Attachment (8) Contractor Production Report Form.docx

DOCX document 19 KB Posted

Attached to
NSWCPD - Bldg 77H Repair Pump Motor 1C
Solicitation number
N64498-25-R-4010
Issued by

About this file

This is a Contractor Production Report form template that serves as a daily documentation tool for construction contractors. The form captures key operational details including weather conditions, work performed, safety measures, labor hours, accidents/incidents, equipment usage, and material deliveries.

The form requires contractors to record specific information such as contract number, location, superintendent details, work activities with associated schedule numbers, trade hours, safety meeting confirmations, cumulative work hours, hazardous material incidents, equipment/material receipts, and construction equipment usage. Notable required safety documentation includes OSHA reports for accidents, inspection checklists for high-risk activities (crane/manlift/trenching/scaffold/HV electrical work), and hazardous material release incidents. This is a standard template that does not contain specific project requirements or completed information.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACTOR PRODUCTION REPORT

(ATTACH ADDITIONAL SHEETS IF NECESSARY)

DATE

CONTRACT NO
TITLE AND LOCATION

REPORT NO

CONTRACTOR

SUPERINTENDENT

AM WEATHER

PM WEATHER

MAX TEMP (F)
MIN TEMP (F)

WORK PERFORMED TODAY

Schedule Activity No.

WORK LOCATION AND DESCRIPTION
EMPLOYER
NUMBER
TRADE
HRS

JOB

SAFETY

WAS A JOB SAFETY MEETING HELD THIS DATE?

|_| YES
|_| NO
TOTAL WORK HOURS ON JOB SITE,

THIS DATE, INCL CON'T SHEETS

WERE THERE ANY LOST TIME ACCIDENTS THIS DATE?

(If YES attach copy of completed OSHA report)

|_| YES
|_| NO
CUMULATIVE TOTAL OF WORK

HOURS FROM PREVIOUS REPORT

WAS CRANE/MANLIFT/TRENCHING/SCAFFOLD/HV ELEC/HIGH WORK/ HAZMAT WORK DONE?

(If YES attach statement or checklist showing inspection performed.)

|_| YES
|_| NO

TOTAL WORK HOURS FROM

START OF CONSTRUCTION

WAS HAZARDOUS MATERIAL/WASTE RELEASED INTO THE ENVIRONMENT?

(If YES attach description of incident and proposed action.)

|_| YES
|_| NO

Schedule Activity No.

LIST SAFETY ACTIONS TAKEN TODAY/SAFETY INSPECTIONS CONDUCTED
|_|
SAFETY REQUIREMENTS HAVE BEEN MET.

EQUIPMENT/MATERIAL RECEIVED TODAY TO BE INCORPORATED IN JOB (INDICATE SCHEDULE ACTIVITY NUMBER)

Schedule Activity No.

Submittal #
Description of Equipment/Material Received

CONSTRUCTION AND PLANT EQUIPMENT ON JOB SITE TODAY. INDICATE HOURS USED AND SCHEDULE ACTIVITY NUMBER.

Schedule Activity No.

Owner
Description of Construction Equipment Used Today (incl Make and Model)
Hours Used

Schedule Activity No.

REMARKS

CONTRACTOR/SUPERINTENDENT
DATE

Standard SOW Attachment (8) Contractor Production Report Form Sheet 1 of 1