updated .