Attachment 7 Specialized Experience Construction Form.docx
DOCX document 13 KB Posted
- Attached to
- Rosebud Heating Plant Replacement Federal contract opportunity
- Solicitation number
- 75H70124R00024
About this file
The provided document is an Attachment 7 Specialized Experience Construction Form, which is likely part of a Request for Proposal (RFP) or solicitation for a construction project. The key details are:
The solicitation number is 75H70124R00024 for a construction project to remove and replace the boiler system at the Rosebud Comprehensive Health Care Facility in Rosebud, SD. The project is a 100% Small Business set-aside under NAICS code 236220 with a $45 million size standard. The period of performance is 365 calendar days after notice to proceed, and the construction magnitude is between $1 million and $5 million. The contract type is Firm Fixed Price and the evaluation method is Lowest Price Technically Acceptable (LPTA). Quotes are due by the date and time indicated in the solicitation, and all questions should be submitted in writing to the Contract Specialist. Registration in the System for Award Management (SAM) is mandatory to be considered for award.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B05 Amendment 4.pdf | ||
| B05 Amendment 3.pdf | ||
| B05 Amendment 3 Attachment 1 RFI Response 1-28.pdf | ||
| B05 Amendment 2.pdf | ||
| B05 Amendment 1.pdf | ||
| B01 24R00024 v3.pdf | ||
| Attachment 3 Drawings 23.02.09.pdf | ||
| Attachment 4 WH347 PAYROLL.pdf | ||
| Attachment 5 Release of Claims.pdf | ||
| Attachment 1 Wage Determination SD20240018.pdf | ||
| Attachment 8 Past Performance Questionnaire.docx | DOCX document | |
| Attachment 2 Specifications 23.02.09.pdf | ||
| Attachment 6 Subcontracting Plan.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TECHNICAL EXPERIENCE - OFFEROR WORKSHEET
Contract Number / Task Order
Project Title
Award Value
Period of Performance
| Prime Contractor or Subcontractor |
| ☐ Prime ☐ Subcontractor |
If subcontractor percentage of overall work completed
Agency or Entity Name and Address
Agency or Entity POC Name, email, phone #
Detailed Description of Project and Responsibilities as prime or subcontractor (expand as needed)
| Relevance |
| ☐ Construction at a healthcare facility that primarily involved boiler system repair, renovation, and/or replacement |
If the team is proposing as a joint venture, the team will be required to discuss if the joint venture has experience working together in the past. If a team is proposing as a joint venture, the team will be required to provide a copy of the joint venture agreement.
File details come from the government source that posted it. Updated .