ATTACHMENT 7 Total cost breakdown cafeteria ramp.pdf
PDF 289 KB Posted
- Attached to
- CONSTRUCTION OF AN ACCESS RAMP Federal contract opportunity
- Solicitation number
- 19SP5025Q0003
- Issued by
- Department of State US Embassy Madrid
About this file
This is a cost breakdown template (Attachment 7) for construction work at the U.S. Embassy Madrid, Spain, detailing two main components: an ADA ramp and a motorcycle parking area expansion. The document outlines specific line items and quantities for each component. For the ADA ramp, requirements include drainage rerouting, ground demolition and excavation of 25 square meters to 20cm depth, waterproofing membrane installation, steel mesh placement, concrete slab work, and installation of 30 meters of handrails.
The motorcycle parking area expansion requirements include similar elements: drainage relocation, 31.16 cubic meters of demolition and excavation, 41 square meters of steel mesh installation, 8.2 cubic meters of concrete slab work, and 20 meters of handrail installation. Both components include provisions for cleaning, waste management, and safety measures. The document notes that all measurements are estimates, and contractors are responsible for their own measurements with no price adjustments allowed for measurement errors.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| ATTACHMENT 5 Drawings.pdf | ||
| Invitation letter.pdf | ||
| ATTACHMENT 6 - SPECIFICATIONS.pdf | ||
| RFQ No. 19SP5025Q0003.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
U.S. DEPARTMENT OF STATE
OBO FACILITIES MANAGEMENT DIVISION
Attachment 8. Total cost breakdown.
All measurements included herein are estimates. Each Offeror is responsible for taking its own measurements.
No adjustment in price shall be made due to errors in Offeror's measurements.
U.S. Embassy Madrid Spain
June, 2021
All measurements included herein are estimates. Each Offeror is responsible for taking its own measurements. No adjustment in price shall be made due to errors in Offeror's measurements.
Presupuesto Código Ud Item Mes CanPres Pres
LINE 1 : ADA RAMP
01.01 PA
Reroute and relocate the drainage located on the base of the stairs and other utilities on the area before starting the works 1
01.02 m2
Demolition and excavation: Dig the ground to a depth of about 20 cm (the thickness of the slab). If the soil is too soft, you might need to excavate deeper and add compacted gravel to improve stability. 25
01.03 m2 Placed a waterproofing membrane 25
01.04 m2 Place steel mesh or rebar inside the excavation before pouring the concrete 25
01.05 m3 Slab concrete HA 25 5
01.06 ml Handrail 30
01.07 ml pasamanos 5
01.08 ml Grill on drainage 3
01.09 PA Cleaning and waste management 1
01.10 PA Security and safety 1
LINE 2 : MOTORCYCLE
01.01 PA
Reroute and relocate the drainage located on the base of the stairs and other utilities on the area before starting the works 1
01.02 M3 Demolition and excavation 31.16
01.03 m2 Place steel mesh or rebar inside the excavation before pouring the concrete 41
01.04 m3 Slab concrete HA 25 8.2
01.05 m3 Concrete ciclopedo 31.16
01.06 ml Handrail 20
01.07 ml Grill on drainage 3
01.08 PA Cleaning and waste management 1
01.09 PA Security and safety 1