Attachment (8) Contractor Production Report Form.docx
DOCX document 19 KB Posted
- Attached to
- NSWCPD - Bldg 77H Repair Pump Motor 1C
- Solicitation number
- N64498-25-R-4010
About this file
This is a Contractor Production Report form template that serves as a daily documentation tool for construction contractors. The form captures key operational details including weather conditions, work performed, safety measures, labor hours, accidents/incidents, equipment usage, and material deliveries.
The form requires contractors to record specific information such as contract number, location, superintendent details, work activities with associated schedule numbers, trade hours, safety meeting confirmations, cumulative work hours, hazardous material incidents, equipment/material receipts, and construction equipment usage. Notable required safety documentation includes OSHA reports for accidents, inspection checklists for high-risk activities (crane/manlift/trenching/scaffold/HV electrical work), and hazardous material release incidents. This is a standard template that does not contain specific project requirements or completed information.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACTOR PRODUCTION REPORT
(ATTACH ADDITIONAL SHEETS IF NECESSARY)
DATE
| CONTRACT NO |
| TITLE AND LOCATION |
REPORT NO
CONTRACTOR
SUPERINTENDENT
AM WEATHER
PM WEATHER
| MAX TEMP (F) |
| MIN TEMP (F) |
WORK PERFORMED TODAY
Schedule Activity No.
| WORK LOCATION AND DESCRIPTION |
| EMPLOYER |
| NUMBER |
| TRADE |
| HRS |
JOB
SAFETY
WAS A JOB SAFETY MEETING HELD THIS DATE?
| |_| YES |
| |_| NO |
| TOTAL WORK HOURS ON JOB SITE, |
THIS DATE, INCL CON'T SHEETS
WERE THERE ANY LOST TIME ACCIDENTS THIS DATE?
(If YES attach copy of completed OSHA report)
| |_| YES |
| |_| NO |
| CUMULATIVE TOTAL OF WORK |
HOURS FROM PREVIOUS REPORT
WAS CRANE/MANLIFT/TRENCHING/SCAFFOLD/HV ELEC/HIGH WORK/ HAZMAT WORK DONE?
(If YES attach statement or checklist showing inspection performed.)
| |_| YES |
| |_| NO |
TOTAL WORK HOURS FROM
START OF CONSTRUCTION
WAS HAZARDOUS MATERIAL/WASTE RELEASED INTO THE ENVIRONMENT?
(If YES attach description of incident and proposed action.)
| |_| YES |
| |_| NO |
Schedule Activity No.
| LIST SAFETY ACTIONS TAKEN TODAY/SAFETY INSPECTIONS CONDUCTED |
| |_| |
| SAFETY REQUIREMENTS HAVE BEEN MET. |
EQUIPMENT/MATERIAL RECEIVED TODAY TO BE INCORPORATED IN JOB (INDICATE SCHEDULE ACTIVITY NUMBER)
Schedule Activity No.
| Submittal # |
| Description of Equipment/Material Received |
CONSTRUCTION AND PLANT EQUIPMENT ON JOB SITE TODAY. INDICATE HOURS USED AND SCHEDULE ACTIVITY NUMBER.
Schedule Activity No.
| Owner |
| Description of Construction Equipment Used Today (incl Make and Model) |
| Hours Used |
Schedule Activity No.
REMARKS
| CONTRACTOR/SUPERINTENDENT |
| DATE |
Standard SOW Attachment (8) Contractor Production Report Form Sheet 1 of 1