ATTACHMENT 7 Total cost breakdown cafeteria ramp.pdf

PDF 289 KB Posted

Attached to
CONSTRUCTION OF AN ACCESS RAMP Federal contract opportunity
Solicitation number
19SP5025Q0003
Issued by
Department of State US Embassy Madrid

About this file

This is a cost breakdown template (Attachment 7) for construction work at the U.S. Embassy Madrid, Spain, detailing two main components: an ADA ramp and a motorcycle parking area expansion. The document outlines specific line items and quantities for each component. For the ADA ramp, requirements include drainage rerouting, ground demolition and excavation of 25 square meters to 20cm depth, waterproofing membrane installation, steel mesh placement, concrete slab work, and installation of 30 meters of handrails.

The motorcycle parking area expansion requirements include similar elements: drainage relocation, 31.16 cubic meters of demolition and excavation, 41 square meters of steel mesh installation, 8.2 cubic meters of concrete slab work, and 20 meters of handrail installation. Both components include provisions for cleaning, waste management, and safety measures. The document notes that all measurements are estimates, and contractors are responsible for their own measurements with no price adjustments allowed for measurement errors.

View the file

Other files for this federal contract opportunity

Other files attached to CONSTRUCTION OF AN ACCESS RAMP, newest first.
File Type Posted
ATTACHMENT 5 Drawings.pdf PDF
Invitation letter.pdf PDF
ATTACHMENT 6 - SPECIFICATIONS.pdf PDF
RFQ No. 19SP5025Q0003.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

U.S. DEPARTMENT OF STATE

OBO FACILITIES MANAGEMENT DIVISION

Attachment 8. Total cost breakdown.

All measurements included herein are estimates. Each Offeror is responsible for taking its own measurements.

No adjustment in price shall be made due to errors in Offeror's measurements.

U.S. Embassy Madrid Spain

June, 2021

All measurements included herein are estimates. Each Offeror is responsible for taking its own measurements. No adjustment in price shall be made due to errors in Offeror's measurements.

Presupuesto Código Ud Item Mes CanPres Pres

LINE 1 : ADA RAMP

01.01 PA

Reroute and relocate the drainage located on the base of the stairs and other utilities on the area before starting the works 1

01.02 m2

Demolition and excavation: Dig the ground to a depth of about 20 cm (the thickness of the slab). If the soil is too soft, you might need to excavate deeper and add compacted gravel to improve stability. 25

01.03 m2 Placed a waterproofing membrane 25

01.04 m2 Place steel mesh or rebar inside the excavation before pouring the concrete 25

01.05 m3 Slab concrete HA 25 5

01.06 ml Handrail 30

01.07 ml pasamanos 5

01.08 ml Grill on drainage 3

01.09 PA Cleaning and waste management 1

01.10 PA Security and safety 1

LINE 2 : MOTORCYCLE

01.01 PA

Reroute and relocate the drainage located on the base of the stairs and other utilities on the area before starting the works 1

01.02 M3 Demolition and excavation 31.16

01.03 m2 Place steel mesh or rebar inside the excavation before pouring the concrete 41

01.04 m3 Slab concrete HA 25 8.2

01.05 m3 Concrete ciclopedo 31.16

01.06 ml Handrail 20

01.07 ml Grill on drainage 3

01.08 PA Cleaning and waste management 1

01.09 PA Security and safety 1

Attachment 8. Total cost breakdown